NATIONAL GRID GROUP P L C
U-1/A, 2000-02-16
ELECTRIC SERVICES
Previous: MULLY CORP, 8-K, 2000-02-16
Next: NATIONAL GRID GROUP P L C, U-1/A, 2000-02-16



                                                                File No. 70-9473

                                  UNITED STATES
                       SECURITIES AND EXCHANGE COMMISSION
                             WASHINGTON, D.C. 20549
                     --------------------------------------
                                 AMENDMENT NO. 7
                                       TO
                                    FORM U-1
                             APPLICATION-DECLARATION
                                      UNDER

                 THE PUBLIC UTILITY HOLDING COMPANY ACT OF 1935
              ----------------------------------------------------

The National Grid Group plc                 New England Electric System
National Grid (US) Holdings                 25 Research Drive
         Limited                            Westborough, Massachusetts 01582
National Grid (US)
         Investments
National Grid House
Kirby Corner Road
Coventry CV4 8JY
United Kingdom

National Grid (Ireland) 1
         Limited
National Grid (Ireland) 2
         Limited
8-10 rue Mathias Hardt

BP39, L2010
Luxembourg

National Grid General
         Partnership

NGG Holdings, Inc.
10th Floor
Oliver Building
2 Oliver Street
Boston, MA 02109

                   (Name of company filing this statement and
                     address of principal executive offices)
                 ----------------------------------------------
    The National Grid Group plc                 New England Electric System

                     (Name of top registered holding company
                     parent of each applicant or declarant)
                   ------------------------------------------



<PAGE>



Jonathan M. G. Carlton                  Douglas W. Hawes
The National Grid Group plc             Joanne C. Rutkowski
National Grid House                     Sheri E. Bloomberg
Kirby Corner Road                       Markian M.W. Melnyk
Coventry CV4 8JY                        LeBoeuf, Lamb, Greene & MacRae, L.L.P.
United Kingdom                          125 West 55th Street
Telephone: 011-44-1203-537-777          New York, NY  10019
Facsimile: 011-44-1203-423-678          Telephone: 212-424-8000
                                        Facsimile: 212-424-8500

NGG Holdings, Inc.
10th Floor
Oliver Building
2 Oliver Street
Boston, MA  02109
Telephone:  617-946-2104
Facsimile:  617-946-2111

Michael E. Jesanis                      Clifford M. Naeve
Kirk L. Ramsauer                        Judith A. Center
New England Electric System             Skadden, Arps, Slate, Meagher
25 Research Drive                         & Flom L.L.P.
Westborough, Massachusetts 01582        1440 New York Avenue, N.W.
                                        Washington, D.C.  20005


                      ------------------------------------
                   (Names and addresses of agents for service)








                                       -2-


<PAGE>



                                  Defined Terms

     1.   Applicants means the Intermediate Companies, National Grid and NEES.

     2.   Intermediate  Companies  means  National Grid (US)  Holdings  Limited,
          National Grid (US)  Investments,  National  Grid  (Ireland) 1 Limited,
          National   Grid   (Ireland)  2  Limited  and  National   Grid  General
          Partnership.

     3.   NEES  --  Immediately  after  the  proposed  Merger,  pursuant  to  an
          amendment to NEES' Agreement and Declaration of Trust,  NEES will have
          been merged with NGG Holdings,  LLC, with NEES as the surviving entity
          and then merged again into another LLC (which  survives) which in turn
          will merge into NGG  Holdings,  Inc.  with NGG  Holdings,  Inc. as the
          surviving  entity.  The  term  "NEES"  refers  to  both  NEES  and NGG
          Holdings, Inc. as the surviving entity.

     4.   National Grid means The National Grid Group plc.

     5.   National Grid System means National Grid and its subsidiary companies.

     6.   NEES Group means NEES and the NEES Subsidiary Companies.

     7.   NEES Subsidiary Companies means the subsidiary companies of NEES.

     8.   U.S.  Subsidiary  Companies means NEES, the NEES Subsidiary  Companies
          and the Intermediate Companies.

     9.   U.S.   Utility   Subsidiaries   means  New  England   Power   Company,
          Massachusetts  Electric  Company,  The Narragansett  Electric Company,
          Granite  State  Electric  Company,  Nantucket  Electric  Company,  New
          England    Electric    Transmission    Corporation,     New    England
          Hydro-Transmission   Corporation,   New  England  Hydro-  Transmission
          Electric Company, Inc. and Vermont Yankee Nuclear Power Corporation.



                                       -3-


<PAGE>



                                TABLE OF CONTENTS

Item    1.   Description of Proposed Merger

         A.  Introduction
             1.  General Request
             2.  Overview of Merger

         B.  Description of the Parties to the Merger
             1.  National Grid
             2.  NEES

         C.  Description of the Merger
             1.  Background
             2.  Merger Agreement
             3.  Corporate Structure for the Merger
             4.  Financing the Merger

         D.  Management and Operations of National Grid and NEES Following the
             Merger

         E.  Industry Restructuring Initiatives Affecting U.S. Operations

         F.  Reporting

Item    2.   Fees, Commissions and Expenses

Item    3.   Applicable Statutory Provisions

         A.  Legal Analysis

             1.  Section 10(b)
                 a.  Section 10(b)(1)
                     i.   Interlocking Relationships
                     ii.  Concentration of Control
                 b.  Section 10(b)(2) -- Fairness of Consideration
                 c.  Section 10(b)(2) -- Reasonableness of Fees
                 d.  Section 10(b)(3)
             2.  Section 10(c)
                 a.  Section 10(c)(1)
                 b.  Section 10(c)(2)
             3.  Section 10(f)

         B.  Other Statutory Provisions

Item    4.   Regulatory Approvals

         A.  Antitrust

         B.  Federal Power Act

         C.  Atomic Energy Act

         D.  Exon-Florio

         E.  State Public Utility Regulation

Item    5.   Procedure


                                       -4-


<PAGE>



Item    6.   Exhibits and Financial Statements

         A.  Exhibits

         B.  Financial Statements

Item    7.   Information as to Environmental Effects




                                       -5-


<PAGE>



     This    Pre-Effective    Amendment    No.   7    amends    the   Form   U-1
Application/Declaration in this proceeding, originally filed with the Securities
and Exchange Commission on March 26, 1999, in its entirety as follows:

ITEM 1. DESCRIPTION OF THE PROPOSED MERGER

     A.   Introduction

     This  Application/Declaration  seeks  approvals  relating  to the  proposed
acquisition of NEES, a Massachusetts  business trust, by National Grid, a public
limited company  incorporated  under the laws of England and Wales,  pursuant to
which NEES and its subsidiaries  will become  subsidiaries of National Grid (the
"Merger").  Following consummation of the Merger,  National Grid and each of the
Intermediate Companies will register with the Securities and Exchange Commission
(the  "Commission")  as holding  companies under Section 5 of the Public Utility
Holding  Company  Act of 1935,  as amended  (the  "Act").1  NEES is  currently a
holding  company  registered  under Section 5 of the Act and will remain as such
following  consummation of the Merger.  On February 1, 1999, NEES announced that
it had entered into an agreement to acquire all of the outstanding  common stock
of Eastern Utilities  Associates ("EUA"), a holding company registered under the
Act.  Consummation of the merger between NEES and EUA is not conditional on, and
is proceeding independently from, the closing of the Merger. Authorization under
the  Act  for  NEES'  acquisition  of EUA  will  be the  subject  of a  separate
application to the Commission by NEES.

          1.   General Request

     Pursuant  to  Sections  9(a)(2) and 10 of the Act,  the  Applicants  hereby
request authorization and approval of the Commission to acquire, by means of the
Merger,  all of NEES' interest in the issued and outstanding common stock of the
subsidiaries of NEES that are public utility companies within the meaning of the
Act, namely New England Power

- --------
     1 The  Intermediate  Companies  either have been or will be formed prior to
the   consummation   of   the   Merger.   They   have   been   added   to   this
Application/Declaration  to  enable  the  Commission  to  issue  a  notice.  The
Intermediate  Companies will require the approval of their respective  boards of
directors to engage in the activities contemplated by this filing.


                                       -1-


<PAGE>



Company  ("NEP"),   Massachusetts  Electric  Company  ("Mass.   Electric"),  The
Narragansett Electric Company  ("Narragansett"),  Granite State Electric Company
("Granite  State"),  Nantucket  Electric  Company  ("Nantucket"),   New  England
Electric  Transmission  Corporation  ("NEET"),  New  England  Hydro-Transmission
Corporation ("N.H.  Hydro"),  New England  Hydro-Transmission  Electric Company,
Inc.  ("Mass.  Hydro")  and  Vermont  Yankee  Nuclear  Power  Corporation.   The
Applicants  also hereby request that the Commission  approve (i) the acquisition
by the Applicants of NEES' interest in the non- utility  activities,  businesses
and   investments  of  NEES  and  the  retention  of  National  Grid's  existing
non-utility    activities,    businesses   and    investments;    (ii)   certain
acquisition-related  financing matters, and (iii) certain amendments to the NEES
standard form of service company agreement.

     The timing of the Commission's action on the merger of NEES and EUA and the
Merger (i.e.,  National  Grid's  acquisition  of NEES) is uncertain.  Should the
Commission  approve the  NEES/EUA  merger  first,  Applicants  propose  that the
authorization requested in this  Application/Declaration be deemed a request for
the acquisition of an indirect  interest in the EUA  subsidiaries and operations
acquired by NEES. Should the Commission approve the Merger first,  National Grid
will join NEES as an applicant in the  NEES/EUA  merger  application/declaration
filed with the Commission.

          2.   Overview of the Merger

     Pursuant to an Agreement and Plan of Merger (the "Merger Agreement"), dated
as of  December  11,  1998 by and among  National  Grid,  NGG  Holdings  LLC,  a
Massachusetts  limited  liability  company  and a  wholly  owned  subsidiary  of
National Grid, and NEES, NEES will become an indirect,  wholly owned  subsidiary
of National  Grid. The proposed  corporate  structure of National Grid after the
Merger is discussed in more detail in Item 1.E below.

     As  consideration  for each common share of NEES outstanding at the time of
the Merger, the NEES shareholders will receive $53.75 per share in cash, plus up
to an additional $0.60 in cash per share if the Merger is not consummated within
six months after the NEES shareholders approve the Merger,  calculated at a rate
of $0.003288 for each day


                                       -2-


<PAGE>



that the Merger  closing is delayed  past the end of the six month  period.  The
NEES shareholders will not obtain any stock  consideration from National Grid in
the Merger.

     As  discussed in more detail in Item 3.A.  below,  in addition to providing
substantial  value to NEES  shareholders  as  described  above,  the Merger will
produce  substantial  benefits to the public  interest  and to  consumers in New
England,  as well as the  shareholders  of National Grid, by combining a company
with  demonstrated  expertise in operating in a competitive  environment  with a
company that having divested the bulk of its generation  assets and operating in
states  where  deregulation  initiatives  are  advanced  is well  positioned  to
compete.

     Benefits to customers fall in three  categories.  First,  National Grid has
significant  expertise  in  providing  the  infrastructure,  dispatch  and power
exchange  necessary for an efficient  power supply  market.  Power supply is the
major cost element of electricity  and is crucially  influenced by the efficient
development  of the market  for the  product.  The  efficient  provision  of the
infrastructure  to let the supply market develop will facilitate the increase in
potential suppliers of electricity, with the competition so generated leading to
lower and more stable prices for the  unregulated  supply  component of electric
service.

     Second,  there  will  be  savings  and  efficiencies  associated  with  the
NEES-National Grid Merger itself. The two companies are currently in the process
of evaluating integration  possibilities,  aimed at eliminating  duplication and
implementing best practices. National Grid's significantly larger scale, both in
financial  and  operational  terms,  will enhance the ability of NEES to use new
developments in transmission and distribution  technology,  information systems,
and capital markets, where these can be seen to bring economic benefit.

     Third,  the Merger  will allow  further  pursuit  of  consolidation  in the
electric utility business.  The restructuring of the industry in New England and
the divestiture of generation by companies owning  transmission and distribution
interests has left a fragmented  infrastructure with individual companies of too
small a size to fully  exploit  economies of scale.  NEES,  with its already low
distribution  prices and  profit  margins,  is not in a  position  on its own to
pursue significant further regional consolidation. This transaction


                                       -3-


<PAGE>



will allow further consolidations and consolidation savings to be pursued, while
maintaining  low rates for  customers.  The  agreement  for NEES to acquire EUA,
while not in itself  conditional on the  NEES-National  Grid Merger, is entirely
consistent with this strategy.

     The Merger also provides NEES employees with the  opportunity for growth as
they participate in industry restructuring and allows National Grid to apply its
extensive   experience  in  competitive   electricity   supply  markets  to  the
electricity  industry in the U.S.  at a time of  strategic  significance  in the
reform and restructuring of the industry.

     The Merger has been approved by the shareholders of NEES and National Grid,
as well as by the Federal Energy Regulatory Commission (the "FERC"), the Vermont
Public Service Board (the "VPSB"), the Connecticut  Department of Public Utility
Control  (the  "CDPUC")  and  the  New  Hampshire  Public  Utilities  Commission
("NHPUC").  While  the  express  approval  of the  Massachusetts  Department  of
Telecommunications  and Energy (the "MDTE") and the Rhode Island Public  Utility
Commission (the "RIPUC") are not required,  those regulators have issued letters
certifying that they have the authority and resources to protect ratepayers.  In
addition,  Granite State and NEP have made representations to the NHPUC that the
Merger will not adversely affect their rates, terms, service or operations.  The
Nuclear Regulatory Commission (the "NRC") has approved the transaction. Finally,
the  Merger has been  cleared by the  Committee  on Foreign  Investments  in the
United  States  under  the  Exon-Florio  Provisions  of the  Omnibus  Trade  and
Competitiveness  Act of  1988  and  by the  Antitrust  Division  of the  Justice
Department  and  the  Federal  Trade  Commission  under  the   Hart-Scott-Rodino
Antitrust Improvements Act of 1976.

     B.   Description of the Parties to the Merger

          1.   National Grid

     National  Grid  is  a  holding   company  formed  in  1989.  Its  principal
subsidiary,  The National  Grid Company plc ("NGC"),  a public  limited  company
formed  under the laws of  England  and  Wales,  was  created as a result of the
privatization and restructuring of the British electric system.  National Grid's
ordinary shares are listed on the London Stock


                                       -4-


<PAGE>



Exchange (the "LSE") and National Grid American Depositary Receipts ("ADRs") are
listed on the New York Stock Exchange.

     The table below shows the revenues, net income and total assets of National
Grid,  NEES and EUA for the twelve  months to September  30, 1999,  according to
U.S. GAAP.

                            National Grid            NEES                EUA
                                ($ mm)              ($ mm)             ($ mm)

Revenues                        2,412               2,513                548
Net Income                      1,661                149                 17
Total Assets                    8,437               4,900               1,481


     The table below shows the  capitalization  of National Grid, NEES, EUA, and
the combined group on a pro forma basis, as of September 30, 1999,  according to
U.S.

GAAP.2

- --------
     2 The figures for  revenues,  net income and assets  were  translated  into
dollars using a rate of U.S. $1.60 equals one pound.  Consistent with U.S. GAAP,
National Grid's share of joint ventures and  associate's  businesses is included
in net  income  and assets  but is  omitted  from  revenues.  For the year ended
September  30, 1999,  National  Grid's share of Energis  losses were $26 million
(excluding exceptional profits of $1,427 million).


                                       -5-


<PAGE>




<TABLE>
<CAPTION>
                   National     National      NEES        NEES        EUA         EUA       Pro Forma       Pro Forma
                     Grid       Grid (%)                                          (%)        Combined       Combined
                    ($ mm)                   ($ mm)       (%)        ($ mm)                   ($ mm)           (%)

<S>                  <C>          <C>          <C>        <C>         <C>        <C>           <C>            <C>
Short-term            404         6.7%          39        1.4%        118        16.8%          561           5.7%
debt

Long-term           3,133        52.3%       1,059       38.8%        190        27.1%        6,682 (3)      68.2%
debt

Preferred             -            -            20        0.7%         35         5.0%           55           0.6%
stock

Minority                1          -            39        1.4%         -           -             40           0.4%
interest

Common              2,454        41.0%       1,578       57.7%        358        51.1%        2,454          25.1%4
stock equity

Total               5,992         100%       2,735        100%        701        100%         9,791           100%
</TABLE>


     Except for  National  Grid (US)  Holdings  Limited,  National  Grid has one
direct  subsidiary,  National Grid Holdings Limited  ("National Grid Holdings").
National Grid Holdings was formed under the laws of England and Wales in 1999 to
serve as a subholding  company over NGC and the other  subsidiaries  of National
Grid not in the NEES chain of ownership.  Prior to  consummation  of the Merger,
National Grid Holdings will file its  notification  of foreign  utility  company
("FUCO")  status to  qualify as a FUCO  within the  meaning of Section 33 of the
Act. The parties  expect that  National  Grid  Holdings  will retain this status
following  the Merger and that the  activities  and  operations of National Grid
Holdings' direct and indirect  subsidiary  companies will be exempt from the Act
as subsidiaries of National Grid Holdings, provided that each derives no part of
its income,  directly  or  indirectly,  from the  generation,  transmission,  or
distribution  of  electric  energy  for sale or the  distribution  at  retail of
natural or manufactured  gas for heat,  light, or power,  within the US and none
are public utility companies operating in the US. A chart showing

- --------
     3 Includes $2,300 million of acquisition financing.

     4 Cash  balances  of  $1,074  million  (on a pro  forma  basis)  on hand on
September 30, 1999 are not shown above.


                                       -6-


<PAGE>



National  Grid and all of its  subsidiaries  following the formation of National
Grid Holdings is attached hereto as Exhibit E-2.

     The  following  entities  are the  direct  subsidiaries  of  National  Grid
Holdings and the description of their  operations  provides a description of the
principal lines of business, as well as some administrative  operations,  within
the National Grid holding company system.

