                                                                     EXHIBIT B-8


American Transmission Company LLC                          Original Sheet No.
FERC Electric Tariff No. 1                                                    --


                           NETWORK OPERATING AGREEMENT

1    PURPOSE OF AGREEMENT

     By this agreement, the Parties, American Transmission Company LLC
("Transmission Provider" or ATCLLC) and              ("Transmission Customer")
                                        ------------
agree that the provisions of this Network Operating Agreement (NOA), the Network
Integration Transmission Service Agreement (NITS) and the Transmission
Provider's Open Access Transmission Tariff (OATT or "Tariff") govern the terms
and conditions of the Transmission Provider's rendering of transmission service
to the Transmission Customer, as each may be amended from time to time.

     The Parties agree that the Transmission Provider will provide Network
Integration Transmission Service to Transmission Customer pursuant to the OATT,
which allows Transmission Customer to integrate, economically dispatch and
regulate its current and planned Network Resources to serve its Network Load and
to deliver economy energy purchases to its Network Load from non-designated
resources on an as-available basis without additional charge.

2    GENERAL PROVISIONS

     2.1  The Transmission Customer shall comply fully with the terms and
          conditions of this NOA except to the extent an executed
          interconnection agreement between the Parties provides otherwise, in
          which case, compliance with the relevant provision(s) of the
          interconnection agreement(s) shall be deemed compliance with the
          applicable provision of this NOA. The terms of any executed agreement
          for interconnection service between the Parties shall govern such
          service and control over this NOA with respect to such service.

     2.2  The Parties agree to:

          (a)  operate and maintain equipment necessary for incorporating the
               Transmission Customer within the Transmission Provider's
               Transmission System (including, but not limited to, remote
               terminal units, metering, communications and relaying equipment);

          (b)  transfer data (including, but not limited to, operational
               dispatch cost characteristics of Network Resources, generation
               schedules for Network Resources, interchange schedules, unit
               outputs for redispatch required under Section 30.5 of the OATT,
               voltage schedules, loss factors and other real time data
               reasonably required for provision of transmission service under
               the Tariff) between their respective control centers;

          (c)  implement software programs required for data links and
               redispatching to relieve constraints;


<PAGE>


American Transmission Company LLC
FERC Electric Tariff No. 1


          (d)  exchange data on forecasted loads and resources necessary for
               planning and operations; and

          (e)  address any other technical and operational considerations
               required for implementation of the OATT.

     2.3  The Transmission Customer shall:

          (a)  operate as a control area under applicable guidelines of the
               North American Electric Reliability Council (NERC) or its
               successor, as well as the Mid-America Interconnected Network
               (MAIN) or the applicable regional reliability council; or

          (b)  operate within a Control Area operated by the Transmission
               Provider, and satisfy its load balancing area requirements,
               including all Ancillary Services, by providing them itself or by
               contracting with another entity which can satisfy those
               requirements in a manner that is consistent with Good Utility
               Practice and which satisfies NERC and MAIN guidelines; or

          (c)  operate within another Control Area and satisfy its load
               balancing area requirements, including all Ancillary Services, by
               providing them itself or by contracting with another entity which
               can satisfy those requirements in a manner that is consistent
               with Good Utility Practice and which satisfies NERC and MAIN
               guidelines.

     2.4  Unless specified herein, capitalized terms shall refer to terms
          defined in the OATT. The OATT and the Network Integration Transmission
          Service Agreement are incorporated herein and made a part hereof.

3    NETWORK SERVICE

     3.1  General. This Network Operating Agreement sets out the terms and
          -------
          conditions under which Transmission Provider and the Transmission
          Customer will operate their respective systems. The Parties shall
          operate and maintain their respective systems in a manner that will
          allow Transmission Provider to operate its system consistent with Good
          Utility Practice; provided, however, that notwithstanding any other
          provision of this Network Operating Agreement, Transmission Provider
          shall retain the sole responsibility and authority for the operating
          decisions as they relate to the integrity and the security of the
          Transmission System.

