<PAGE> 1
PORTIONS OF THIS EXHIBIT IDENTIFIED BY "***" HAVE BEEN DELETED PURSUANT TO A
REQUEST FOR CONFIDENTIAL TREATMENT FILED WITH THE SECURITIES AND EXCHANGE
COMMISSION UNDER RULE 24b-2 OF THE SECURITIES EXCHANGE ACT OF 1934, AS AMENDED,
AND THE FREEDOM OF INFORMATION ACT.
EXHIBIT 10(b)-1
BAY GAS STORAGE CO., LTD.
P.O. Box 1368
Telephone Mobile, Alabama 36633 Fax
(334) 476-2720 (334) 478-5817
July 19, 2000
Mr. Alan Kilpatrick
Southern Company Services, Inc.
600 N. 18th Street
Birmingham, AL 35291
Re: Modification of the Storage Service Agreement FSMC99, date April 1, 1999,
between Bay Gas Storage Company, Ltd. and Southern Company Services, Inc.
(the "Contract")
Dear Alan:
Southern Company Services, Inc. as Agent for Alabama Power Company, Georgia
Power Company, Gulf Power Company, Mississippi Power Company and Savannah
Electric and Power Company ("Southern Company") and Bay Gas Storage Company,
Ltd. ("Bay Gas") (collectively referred to herein as "Parties") have executed
the above-referenced Contract under which Bay Gas provides certain natural gas
storage services to Southern Company. The Parties wish to modify the Contract to
include the following provisions:
Beginning April 1, 2001 and continuing for the term of the Contract, quantities
as shown in Article 1.1 shall be amended to read as follow:
(a) Firm Withdrawal - a Firm Maximum Daily Withdrawal Quantity ("FMDWQ")
of *** MMBtu per day and;
Interruptible Withdrawal - an Interruptible Maximum Daily Withdrawal
Quantity ("IMDWQ") of *** MMBtu per day;
<PAGE> 2
(b) Firm Storage - a Firm Maximum Storage Quantity (" FMSQ") in the
Storage Facilities equal to *** MMBtu.
(c) Firm Injection - a Firm Maximum Daily Injection Quantity ("FMDIQ") of
*** MMBtu per day and;
Interruptible Injection - an Interruptible Maximum Daily Injection
Quantity ("IMDIQ") of *** MMBtu per day.
In addition, beginning April 1, 2001 and continuing for the term of the
Contract, the Exhibit "A" attached hereto will replace the existing Exhibit "A".
All other terms and conditions of the Contract remain in effect.
The Parties have negotiated a separate storage service agreement (Number FMSE00,
dated August 1, 2000) and agree to execute this modification contemporaneously
with the execution of the separate storage service agreement number FMSE00.
If the provisions described herein are agreeable to Southern Company, please
signify your acceptance by executing two originals of this letter and returning
both to my attention. I will forward one fully executed original for your files.
Thank you for your help in this matter.
Sincerely,
/s/ Greg Welch
Greg Welch
Director - Storage Marketing
Southern Company Services, Inc., as agent MGS Storage Services, Inc.
for Alabama Power Company, Georgia Power General Partner of
Company, Mississippi Power Company, and Bay Gas Storage Company, Ltd.
Savannah Electric and Power Company
By: /s/ A. J. Topazi By: /s/ W. G. Coffeen, III
Title: Vice President Title: Vice President
Agreed and accepted this Agreed and accepted this
24th day of July 2000 1st day of August 2000
<PAGE> 3
EXHIBIT "A"
TO STORAGE AGREEMENT ("CONTRACT") BETWEEN BAY GAS STORAGE
COMPANY, LTD. AND SOUTHERN COMPANY SERVICES, INC.
<TABLE>
<CAPTION>
MINIMUM
POINT(S) OF RECEIPT INJECTION QUANTITY PRESSURE
------------------- ------------------ --------
(MMBtus) (PSIG)
<S> <C> <C>
Interconnection between the Storage
Facilities and the pipeline facilities of
FGT in Mobile County, Alabama *** 625
(Interconnect ID: BG- 1002)
Interconnection between the Storage
Facilities and the pipeline facilities of
KOCH GATEWAY in Mobile County, Alabama *** 575
(Interconnect ID: BG-1003)
</TABLE>
Gas may be scheduled for delivery at either or all of the Points of Receipt, in
quantities up to the maximum quantities indicated for each such Point, but the
cumulative total of deliveries at all Points of Receipt shall not exceed the
maximum quantity indicated for any single Point, unless otherwise agreed by
Company.
<TABLE>
<CAPTION>
FMDWQ
--------
(MMBtus)
<S> <C>
POINT(S) OF DELIVERY
Interconnection between the Storage Facilities and
the pipeline facilities of FGT in Mobile County, Alabama ***
(Interconnect ID: BG-1002)
Interconnection between the Storage Facilities and
the pipeline facilities of KOCH GATEWAY in
Mobile County, Alabama ***
(Interconnect ID: BG-1003)
Interconnection between the Storage
Facilities and the facilities of FGT at
Olin in Washington County, Alabama ***
(Interconnect ID: BG-1005)
The weld connection between the Storage Facilities and Alabama Power Company's
pipeline downstream of the Bay Gas metering facility at Plant Barry in
Mobile County, Alabama (Interconnect ID: BG-1006) ***
</TABLE>
Gas may be scheduled for delivery at either or all of the Points of Delivery, in
quantities up to the maximum quantities indicated for each such Point, but the
cumulative total of deliveries at all Points of Delivery shall not exceed the
maximum quantity indicated for any single Point, unless otherwise agreed by
Company.