     (1) NGC -- As part of the  U.K.  government's  privatization  efforts,  the
Central Electricity Generating Board, which owned and operated the vast majority
of electric  generation and  transmission  facilities in England and Wales,  was
split into three competing generation companies, and an independent transmission
company,  NGC. As a result, NGC is the only transmission  company in England and
Wales and now owns 4,300 miles of overhead  transmission  lines and 400 miles of
underground cables, all in England and Wales, as well as  interconnections  with
Scotland and France. The principal  functions of NGC in the competitive  British
power  supply  market  are to provide  transmission  services  on a  for-profit,
non-discriminatory  basis,  and to maintain and make all needed  improvements to
optimize  access  to  that  system;  to  procure   ancillary   services  on  the
transmission  system;  to match demand and supply; to manage the daily system of
half-hourly  bids for competing  generators;  and to calculate market prices and
make the  payments  due from  each  day's  energy  trading.  NGC is  subject  to
regulatory  controls overseen by the Director General of Electricity Supply with
regard to the prices it may  charge for  transmission  services  in England  and
Wales. The current  transmission price control arrangements for NGC are expected
to remain in force until March 31, 2001.

     (2) National Grid Insurance Limited,  is an insurance  subsidiary formed in
connection  with  the  self-insured  retention  of  NGC's  transmission  assets.
National  Grid owns all of the  outstanding  ordinary  shares of  National  Grid
Insurance Limited, with preference shares held by Barclays Bank.

     (3) National Grid International Limited, is an intermediate holding company
for certain of the overseas  operations  of National  Grid, in  particular,  its
businesses  in  South  America,   India,  Africa  and  the  U.S.  National  Grid
International Limited is


                                       -7-


<PAGE>



indirectly engaged in the following businesses:  (a) automated meter reading and
billing; (b) telecommunications, and (c) electric transmission and distribution.
Teldata  International  Limited and National Grid USA Inc. are  subsidiaries  of
National Grid International  Limited with operations in the US. Teldata Inc. and
First Point Services Inc. are Delaware  corporations and subsidiaries of Teldata
International  Limited that provide  metering and billing  services to electric,
gas and water utilities and energy service providers.  National Grid USA Inc. is
a Delaware corporation that was formed to investigate potential opportunities in
the US market for National Grid.  Except as mentioned  above,  no other National
Grid  companies  maintain  operations  in the US.  National  Grid  International
Limited does not directly or  indirectly  derive any part of its income from the
generation,  transmission  or  distribution  of electric  energy for sale or the
distribution at retail of natural or manufactured  gas for heat,  light or power
within the US. None of National Grid  International  Limited or its subsidiaries
is a public utility company operating in the US.

     (4) The National Grid Group Quest Trustees  Limited is the trustee  company
for National Grid's qualifying employee share ownership trust.

     (5) NGG Telecoms Holdings Limited indirectly holds National Grid's interest
(currently at 36.0%) in Energis plc ("Energis"),  a  telecommunications  company
focusing on the business marketplace in the United Kingdom.  Originally known as
Telecom   Electric,   Energis   was   created  to  build  a  new   network   for
telecommunications  in the U.K.,  under  government  license,  and to respond to
NGC's need for a high speed  telecommunications  system that could transmit data
and be used  to  coordinate  operations  among  NGC's  protection,  control  and
signaling  systems.  NGC met this  need,  employing  its  expertise  in  network
engineering and certain NGC-developed cable stringing  technology,  with a fiber
optic  network  built on top of its  existing  network of electric  transmission
facilities  and  associated  rights  of way.  NGC  leased  the  physical  assets
comprising   the   telecommunications    system   to   Energis   which   markets
telecommunications services to the public and to NGC on an arm's-length basis.

     (6) Natgrid Finance Holdings Limited is an intermediate holding company for
entities that provide financial management services to National Grid.


                                       -8-


<PAGE>



          2.   NEES

     NEES is organized and exists as a voluntary  association  created under the
laws of the Commonwealth of  Massachusetts on January 2, 1926.  NEES's principal
executive  office is located at 25 Research  Drive,  Westborough,  Massachusetts
01582.

     NEES is a holding company  registered  under Section 5 of the 1935 Act, and
it and its subsidiaries  are subject to the broad  regulatory  provisions of the
Act.  Various NEES  subsidiaries  are also subject to regulation by (i) the FERC
under  the  Federal  Power Act  ("FPA")  with  respect  to  wholesale  sales and
transmission of electric power,  accounting and other matters,  and (ii) various
state regulatory commissions, as discussed below. In addition, the activities of
nuclear  facilities in which NEES and its subsidiaries have ownership  interests
are regulated by the NRC.

     The common  stock,  par value of $1.00 per share,  of NEES is listed on the
New York Stock Exchange and the Boston Stock Exchange.  As of December 31, 1998,
there were 59,171,015 shares of NEES common stock outstanding. On a consolidated
basis for the year ended  September  30,  1999,  NEES had total  assets of $4.90
billion, net utility assets of $2.51 billion,  total operating revenues of $2.51
billion,  utility  operating  revenues of $2.24 billion,  and net income of $149
million.

     NEES owns all of the voting  securities of the following four  distribution
subsidiaries,  Mass. Electric,  Narragansett,  Granite State and Nantucket,  and
99.97 percent of the outstanding voting securities of its principal transmission
subsidiary,  NEP.  The NEES system  covers more than 4,500  square  miles with a
population  of  approximately  3,000,000.  At September  30, 1999,  NEES and its
subsidiaries had approximately 3,826 employees.

     (1) Mass.  Electric is a public utility  company engaged in the delivery of
electric  energy  to  approximately  980,000  customers  in an  area  comprising
approximately  43  percent  of  Massachusetts.  Mass.  Electric's  service  area
consists of 146 cities and towns,  including the highly  diversified  commercial
and  industrial  cities of Worcester,  Lowell and Quincy.  The population of the
service area is approximately  2,160,000,  or 36 percent of the total population
of the state. During 1998, 39 percent of Mass. Electric's revenues from the


                                       -9-


<PAGE>



sale of  electricity  was derived from  residential  customers,  39 percent from
commercial  customers,  21 percent from industrial  customers and 1 percent from
others. In 1998, the utility's 20 largest customers  accounted for approximately
7 percent of its electric revenues. As of September 30, 1999, Mass. Electric had
total  assets of $1.41  billion,  operating  revenues  of $1.37  billion and net
income of $60.0 million for the twelve months to date. Mass. Electric is subject
to rate regulation by the FERC and the MDTE.

     (2)  Narragansett  is a public utility  company  engaged in the delivery of
electric energy to approximately  335,000 customers in Rhode Island. Its service
area covers about 839 square miles, or 80 percent of the area of the state,  and
encompasses 27 cities and towns, including Providence, East Providence, Cranston
and Warwick.  The population of the service area is approximately  725,000 or 72
percent  of the total  population  of the  state.  During  1998,  44  percent of
Narragansett's   revenues  from  the  sale  of  electricity   was  derived  from
residential  customers,  40 percent from commercial  customers,  14 percent from
industrial  customers,  and 2  percent  from  others.  In 1998,  the 20  largest
customers of Narragansett accounted for approximately 10 percent of its electric
revenues.  As of  September  30, 1999,  Narragansett  had total assets of $673.4
million,  operating  revenues of $456.1  million and net income of $30.1 million
for the twelve  months to date.  Narragansett  is subject to  regulation  by the
FERC, the RIPUC and the Rhode Island  Division of Public  Utilities and Carriers
("RIDIV").

     (3) Granite State is a public  utility  company  engaged in the delivery of
electric  energy  to   approximately   37,000  customers  in  21  New  Hampshire
communities.   The  Granite  State   service   territory  has  a  population  of
approximately  73,000 and includes the Salem area of southern New  Hampshire and
several  communities  along the  Connecticut  River.  During 1998, 49 percent of
Granite  State's  revenues  from  the  sale  of  electricity  was  derived  from
commercial  customers,  36 percent from residential  customers,  14 percent from
industrial  customers,  and 1  percent  from  others.  In 1998,  the 10  largest
customers  of  Granite  State  accounted  for  approximately  18  percent of its
electric  revenue.  As of September 30, 1999,  Granite State had total assets of
$65.0  million,  operating  revenues  of $60.6  million,  and net income of $2.8
million for the twelve months to date. Granite State is subject to regulation by
the FERC and the NHPUC.


                                      -10-


<PAGE>



     (4) Nantucket  provides  electric utility service to  approximately  10,000
customers  on  Nantucket  Island  in   Massachusetts.   Nantucket's   year-round
population is approximately  6,000, with a summer peak of approximately  40,000.
Nantucket's  service area covers the entire  island.  During 1998, 62 percent of
Nantucket's  revenues from the sale of electricity was derived from  residential
customers,  37 percent from commercial  customers and 1 percent from others.  At
the end of 1998,  Nantucket had total assets of $44 million,  operating revenues
of $15.1 million, and net income of $567,000. Nantucket is subject to regulation
by the FERC and the MDTE.5

     (5) NEP is  principally  engaged in  purchasing,  transmitting  and selling
electric  energy at  wholesale.  In 1998,  98 percent  of NEP's  all-requirement
revenue  from the sale of  electricity  was  derived  from  sales for  resale to
affiliated  companies and 2 percent from sales for resale to municipal and other
utilities.  NEP has  recently  completed  the sale of  substantially  all of its
non-nuclear generating business and currently is attempting to sell its minority
interests  in  three  operating  nuclear  power  plants  and  one  fossil-fueled
generating  station in Maine.6 As of September 30, 1999, NEP had total assets of
$2.28  billion,  operating  revenues  of $586.2  million and net income of $70.8
million for the twelve months to date. NEP is subject, for certain purposes,  to
regulation by the SEC, the FERC, the NRC, the RIDIV,  the MDTE,  the NHPUC,  the
VPSB, the CDPUC, and the Maine Public Utilities Commission.

     (6) NEET, a wholly  owned  subsidiary  of NEES,  owns and operates a direct
current/alternating  current converter  terminal facility for the first phase of
the Hydro-Quebec and New England interconnection (the "Interconnection") and six
miles of high voltage direct current transmission line in New Hampshire.

- --------
     5 Audited  financial  statements for the year ended  September 30, 1999 are
not available.

     6 NEP is also a  holding  company  because  it owns 20% of the  outstanding
voting  securities of Vermont  Yankee  Nuclear Power  Corporation,  the licensed
operator of the Vermont Yankee nuclear facility. NEP also has minority interests
in Yankee Atomic Electric Company (30%), Maine Yankee Atomic Power Company (20%)
and Connecticut Yankee Atomic Power Company (15%), all of which have permanently
ceased operations. NEP is an exempt holding company under the Act. Yankee Atomic
Electric Company, Holding Co. Act Release No. 13048 (Nov. 25, 1955); Connecticut
Yankee Atomic Power Company, Holding Co. Act Release No. 14768 (Nov. 15, 1963).


                                      -11-


<PAGE>



     (7) N.H.  Hydro,  in which NEES holds 53.97% of the common stock,  operates
121 miles of high-voltage direct current  transmission line in New Hampshire for
the second phase of the Interconnection,  extending to the Massachusetts border.
As of  September  30,  1999,  N.H.  Hydro  had total  assets of $129.3  million,
operating  revenues  of $30.7  million,  and net income of $4.5  million for the
twelve months to date.

     (8)  Mass.  Hydro,  53.97%  of the  voting  stock of which is held by NEES,
operates a direct  current/alternating  current terminal and related  facilities
for the second phase of the  Interconnection and 12 miles of high-voltage direct
current  transmission  line in  Massachusetts.  As of September 30, 1999,  Mass.
Hydro had total assets of $155.7 million,  operating  revenues of $35.5 million,
and net income of $7.3 million for the twelve months to date.

     o    New England Hydro Finance Company,  Inc. ("NE Hydro Finance") is owned
          in equal  shares by Mass.  Hydro and N.H.  Hydro and provides the debt
          financing  required by the owners to fund the  capital  costs of their
          participation in the Interconnection.

     (9) NEES  Communication,  Inc.  ("NEESCom")  has been  declared  an  exempt
telecommunications  company by the Federal  Communications  Commission.  NEESCom
presently focuses on dark fiber leasing.  At the end of 1998,  NEESCom had total
assets of $12.6 million and a net loss of $1.2 million.7

     o    NEES  Telecommunications  Corp.  is  wholly  owned by  NEESCom  and is
          presently inactive.

     (10) Wayfinder Group, Inc. ("Wayfinder")  (formerly NEES Global, Inc.) is a
wholly-owned  nonutility subsidiary of NEES that provides principally consulting
services and product licenses to unaffiliated utilities in the areas of electric
utility restructuring and customer choice. On September 21, 1999, Wayfinder sold
its wholly- owned subsidiary,  New England Water Heater Company,  Inc., which is
in the water heater leasing  business.  As of September 30, 1999,  Wayfinder had
total assets of $7.8 million,

- --------
     7 Audited  financial  statements for the year ended  September 30, 1999 are
not available.


                                      -12-


<PAGE>



operating  revenue  of $9.1  million  and a net income of $1.7  million  for the
twelve months to date.  Monitoring  Technologies,  Inc.,  Nexus Energy Software,
Inc. and  Separation  Technologies,  Inc. are owned in part by Wayfinder and are
described below.

     (11)  NEES  Energy,  Inc.  ("NEES  Energy")  is  a  wholly-owned  marketing
subsidiary of NEES.  As of September  30, 1999,  NEES Energy had total assets of
$195  million,  operating  revenue  of  $358.8  million  and a net loss of $10.3
million for the twelve months to date.

     o    AllEnergy Marketing Company,  L.L.C.  ("AllEnergy") is a wholly- owned
          subsidiary  of NEES  Energy.  AllEnergy  markets  energy  products and
          provides a wide range of energy-related  services  including,  but not
          limited to,  marketing,  brokering and sales of energy,  audits,  fuel
          supply,  repair,   maintenance,   construction,   operation,   design,
          engineering  and  consulting  to  customers in the  competitive  power
          markets of New England and New York.

     o    AllEnergy's  subsidiary Texas Liquids,  L.L.C. (owned 99% by AllEnergy
          and 1% by NEES Energy),  engages principally in marketing and sales of
          propane and energy in the New Jersey area.

     o    AEDR Fuels L.L.C., a company engaged in the home heating oil business,
          is 100% owned by AllEnergy.

     o    Weatherwise  USA,  L.L.C.,  a  company  engaged  in  providing  energy
          management, demand side management and technical services, and utility
          hedging services to reduce weather-related financial uncertainties for
          utilities and energy users, is 4.2% owned by AllEnergy.

     o    AllEnergy's  wholly-owned  subsidiary,  Texas-Ohio  Gas, Inc.  markets
          natural gas to industrial  and  commercial  end users  throughout  the
          northeast US.


                                      -13-


<PAGE>



     (12) Granite State Energy, Inc. ("Granite State Energy") is a wholly- owned
nonutility  marketing  subsidiary of NEES. Granite State Energy provides a range
of energy and  energy-related  services,  including:  sales of electric  energy,
audits, power quality, fuel supply, repair, maintenance,  construction,  design,
engineering and consulting.  At the end of 1998,  Granite State Energy had total
assets of $304,000, operating revenues of $718,000 and a net loss of $22,000.8

     (13) New  England  Water  Heater  Company,  Inc.  is engaged in the rental,
service, sale and installation of water heaters.9

     (14) New England  Power Service  Company  ("Service  Company"),  provides a
variety of administrative  and consulting  services for the NEES system pursuant
to a  service  agreement  approved  by the  Commission  in  accordance  with the
requirements  of Rule 90. As of September  30, 1999,  Service  Company had total
assets of $131.6 million, operating revenues of $197.7 million and net income of
$1.8 million for the twelve months to date.

     (15) Metro West Realty, L.L.C., a wholly-owned  subsidiary of NEES conducts
real estate investment and management activities.

     (16) 25 Research  Drive,  L.L.C.,  a  wholly-owned  subsidiary of NEES, was
formed to facilitate the proposed acquisition of Eastern Utilities Associates.

     (17) New England Energy,  Inc.  ("NEEI"),  is a wholly-owned  subsidiary of
NEES that  owned oil and gas  properties  that were sold  during  1998.  NEEI is
currently inactive.

     (18) Monitoring Technologies,  Inc. ("MTC") designs, develops, manufactures
and markets microprocessor-based products that monitor wear and forecast failure
of components in machinery. NEES Global has a 4% ownership interest in MTC.

- --------
     8 Audited  financial  statements for the year ended  September 30, 1999 are
not  available.

     9 The sale of this company was closed effective September 21, 1999.


                                      -14-


<PAGE>



     (19) Nexus  Energy  Software,  Inc.  ("Nexus"),  develops  and licenses its
software to utilities and operates a website which targets energy  consumers for
the  purpose  of  helping  them make  energy  choices.  NEES  Global has a 42.6%
ownership interest in Nexus.

     (20) Separation Technologies, Inc. ("STI"), is a provider of ash processing
equipment,  project financing,  operations and marketing services related to its
equipment.  NEES  Global  has a 5.02%  ownership  interest  with a voting  stock
ownership interest of 5.67% in STI.

     (21) UNITIL Company ("Unitil"),  is a registered holding company located in
New England.  NEES holds a 0.8% ownership interest in Unitil.  NEES acquired the
Unitil  interest in exchange for NEES'  interest in  Fitchburg  Gas and Electric
Company when that company was merged with Unitil.

     Narragansett  and NEP (and  AllEnergy) are members of the New England Power
Pool  ("NEPOOL").  Mass.  Electric,  Nantucket and Granite State  participate in
NEPOOL  through NEP. The FERC  recently has approved a  restructuring  of NEPOOL
involving (i) the formation of an Independent  System Operator that will control
the  transmission  facilities  owned by the NEPOOL  public  utility  members and
administer the NEPOOL open-access  transmission tariff and (ii) the operation of
a power  exchange that will embody a  competitive  wholesale  power market.  New
England Power Pool, 85 FERC P. 61,379 (Dec. 17, 1998).

     A chart of the organization of NEES is attached hereto as Exhibit E-3.

     C.   Description of the Merger

          1.   Background

     National  Grid has been  seeking  opportunities  to develop  earnings  from
outside  the UK  transmission  business  by  applying  its  core  skills  in the
development and management of infrastructure assets and systems. The Merger is a
major step toward realizing those goals. From National Grid's perspective, NEES:


                                      -15-


<PAGE>



     o    represents  a  significant   investment   in  an  efficient,   focused
          transmission and distribution business with a strong operational track
          record, which will benefit further from National Grid's core skills;

     o    enhances  National Grid's earnings per share,  before the amortization
          of goodwill,  and significantly enhances National Grid's cash flow per
          share immediately following acquisition;

     o    provides  the right point of entry into the U.S.  for  National  Grid,
          given New England's  favorable  economic climate and its more advanced
          state of regulatory evolution towards performance-based regulation;

     o    brings  National  Grid a  high-quality  management  team  with  proven
          distribution  expertise  and a shared  view of the  industry's  future
          development in the Northeast U.S.; and

     o    provides an excellent regional platform for growth in transmission and
          distribution.