     3.2  Loss of Power Supply. In the event a transmission constraint or other
          --------------------
          contingency causes the loss of access to a Transmission Customer's
          particular power supply resource, the loss of such resource may
          require the curtailment of the Transmission Customer's Network Load
          unless the Transmission Customer obtains substitute resources to serve


                                       2
<PAGE>


American Transmission Company LLC
FERC Electric Tariff No. 1


          such Network Loads within the time that is customary in the MAIN or
          applicable regional reliability council for obtaining replacement
          power supplies. Any curtailment will be implemented pursuant to the
          OATT.

     3.3  Notice of Transmission Service interruptions: If at any time, in the
          --------------------------------------------
          reasonable exercise of the Transmission Provider's judgment, operation
          of the Transmission Customer's equipment adversely affects the quality
          of service or interferes with the safe and reliable operation of the
          system, the Transmission Provider may discontinue transmission service
          until the condition has been corrected. Unless the Transmission
          Provider perceives that an emergency exists or the risk of an
          emergency is imminent, the Transmission Provider shall give the
          Transmission Customer reasonable notice of its intention to
          discontinue transmission service and, where practical, allow suitable
          time for the Transmission Customer to remove the interfering
          condition. The Transmission Provider's judgment with regard to the
          discontinuance of service under this paragraph shall be made in
          accordance with Good Utility Practice and NERC and MAIN guidelines. In
          the case of such discontinuance, the Transmission Provider shall
          immediately confer with the Transmission Customer regarding the
          conditions causing such discontinuance and its recommendation
          concerning timely correction thereof.

4   NETWORK OPERATING COMMITTEE

     4.1  Membership. The Network Operating Committee shall be composed of a
          ----------
          representative from each Transmission Customer taking service under
          Part III of the OATT and the Transmission Provider or their designated
          agents.

     4.2  Responsibilities. The Network Operating Committee shall: (1) adopt
          ----------------
          rules and procedures consistent with this NOA and the OATT governing
          operating and technical requirements for implementing the OATT; (2)
          review Network Resources and Network Loads on an annual basis in order
          to assess the adequacy of the Transmission System; (3) establish
          procedures for coordinating maintenance schedules, as provided below;
          and (4) review the adequacy, procurement, management and verification
          of Ancillary Services and other operating criteria from time to time.

5    SERVICE FOR A NETWORK RESOURCE

     The following terms and conditions apply to service for a generator Network
     Resource connected to the Transmission System:

     5.1  Voltage or Reactive Control Requirements.
          ----------------------------------------

          5.1.1 Unless directed otherwise, the Transmission Customer will
               operate its interconnected generation facility(ies) with an
               automatic voltage regulator(s). The voltage regulator will
               control voltage at the Point(s) of Receipt consistent with the
               range of voltage required by the Transmission Provider, the
               Transmission Provider's agent, MAIN or other applicable regional
               reliability council.


                                       3
<PAGE>


American Transmission Company LLC
FERC Electric Tariff No. 1


          5.1.2 At the discretion of the Transmission Provider, the Transmission
               Provider's agent, MAIN or other applicable regional reliability
               council, the Transmission Customer may be directed to deactivate
               the automatic voltage regulator and to supply reactive power per
               a schedule provided by the Transmission Provider.

          5.1.3 If the Transmission Customer has not installed capacity
               sufficient to operate its generation facility consistent with
               recommendations of the Transmission Provider resulting from the
               System Impact and Facilities Studies or fails to operate at such
               capacity, the Transmission Provider may install, at the
               Transmission Customer's expense, reactive compensation equipment
               necessary to ensure the proper voltage or reactive supply at the
               Point(s) of Receipt.

     5.2  Protection Requirements. Transmission Customer must comply with the
          -----------------------
          protection requirements as defined by MAIN or other applicable
          regional reliability council and any interconnection agreement(s)
          between Transmission Provider and Transmission Customer.