     The  Applicants  believe  that  National  Grid and NEES have  complementary
skills that can be used to benefit the public interest,  as well as the interest
of investors and consumers,  the "protected  interests" under the Act.  National
Grid has considerable experience:

     o    operating as a facilitator of competition in a regulatory  environment
          that promotes and rewards efficiency; and

     o    improving system performance through investing in and managing complex
          transmission  system networks and the  sophisticated  software systems
          that control the networks in real time.

National Grid believes that this experience  complements  NEES' proven expertise
in  operating  efficient  distribution  businesses  in  an  evolving  regulatory
environment and will provide it with an important  competitive advantage both in
developing  its  U.S.   transmission  and  distribution  business  and  pursuing
opportunities elsewhere. Both National Grid and


                                      -16-


<PAGE>



NEES are  committed to providing  reliable and  efficient  service and enhancing
overall performance standards for the benefit of customers and shareholders.

          2.   Merger Agreement

     Under the terms of the  Merger  Agreement,  each  outstanding  NEES  common
share,  other than shares  held by NEES as  treasury  stock or held by any other
NEES subsidiary and shares held by National Grid or any of its subsidiaries, but
including  all  common  shares  held as  treasury  shares  under  a rabbi  trust
maintained by NEES to satisfy certain benefit  obligations,  will converted into
the right to receive  $53.75 in cash per share.  This cash payment will increase
by $0.003288  per share,  up to a maximum price of $54.35 per share for each day
completion of the Merger is delayed longer than six months after approval of the
Merger  by NEES  shareholders.  The  Merger  is  subject  to  customary  closing
conditions,  including receipt of all necessary regulatory approvals,  including
the approval of the Commission.

          3.   Corporate Structure for the Merger

     As stated above,  the Merger is structured as the indirect  acquisition  of
NEES by National Grid.  Promptly after the Merger is consummated,  National Grid
currently  intends to convert NEES from a  Massachusetts  business  trust into a
more  conventional  business  corporation.  This  conversion  may result in NEES
having  a  different   corporate   name.  All   references   contained  in  this
Application/Declaration  to NEES after  consummation of the Merger refer to NEES
and  its  potential  corporate  successor.  The  Intermediate  Companies  in the
corporate  structure  between National Grid and NEES create a structure  typical
for U.K.  cross-border  transactions;  these  entities  exist  primarily for the
purpose of creating  an  economically  efficient  and viable  structure  for the
transaction  and the ongoing  operations  of NEES.  The  proposed  structure  as
currently planned and specific function of each of the Intermediate Companies is
set forth in Exhibit J-2 hereto. The Applicants note that certain adjustments in
the structure may be necessary to reflect tax and accounting  changes as well as
management  decisions  prior to  consummation  of the Merger.  Material  changes
between the date of this  Application/Declaration  and the  consummation  of the
Merger will be reflected in a pre-effective  amendment  hereto.  National Grid's
direct and


                                      -17-


<PAGE>



indirect interest in each of the Intermediate  Companies will flow through loans
and equity  interests  similar to those  indicated  in Exhibit J-2. It should be
noted that under this structure there will be no outside, third party interests,
including no lenders and no customers, in the Intermediate Companies.10

          4.   Financing the Merger

     National  Grid  intends to finance  the  acquisition  of NEES (and the NEES
acquisition  of EUA) through a  combination  of borrowings  under  existing bank
facilities  and  other  internal  cash  sources.   Given  the  price  escalation
provisions of the Merger Agreement and the nature of the transaction,  the exact
cash purchase price to be paid to NEES shareholders in the aggregate will depend
on the timing of the  closing of the Merger as well as the number of NEES shares
outstanding at that time.  However,  it is expected that the  acquisition  price
will be approximately $3.2 billion. On March 5, 1999, National Grid entered into
a fully  committed  bank  facility  with six  banks  providing  for up to $2.750
billion in borrowings by National Grid,  wholly-owned National Grid subsidiaries
incorporated in the UK (other than NGC), and other National Grid subsidiaries as
approved  in writing by the banks,  plus a further 250  million  pound  sterling
facility  available  to NGC only.  The  facility has a maturity of 3 to 5 years.
Each of these banks is a sophisticated commercial lender and the facilities were
negotiated at arms' length.  It is expected that additional  banks will be added
to the  facility  and  subsequent  syndication  may  bring  the  number of banks
involved to over 70.  These  facilities  were  established  both for funding the
acquisition  and to provide  other working  capital needs for National  Grid. In
addition,  National Grid will have access to other internal sources of funds for
the  acquisition,  namely  existing  cash  balances.  As of September  30, 1999,
National Grid had on hand deposits of $2,432 million.

- --------
     10 The Intermediate  Company structure also will be free of minority equity
interest holders, except that National Grid (US) Holdings Limited ("NGUSH") will
own one  share  in each of its  indirect  subsidiary  companies,  National  Grid
(Ireland) 1 Limited and National Grid (Ireland) 2 Limited.  NGUSH's wholly-owned
subsidiary company,  National Grid (US) Investments ("NGUSI"),  will own all the
remaining  shares.  In addition,  National Grid will own 0.1% of the  preference
shares  issued  by  NGUSI.  All the  remaining  preference  shares  (and all the
ordinary shares issued by NGUSI) will be owned by NGUSH.


                                      -18-


<PAGE>



     D.   Management  and  Operations  of National  Grid and NEES  Following the
          Merger

          1.   National Grid

     Following  consummation  of the  Merger,  National  Grid  will  become  the
indirect  parent company to NEES. All of National  Grid's other  operations will
remain  unchanged  in the  Merger.  The Merger  Agreement  provides  that at the
effective time of the Merger,  National Grid will appoint Richard P. Sergel, the
NEES president and chief  executive  officer and one  additional  NEES director,
Paul Joskow, to National Grid's board of directors.  There will be ten directors
in all after the Merger.  Both Richard Sergel and Paul Joskow are U.S.  citizens
and residents of New England.  Robert Faircloth,  who is also a U.S. citizen and
part-time resident of New England,  currently serves on the National Grid board.
The management of National Grid shall otherwise remain unchanged by the Merger.

     National  Grid's  proposed  board  composition   demonstrates  a  continued
commitment  to  maintaining  a local  presence in the U.S.  that is sensitive to
local  concerns.11  Indeed,  National Grid intends to expand its presence in the
U.S.  as  opportunities  arise  through  the  restructuring  of the  electricity
industry and, in particular,  within the fragmented New England market. National
Grid's  commitment  to the  New  England  region  is  also  demonstrated  by its
commitment to continue to provide charitable contributions and community support
within the New England region at annual levels  substantially  comparable to the
annual  level  of  charitable  contributions  and  community  support  provided,
directly or indirectly,  by NEES and its public utility  subsidiaries within the
New England region during 1997.12

     Upon  consummation  of the  Merger,  National  Grid  and  the  Intermediate
Companies will register as holding  companies  under Section 5 of the Act. It is
intended that

- --------
     11 See also, National Grid's letter to the Attorney General of Rhode Island
stating that the local management of NEES and Narragansett will continue to make
decisions about the disposition of Rhode Island real estate (included as Exhibit
M-1 to this Application).

     12 Agreement  and Plan of Merger,  dated as of December  11,  1998,  by and
among NEES, National Grid and NGG Holdings LLC, Section 7.07(c).


                                      -19-


<PAGE>



National Grid Holdings will be qualified as a foreign utility company within the
meaning of Section 33 of the Act, and that all operations  thereunder will claim
the benefit of the FUCO exemption.

          2.   NEES

     Following  consummation of the Merger,  NEES will become an indirect wholly
owned  subsidiary of National  Grid and its common  shares will be  deregistered
under the Securities Exchange Act of 1934, as amended, and delisted from the New
York Stock  Exchange  and the Boston  Stock  Exchange.  The NEES  Agreement  and
Declaration  of Trust will be replaced  by  corporate  bylaws for the  surviving
entity in the Merger.  The Merger  Agreement  provides that the  headquarters of
NEES as the  surviving  entity will remain in  Massachusetts,  with  offices for
utility  operations  in  Massachusetts,  Rhode  Island  and New  Hampshire.  The
post-Merger  NEES board of  directors  will be  comprised  of up to nine members
designated from among the officers of National Grid and NEES, as mutually agreed
by National Grid and NEES. In addition,  the then-current  outside  directors of
NEES will be appointed to an advisory  board to be  maintained  for at least two
years after the effectiveness of the Merger.  The function of the advisory board
will be to advise the  surviving  entity's  board of  directors  with respect to
general business  opportunities and activities in the surviving  entity's market
area as well as customer relations issues. NEES will remain a registered holding
company under the Act.

     E.   Industry Restructuring Initiatives Affecting U.S. Operations.

     NEES'  public  utility  subsidiaries  operate  in states in which  electric
utility restructuring has advanced  significantly over the past year and a half.
The Applicants believe that these restructuring efforts will continue to lead to
significant  changes in the  electric  utility  industry in New England and will
serve as models for restructuring efforts in other parts of the nation.

     Starting in 1996 and continuing through 1998, restructuring legislation was
passed in Massachusetts,  Rhode Island and New Hampshire relating to competition
and customer choice of power suppliers,  recovery of stranded costs by utilities
and  reductions  in rates.  During this  period,  and in some cases prior to the
enactment of legislation, NEES'


                                      -20-


<PAGE>



public  utility  subsidiaries  entered  into  settlement  agreements  with their
relevant  state  regulators   relating  to  corporate   restructuring   and  the
introduction  of retail access to competitive  power  suppliers.  The settlement
agreements  were also  approved by the FERC.  The  overriding  principle in this
restructuring  was that the  transition to full  competition at the retail level
should be  accomplished by separating  generation from  transmission to create a
regime of independent transmission companies with a competitive market for power
suppliers.  Accordingly,  NEES and its subsidiaries committed to the divestiture
of all  generating  facilities,  including  all  nuclear  plants,  to the extent
practicable. As noted above, in 1998, NEP and Narragansett completed the sale of
substantially all non-nuclear generation facilities, including obligations under
power purchase and sale  agreements,  to USGen New England,  Inc. As a result of
this divestiture,  NEES is now primarily a transmission and distribution  system
operating in a region undergoing significant restructuring. National Grid, which
is the world's largest privately owned  independent  transmission  company,  has
participated  in the transition to a competitive  electric market in England and
Wales  and  has  had  nine  years  experience  in  operating  in  a  competitive
environment.  The industry  restructuring  that is occurring in New England is a
critical factor in understanding the rationale and benefits of the Merger, which
are discussed in detail in Item 3.A.2.b below.

     Pursuant to Mass. Electric's settlement with state regulators and the FERC,
and in  accordance  with  legislation  enacted  in  Massachusetts  in late 1997,
starting in March,  1998,  customers of Mass.  Electric have been able to choose
their power supplier.  The legislation  requires  electric  utilities to provide
customers  who do not choose a power  supplier  with  standard  offer service at
prices that  produce a 10 percent  rate  reduction  from the prices that were in
effect in 1997. The legislation also requires the rate reductions to increase to
15% (in real  terms  over 1997  prices)  on or  before  September  of 1999.  The
settlement  and  legislation  also  authorized  the  recovery of stranded  costs
resulting  from the  introduction  of customer  choice.  The MDTE  approved  the
settlement and found it to be consistent with the  legislation.  A November 1998
referendum  on the  ballot  in  Massachusetts  calling  for  the  repeal  of the
Massachusetts statute was defeated by the voters.


                                      -21-


<PAGE>



     Under the Massachusetts settlement agreement providing for customer choice,
recovery  of NEP's  stranded  costs is allowed  through a  contract  termination
charge billed to Mass.  Electric and  Nantucket,  which is in turn  collected by
Mass.   Electric  and  Nantucket  from  all  retail  delivery   customers.   The
Massachusetts  settlement agreement also required the relevant NEES companies to
divest  all of  their  generation  and  related  properties,  and the  companies
completed the sale of their  non-nuclear  generating assets to USGen New England
in 1998. The net proceeds of such sale were used to reduce the transition access
charge  from  2.8  cents  per kWh  initially  reflected  in the  settlement.  In
addition,  NEES's oil and gas properties were sold to Sameden Oil Corporation as
of January 1, 1998.  Through power  purchase  contracts  with USGen New England,
Inc.  and  TransCanada  Power  Marketing  Ltd.,  Mass.   Electric  is  providing
transition  services  to  customers  who do not  choose  a power  supplier.  The
Massachusetts settlement agreement and related transactions were approved by the
MDTE and the FERC.

     The  State of  Rhode  Island  enacted  restructuring  legislation  in 1996,
allowing certain customers in the state to choose power suppliers  pursuant to a
phase in schedule  that is now  complete.  NEP and  Narragansett  entered into a
settlement  agreement  with the RIPUC and RIDIV to implement the  legislation on
terms  similar  to  the  Massachusetts  settlement  agreement  with  respect  to
divestiture,  stranded cost recovery and transition  services.  This  settlement
agreement was approved by the FERC.

     While restructuring  efforts in New Hampshire began early, with the passage
of legislation in 1996,  regulatory efforts have largely been halted as a result
of  litigation  by  other  in-state  utilities.  Granite  State  entered  into a
settlement  with the Governor of New Hampshire and several  public  interest and
customer  groups in July 1998 that provided all of its customers  with the right
to choose  their  electricity  supplier and  guaranteed  a rate  reduction of 10
percent.  Following the sale of the system's non-nuclear  generation facilities,
additional  savings  were  passed on to  Granite  State's  customers.  Under the
settlement  transition service was to be provided by Granite State for a two and
one-half year period.  In January 1999,  following an auction  process,  Granite
State  selected  Constellation  Power Source as the supplier for its  transition
service offer, replacing USGen New England. Again, this settlement agreement was
approved by the NHPUC and FERC.


                                      -22-


<PAGE>



     F.   Reporting

     Applicants will file Form U5S annually with the Commission  within 120 days
of the close of National  Grid's  fiscal year.  In addition,  National Grid will
file Form 20-F  annually with the  Commission,  a semiannual  report  containing
earnings information,  and reports on Form 6-K containing material announcements
as made.  National  Grid will provide the staff with paper copies of its filings
on Form 20-F and its semiannual reports when filed with the Commission.

     Under UK  rules,  National  Grid  must  prepare  and  publish  consolidated
financial information semi-annually. In addition, semiannual financial reporting
is consistent  with National  Grid's ADR listing on the New York Stock Exchange.
Due to National Grid's extensive foreign holdings,  it would entail  significant
additional work and expense for National Grid to prepare consolidated  financial
statements on a quarterly basis. In that regard,  in the interest of maintaining
the consistent  presentation of financial  information,  Applicants propose that
their Form U5S filings will  comprise  National  Grid's  consolidated  financial
statements  in the format  required by Form 20-F,  i.e.,  U.K.  GAAP format with
reconciliations  to U.S.  GAAP.  In addition,  Applicants  propose to include in
their Form U5S filings: (1) U.S. GAAP financial statements for all the companies
in the  NEES  Group,  and  (2)  U.S.  GAAP  financial  statements  or  financial
statements in the format  required by Form 20-F for (a) National Grid  Holdings,
on a consolidated basis, and (b) the Intermediate Companies. Amounts included in
Form U5S filings will be stated in U.S. dollars.  National Grid will provide the
Commission  access to the books,  records and  financial  statements,  or copies
thereof, of any of its subsidiary  companies,  in English, as the Commission may
request.

     Applicants request an exemption from Rule 26(a)(1) under the Act, regarding
the maintenance of financial  statements in conformance with Regulation S-X, for
any  subsidiary of National Grid  Holdings  organized  outside the U.S. Any FUCO
acquired  directly or indirectly by National Grid  subsequent to the issuance of
an order in this  Application-Declaration will maintain its financial statements
in U.S.  GAAP or reconcile  such  statements  to U.S. GAAP in the same manner as
required by Form 20-F.


                                      -23-


<PAGE>



     Applicants also will report  annually,  as a supplement to the Form U-13-60
filed by Service  Company,  about service  transactions  among the National Grid
System companies  (excepting the NEES Group) and the NEES Group  companies.  The
report will contain the following:

     a.   A  narrative  description  of  the  services  rendered  by  individual
          National Grid System companies  (excepting the NEES Group) to the NEES
          Group and by the NEES Group  companies to other  National  Grid System
          companies;

     b.   Disclosure  of the dollar  amount of services  rendered  according  to
          category or department;

     c.   Identification   of  companies   rendering   services  and   recipient
          companies,  including  disclosure  of the  allocation of service costs
          among the companies in the NEES Group, and;

     d.   Disclosure of the number of NEES Group employees  engaged in rendering
          services to other  National  Grid System  companies on an annual basis
          stated on an absolute and percentage of total employees basis.

Item 2. Fees, Commissions and Expenses

                                                                     Millions

Accountants' fees                                                        $6.9

Legal fees and expenses                                                   9.5

Shareholder communication and proxy solicitation expenses                 2.3

Investment bankers' fees and expenses                                    30.7

Consulting fees                                                            .8

Miscellaneous                                                             4.0

         Total                                                          $54.2


                                      -24-


<PAGE>



     The total  fees,  commissions  and  expenses  expected  to be  incurred  in
connection with the Merger are estimated to be approximately $54.2 million.

Item 3. Applicable Statutory Provisions

     The following sections of the Act and the Commission's rules thereunder are
or may be directly or indirectly applicable to the proposed transaction:

Sections of the Act               Transactions to which section or rule is
                                           or may be applicable:

2(a)(7), 2(a)(8)    Request for declaration that Intermediate  Companies and NEP
                    are not holding  companies or subsidiary  companies,  solely
                    for purposes of Section 11(b)(2)

4, 5                Registration of National Grid as a holding company following
                    the consummation of the Merger

9(a)(2), 10         Acquisition  by National Grid of common stock of NEES public
                    utility subsidiary companies

11(b)(2)            Request for declaration that the Intermediate  Companies are
                    not subsidiary  companies or holding companies,  solely with
                    respect  to the  "great-grandfather"  provisions  of Section
                    11(b)(2).