     5.3  Operational Obligations.
          -----------------------

          5.3.1 The Transmission Provider, its agent, MAIN or other applicable
               regional reliability council, may require the generators to be
               equipped with Automatic Generating Control (AGC). The
               Transmission Customer will be responsible for all costs
               associated with installing and maintaining an AGC system on the
               generators.

          5.3.2 The Transmission Provider retains the right to require reduced
               generation at times when system conditions present transmission
               restrictions or otherwise adversely affect the Transmission
               Provider's other customers. The Transmission Provider will use
               due diligence to resolve the problems to allow the generator to
               return to the operating level prior to the Transmission
               Provider's notice to reduce generation.

          5.3.3 All operations, including start-up, shutdown and determination
               of hourly generation will be coordinated with the Transmission
               Provider or its agent.

     5.4  Coordination of Operations
          --------------------------

          5.4.1. The Transmission Customer shall furnish the Transmission
               Provider with generator annual maintenance schedules and advise
               the Transmission Provider if any of its Network Resources are
               capable of participation in system restoration and/or if they
               have black start capability. If Transmission Provider determines,
               in its reasonable judgment, that insufficient black start
               capability exists to restore Network Service, Transmission
               Provider shall consult with the Network Operating Committee to


                                       4
<PAGE>


American Transmission Company LLC
FERC Electric Tariff No. 1


               determine if a mutually acceptable means of providing additional
               black start capability exists. If such mutual agreement cannot be
               reached, Transmission Provider may make a unilateral filing with
               FERC proposing the method by which it will obtain the black start
               capability Transmission Provider deems necessary to restore
               Network Service.

          5.4.2 The Transmission Provider reserves the right to specify turbine
               and/or generator control (e.g. droop) settings as determined by
               the System Impact or Facilities Study or subsequent studies. The
               Transmission Customer agrees to comply with such specifications
               by the Transmission Provider at the Transmission Customer's
               expense.

     5.5  The Transmission Customer shall provide the Transmission Provider its
          day-ahead plan, including expected unit dispatch and resource
          commitment . In circumstances such as forced outages, the Transmission
          Customer shall notify the Transmission Provider as promptly as
          possible of the Network Resource's temporary interruption of
          generation or transmission.

6    OPERATIONAL OBLIGATIONS

     6.1  Operational Obligations  The Transmission Customer shall be
          -----------------------
          responsible for operating and maintaining security of its electric
          system in a manner consistent with Good Utility Practice that avoids
          adverse impact to the Transmission Provider's or others'
          interconnected systems and complies with all applicable Transmission
          Provider, MAIN, or other applicable regional reliability council
          operating criteria, rules, procedures, guidelines and interconnection
          standards as may be amended or adopted.

7    REDISPATCH TO MAINTAIN NETWORK TRANSMISSION SERVICE

     7.1  If the Transmission Provider determines that redispatching Network
          Resources (including reductions in off-system sales) is necessary to
          maintain Network Transmission Service and is the most effective way to
          ensure the reliable operation of the Transmission System, the
          Transmission Provider will initiate redispatch of designated Network
          Resources on a least-cost basis, without regard to the ownership of
          such resources. Such redispatch will be conducted in accordance with
          Section 30.5 and Attachment K of the OATT.

     7.2  The Transmission Customer is obligated to respond immediately to
          requests for redispatch from the Transmission Provider.

     7.3  The Transmission Customer will submit to the Transmission Provider
          verifiable incremental and decremental cost data for its Network
          Resources in accordance with Section 29.2 of the OATT. The cost data


                                       5
<PAGE>


American Transmission Company LLC
FERC Electric Tariff No. 1


          will be used as the basis for least-cost redispatch. The Transmission
          Provider will keep this data confidential.

     7.4  The Transmission Customer may audit, at its own expense, redispatch
          events (such as the cause or necessity of the redispatch) during
          normal business hours following reasonable notice to the Transmission
          Provider. The Transmission Provider may request an audit of
          Transmission Customer's costs data at Transmission Provider's expense.