13                  Approval of the Service  Agreement and services  provided to
                    affiliates thereunder by New England Power Service Company.

14, 15              Reporting, books and records.

33                  Operations  of National  Grid  Holdings  and its  subsidiary
                    companies.



Rules

45(a), 52           Financing transactions, generally.

80-91               Affiliate transactions, generally.

93, 94              Accounts,  records and annual reports by subsidiary  service
                    company.

To the  extent  that  other  sections  of the  Act  or  the  Commission's  rules
thereunder are deemed  applicable to the merger,  such sections and rules should
be considered to be set forth in this Item 3.


                                      -25-


<PAGE>



A.   Legal Analysis

     Section 9(a)(2) makes it unlawful, without approval of the Commission under
Section  10,  "for any person . . . to  acquire,  directly  or  indirectly,  any
security of any public utility company,  if such person is an affiliate . . . of
such  company and of any other  public  utility or holding  company,  or will by
virtue of such acquisition  become such an affiliate."  Under the definition set
forth in Section  2(a)(11)(A),  an "affiliate" of a specified company means "any
person that directly or indirectly owns, controls,  or holds with power to vote,
5 per centum or more of the  outstanding  voting  securities  of such  specified
company."

     Because  National Grid directly or indirectly,  will acquire more than five
percent of the voting  securities of each of the U.S. Utility  Subsidiaries as a
result of the merger,  and thus will become an "affiliate" as defined in Section
2(a)(11)(A)  of the Act of the U.S.  Utility  Subsidiaries  as a  result  of the
merger,  National Grid must obtain the approval of the Commission for the Merger
under  Sections  9(a)(2)  and 10 of  the  Act.  The  statutory  standards  to be
considered  by the  Commission in evaluating  the proposed  transaction  are set
forth in Sections 10(b), 10(c) and 10(f) of the Act.

     As set  forth  more  fully  below,  the  Merger  complies  with  all of the
applicable  provisions  of Section 10 of the Act and should be  approved  by the
Commission because:

     -    the consideration to be paid in the Merger is fair and reasonable;

     -    the  Merger  will not create  detrimental  interlocking  relations  or
          concentration of control;

     -    the Merger will not result in an unduly complicated  capital structure
          for the National Grid system;

     -    the Merger is in the public  interest  and the  interests of investors
          and consumers;

     -    the Merger is consistent with Sections 8 and 11 of the Act;

2/15/00 1:17 PM

                                      -26-


<PAGE>



     -    the Merger tends towards the economical  and efficient  development of
          an integrated public utility system; and

     -    the Merger will comply with all applicable state laws

          1.   Section 10(b)

     Section  10(b)  provides  that,  if the  requirements  of Section 10(f) are
satisfied,  the  Commission  shall  approve an  acquisition  under  Section 9(a)
unless:

     (1)  such  acquisition  will tend  towards  interlocking  relations  or the
          concentration of control of public utility companies,  of a kind or to
          an extent  detrimental  to the public  interest  or the  interests  of
          investors or consumers;

     (2)  in case of the  acquisition  of  securities  or  utility  assets,  the
          consideration,    including   all   fees,   commissions,   and   other
          remuneration, to whomsoever paid, to be given, directly or indirectly,
          in connection with such acquisition is not reasonable or does not bear
          a fair relation to the sums invested in or the earning capacity of the
          utility  assets to be acquired or the utility  assets  underlying  the
          securities to be acquired; or

     (3)  such acquisition will unduly  complicate the capital  structure of the
          holding  company system of the applicant or will be detrimental to the
          public  interest or the  interests  of  investors  or consumers or the
          proper functioning of such holding company system.

          a.   Section 10(b)(1)

               i.   Interlocking Relationships

     By its  nature,  any  merger  results  in  new  links  between  theretofore
unrelated  companies.  Northeast  Utilities,  Holding Co. Act Release No.  25221
(Dec.  21,  1990),  as  modified,  Holding Co. Act Release No.  25273 (March 15,
1991),  aff'd sub nom.  City of Holyoke v. SEC,  972 F.2d 358 (D.C.  Cir.  1992)
("interlocking  relationships  are  necessary  to  integrate  [the  two  merging
entities]").  The  Merger  Agreement  provides  for the  Board of  Directors  of
National Grid to be composed of members of the Board of Directors of


                                      -27-


<PAGE>



National Grid and from top  management  of NEES.  This is necessary to integrate
NEES fully into the  National  Grid system and will  therefore  be in the public
interest and the interests of investors and consumers. Forging such relations is
beneficial to the protected  interests under the Act and thus are not prohibited
by Section 10(b)(1).

               ii.  Concentration of Control

     Section  10(b)(1)  is  intended  to avoid "an excess of  concentration  and
bigness"  while  preserving  the  "opportunities  for  economies  of scale,  the
elimination of duplicate  facilities and  activities,  the sharing of production
capacity and reserves and generally more efficient  operations"  afforded by the
coordination of local  utilities into an integrated  system.  American  Electric
Power Co., 46 S.E.C.  1299, 1309 (1978). In applying Section 10(b)(1) to utility
acquisitions,  the Commission must determine whether the acquisition will create
"the type of  structures  and  combinations  at which  the Act was  specifically
directed." Vermont Yankee Nuclear Corp., 43 S.E.C. 693, 700 (1968). As discussed
below, the Merger will not create a "huge,  complex, and irrational system," but
rather  will  result  in  a  new  holding  company  over  a  previously-approved
integrated  electric  utility system.  See WPL Holdings,  Inc.,  Holding Co. Act
Release No.  24590 (Feb.  26,  1988),  aff'd in part and rev'd in part sub nom.,
Wisconsin's  Environmental  Decade,  Inc. v. SEC, 882 F.2d 523 (D.C. Cir. 1989),
reaffirmed, Holding Co. Act Release No. 25377 (Sept. 18, 1991).

     Competitive  Effects: In Northeast  Utilities,  Holding Co. Act Release No.
25221 (Dec. 21, 1990), the Commission stated that "antitrust ramifications of an
acquisition  must be considered  in light of the fact that public  utilities are
regulated monopolies and that federal and state administrative agencies regulate
the rates charged consumers." National Grid and NEES have filed Notification and
Report Forms with the DOJ and FTC pursuant to the HSR Act describing the effects
of the Merger on competition and the Merger has been cleared by these agencies.

     In addition, the competitive impact of the Merger has been fully considered
by the FERC  pursuant to Section  203 of the Federal  Power Act in its review of
the Merger.  As explained more fully in the FERC order  approving the Merger,  a
copy of which is


                                      -28-


<PAGE>



attached hereto as Exhibit D-1.2,  the Merger will not have an adverse effect on
competition.  NEES and its subsidiary  companies,  on the one hand, and National
Grid and its related  companies,  on the other,  do not have  facilities or sell
products in any common  geographic  markets.  With the exception of NEES Global,
which does some limited  consulting work outside of the United States,  the NEES
companies  operate  exclusively in the United States,  selling  electricity  and
transmission,  distribution and related energy  services.  National Grid and its
subsidiary  companies operate almost exclusively in the United Kingdom and other
countries outside the United States.

     For these reasons, the Merger will not "tend toward interlocking  relations
or the  concentration of control" of public utility  companies,  of a kind or to
the extent  detrimental to the public  interest or the interests of investors or
customers within the meaning of Section 10(b)(1).

          b.   Section 10(b)(2) -- Fairness of Consideration

     Section  10(b)(2)   requires  the  Commission  to  determine   whether  the
consideration  to be given by National  Grid to the holders of NEES common stock
in connection with the Merger is reasonable and whether it bears a fair relation
to  investment  in and earning  capacity of the utility  assets  underlying  the
securities  being  acquired.  Market prices at which  securities are traded have
always been strong  indicators  as to values.  As shown in the table below,  the
quarterly  price data,  high and low, for NEES common stock provide  support for
the consideration of $53.75 for each share of NEES common stock.

                                                  NEES

                               High                Low                Dividends

1996

First Quarter                 40 5/8               36 1/8               $0.59

Second Quarter                36 7/8               32 7/8                 0.59

Third Quarter                 36 3/8               31 1/8                 0.59

Fourth Quarter                35 5/8               31                     0.59





                                      -29-


<PAGE>




1997

First Quarter                 35 5/8               33 3/8                 0.59

Second Quarter                37 1/8               33 1/4                 0.59

Third Quarter                 39 11/16             36 1/4                 0.59

Fourth Quarter                43 5/16              37 1/4                 0.59
1998

First Quarter                 45 13/16             41                     0.59

Second Quarter                45 9/16              40 5/8                 0.59

Third Quarter                 45 3/8               38 15/16               0.59

Fourth Quarter                49 1/8               40 5/16                0.59




     On  December  11,  1998,  the last  full  trading  day  before  the  public
announcement of the execution and delivery of the Merger Agreement,  the closing
price per share as reported  on the  NYSE-Composite  Transaction  of NEES common
stock was $43.

     In addition,  the  consideration  is the product of extensive  and vigorous
arms-length negotiations between National Grid and NEES. These negotiations were
preceded by months of due  diligence,  analysis  and  evaluation  of the assets,
liabilities  and business  prospects of the respective  companies.  See National
Grid Circular (Exhibit C-2 hereto); NEES proxy statement (Exhibit C-1 hereto).

     Finally,  internationally-recognized  investment  bankers for both National
Grid and NEES have reviewed extensive  information  concerning the companies and
analyzed a variety of valuation  methodologies,  and have provided advice to the
companies that the consideration is fair, from a financial point of view, to the
holders of National Grid ordinary  shares and NEES common stock.  The investment
bankers' analyses are attached hereto. See National Grid Circular (Exhibit C-2);
Opinion of Merrill Lynch, Pierce, Fenner & Smith, Incorporated (Exhibit G-1).

     In  light  of these  opinions  and an  analysis  of all  relevant  factors,
including the benefits that may be realized as a result of the Merger,  National
Grid believes that the


                                      -30-


<PAGE>



consideration  for the Merger bears a fair relation to the sums invested in, and
the earning capacity of, the utility assets of NEES.

          c.   Section 10(b)(2) -- Reasonableness of Fees

     National  Grid believes  that the overall  fees,  commissions  and expenses
incurred and to be incurred in  connection  with the Merger are  reasonable  and
fair in light  of the  size  and  complexity  of the  Merger  relative  to other
transactions and the anticipated benefits of the Merger to the public, investors
and consumers;  that they are consistent  with recent  precedent;  and that they
meet the standards of Section 10(b)(2).

     As set forth in Item 2 of this  Application/Declaration,  National Grid and
NEES together expect to incur a combined total of approximately $54.2 million in
fees,  commissions  and  expenses in  connection  with the  Merger.  By example,
American  Electric  Power  Company and Central and South West  Corporation  have
represented  that they expect to incur  total  transaction  fees and  regulatory
processing fees of approximately $53 million,  including financial advisory fees
of approximately $31 million, in connection with their proposed Merger.

     The Applicants  believe that the estimated fees and expenses in this matter
bear a fair  relation  to the  value of NEES and the  strategic  benefits  to be
achieved by the  Merger,  and further  that the fees and  expenses  are fair and
reasonable in light of the  complexity of the Merger.  See Northeast  Utilities,
Holding  Co. Act Release No.  25548 (June 3, 1992),  modified on other  grounds,
Holding Co. Act Release No. 25550 (June 4, 1992)  (noting that fees and expenses
must bear a fair  relation to the value of the  company to be  acquired  and the
benefits to be achieved in connection with the acquisition).  Based on the price
of NEES stock on December 11, 1998, the Merger would be valued at  approximately
$3.2 billion.  The total estimated fees and expenses of $54.2 million  represent
approximately  1.69% of the value of the  consideration  to be paid by  National
Grid, and are consistent with percentages previously approved by the Commission.
See,  e.g.,  Entergy  Corp.,  Holding Co. Act Release No. 25952 (Dec.  17, 1993)
(fees  and  expenses  represented   approximately  1.7%  of  the  value  of  the
consideration paid to the shareholders of Gulf States


                                      -31-


<PAGE>



Utilities);  Northeast  Utilities,  Holding Co. Act  Release No.  25548 (June 3,
1992) (approximately 2% of the value of the assets to be acquired).

          d.   Section 10(b)(3)

     Section  10(b)(3)  requires the Commission to determine  whether a proposed
acquisition will unduly  complicate the acquiror's  capital structure or will be
detrimental to the public  interest or the interest of investors or consumers or
the proper functioning of the resulting system.

     For the reasons that follow,  the capital  structure of National  Grid will
not be unduly complicated nor will it be detrimental to the public interest, the
interest of investors or  consumers  or the proper  functioning  of the combined
system.

     The  Applicants  are  proposing  a  structure  for the Merger  that will be
completely  transparent  between National Grid and NEES and will meet all of the
requirements of the 1935 Act.

     In the Merger,  current common  shareholders  of NEES will receive cash (in
the  aggregate,  the "Cash  Consideration")  in exchange  for their NEES shares.
National  Grid  proposes  to  obtain  the  amount  of cash  comprising  the Cash
Consideration  from existing cash resources and through the Bank Loans. The Bank
Loans will be  straightforward  commercial loans from  sophisticated  commercial
lenders  directly  to  National  Grid.  The  Bank  Loans  will be full  recourse
obligations  of National Grid and will be neither  guaranteed by, nor secured by
any assets of, any subsidiary of National Grid which directly or indirectly owns
equity  securities  of NEES.  In no event will National Grid issue any equity or
debt  securities to NEES  shareholders as  consideration  for the Merger and the
acquisition of NEES.

     Upon  consummation of the Merger,  NEES will become a wholly owned indirect
subsidiary of National Grid. National Grid proposes to hold its interest in NEES
through the Intermediate  Companies.  Each of the Intermediate Companies will be
organized  under the laws of either a member  state of the  European  Union with
which the U.S. has a comprehensive Double Taxation Treaty or a state of the U.S.
All of the


                                      -32-


<PAGE>



Intermediate  Companies will be directly or indirectly  wholly owned by National
Grid and will have no public or private  institutional  equity or debt  holders.
The  Intermediate  Companies will be capitalized  with equity and/or debt all of
which  will be held by either  National  Grid or an  Intermediate  Company.  The
ultimate U.S.  parent of NEES will be capitalized  with both equity and debt, to
be held by one or more of the  Intermediate  Companies.  Absent such  additional
approval as may be required,  none of the Intermediate Companies will be engaged
in any  business  or trade  other  than the  business  of  owning,  directly  or
indirectly,  equity securities of NEES and the financing  transactions which are
the subject of this  memorandum and none of the  Intermediate  Companies will be
regulated  by  U.K.  or  other  third  country  regulatory   authorities  having
jurisdiction over electricity rates and service.

     As a wholly owned indirect  subsidiary of National  Grid,  NEES will retain
its  designation as a registered  holding  company under the 1935 Act as well as
its  current  capital  structure.  Neither  NEES nor any of the NEES  Subsidiary
Companies  will incur any  additional  indebtedness  or issue any  securities to
finance any part of the Cash Consideration. Except with respect to the effect in
corporate  structure  resulting  from the  potential  conversion  of NEES from a
business trust into a business corporation,  the acquisition of NEES by National
Grid and the corporate and financing mechanics summarized above are not designed
or intended to alter or otherwise  affect the current  corporate  structure  and
financing  obligations  of the NEES Group  companies  as members of a registered
holding company system.

     It is contemplated  that the companies in the NEES Group will each continue
to pay dividends (and, in the case of the NEES Subsidiary  Companies,  dividends
on preferred stock and interest on and principal of long-term  debt).  Dividends
paid by NEES may ultimately be used by National Grid to service its debt.13

- --------
     13 In a companion filing,  National Grid and the U.S. Subsidiary  Companies
are requesting  authority to pay dividends out of additional  paid-in capital up
to the amount of NEES'  consolidated  retained earnings just prior to the Merger
and out of earnings  before  amortization  of goodwill  thereafter.  In no event
would  dividends be paid if the common  stock equity of NEES as a percentage  of
total  capital was below 35% on a  consolidated  basis.  File No.  70-9519  (the
"Financing Application").


                                      -33-


<PAGE>



               i.   The  presence of debt at more than one level of the National
                    Grid  system  does  not  "unduly   complicate"  the  capital
                    structure of that company for purposes of Section 10(b)(3).

     Implementation of the transaction structure requires that a number of steps
be taken in a specified  sequence in order to achieve the  economic  benefits of
the  transaction  structure  as  an  entirety.  While  many  of  the  individual
transactional steps necessary to implement the transaction  structure will occur
prior to  consummation  of the Merger at a time when National Grid will continue
to enjoy the benefits of exemption  under Rule 5,  completion of a number of the
steps  necessary to  implement  the  transaction  structure  will occur  shortly
following  consummation  of the Merger and, thus, will be subject to SEC review.
We  request  that the SEC view  all of the  steps  necessary  to  implement  the
transaction  structure  in their  entirety  as they  are,  in fact,  constituent
elements comprising a single transaction.

     In addition, we recognize that, in prior matters involving the formation of
a registered  holding  company,  the SEC has  considered  preliminary  financing
transactions  (i.e.,   transactions  occurring  prior  to  the  formation  of  a
registered  holding company) in view of their effect on the capital structure of
the resulting  holding  company.  For example,  in connection with the merger of
Atlantic  Energy,  Inc. and Delmarva Power & Light Co., the SEC took occasion to
comment on the fact that the resulting registered holding company would have two
classes  of common  stock --  notwithstanding  that,  at the time the  letter or
tracking stock was issued, the issuer was not a registered holding company.  The
SEC did not address the specific question of whether it had jurisdiction to pass
on the securities  issuance but instead noted that, under Section  7(c)(2)(A) of
the 1935 Act, a registered  holding company can issue other than "plain vanilla"
securities  "solely . . . for the purpose of effecting a Merger,  consolidation,
or other reorganization."  Conectiv, Inc., Holding Company Act Release No. 26832
(Feb. 25, 1998).  Accordingly,  to the extent that the SEC might choose to treat
any element of the implementation of the transaction structure, such as


                                      -34-


<PAGE>



the borrowing of the Bank Loans,  as a  jurisdictional  event,  there is express
statutory  provision for such transactions  under Section 7(c)(2)(A) of the 1935
Act.

     Nor does the presence of parent  level debt to be used for general  working
capital  represent an undue  complication  of the capital  structure of National
Grid for purposes of Section 10(b)(1). In the first instance, to the extent that
the debt is  associated  with  facilities  that have been  entered  into  before
National Grid becomes a registered  holding company,  it should be grandfathered
for  purposes  of the  Act.  Second,  and  more  important,  Section  7(c)(2)(D)
expressly  provides  for the  issuance  of  nontraditional  securities  if "such
security  is to be issued  or sold  solely  for  necessary  or urgent  corporate
purposes of the declarant where the  requirements of the provisions of paragraph
(1) would impose an unreasonable financial burden upon the declarant and are not
necessary  or  appropriate  in the  public  interest  or for the  protection  of
investors or  consumers."  Registered  gas systems have relied on this provision
for years in connection with their routine  financing  transactions.  See, e.g.,
The Columbia Gas System, Inc., Holding Co. Act Release No. 26634 (Dec. 23, 1996)
(authorizing Columbia to issue external,  long-term debt which, in the aggregate
with equity financing issued by Columbia, would not exceed $5 billion at any one
time outstanding through December 31, 2001).

     Further, the issue for purposes of Section 10(b)(3) is not the existence of
parent-level debt per se. Rather,  the question is whether it is permissible for
a registered  system to have debt at more than one level.  Again, the Commission
has answered that question in the  affirmative.  In the 1992  amendments to Rule
52, the Commission  eliminated the requirement that a public-utility  subsidiary
company could issue debt to nonassociates only if its parent holding company had
issued no  securities  other than common  stock and  short-term  debt.  The rule
release explains:

          Condition (6) provides that a  public-utility  subsidiary  company may
     issue and sell  securities  to  nonassociates  only if its  parent  holding
     company has issued no  securities  other than common  stock and  short-term
     debt. All eight commenters that considered this condition  recommended that
     it be  eliminated.  They  noted  that it may be  appropriate  for a holding
     company to issue and sell  long-term  debt and that such a  transaction  is
     subject to prior


                                      -35-


<PAGE>



     Commission  approval.  They further observed that other controls,  that did
     not  exist  when the  statute  was  enacted,  provide  assurance  that such
     financings  will  not lead to  abuse.  These  include  the  likely  adverse
     reaction  of rating  agencies  to  excessive  amounts of debt at the parent
     holding  company  level and the  disclosure  required of companies  seeking
     public  capital.  The Commission  agrees with these  observations  and also
     noted the power of many state utility  commissions  to limit the ability of
     utility  subsidiaries  to service  holding  company debt by restricting the
     payment of dividends to the parent company.  The Commission  concludes that
     this provision should be eliminated.

Exemption  of  Issuance  and  Sale  of  Certain   Securities  by  Public-Utility
Subsidiary Companies of Registered Public-Utility Holding Companies, Holding Co.
Act Release No. 25573 (July 7, 1992).

     The Applicants have  commissioned a study by Professor Julian Franks of the
London Business School,  working with  independent  consultants from the Brattle
Group,  to address the  financial  strength of the  registered  holding  company
system  post-Merger.  A copy of the study is attached as Exhibit  J-3. The study
examines  National  Grid's  debt  level  after both the  instant  Merger and the
acquisition by NEES of EUA, and concludes that National Grid's  post-acquisition
debt,  relative  to its  projected  rate  base,  will  lie  within  a range  for
comparable U.S.  utilities.  Credit rating agencies have confirmed that National
Grid will retain a strong  credit  rating.  The debt  issuances of National Grid
currently  have a rating of "AA" from  Standard & Poor's and "A1" from  Moody's.
The major rating agencies have indicated that National Grid will retain at least
an "A" rating post-Merger. The financial strength of the company is confirmed by
the  competitive  terms  under  which  National  Grid  has been  able to  secure
financing for the proposed transaction.14

- --------
     14 The Applicants  are  submitting,  on a  confidential  basis, a series of
financial  projections  for NEES,  EUA and the  consolidated  National Grid. The
projections  are intended to demonstrate the ability of National Grid to service
its indebtedness in a reasonable manner.


                                      -36-


<PAGE>



                    ii.  The  Merger  will  not be  detrimental  to  the  public
                         interest or the  interest of  investors or consumers or
                         the  proper   functioning  of  the  registered  holding
                         company system.

     For the reasons set forth previously, and discussed below in the context of
Section 10(c)(2), the Applicants believe that the proposed Merger will, in fact,
benefit the  protected  interests and enhance the  functioning  of the resulting
holding  company  systems.  NEES and National Grid are requesting an affirmation
from  each of the  affected  state  regulators  that it has  the  authority  and
resources to protect  consumers  subject to its jurisdiction and that it intends
to exercise that authority. In addition,  National Grid commits that it will not
seek  recovery in higher rates to NEES  ratepayers  for any losses or inadequate
returns that may be  associated  with its  non-NEES  investments.  Finally,  the
Merger is  expected  to have no  adverse  effect on the rights of holders of the
outstanding   preferred  stock  and  debt  securities  of  the  NEES  Subsidiary
Companies.15  Accordingly,  the proposed  Merger will not be  detrimental to the
public  interest  or the  interest  of  investors  or  consumers  or the  proper
functioning of the registered holding company system.

          2.   Section 10(c)

     Section 10(c) of the Act provides that,  notwithstanding  the provisions of
Section 10(b), the Commission shall not approve:

     (1)  an  acquisition  of  securities  or  utility  assets,  or of any other
          interest,  which is unlawful  under the  provisions of Section 8 or is
          detrimental to the carrying out of the provisions of Section 11; or

     (2)  the acquisition of securities or utility assets of a public utility or
          holding company unless the Commission finds that such acquisition will
          serve the  public  interest  by tending  towards  the  economical  and
          efficient development of an integrated public utility system.

- --------
     15  NEES  currently  has no  public  security  holders  other  than  common
stockholders.


                                      -37-


<PAGE>



               a.   Section 10(c)(1)

     Section  10(c)(1),  in  the  first  instance,   precludes  approval  of  an
acquisition  that is unlawful  under the  standards of Section 8. That  section,
which  requires  compliance  with  the  applicable  state  laws  concerning  the
ownership or operation of the utility assets of an electric  utility company and
a gas utility company serving  substantially the same territory,  does not apply
to the instant Merger.

     Section  10(c)(1) also requires that an  acquisition  not be detrimental to
carrying out the provisions of Section 11. Section 11(a) directs the Commission:

               to examine the corporate  structure of every  registered  holding
          company and subsidiary  company thereof,  the relationships  among the
          companies in the holding-company  system of every such company and the
          character  of the  interests  thereof  and  the  properties  owned  or
          controlled  thereby to  determine  the  extent to which the  corporate
          structure of such holding-company system and the companies therein may
          be simplified,  unnecessary  complexities  therein eliminated,  voting
          power fairly and equitably distributed among the holders of securities
          thereof,  and the  properties and business  thereof  confined to those
          necessary  or   appropriate   to  the   operations  of  an  integrated
          public-utility system.

Sections  11(b)(1)  and  11(b)(2)  provide  further  directions  concerning  the
specifics of a permissible registered holding company system.

                    i.   The Merger  will  satisfy the  requirements  of Section
                         11(b)(1), as incorporated by Section 10(c)(1).

     Section 11(b)(1) directs the Commission:

               To require . . . that each registered  holding company,  and each
          subsidiary  company  thereof,  shall take such take such action as the
          Commission  shall  find  necessary  to  limit  the  operations  of the
          holding-company  system of which  such  company  is a part to a single
          integrated public-utility system, and to such other businesses as are


                                      -38-


<PAGE>



          reasonably incidental, or economically necessary or appropriate to the
          operations  of  such  integrated  public-utility  system.  . .  .  The
          Commission  may  permit  as  reasonably  incidental,  or  economically
          necessary or appropriate  to the operations of one or more  integrated
          public-utility  systems the  retention  of an interest in any business
          (other than the  business of a  public-utility  company as such) which
          the  Commission  shall find  necessary  or  appropriate  in the public
          interest or for the  protection  of  investors  or  consumers  and not
          detrimental to the proper functioning of such system or systems.

For purposes of the single system requirement,  the Merger would simply impose a
new holding company structure over a fully-integrated electric utility system.

     The question then becomes  whether the "other  businesses" of National Grid
are  retainable  under the standards of Section 11 and the statutory  amendments
thereto.  As previously  noted,  National Grid  Holdings,  National  Grid's only
direct  subsidiary,  will  claim an  exemption  as a FUCO  under the Act.  Thus,
National  Grid  Holdings  and  all of  its  subsidiaries  will  be  exempt  from
regulation, and are retainable,  under the Act in accordance with the provisions
of Section 33(a)(1) of the Act.

     Although not jurisdictional, the parties note that National Grid's indirect
subsidiaries would be retainable in their own right as well. Attached as Exhibit
J-1 is a description of these subsidiaries and an explanation of the independent
bases for retention of each.

                    ii.  The Merger  will  satisfy the  requirements  of Section
                         11(b)(2), as incorporated by Section 10(c)(1).

     Section 11(b)(2) further directs the Commission:

               To require . . . that each registered  holding company,  and each
          subsidiary  company  thereof,  shall take such steps as the Commission
          shall  find  necessary  to  ensure  that the  corporate  structure  or
          continued existence of any company in the holding- company system does
          not unduly or unnecessarily complicate the


                                      -39-


<PAGE>



          structure,  or unfairly or inequitably  distribute  voting power among
          security holders, of such holding-company  system. In carrying out the
          provisions  of  this  paragraph  the  Commission  shall  require  each
          registered  holding  company (and any such company in the same holding
          company  system with such holding  company) to take such action as the
          Commission  shall find  necessary in order that such  holding  company
          shall  cease  to be a  holding  company  with  respect  to each of its
          subsidiary  companies which itself has a subsidiary company which is a
          holding  company.  Except  for the  purpose  of fairly  and  equitably
          distributing  voting power among the security holders of such company,
          nothing in this  paragraph  shall  authorize the Commission to require
          any change in the  corporate  structure  or  existence  or any company
          which is not a holding  company,  or of any  company  whose  principal
          business is that of a public-utility company.

There are two sets of issues under Section  11(b)(2):  first, will the corporate
structure  or  continued  existence  of  any  company  unduly  or  unnecessarily
complicate the structure of the National Grid holding company system post-Merger
and, second, will the Merger result in an unfair or inequitable  distribution of
voting  power among the security  holders of National  Grid.  As explained  more
fully below, any apparent  complexity in the resulting holding company system is
justified by the economic  efficiencies to be achieved thereby.  Further,  there
will be no inequitable  distribution of voting power as a result of the proposed
Merger.

     The  principal  economic  effect of the  transaction  structure  will be to
permit National Grid to maximize after-tax returns, given that the consideration
for the Merger will be funded by external borrowings in the U.K. and cash in the
U.K. The only  external  parties to the  contemplated  transactions  will be the
sophisticated  commercial lenders that will be advancing moneys to National Grid
under  fully  negotiated  lending  agreements,  none of which will  involve  any
guarantees  by,  or  pledges  of assets  from,  the U.S.  Subsidiary  Companies,
including NEES and the NEES Subsidiary Companies.

     It is common  practice for U.K. based  multinational  corporations  to hold
their  non-U.K.   subsidiaries  through  one  or  more  intermediary   companies
incorporated under the


                                      -40-


<PAGE>



laws of European Union member states. These types of transaction  structures are
implemented to minimize the impact of tax on the  repatriation  of dividends and
interest to the U.K. and are  understood by the U.K. tax  authorities.  National
Grid has used this  type of  structure  in  connection  with its  other  foreign
investments.  Again,  in  considering  the  appropriateness  of the  transaction
structure, the Applicants ask the staff to recognize that this type of corporate
and  financing  structure  is  normal  for  cross-border  transactions.  In that
connection,  it is worth noting that U.S.  registered  holding companies already
employ  similar   structures  in  connection  with  their,   albeit   out-bound,
cross-border  transactions.  See, e.g., Exhibit H from the Form U5S filed by The
Southern  Company for the year ended December 31, 1997,  detailing the ownership
structure for the system's exempt wholesale generators ("EWGs") and FUCOs.16

          o    National  Grid's  Corporate  Structure  Will  Not Be  "Unduly  or
               Unnecessarily" Complicated.

     As noted above,  National  Grid's  proposed  transaction  structure is more
complicated  than the  traditional  corporate  structure  commonly  used by U.S.
registered  holding  companies  with  respect  to their  U.S.  subsidiaries  and
operations in that there will be more corporate layers between National Grid and
NEES than there are, for example,  between NEES and its operating  subsidiaries.
The Applicants believe that the structure is nonetheless appropriate in that the
type of  corporate  structure  proposed by  National  Grid,  with its  principal
objective  being to maximize  after-tax  returns to  shareholders,  is the norm,
rather than the exception, for cross-border transactions generally. Moreover, as
to its future U.S. subsidiaries and regulated utility operations; i.e., the NEES
Group, National Grid proposes to continue the current NEES corporate and holding
company system structure.17

- --------
     16 We recognize  that  Section  11(b)(2)  does not, by its terms,  apply to
acquisitions  of EWGs and FUCOs because these entities,  by definition,  are not
"public utility companies" within the meaning of the 1935 Act.

     17 Although NEP is technically a holding company,  the structure should not
be a  long-term  concern  due to  shut-down/probable  sale of Yankee  companies.
Nonetheless,  the  Applicants  seek a  declaratory  order with respect to NEP as
well, solely for purposes of complying with the "great  grandfather"  provisions
of Section 11(b)(2).


                                      -41-


<PAGE>



     Further,  the  Intermediate  Companies  will not be means by which National
Grid seeks to diffuse control of NEES and the NEES Subsidiary Companies. Rather,
these companies will be created as special-purpose entities for the sole purpose
of helping the parties to capture economic  efficiencies that might otherwise be
lost in a cross-border transaction. There will be no third-party investors; each
of the Intermediate Companies will be wholly-owned,  directly or indirectly,  by
National Grid. Nor will the "upper  structure"  affect the operation of the NEES
Group;  indeed,  the  corporate  structure  "downstream"  from NEES will  remain
unaffected as a result of the proposed Merger.  Finally,  at the end of the day,
both  National  Grid  and  NEES  will  be  fully  regulated  registered  holding
companies.  Accordingly,  the  Applicants  submit  that  this is not the type of
situation that concerned the drafters of the Act, and that the Commission should
thus  exercise  its  discretion  to find  that any  apparent  complexity  of the
proposed transaction structure is neither undue nor unnecessary.

     The  Commission  has  in  the  past,   consistent  with  its  role  as  the
administrative agency with the expertise, authority and discretion to administer
the 1935 Act in a  responsive  manner,  giving  due  regard to  relevant  policy
considerations,  recognized the necessity of permitting the continued  existence
of intermediate holding companies in registered holding company systems in order
to achieve economic and tax efficiencies  that would not otherwise be achievable
in the absence of such arrangements. Thus, in specific cases where the issue was
considered,  the Commission exercised reasonable discretion and, on the basis of
other  relevant  provisions of the 1935 Act,  expressly  permitted the continued
existence of  intermediate  holding  companies in a registered  holding  company
system,  apparently  on a finding of "no harm, no foul" and giving due regard to
the economic  desirability  of the corporate  structure and other  arrangements.
See, e.g., West Penn Railways Co.,  Holding Company Act Release No. 953 (Jan. 3,
1938) (expressly  authorizing the continued existence of an intermediate holding
company);  and West Texas Utilities Co.,  Holding Co. Act Release No. 4068 (Jan.
25, 1943)  (reserving  jurisdiction  under Section  11(b)(2) in connection  with
acquisition that resulted in the creation of a "great grandfather"  company). In
each of these  matters,  the Commission  apparently  concluded that the economic
benefits associated with the additional  corporate layers in the holding company
system outweighed the potential for harm and the possibility that there could be
a recurrence


                                      -42-


<PAGE>



of the financial  abuses that the 1935 Act was intended to  eliminate.  See West
Penn Railways  ("The  substantial  traction  interests of the West Penn Railways
Company make it impractical,  from a financial standpoint,  to eliminate it as a
separate corporation.");  and West Texas Utilities Co. (noting likely bankruptcy
of acquired company in the event transaction not approved).

     In the specific  cases in which the issue was considered and the Commission
ultimately   determined  to  permit  the  continued  existence  of  intermediate
companies in a registered  holding company system, in an apparent  contradiction
of the  "great-grandfather"  provisions  of  Section  11(b)(2)  (when  viewed in
isolation),  the Commission, in an exercise of reasonable discretion,  relied on
other  provisions of the 1935 Act, such as the definitions of "holding  company"
and  "subsidiary  company," to find that such  intermediate  companies  could be
excluded from  designation as "holding  companies" and  "subsidiary  companies,"
respectively,  and, thus, could be exempted from the "elimination" provisions of
Section  11(b).  Based on that  precedent,  the Applicants ask the Commission to
exercise  its  discretion  to  declare  the  Intermediate  Companies  not  to be
subsidiary  companies or holding  companies,  solely for purposes of  compliance
with the "great-grandfather" provisions of Section 11(b)(2).

     It is again worth emphasizing that none of the economic planning  reflected
in the proposed transaction structure will result in any change in the corporate
organization  of the NEES system (other than the change in  organization of NEES
from business trust to corporation) or in the financing transactions  undertaken
by NEES and its subsidiaries.  NEES will receive cash in the form of equity from
National Grid to pay the Cash  Consideration  and neither NEES nor any of NEES's
subsidiaries  will borrow or issue any  security or pledge any assets to finance
any  part  of  the  Cash  Consideration.  Thus,  there  is no  possibility  that
implementation  and  continuance  of the proposed  transaction  structure  could
result in an undue or unnecessarily  complex capital  structure to the detriment
of the public interest or the interest of consumers.

     The Applicants thus request that the Commission  exercise its authority and
discretion  (under all  relevant  sections of the 1935 Act and  considering  the
policy of the 1935 Act as a whole) to approve the  transaction  structure in the
instant situation because, as


                                      -43-


<PAGE>



with "out-bound"  investments by U.S. registered holding companies,  the "layers
of complication" are in fact the economically  necessary and efficient bridge by
which cross- border transactions are generally accomplished.

          o    Voting Power Will Be Fairly and Equitably Distributed.