     7.5  In accordance with Section 34.4 of the OATT, once redispatch has been
          implemented, the Network Integration Transmission Customers will each
          bear a proportional share of the total redispatch costs based on their
          then-current Load Ratio Shares. The Transmission Provider shall bill
          or credit the Transmission Customer's monthly bill as appropriate.

8    DYNAMIC SCHEDULING [IF APPLICABLE]

     8.1  The Parties have agreed to utilize a dynamic scheduling arrangement
          that will transfer the power supply requirements for the Network Load
          specified in Exhibit 2 of this NOA.

     8.2  Dynamic Scheduling will be interrupted to the extent equipment used to
          implement dynamic scheduling becomes totally or partially unavailable.
          Transmission Customer shall notify Transmission Provider in a timely
          manner of any interruption of dynamic scheduling. In such event, the
          Transmission Customer will estimate the amount of the load to be
          removed from dynamic scheduling and provide such estimate to the
          Transmission Provider. The estimated amount of the load will be block
          scheduled by the Transmission Customer as described in Exhibit 2 until
          dynamic scheduling of the full amount of Network Load is restored.

9    MAINTENANCE OF FACILITIES

     9.1  The Network Operating Committee shall establish procedures to
          coordinate the maintenance schedules of the designated Network
          Resources and transmission and substation facilities, to the greatest
          extent practical, to ensure sufficient transmission resources are
          available to maintain system reliability and reliability of service.

     9.2  The Transmission Customer shall obtain: (1) concurrence from the
          Transmission Provider, at an interval established by the Network
          Operating Committee, before beginning any scheduled maintenance of its
          facilities; and (2) clearance from the Transmission Provider when the
          Transmission Customer is ready to begin maintenance on a transmission
          line or substation operating at transmission voltage. The Transmission
          Customer shall immediately notify the Transmission Provider at the
          time when any unscheduled or forced outages occur and again when such
          unscheduled or forced outages end. The Transmission Customer shall


                                       6
<PAGE>


American Transmission Company LLC
FERC Electric Tariff No. 1


          notify and coordinate with the Transmission Provider prior to
          reparalleling the Network Resource, transmission line, or substation
          with the Transmission System.

     9.3  The Transmission Provider may request that the Transmission Customer
          test, calibrate, verify or validate the data link, metering, data
          acquisition, transmission, protective, or other equipment or software
          owned by the Transmission Customer, consistent with the Transmission
          Customer's obligation to maintain its equipment and facilities or for
          the purposes of troubleshooting problems on the network facilities.
          The Transmission Customer will be responsible for the cost to test,
          calibrate, verify or validate the equipment or software.

     9.4  The Transmission Provider shall have the right to monitor and inspect
          the tests, calibrations, verifications and validations of the
          Transmission Customer's data link, metering, data acquisition,
          transmission, protective or other equipment or other software
          connected to the Transmission Provider's system.

10   LOAD SHEDDING

     The Transmission Provider shall implement load shedding programs to
maintain the reliability and integrity of the Transmission System as provided in
Section 33 of the OATT in accordance with NERC, MAIN or other applicable
regional reliability council guidelines and Good Utility Practice. Load shedding
may include: (1) automatic load shedding; (2) manual load shedding; or (3)
rotating interruption of customer load or restoration and interruption of load
to facilitate overall restoration in conjunction with the Black Start Plan as
coordinated by MAIN. The Transmission Provider shall inform the Transmission
Customer of its plans for load shedding. When manual load shedding or rotating
interruptions are necessary, the Transmission Provider shall notify the
Transmission Customer's dispatchers or schedulers of the required action and the
Transmission Customer shall comply immediately.

11   OPERATIONAL OBLIGATIONS

     11.1 The Transmission Customer shall request permission from the
          Transmission Provider prior to opening and/or closing circuit breakers
          per applicable switching and operating procedures. The Transmission
          Customer shall carry out all switching orders from the Transmission
          Provider, or the Transmission Provider's designee in a timely manner.