     National Grid is a public corporation  organized under and domiciled in the
U.K..  Its shares are listed on, and trade on, the London  Stock  Exchange.  The
vast  majority of  National  Grid's  800,000  public  shareholders  are not U.S.
residents.  The government of the U.K. also owns what is commonly referred to as
the "golden  share" in National  Grid.  The golden share is a single  non-voting
share that prevents  amendments to National  Grid's  Memorandum  and Articles of
Association  without  the  consent  of the  holder  of  the  golden  share.  The
Memorandum and Articles of Association  contain  restrictions on certain classes
of persons holding more than a prescribed  shareholding in National Grid (as the
indirect holder of the England and Wales  Transmission  License through NGC). In
particular,  the Memorandum and Articles of Association  restrict companies that
trade electricity in England and Wales from owning more than 1% of the shares of
National  Grid and also requires that no party may own more than 15% of National
Grid's  shares.  The golden  share is a means to preserve the status of National
Grid as an independent  provider of  transmission  services and as such does not
restrict  shareholder  voting  rights.  The  golden  share  may  not be  sold or
transferred by the U.K. government, but it may be rescinded.

     National Grid has a small number of American  Depositary Shares in the U.S.
which  trade as ADRs and are  principally  held by U.S.  institutions.  American
Depositary Shares, in the aggregate, account for less than 1% of National Grid's
publicly  issued  shares.  National  Grid's  shareholders  and ADR holders  have
approved the Merger under applicable  requirements of the London Stock Exchange.
The moneys necessary to pay the Cash  Consideration will be borrowed by National
Grid from sophisticated commercial lenders and the financing has been documented
in fully negotiated loan agreements.  None of the Intermediate Companies or NEES
will have any  public or private  institutional  equity or debt  holders.  While
NEES's operating  subsidiaries have, and will continue to have,  publicly issued
preferred  stock and long-term  debt, the terms of these  securities will not be
altered  or  modified  or  otherwise  affected  by virtue  of the  Merger or the
proposed transaction


                                      -44-


<PAGE>



structure.  Thus,  as there are no direct or indirect  security  holders of NEES
with whom National Grid must share voting power,  there is no  possibility  that
voting power among security  holders of the National Grid holding company system
could be unfairly or inequitably distributed.

          o    Policy Considerations.

     The  Commission  has publicly  confirmed that the 1935 Act does not bar the
acquisition of a U.S. utility by a non-U.S. person. See Gaz Metropolitain, Inc.,
Holding  Commission will permit such  transactions to proceed in an economically
desirable  and  efficient  manner.  Following  the  Merger,  National  Grid will
register as a holding  company under Section 5 of the 1935 Act and will be fully
subject  to  Commission  regulation  and  oversight  with  respect  to its  U.S.
operations.  Moreover,  no component of the transaction structure implicates the
abuses  identified  in  Section  1(b) of the 1935 Act  associated  with  holding
companies  prior to 1935.  In this  regard,  the  absence of public and  private
institutional  investors  in the  National  Grid-NEES  ownership  chain  and the
commitment  on the part of National  Grid to retain the  corporate and financing
structure  of the NEES  Group are  critical  to the  analysis.  No aspect of the
proposed transaction structure will work to the detriment of the public interest
or the  interests  of  investors  or  consumers.  National  Grid's  intention in
implementing  the  proposed  transaction  structure  is to bridge the  differing
legal,  regulatory  and tax regimes in the U.K.  and the U.S.  while  maximizing
after-tax returns from the National Grid-NEES combination.  In other situations,
the Commission has recognized that efforts to achieve economic  efficiencies and
synergies  through tax savings are "in the  ordinary  course of  business"  of a
registered  holding  company.  See Central and South West  Corporation,  Holding
Company  Act  Release  No.  23578  (1985)  ("It can hardly be argued  that for a
business to attempt to reduce its tax liability is anything but an indication of
prudent management and is not uncommon in the non-regulated business sector. For
such businesses to attempt such reductions can fairly be  characterized as being
in the ordinary course of business . . . The Commission can think of no argument
which suggests that attempting to reduce one's tax liability  should not also be
considered  to be in the  ordinary  course of business  for a regulated  utility
holding company.").


                                      -45-


<PAGE>



     Section  11(b)(2)  of the 1935 Act directs  the  Commission  to require the
elimination of any "undue or unnecessary" complication in the capital structures
of  registered  holding  company  systems.  As  an  administrative  agency,  the
Commission  has an  obligation  to use its  expertise  and  authority to achieve
statutory  objectives  of the 1935 Act. No provision  of the 1935 Act,  however,
requires the Commission to ignore the realities of commercial  practice that are
commonplace in  cross-border  transactions  or the benefits that may be obtained
through the use of  sophisticated  corporate and financial  planning  techniques
when such  techniques do not result in any detriment to the protected  interests
under the 1935 Act. Rather,  the Applicants  submit that the attempt to maximize
after-tax  returns  in  connection  with a Merger is an  indication  of  prudent
management and typical in the non-regulated  business sector.  Accordingly,  the
policy  and  practice  under the 1935 Act  provide a  compelling  rationale  for
approving  the  proposed  transaction   structure  for  the  National  Grid-NEES
combination.

     The  Applicants  note  that   maintaining  an  efficient   post-acquisition
structure will require them to respond quickly to changes in matters such as tax
and  accounting  rules,   including  by  making   appropriate   revisions  after
consummation  of the Merger to the "upper  structure"  between NGG and NEES that
will not have any material  impact on the  financial  condition or operations of
NEES and its subsidiaries or of NGG. For the reasons noted above, and especially
the lack of any third party  interests in the upper  structure,  the  Applicants
request  authorization to make these  non-material  corporate  structure changes
without  having to seek specific  authority from the Commission for each change,
subject to the condition that no change (i) will result in the  introduction  of
any  third  party  interests  in the upper  structure,  (ii)  will  introduce  a
non-European  Union or non-U.S.  entity into the upper  structure  or (iii) will
have any material  impact on the  financial  condition or operations of NEES and
its subsidiaries or of National Grid.

               b.   Section 10(c)(2)

     The  standards of Section  10(c)(2) are  satisfied  because the Merger will
tend toward the  economical and efficient  development  of an integrated  public
utility system, thereby serving the public interest, as required by that section
of the Act.  Integration is not an issue in that the Merger will simply impose a
new holding company structure over an


                                      -46-


<PAGE>



existing integrated electric utility system. The analysis under Section 10(c)(2)
focuses  then  on  the  associated   benefits,   the  so-called  "economies  and
efficiencies" as a result of the proposed transaction.

     The first part of the  discussion  will focus on the perceived  benefits to
customers, employees and shareholders,  arising from the transaction. The second
part will then consider the more strategic  benefits which the transaction  will
bring to New England.

               o    Benefits to customers, employees and shareholders

     NEES shareholders  will benefit from the  consideration  received for their
shares on closure of the transaction. The base consideration of $53.75 per share
is equal to 125% of the $43 market  value of the shares on the last  trading day
before  the  Merger  was  announced.  The  purchase  price  will be  subject  to
adjustment, dependent on the time of closing, and will be paid in cash. The NEES
Board has received an opinion from Merrill  Lynch,  Pierce,  Fenner & Smith,  an
investment banking firm with extensive  experience in utility Mergers,  that the
consideration for the Merger is fair to shareholders and in line with comparable
utility Mergers.

     For NEES employees the transaction  represents an opportunity for growth as
the  company  becomes  the U. S. base of  operations  for a large  international
group.  National Grid has expressed  intentions  to expand and  consolidate  its
operations  in  this  country,  which  will  bring  expanded  opportunities  for
employees. The transaction will ensure that NEES and its employees remain active
in the  restructuring  debate  in  the  United  States,  while  National  Grid's
expanding  foreign  operations  will provide  opportunities  for NEES  employees
abroad.

     Benefits to customers  fall in two  categories.  First,  National  Grid has
significant  expertise  in  providing  the  infrastructure,  dispatch  and power
exchange  necessary for an efficient  power supply  market.  Power supply is the
major cost element of electricity  and is crucially  influenced by the efficient
development  of the market  for the  product.  The  efficient  provision  of the
infrastructure  to let the supply market develop will facilitate the increase in
potential suppliers of electricity, with the competition so generated leading to
lower and more stable prices for the  unregulated  supply  component of electric
service.


                                      -47-


<PAGE>



     Second,  there will be savings and  efficiencies  associated with the NEES-
National Grid Merger  itself.  The two companies are currently in the process of
evaluating  integration  possibilities,  aimed at  eliminating  duplication  and
implementing best practices. National Grid's significantly larger scale, both in
financial and operational terms, will enhance the ability of NEES to utilize new
developments in transmission and distribution  technology,  information systems,
and capital markets, where these can be seen to bring economic benefit.

               o    Strategic benefits

     National  Grid owns,  operates and  maintains  the high voltage  network in
England and Wales,  which connects power  stations with  distribution  networks.
This  transmission  network  consists  of  approximately  4,300  route  miles of
overhead lines and 400 miles of underground cables,  both operating  principally
at  voltages  of  400kV  and  275kV.   National  Grid  also  owns  and  operates
interconnectors  which enable electricity to be transferred  between the England
and Wales market and Scotland and France.  National Grid also has investments in
transmission  businesses  in  Argentina  and  Zambia and  direct  experience  of
operating and maintaining systems in those countries.

     A key factor in the  efficient  development  of a  competitive  electricity
supply market is the provision of open access on non-discriminatory terms to the
electric transmission system.  National Grid, as holder of the only transmission
licence for  England  and Wales,  is obliged to  facilitate  competition  in the
generation  and supply of  electricity  and to offer terms for connection to and
use of its  transmission  system to those who request it.  Since 1990,  National
Grid has  received  over 70  applications  from  generators  seeking  to use the
transmission  system and is obliged  to  provide a formal  offer of  connection,
including all technical and commercial terms, within 90 days.

     In addition,  National  Grid is the system  operator for England and Wales,
with an  obligation to schedule and dispatch  generation  to meet demand,  while
maintaining  security of the  transmission  system and supply  quality.  Through
wholly-owned  subsidiaries,  National  Grid also provides  data  collection  and
settlement services to facilitate the competitive electricity supply market. The
development of new generation sources and of


                                      -48-


<PAGE>



new competing  electricity  supply  companies,  since the  restructuring  of the
electric  industry,  has seen the  price of  electricity  fall by 15-25% in real
terms, depending on customer class.

     Another  relevant  feature of National  Grid's  experience is its financial
incentivization.  In  England  and Wales  both its wires  ownership  and  system
operation activities are subject to incentive forms of regulation. These provide
a direct  stimulus for National  Grid to improve the  efficiency of its licensed
activities  and this has led to  significant  benefits  for both  customers  and
shareholders.  Supply quality is assured  through the  requirement  for National
Grid  to  work  to  prescribed  standards  and  to  report  annually  on  system
performance to the industry  regulator.  National Grid's experience of this sort
is not limited to England and Wales,  since its  operation  of the  transmission
system in Argentina is also subject to financial incentivization.

     The  Merger  comes at a time of  substantial  change in the  United  States
electricity industry, with reform and restructuring proceeding nationwide and in
particular  in New England.  The  intentions of National Grid and NEES to pursue
consolidation and rationalization of transmission and distribution in the region
are seen as being fully consistent with the views of the FERC on the development
of  strong  Regional  Transmission  Organizations.  NEPOOL  and the New  England
Independent   System   Operator  are  grappling  with  many  complex  issues  on
transmission  pricing,  congestion  management and market price determination as
they attempt to advance the  development of the electric  market in New England.
National Grid does not claim that its  experience  or the  solutions  which have
been  reached  for  similar  issues in England  and Wales can be  simplistically
transplanted  to the United  States.  However,  its experience in addressing and
finding appropriate solutions to similar problems, both in the U.K. and in other
countries,  will be important in  facilitating  the  development  of electricity
markets in the United States and in the timely achievement of the benefits which
such markets can bring.

     Although some of the anticipated  economies and efficiencies  will be fully
realizable only in the longer term, they are properly  considered in determining
whether the standards of Section  10(c)(2) have been met. See American  Electric
Power Co.,  46 S.E.C.  1299,  1320-1321  (1978).  Further,  the  Commission  has
recognized  that while some potential  benefits  cannot be precisely  estimated,
nevertheless they too are entitled to be


                                      -49-


<PAGE>



considered:  "[S]pecific  dollar forecasts of future savings are not necessarily
required;  a  demonstrated  potential for economies will suffice even when these
are not precisely quantifiable." Centerior Energy Corp., Holding Co. Act Release
No. 24073  (April 29, 1986)  (citation  omitted).  See Energy East  Corporation,
Holding Co. Act Release No. 26976 (Feb. 12, 1999) (authorizing acquisition based
on strategic benefits and potential, but presently unquantifiable, savings).

               3.   Section 10(f)

     Section 10(f) provides that:

          The  Commission  shall  not  approve  any  acquisition  as to which an
          application  is made  under  this  section  unless it  appears  to the
          satisfaction  of the  Commission  that such State laws as may apply in
          respect to such acquisition have been complied with,  except where the
          Commission  finds  that  compliance  with  such  State  laws  would be
          detrimental to the carrying out of the provisions of section 11.

As described in Item 4 of this Application/Declaration,  and as evidenced by the
applications  and the requested  certification  from each of the affected  state
regulators,  the  Applicants  intend to comply  with all  applicable  state laws
related to the proposed transaction.

     B.   Other Statutory Provisions

          1.   Sections 6 and 7, and Rule 53

     The  Applicants  seek  confirmation  that their  preexisting  investment in
National Grid Holdings and its direct and indirect  subsidiary  companies (i.e.,
the FUCO holdings) will not be counted toward the cap on "aggregate  investment"
for purposes of Rule 53. The basis for this request is  two-fold:  First,  in an
analogous situation,  the Commission has traditionally  grandfathered nonutility
investments made before an entity became part of a registered system. See, e.g.,
New Century  Energies,  Holding Co. Act elease No. 26748 (Aug.  1, 1997).  Thus,
investments  in  "energy-related  companies"  that predate  registration  of the
investor are not counted toward "aggregate  investment" for purposes of Rule 58.
Although there is no case on point, the Applicants believe that the


                                      -50-


<PAGE>



same accommodation  should be made for preexisting FUCO investments for purposes
of Rule 53, simply as a matter of comity.

     Second,  and  perhaps  more  important,  there is no  equitable  basis  for
including  National  Grid's  preexisting  FUCO  holdings in the  calculation  of
"aggregate  investment"  because,  unlike the FUCO  investments of U.S.  holding
companies,  no part of the capital  currently  invested in National  Grid's FUCO
operations can be deemed to be derived,  directly or directly, from captive U.S.
ratepayers.

     The Applicant also seeks  confirmation that National Grid's borrowing under
Credit Facility for purposes of financing the Merger are  permissible  under the
Act and may be repaid in accordance with the terms of the Credit Facility, which
is attached hereto as Exhibit B-3. Although National Grid will technically incur
this  indebtedness  just  prior  to  its  acquisition  of  NEES  and  consequent
registration  as  a  holding  company,  as  previously  discussed,  the  parties
recognize that the Commission will take this financing into account in approving
the  transaction.  These borrowings will be made from  sophisticated  commercial
lenders on terms negotiated at arms-length.

          2.   Section 13 -- Intrasystem Provision of Services

          o    Interaction with FERC Policy

     All services  provided by National Grid system  companies to other National
Grid system  companies will be in accordance with the requirements of Section 13
of the Act and the rules  promulgated  thereunder.  National  Grid is aware that
questions  concerning  the  FERC's  policy in this area are likely to arise with
respect to affiliate transactions  involving NEP, Mass. Electric,  Narragansett,
NEET, Mass. Hydro and AllEnergy  Marketing Company,  L.L.C.,  companies that are
public  utilities  under the Federal Power Act. In connection with the requested
FERC authorization, the applicants in that matter have represented, and the FERC
approved  the merger  subject  to their  commitment,  that "with  respect to any
transaction  between any member company of the NEES system and National Grid and
any of its subsidiary or affiliated companies,  the NEES Companies will abide by
[FERC] policy regarding  intra-affiliate  transactions."  See FERC  Application,
attached  hereto as Exhibit  D-1.1,  and FERC  Order,  Exhibit  D-1.2.  The FERC
intra-corporate


                                      -51-


<PAGE>



transactions  policy,  with respect to non-power  goods and services,  generally
requires that  affiliates or associates of a public  utility not sell  non-power
goods and services to the public  utility at a price above market;  and sales of
non-power goods and services by a public utility to its affiliates or associates
be at the public  utility's cost for such goods and services or market value for
such goods and services, whichever is higher.

     The  Applicants  recognize  that  affiliate  transactions  among the member
companies of National Grid will be subject of the jurisdiction of the Commission
under Section 13(b) of the Act and the rules and  regulations  thereunder.  That
section  generally  requires  that  affiliate   transactions   involving  system
utilities be "at cost, fairly or equitably  allocated among such companies." See
also Rule 90.  Nonetheless,  National Grid believes that, as a practical matter,
there should not be any irreconcilable  inconsistency between the application of
the  Commission's  "at cost"  standard and the FERC's  policies  with respect to
intra-system transactions as applied to National Grid.

     On this basis,  the  applicants  believe that National Grid will be able to
comply  with the  requirements  of both the FERC and the "at  cost" and fair and
equitable  allocation of cost requirements of Section 13, including Rules 87, 90
and 91 thereunder,  for all services,  sale and construction  contracts  between
associate  companies  and with  the  holding  company  parent  unless  otherwise
permitted by the Commission by rule or order.18

          o    Scope of Service

     After  consummation  of the merger,  the New England Power Service  Company
(the "Service  Company"),  which has been previously approved by the Commission,
will continue to provide the NEES  companies  with a variety of  administrative,
management and support services. The anticipated services include electric power
planning, electric system operations, materials management,  facilities and real
estate, accounting,  budgeting and financial forecasting,  finance and treasury,
rates  and  regulation,   legal,  internal  audit,   corporate   communications,
environmental, fuel procurement, corporate planning,

- --------
     18 Under  circumstances  of divergent cost and market prices such that both
the FERC and SEC pricing  standards  could not be reconciled if the  transaction
was  performed,  National Grid will comply by  refraining  from  performing  the
affected service, sales or construction contract.


                                      -52-


<PAGE>



human  resources,  marketing  and  customer  services,  information  systems and
general  administrative and executive management services. In addition,  members
of the  National  Grid System may  provide  services to the NEES Group and, to a
lesser extent,  NEES Group companies may provide incidental services to National
Grid System companies.