     11.2 The Transmission Customer shall balance the load at the Point(s) of
          Delivery such that the differences in the individual phase currents
          are acceptable to the Transmission Provider.

     11.3 The Transmission Customer's equipment shall conform with harmonic
          distortion and voltage fluctuation criteria of the Transmission
          Provider.


                                       7
<PAGE>


American Transmission Company LLC
FERC Electric Tariff No. 1


     11.4 The Transmission Customer shall operate all of its equipment and
          facilities connected to the Transmission Provider's system in a safe
          and efficient manner an in accordance with manufacturers'
          recommendations, Good Utility Practice, applicable regulations, and
          requirements of the Transmission Provider, its designees, NERC, MAIN,
          or other applicable regional reliability council.

     11.5 Emergency System Operations.
          ---------------------------

          a.   The Transmission Customer's equipment and facilities shall be
               subject to all applicable emergency operation standards required
               of and by the Transmission Provider to operate in an
               interconnected transmission network.

          b.   The Transmission Provider reserves the right to have its system
               operators take whatever actions or inactions they deem necessary
               during emergency operating conditions to: (i) preserve the
               integrity of the Transmission System; (ii) limit or prevent
               damage; (iii) expedite restoration of service; or (iv) preserve
               public safety.

     11.6 The Transmission Customer shall supply accurate and reliable
          information to the Transmission Provider regarding metered values for
          MW, MVAR, Volt, amp, frequency, breaker status indication, and all
          other information deemed necessary by the Transmission Provider for
          safe and reliable operation. Information shall be gathered for
          electronic communication using one or more of the following:
          supervisory control and data acquisition (SCADA); remote terminal unit
          (RTU) equipment, remote access pulse recorders (RAPR), and
          inter-control area communications protocol (ICCP). All equipment used
          for metering, SCADA, RTU, RAPR, and communications must be approved by
          the Transmission Provider.

     11.7 Unless otherwise agreed, the Transmission Provider shall install,
          operate, maintain, repair, replace, at Transmission Customer's
          expense, appropriate metering (and related telemetry and
          communications) equipment necessary to enable the Transmission
          Provider to provide Network Integration Transmission Service. Metering
          equipment shall meet the guidelines of NERC, MAIN, or other regional
          reliability council, as applicable, industry standards such as ANSI
          and other practices consistently adhered to by the Transmission
          Provider.

     11.8 Procedures for meter reading, calibration and adjustment shall be
          established by the Network Operating Committee based on practices
          consistently adhered to by the Transmission Provider.

     11.9 The Transmission Provider shall have access to metering data, which
          may reasonably be required to facilitate measurements and billing.


                                       8
<PAGE>


American Transmission Company LLC
FERC Electric Tariff No. 1


     11.10 At the end of each month the Transmission Customer will provide to
          the Transmission Provider an hourly list of metered generation from
          each of its generators.

     11.11 The Transmission Customer shall, at its own expense, install and
          maintain communications links required for scheduling, data transfer,
          and voice communication.

     11.12 A Transmission Customer contributing to regulating margin and
          Operating Reserve requirements or securing the requirements from a
          third party shall, at its own expense, install and maintain telemetry
          equipment to communicate between the generating resource and the
          Transmission Provider to the extent the Transmission Provider is
          operating a Control Area.

12   SYSTEM IMPACT AND FACILITY STUDIES

     Study Agreements for a System Impact Study or a Facilities Study, if
performed for the Agreement, are attached hereto.

13   DATA, INFORMATION AND REPORTING REQUIREMENTS

     13.1 The Transmission Customer shall, upon request, provide the
          Transmission Provider with such reports and information concerning its
          network operation as are reasonably necessary to enable the
          Transmission Provider to operate its Transmission System adequately
          and meet all NERC, MAIN or other applicable regional reliability
          council guidelines and requirements.