     Trans-Atlantic services will fall into two principal categories.  The first
category,  central administrative  services,  detailed in Exhibit B-2.1, will be
provided by NGC. The second  category  encompasses  other  services that will be
rendered by members of the  National  Grid System as  specifically  requested by
members of the NEES Group.  The full range of services in the second category is
not presently known, but the Applicants expect that it will include  engineering
consulting,   laboratory  services,   research  and  development  projects,  and
transmission best practices  consulting.  Although some trans-Atlantic  services
may be performed by NEES Group companies for National Grid System companies, the
Applicants contemplate that the majority of services will flow from the National
Grid System  companies to the NEES Group.  In  particular,  NGC,  the  operating
company for the UK transmission  business and a service company for the National
Grid Group,  will be the principal  entity providing  services,  and the Service
Company will be the  principal  recipient  of services.  The charges to the NEES
Group will be primarily from NGC to the Service Company, and the Service Company
will reallocate the charges as appropriate to members of the NEES Group.

     Some  services  such as  corporate  finance and business  development,  for
example,  are solely concerned with events outside normal  operations.  The NEES
Group will not be charged with any costs relating to these  departments,  unless
their  services  are  specifically  requested.  In  addition,  charges for costs
associated with future mergers and  acquisitions may be allocated to NEES and/or
to  other  National  Grid  Group  companies,  but  not  to the  NEES  Subsidiary
Companies.

     The attached Standard Form of Service Contract  ("Standard Form"),  Exhibit
B-2, will govern the charges  between the Service Company and the NEES Group. It
is  contemplated  that the Standard Form will be amended to provide for services
to entities that will become  associate  companies of NEES as a result of future
mergers and acquisitions.


                                      -53-


<PAGE>



          o    Allocation of Service Costs Among Members of the NEES Group

     The costs of services  provided  by the Service  Company and members of the
National  Grid System will be directly  assigned,  distributed  or  allocated by
activity,   project,  program,  work  order  or  other  appropriate  basis.  The
Applicants  expect that the  majority of costs billed by members of the National
Grid  System to the NEES Group will be paid  initially  by the  Service  Company
which  will then  charge  the  appropriate  service  recipient.  The  Applicants
envision two types of charges.

     First, for services rendered  specifically for the NEES Group or individual
members,  costs will be directly attributed to specific  subsidiaries when it is
possible to accurately do so. The costs of  engineering  or laboratory  services
are routinely  billed  directly based on a  employee-hour  basis.  Exhibit B-2.1
contains a list of services  that are  expected to be billed  directly and those
services that benefit the National Grid System as a whole.

     Second, members of the NEES Group will pay a share of services that benefit
them as members of the National Grid System. Their share will be determined by a
two-step  process.  The NEES Group's  portion of these costs will be  determined
using measures that reflect the relevant contribution and size of the individual
businesses. Allocation of group costs will follow the methodology adopted by the
UK regulator,  the Office of Gas and Electricity  Markets  ("OFGEM").  The OFGEM
approach uses four measures  (revenues,  operating profit,  employee numbers and
net assets) and allocates the group costs equally across the four.  Revenues are
adjusted to exclude the income  resulting  from sales of  purchased  power,  and
income relating to stranded assets (both within NEES). NGC will use figures from
the latest published accounts to calculate the percentage of revenues, operating
profit,  employee numbers and net assets on an annualized  basis, and these four
percentages  will be averaged to calculate the group  allocation.  Exhibit B-2.2
sets forth an estimated  allocation of service costs among the NEES Group, other
members of the National  Grid System,  and both NEES Group and the National Grid
System.

     The Service Company will allocate the costs of service among the NEES Group
using one of several  methods.  Service Company will choose the method that most
accurately  distributes the costs. The method of cost allocation varies based on
the


                                      -54-


<PAGE>



department  rendering the service.  Exhibit B-2.4  provides an  illustration  of
allocation of group costs among the NEES Group.

     The largest  category of costs being billed to the NEES  companies  are for
the following  departments  which are relatively  similar to a category of costs
currently being incurred by the Service Company:  shareholder services, investor
relations and group accounts. In May 1992, in accordance with a 60-day letter to
the SEC, the Service  Company  implemented  a new  allocation  formula for costs
associated with the annual meeting, annual and interim reports, proxy statements
and shareholder and investor related services to the NEES companies. That method
of allocation was based on total Service Company billings for services  rendered
(excluding  convenience  payments) to the NEES associate companies.  The Service
Company believes the costs to be billed by NGC for the departments  listed above
are essentially  similar in nature to the costs currently incurred and allocated
in accordance with the May 1992 letter.  Therefore, the Service Company proposes
to allocate the above costs in accordance with that approved allocation formula.

     The next largest  category of costs is National  Grid's  senior  management
category of costs.  To the extent  that a senior  manager is working on an issue
specific to a particular  NEES  subsidiary  or group of  subsidiaries,  NGC will
identify this cost and the applicable  NEES  subsidiary  that should be charged.
However,  senior management time and costs may relate to setting  corporate-wide
objectives,   policies  and  procedures  as  well  as  reviewing  corporate-wide
activities  and  achievements.  The  Service  Company  currently  has a  general
allocation  formula that  allocates 25% of these costs to NEES (the parent) with
the remainder  allocated to the subsidiaries  based on operation and maintenance
expenses.  In 1998,  in  connection  with the  divestiture  of NEES'  generating
facilities,  the  Commission  reviewed and  approved  the use of  operation  and
maintenance expense for the remaining 75% of the allocator.  The Service Company
proposes to use this  allocation  formula to  allocate  National  Grid's  senior
management time and costs to the extent that these costs cannot be attributed to
a specific individual NEES subsidiary.

     Another  major  category of billings is expected to be costs  incurred  for
human resources,  payroll and pension services.  The Service Company proposes to
allocate these costs to the NEES Subsidiary  Companies using a formula currently
in place that is based on


                                      -55-


<PAGE>



number of employees in each company. This formula exists specifically for use by
NEES' existing human  resources and payroll  departments  and is appropriate for
costs of a similar nature billed by the NGC.

     The  costs  estimated  to  be  billed  by  the  remaining  departments  are
individually  relatively minor and in most cases are of a general nature.  Under
the Service Company's accounting system, costs incurred in a department that are
general in nature, such as supervision or secretarial support costs, are charged
to a department overhead account. Department overhead costs are billed out based
on how the  payroll of that  department  is charged  to the  companies  for whom
Service  Company  performs  services.  The  costs  billed by the  remaining  NGC
departments  listed in Exhibit B-2.3 will be charged to the  applicable  Service
Company department overhead account. These costs will, in turn, be billed out by
the Service Company based on the manner in which that Service Company department
charges its time.  Exhibit B-2.3 lists the overhead accounts for the majority of
the NGC departments.

          o    Calculation of Service Costs

     To gather the information necessary to allocate service costs, employees of
the Service Company will record transactions utilizing the existing data capture
and  accounting  systems of each client  company.  Costs will be  accumulated in
accounts of the Service Company and directly assigned, distributed and allocated
to the appropriate client company in accordance with the guidelines set forth in
Schedule II of the Standard  Form.  The Service  Company's  accounting  and cost
allocation  methods  and  procedures  are  structured  so as to comply  with the
Commission's  standards  for service  companies  in  registered  holding-company
systems.  The Service  Company's  billing system will use the "Uniform System of
Accounts  for  Mutual  Service  Companies  and  Subsidiary   Service  Companies"
established   by  the   Commission   for   service   companies   of   registered
holding-company  systems,  as may be adjusted to use the FERC uniform  system of
accounts.  Further,  since costs will be  equitably  allocated,  charges for all
services  provided by the Service  Company to affiliates will be on an "at cost"
basis as determined under Rules 90 and 91 of the Act.


                                      -56-


<PAGE>



     With  regard to services  provided  by NGC to the NEES Group,  NGC will use
appropriate  policies and procedures to assure that all costs are identified and
attributed  to  particular  projects,  programs or work  orders for  purposes of
direct cost  allocation.19  Records related to services  provided by NGC to NEES
companies  will be made  available  to the  Commission  staff  for  review.  For
example,  within NGC there are several  general ledger  systems,  with one being
dedicated to corporate function  accounting.  Consolidation takes place within a
separate group  consolidation  system. As such, the corporate ledger is discrete
and auditable.

     As required by Rule 91 under the 1935 Act, the costs  allocated  across the
businesses  served by NGC will as far as possible  represent the total true cost
of providing the corporate service.  The costs considered in the allocation will
include (1) total payroll and  associated  costs;  (2) materials and  consumable
costs; (3) building and facilities costs; (4) IS  infrastructure  costs; and (5)
other departmental costs.

     Rates for NGC charges to the Service  Company will be  calculated by taking
total cost over total time worked.  This method of calculation will ensure total
recovery of departmental  costs on a monthly basis, with minimal  fluctuation of
hourly rates. Budgeted rates will be available for forecasting purposes.

          o    Billing

     NGC will bill the Service  Company  monthly in arrears.  The billing format
will list charges by corporate  department,  detailing  total time applicable to
NEES companies, multiplied by the current rate, to give the total charge for the
month.

     If NGC provides  services for the benefit of a specific NEES  company,  the
charge  applicable  to that  company  will  be  specifically  identified  in the
invoice. Otherwise, NGC's charges will be allocated to individual NEES companies
through the Service Company's allocation cycle as described above.

- --------
     19 See  Exhibit  B-4,  National  Grid Group  Policies  and  Procedures  for
Affiliate Transactions.


                                      -57-


<PAGE>



          o    Forecast of NGC's Charges to the Service Company

     NGC's UK  regulator  requires NGC to develop a business  plan  covering the
upcoming  price review  period.  The output of this  planning  process forms the
basis for the forecast  allocations  included in this section.  The  information
provided  below is based upon  projections  over the six-year  plan period.  The
figures in Exhibit  B-2.2 are based on the  forecast  for year  2000/01.  Direct
costs allocated to the NEES Group is estimated to average about $3.0 million per
annum -- this  represents  just under 3.0% of total  corporate  cost incurred by
NGC.  Total  "group"  costs for all the  companies in the  National  Grid System
average about $13 million per annum -- representing  12% of total corporate cost
incurred by NGC.  NEES' share of group  costs will be  approximately  36% of the
total,  a charge of about  $4.7  million  per  annum.  IS  infrastructure  costs
allocated  to NEES will amount to about $0.3  million per annum --  representing
less  than  1% of  total  infrastructure  costs.  Building  and  facility  costs
allocated  to NEES will amount to about $0.3  million per annum --  representing
approximately 3% of the total cost of NGC's headquarters.

     On this basis, total charges to NEES are estimated to be about $8.3 million
per  annum,  representing  approximately  7.5% of  total  corporate  costs.  The
Applicants  also  forecast that the Merger will also reduce the level of certain
services  carried  out within  NEES.  Applicants  expect  that  savings  will be
approximately $8.4 million annually. The savings are described in Exhibit B-2.5.
Accordingly,  the annual cost of transatlantic  services  provided by NGC to the
NEES Group is approximately  equal to the service costs savings  attributable to
the Merger.20

          o    Restriction on Amendments

     No  change  in the  organization  of the  Service  Company,  the  type  and
character of the companies to be serviced  (other than the  amendment  discussed
above to include  services  for the  National  Grid  associate  companies),  the
methods of allocating costs to associate companies, or in the scope or character
of the  services to be  rendered  subject to Section 13 of the Act, or any rule,
regulation or order thereunder, shall be made unless and

- --------
     20 The  projections of the cost of  transatlantic  services and the service
cost savings  attributable  to the Merger  include cost and savings  projections
from the NEES-EUA merger.


                                      -58-


<PAGE>



until the Service  Company shall first have given the Commission  written notice
of the proposed change not less than 60 days prior to the proposed effectiveness
of any such  change.  If, upon the receipt of any such  notice,  the  Commission
shall notify the Service Company within the 60-day period that a question exists
as to whether the proposed  change is consistent  with the provisions of Section
13 of the Act, or of any rule, regulation or order thereunder, then the proposed
change shall not become  effective  unless and until the Service  Company  shall
have  filed  with the  Commission  an  appropriate  declaration  regarding  such
proposed  change and the Commission  shall have  permitted  such  declaration to
become effective.

          3.   Sections 14 and 15 -- Jurisdiction

     Pursuant to these  sections,  the Commission has broad  authority over, and
access to, the books and records and  reporting  of  companies  in a  registered
holding company system. As noted  previously,  National Grid ADRs are now listed
on the New York Stock  Exchange.  In connection  with the ADR listing,  National
Grid will provide financial  statements for the fiscal year ended March 31, 1999
and  semiannually  thereafter  that include a  reconciliation  of net income and
shareholders' equity in accordance with US GAAP.

     It should be further noted that the utility assets of NGC are accounted for
on the basis required by the U.K. regulator,  rather than that used for purposes
of U.S. ratemaking proceedings,  and rates for U.K. regulated utilities are also
determined in a different manner than those for U.S. regulated companies.  These
issues are discussed at length in the attached  paper by Professor  Franks.  See
Exhibit J-3.

     In addition,  National Grid  undertakes  and agrees to file, and will cause
each of its present and future directors and officers,  who is not a resident of
the United States,  to file with the Commission  irrevocable  designation of the
party's  custodian as an agent in the United States to accept service of process
in any suit, action or proceeding before the


                                      -59-


<PAGE>



Commission  or any  appropriate  court to  enforce  the  provisions  of the acts
administered by the Commission.21

          4.   Section 33 -- Foreign Utility Companies

     Neither Section 33 nor the legislative history  specifically  addresses the
availability of the FUCO exemption to registered holding companies  organized in
foreign  countries.  We do not believe that silence should be construed  against
National Grid. To the contrary, in Gaz Metropolitain,  Inc. the Commission found
that foreign  acquisitions of U.S. utility companies were not barred by the fact
that the Act was silent on the question of foreign ownership.22

     Since the Act, on its face, does not  distinguish  between U.S. and foreign
registered holding companies,  the question then becomes how best to provide for
the  protection  of the  public  interest  and the  interest  of  investors  and
consumers (the "protected  interests" under the Act), and how to ensure that the
proposed  Merger and related  transactions  do not lead to a  recurrence  of the
evils that the Act was intended to address.

     Applicants  make numerous  commitments in their  application  for financing
authorization  (File No.  70-9519) to ensure that the proposed  financing of the
National Grid System, including financing for purposes of acquiring interests in
EWGs and FUCOs, is consistent with the protected interests. In particular:

o    National  Grid commits to maintain  the common stock equity  ratios of NEES
     and its electric utility subsidiaries at a minimum of 35%;23

o    National  Grid  commits  to  maintain  its  long-term  debt  rating  at  an
     investment grade level;

- --------
     21 See Exhibit O-1, Appointment of Agent for Service of Process.

     22 Holding Company Act Release No. 35-26170 (Nov. 23,1994).

     23 New England Electric Transmission Corporation and Vermont Yankee Nuclear
Power   Corporation   would  be  excluded  from  the  35%  common  stock  equity
capitalization  standard. In addition,  the 35% standard would be applied to the
combined capitalization of Nantucket Electric Company and Massachusetts Electric
Company.


                                      -60-


<PAGE>



o    National  Grid commits to maintain its interest  cover ratio  (Consolidated
     EBITDA to Net Interest Payable) at not less than 3:1, and;

o    National  Grid  undertakes to cause its common stock equity as a percentage
     of total capitalization,  measured on a book value US GAAP basis, to be 30%
     or above by March 31, 2002.

In addition,  National Grid has structurally  separated its FUCO activities from
the NEES  Group  and it will  limit  the use of  employees  of the U.S.  Utility
Subsidiaries in FUCO operations.  Lastly,  periodic reporting of National Grid's
aggregate investment in EWGs and FUCOs and a description of new FUCO investments
will allow the  Commission  to  continually  monitor  National  Grid's  non-U.S.
activities.

     The Commission has nearly thirty years  experience  dealing with the issues
presented by investments in foreign  activities,  and the measures  necessary to
protect U.S.  ratepayers  from any adverse effects that might be associated with
those activities.

     Beginning in 1971,  the  Commission  authorized a series of  investments in
foreign utility and nonutility  operations.  On the nonutility side,  registered
holding companies have been authorized to engage in the marketing and trading of
energy  commodities  in Canada;24  energy  management,  consulting  services and
related financings;25

- --------
     24 American Electric Power Co., Holding Co. Act Release No. 27062 (Aug. 19,
1999); Southern Co., Holding Co. Act Release No. 27020 (May 13, 1999).

     25 American Electric Power Co., Holding Co. Act Release No. 26682 (March 7,
1997). See also The Columbia Order ($50 million  investment limit worldwide) and
Southern  Co.,  Holding  Co. Act Release No.  22132  (July 17,  1981)  (granting
foreign consulting authority).


                                      -61-


<PAGE>



exploration for and production of natural gas;26 and construction, ownership and
operation of gas pipelines.27

     In addition,  even prior to the Energy Policy Act of 1992,  the  Commission
authorized U.S. holding  companies to acquire foreign utility  operations.  See,
e.g.,  Southern  Co.,  Holding  Co. Act  Release  No.  25639  (Sept.  23,  1992)
(authorizing  the  acquisition  of foreign  utility  interests  by a  registered
holding company) and SCEcorp,  Holding Co. Act Release No. 25564 (June 29, 1992)
(authorizing  the  acquisition  foreign  utility  interests by an exempt holding
company).  In those orders,  the  Commission  sought to protect the interests of
domestic  utility  consumers and investors  while  permitting the acquisition of
foreign utility operations. In the Southern order, the Commission found a number
of  means by which  consumer  interests  would be  protected.  In  SCEcorp,  the
Commission  gave great weight to the statement of the California  Public Utility
Commission  that it had no objection  to the  acquisition  of a foreign  utility
interest  so  long as the  holding  company  complied  with  certain  conditions
designed to protect the interests of domestic consumers.

     Title VII of the Energy  Policy Act  amended the 1935 Act to create two new
classes of exempt entities, EWGs and FUCOs. By exempting these entities from all
provisions of the Act and  providing  generally  for their  acquisition  without
prior Commission approval,  Congress intended to facilitate the participation in
these activities.  See, e.g.,  Statement of Sen. Riegle, Cong. Rec. S17629 (Oct.
8, 1992)  (explaining  that "the purpose of section 33 is to facilitate  foreign
investment, not burden it.").