     13.2 The Transmission Customer shall respond promptly and completely to the
          Transmission Provider's requests for information, including but not
          limited to, data necessary for operations, maintenance, regulatory
          requirements and analysis. In particular, that information may
          include:

          (a)  For Network Loads: 10-year annual peak load forecast, load power
               factor performance, under frequency load shedding capability,
               load shedding capability, disturbance/interruption reports;
               protection system setting conformance; system testing and
               maintenance conformance; planned changes to protection systems;
               metering testing and maintenance conformance; planned changes in
               transformation capability; conformance to harmonic and voltage
               fluctuation limits; dead station tripping conformance; and
               voltage reduction capability conformance.

          (b)  For Network Resources and interconnected generators: 10-year
               forecast of generation capacity retirements and additions;
               generator reactive capability verification; generator under
               frequency relaying conformance; protection system testing and


                                       9
<PAGE>


American Transmission Company LLC
FERC Electric Tariff No. 1


               maintenance conformance; planned changes to protection system;
               and planned changes to generation parameters.

14   ACCESS AND CONTROL

     Properly accredited representatives of the Transmission Provider shall at
all reasonable times have access to the Transmission Customer's facilities to
make reasonable inspections and obtain information required in connection with
the Tariff. Such representatives shall make themselves known to the Transmission
Customer's personnel, state the object of their visit, and conduct themselves in
a manner that will not interfere with the construction, operation, or any
maintenance of the Transmission Customer's facilities. The Transmission Provider
will have control such that it may open or close the circuit breaker or
disconnect and place safety grounds at the Point(s) of Delivery, or at the
station, if the Point(s) of Delivery is remote from the station.

15   ASSIGNMENT

     The Parties hereby agree that upon American Transmission Company LLC's
transfer of its operations to the Midwest Independent Transmission System
Operator (Midwest ISO), this Agreement shall be transferred to the Midwest ISO,
which will then become the Transmission Provider under this Agreement.
Assignment of this agreement to the Midwest ISO may require certain operational
changes, which will be resolved through the Network Operating Committee.

     This NOA shall inure to the benefit of and be binding upon the Parties
hereto and their respective successors and assigns, including the Midwest ISO,
but shall not be assigned by either Party, except to successors to all or
substantially all of the electric properties and assets of such Party, without
the written consent of the other, provided that such consent shall not be
unreasonably withheld.

16   NOTICE

     Any notice or request made to or by either Party regarding this NOA shall
be made to the representative of the other Party as indicated in the Network
Integration Transmission Service Agreement.

17   TERM

     The term of this Network Operating Agreement shall be concurrent with the
term of the Network Integration Service Agreement between the parties.

18   FAILURE TO PERFORM

     If either Party fails to carry out its obligations under this agreement the
matter will be subject to the dispute resolution procedures of Section 12 of the
OATT.


                                       10
<PAGE>


American Transmission Company LLC
FERC Electric Tariff No. 1


19   CHANGES AND MODIFICATIONS

     19.1 Nothing contained in this NOA or any NITS shall be construed as
          affecting in any way the right of Transmission Provider unilaterally
          to make application to the Commission under Section 205 of the Federal
          Power Act and/or pursuant to rules and regulations promulgated
          thereunder for a change in any rate, term, condition, charge,
          classification of Transmission Service , rule or regulation under this
          Agreement. Nothing contained in this NOA or any NITS shall be
          construed as affecting in any way the right of Transmission Customer
          to exercise any right under the Federal Power Act and pursuant to the
          Commission's rules promulgated thereunder.

     19.2. Additional terms and conditions shall be negotiated with the
          Transmission Customer if necessary and appropriate. Additional
          provisions shall be added to this Agreement in the case of a
          Transmission Customer which has no executed interconnection agreement.


                                       11
<PAGE>


American Transmission Company LLC
FERC Electric Tariff No. 1


IN WITNESS WHEREOF, the Parties have caused this NOA to be executed by their
respective authorized officials.

AMERICAN TRANSMISSION COMPANY LLC



By:
    -----------------------------     -------------------     ------------------
               Name                         Title                    Date


[TRANSMISSION CUSTOMER]



By:
    -----------------------------     -------------------     ------------------
               Name                         Title                    Date