- --------
     26 Columbia  Energy  Group,  Holding Co. Act  Release No.  26820 (Jan.  23,
1998),  as  amended,   Holding  Co.  Act  Release  No.  27055  (July  30,  1999)
(authorizing  Columbia to invest up to $55 million in Canadian E&P  activities).
See also Columbia Gas System, Inc., Holding Co. Act Release No. 17290 (Sept. 27,
1971)  (authorizing  the  formation  of a  wholly-owned  Canadian  oil  and  gas
exploration  and  production  subsidiary in connection  with an effort to obtain
natural gas from the Prudhoe Bay and Arctic  region of Canada),  and Holding Co.
Act Release No. 18534 (Aug. 16, 1974) (authorizing participation in projects for
the  development  of  proven  gas  reserves  in  Alaska  and  Canada,   and  for
transportation of the gas to the United States).

     27 See  Consolidated  Natural Gas Co.,  Holding  Co. Act Release No.  26595
(Oct.  25,  1996),  and  Holding  Co. Act Release  No.  26608  (Nov.  19,  1996)
(authorizing  CNG to  invest,  on a  case-by-case  basis,  in  foreign  pipeline
projects).


                                      -62-


<PAGE>



     A question arises because  neither  Section 33 nor the legislative  history
specifically  addresses the  availability  of the  exemption to foreign  holding
companies.  Although the Commission  has not yet addressed  this issue,  we note
that, in a related context,  the Commission  found that foreign  acquisitions of
U.S.  utility  companies  were not barred by the fact that the Act was silent on
the issue. In the Gaz  Metropolitain  case the Commission  staff had opposed the
acquisition by a Canadian  parent of a Vermont gas utility  company on the basis
that,  among other things,  Congress had not contemplated  foreign  ownership of
U.S.  utilities  when it drafted the Act in 1935.  The  Commission  rejected the
staff's argument, stating:

               We do not agree with the staff's  analysis.  The Act  contains no
          prohibition against foreign utilities as such. Indeed,  nothing in the
          Act  prevents a foreign  company  that does not own or control  public
          utility or holding company securities from acquiring the securities of
          a domestic public utility company.

Emphasis added. The  Commission's  focus,  instead,  was on whether the proposed
transactions  would be  detrimental  to the public  interest or the  interest of
investors or  consumers,  or would lead to a recurrence of the problems that the
Act was intended to address.  Cf. Section 1(b) of the Act (describing the abuses
that gave rise to the Act).

     Accordingly, we believe it is appropriate for the Commission to rely on the
plain  meaning of Section 33, so long as there are adequate  safeguards  for the
protected interests and it does not appear that the proposed  transactions would
lead to a recurrence of the evils that the Act was intended to address.  In this
regard, the staff has emphasized the need for a "level playing field" as between
U.S. and foreign registered  holding  companies.  In practical terms, this means
that the foreign  holding  company should not be able to rely on Section 33 in a
way that is not available to U.S. companies.  We believe there are three sets of
issues in this regard:

     1.   Reliance on the FUCO exemption for all pre-existing interests

     National Grid, through its wholly-owned  subsidiary National Grid Holdings,
is the parent of NGC,  which owns and  operates  the England and Wales  electric
transmission


                                      -63-


<PAGE>



system,  and certain  other  nonutility  interests.  Prior to the closing of the
proposed  transactions,  National Grid Holdings will file a Form U-57 to perfect
its exemption as a FUCO. Thereafter,  it is our view that National Grid Holdings
and its subsidiaries,  including, for example,  Energis, will be exempt from all
provisions of the Act -- except with respect to transactions  with National Grid
and its non-FUCO  subsidiary  companies.  This latter set of  transactions  will
continue to be fully regulated under the Act.28 See Section  33(a)(1) of the Act
("A foreign  utility  company  shall be exempt from all  provisions  of the Act,
except as otherwise provided under this section").

     As explained more fully in Exhibit J-1 to this  Application,  while NGC and
other FUCO  interests  will form the  largest  part of National  Grid  Holdings'
interests,  the company will have certain non-FUCO subsidiaries.  In particular,
National  Grid holds a  significant  interest  in  Energis,  which is engaged in
telecommunications  in the U.K.  Typically,  Energis  would be  qualified  as an
"exempt  telecommunications  company" or "ETC" under Section 34 of the 1935 Act.
In this matter, however, there is no way for National Grid, as a minority owner,
to ensure that Energis will  continue to be engaged  "exclusively"  in providing
telecommunications,  information and related goods and services,  as required by
the ETC definition.

     Accordingly,  the  Applicants  seek to rely on the  fact  that  Section  33
(unlike  Sections 32 and 34) does not require that the exempt  entity be engaged
"exclusively" in the subject  activity.  Although there is no discussion of this
point in the legislative  history,  it does not seem  unreasonable that Congress
was  attempting to accommodate  the nature of the entities  exempt under Section
33. Unlike EWGs and ETCs, which are likely to be special purpose entities, FUCOs
may  comprise  vertically-integrated  utility  systems and  businesses  that are
reasonably incidental or economically necessary or appropriate thereto.  Indeed,
a review of the Forms U5S suggests that U.S.  holding  companies have indirectly
acquired certain nonexempt interests in connection with their FUCO holdings.

- --------

     28  The  Commission's   residual   jurisdiction  is  generally  limited  to
parent-level financings, affiliate transactions and "the creation or maintenance
of any other  relationship  between a foreign  utility  company and a registered
holding company." Section 33(c)(2).


                                      -64-


<PAGE>



     The Commission should not find these "other  businesses" to be inconsistent
with the  policies  and  provisions  of the Act, so long as: (i) the  nonutility
interests are functionally related to the foreign utility business,  in the same
way  domestic   nonutility   interests  must  be  related  to  domestic  utility
operations,  (ii) all direct or indirect  investments  in these  businesses  for
which there is  recourse,  directly or  indirectly,  to the  registered  holding
company will be counted toward  "aggregate  investment" for purposes of Rule 53,
and (iii) there are appropriate  safeguards,  such as those described  above, to
protect the interests of U.S.  ratepayers from the adverse effects, if any, that
may be associated with the foreign operations.

     2.   Compliance with Rule 53

     In 1992,  Congressman  Markey  expressed  concern  that  Sections 32 and 33
"would invite  utilities to shift valuable  resources and management -- paid for
by captive retail ratepayers" to new "competitive"  ventures.  Statement of Rep.
Markey,  Cong.  Rec. H11446 (Oct. 5, 1992).  These concerns were  addressed,  in
part, when the Commission adopted Rule 53 which, among other things, effectively
limits the amount of  ratepayer-  generated  capital that a  registered  holding
company can invest in foreign utility operations. While National Grid intends to
comply  fully with the  substantive  requirements  of Rule 53 --  including  the
limitation on additional  aggregate investment in FUCOs -- the Applicants do not
believe that  National  Grid's  existing  investments  should be counted  toward
aggregated  investment  for  purposes  of the  rule.  In  contrast  to the  FUCO
investments of U.S.  registereds,  none of National Grid's existing  investments
have been funded,  directly or indirectly,  with the proceeds from U.S.  utility
operations.  A decision to count these interests as aggregate  investment  would
effectively  penalize  National  Grid for its success in its  operations to date
and, further, would place the company at a competitive disadvantage to similarly
situated U.S.  holding  companies.  Accordingly,  Applicants are requesting that
National   Grid's  existing   investment  in  foreign   utility   operations  be
grandfathered for purposes of the limit on "aggregate  investment" under Rule 53
of the Act.

     On an ongoing basis,  National Grid will comply fully with the  substantive
provisions of Rule 53:


                                      -65-


<PAGE>



     (i)  National  Grid is seeking  authority to use the proceeds of financings
          to  invest  in  EWGs  and  FUCOs,  only  in an  amount  up to  50%  of
          consolidated retained earnings, and;

     (ii) National  Grid will  comply  with the  requirements  of Rule  53(a)(3)
          regarding the limitation on the use of the U.S. Utility  Subsidiaries'
          employees in connection with providing services to EWGs and FUCOs.

In addition, National Grid will provide the information required by Form 20-F to
permit the  Commission  to monitor  the effect of  National  Grid's EWG and FUCO
investments  on National  Grid's  financial  condition.  National Grid will also
report to the Commission semiannually regarding its aggregate investment in EWGs
and FUCOs as a  percentage  of  consolidated  retained  earnings  and  provide a
description of EWG and FUCO  investments  acquired during the reporting  period.
See File No. 70-9519.

     Recently,  the  Commission  issued a concept  release on Registered  Public
Utility Holding Companies and  Internationalization  ("Concept  Release").29 The
Concept  Release asks numerous  questions  regarding the acquisition of domestic
utilities by foreign companies.  Applicants believe that,  properly  structured,
foreign  ownership  of  U.S.  utility  companies  can  bring  many  benefits  to
consumers,  investors and the public. Exhibit N-1 to this Application provides a
road map  showing  where each of the  issues  raised in the  Concept  Release is
addressed  in  this  Application  and  the  Applicants  application  for  system
financing authorization in File No. 70-9519.

ITEM 4. Regulatory Approvals

     Set forth below is a summary of the regulatory approvals that National Grid
and NEES expect to obtain in connection with the Merger.


- --------
     29 Registered  Public Utility Holding  Companies and  Internationalization,
Holding Co. Act Release No. 27110 (Dec. 14, 1999).


                                      -66-


<PAGE>



          (1)  Antitrust

     The Merger is subject to the  requirements of the HSR Act and the rules and
regulations thereunder,  which provide that certain acquisition transactions may
not be consummated until certain information has been furnished to the Antitrust
Division of the Department of Justice (the "Antitrust Division") and the Federal
Trade  Commission  (the  "FTC")  and until  certain  waiting  periods  have been
terminated or have expired.  NEES and National Grid Group filed their  premerger
notifications  on  March  31,  1999 and on April  9,  1999  the  waiting  period
thereunder was  terminated.  If the Merger is not  consummated  within 12 months
after the  expiration  or earlier  termination  of the  initial  HSR Act waiting
period, NEES and National Grid Group would be required to submit new information
to the  Antitrust  Division and the FTC, and a new HSR Act waiting  period would
have to expire or be earlier terminated before the Merger could be consummated.

          (2)  Federal Power Act

     Section 203 of the Federal  Power Act (the "FPA")  provides  that no public
utility  may  sell  or  otherwise  dispose  of  its  facilities  subject  to the
jurisdiction of the FERC or, directly or indirectly,  merge or consolidate  such
facilities  with those of any other  person or acquire any security of any other
public  utility  without  first  having  obtained  authorization  from the FERC.
Because this  transaction  involves a change in ownership  and control of NEES's
public  utility  subsidiaries,  the prior approval of the FERC under FPA Section
203 is required in order to consummate the Merger.

     Under  Section 203 of the FPA,  the FERC is directed to approve a Merger if
it finds such  Merger  "consistent  with the public  interest."  In  reviewing a
Merger,  the FERC  generally  evaluates:  (1) whether the Merger will  adversely
affect competition;  (2) whether the Merger will adversely affect rates; and (3)
whether  the  Merger  will  impair the  effectiveness  of  regulation.  NEES and
National Grid Group believe the proposed Merger satisfies these standards.

     By order dated June 16, 1999, the FERC unconditionally approved the Merger.
New England Power Co., 87 FERCP. 61,287.


                                      -67-


<PAGE>



          (3)  Atomic Energy Act

     As NEP holds licenses issued by the Nuclear  Regulatory  Commission ("NRC")
in connection with that  subsidiary's  interests in various nuclear power plants
and also holds  minority  common stock interest in  corporations  that hold such
licenses,  the Merger  (which  would  constitute  an indirect  transfer of NEP's
licenses to National  Grid) requires NRC approval under the Atomic Energy Act of
1954. The Atomic Energy Act effectively  prohibits  foreign ownership or control
of a nuclear license (as distinct from the physical  plant).  National Grid is a
foreign  entity  within the meaning of the Atomic  Energy Act. NEES and National
Grid believe they can satisfy NRC concerns about foreign  ownership and control.
NEP's minority  interests in the common stock of corporations  that hold nuclear
licenses does not give NEES control over such facilities or the licensee for the
facilities,  and  therefore the indirect  acquisition  by National Grid of NEP's
interest  will not be  inconsistent  with the Atomic  Energy Act.  In  addition,
although NEP owns a minority  interest in two nuclear  facilities  and therefore
has minority, non-operating ownership licenses with respect to those facilities,
NEP has no control over the  facilities  themselves,  and a recently  issued NRC
Stranded Review Procedure (SRP) regarding  foreign ownership or control provides
that foreign ownership of such minority  non-operating  licenses is permissible,
provided that the licensee agrees to conditions that prevent foreign  domination
or control of the facility.

     On March 15, 1999, NEP and National Grid filed an application  with the NRC
requesting  approval of the indirect  transfer of control  over NEP's  minority,
non- operating  interests in the nuclear  facilities and corporations.  Therein,
NEP and National Grid proposed a negation  action plan  consistent with the SRP.
The  application  was  noticed  on June  30,  1999.  Subsidiaries  of  Northeast
Utilities  ("NU"),  co-owners  in  the  nuclear  facilities,  intervened  in the
proceeding  and requested a hearing.  On November 4, 1999,  the NU  subsidiaries
filed a notice of  withdrawal  of their  petitions to intervene and jointly with
NEP  requested  that  the  proceeding  be  terminated.  The NRC  terminated  the
proceeding  on November  19,  1999.  On December  10, 1999 the NRC  approved the
transfer. See Exhibit D-2.2.


                                      -68-


<PAGE>



          (4)  Exon-Florio

     The  Committee on Foreign  Investment  in the United  States  ("CFIUS") may
review and  investigate the Merger under  Exon-Florio,  and the President of the
United  States or his designee is empowered to take certain  actions in relation
to Mergers,  acquisitions and takeovers by foreign persons which could result in
foreign control of persons  engaged in interstate  commerce in the United States
pursuant to  Exon-Florio.  In particular,  Exon- Florio enables the President to
block or reverse any  acquisitions  by foreign  persons which threaten to impair
the  national  security  of  the  United  States.   Before  the  Merger  may  be
consummated,  any CFIUS review and investigation of the Merger under Exon-Florio
must  have  terminated,  and  the  President  must  not  have  taken  any of his
authorized actions under Exon-Florio.  The Exon-Florio application in connection
with the Merger was filed on March 30,  1999,  and on April 29, 1999 the parties
were informed by the  Department  of the Treasury that action under  Exon-Florio
had concluded with respect to the Merger.30

          (5)  State Regulatory Approval

     The Merger  does not require  the  approval  of the MDTE,  the RIPUC or the
Maine Public Utilities  Commission.  The merger does require the approval of the
VPSB and the CDPUC and is subject to review by the NHPUC.

     While  the MDTE  does  not have  jurisdiction  over  the  merger,  NEES and
National  Grid  made an  informational  filing  on March 8,  1999 with the MDTE,
describing the merger and the benefits of the merger to  ratepayers.  As part of
the  filing,  the  companies  advised  the MDTE that the SEC would be  seeking a
certification  from the MDTE,  the  RIPUC  and the NHPUC  that each of the state
commissions has the authority and resources to protect ratepayers in matter such
as rates, financings,  affiliate transactions and the financial integrity of the
operating utility within its state and additionally that the commission  intends
to continue to exercise  its  authority.31  The MDTE has issued a letter to this
Commission, a copy of which is attached as Exhibit D-3.2.

- --------
     30 See Exhibit L-1 to this Application.

     31 NEP is not  subject  to  regulation  as a utility  by the  Maine  Public
Service Commission, consequently, a certification was not pursued.


                                      -69-


<PAGE>



     On March 18, 1999, the companies made a similar  informational  filing with
the NHPUC and requested  certification from the NHPUC to the SEC that it has the
authority  and  resources  to  protect  ratepayers.  The  companies  also  filed
affidavits attesting to the fact that the transaction would not adversely affect
ratepayers  and that there would be no change in the NHPUC's  jurisdiction  over
Granite  State and NEP as a result of the merger.  On April 21, 1999,  the NHPUC
issued an order  finding  that the merger did not satisfy the  requirements  for
exemption from the NHPUC's formal review process.  A hearing was held before the
NHPUC on June  24-25,  1999 and an order  approving  the  Merger  was  issued on
October 4, 1999. See Exhibit  D-5.3. A motion for rehearing  filed by the Office
of Consumer Advocate was denied on November 29, 1999. See Exhibit D-5.4.

     While the RIPUC has indicated that no filing with it is required, a copy of
the informational filing made with the MDTE was given to the RIPUC and a written
request for a letter to the Securities and Exchange  Commission was made on June
25, 1999.  Additionally,  the companies will be meeting with the RIPUC and staff
to  answer  questions.  The  RIPUC  issued a letter  certifying  that it has the
authority  and resources to protect  ratepayers on August 31, 1999.  See Exhibit
D-8.

     NEP has a small amount of  transmission  assets in Vermont and therefore is
deemed  to be a  Vermont  public  utility.  While  the  VPSB  has no  regulatory
jurisdiction over NEP's operations,  under Vermont law it does have authority to
approve the merger.  The  application for approval of the Merger by the VPSB was
filed on March 29, 1999.  An order  approving  the Merger was issued on June 15,
1999. A copy is attached as Exhibit D-6.2.

     The CDPUC has jurisdiction  over the transaction  because of NEP's minority
ownership  interest in the Millstone III Nuclear Power Plant. On March 31, 1999,
the  parties  filed a letter  with the CDPUC  seeking  confirmation  that  CDPUC
approval is not required for the Merger.  The CDPUC  determined that it did have
jurisdiction.  An order  from the  CDPUC  issued  on June  30,  1999.  A copy is
attached as Exhibit D-7.2.

                                    * * * * *


                                      -70-


<PAGE>



Finally,  pursuant to Rule 24 under the Act, the  Applicants  represent that the
transactions proposed in this filing shall be carried out in accordance with the
terms   and   conditions   of,   and   for   the   purposes   stated   in,   the
declaration-application no later than December 31, 2004.

ITEM 5. Procedure

     The  Commission  is  respectfully  requested to issue and publish not later
than July 15, 1999 the requisite notice under Rule 23 with respect to the filing
of this  Application,  such  notice to specify a date not later than  August 10,
1999 by which  comments may be entered and a date not later than August 30, 1999
as the date after which an order of the Commission  granting and permitting this
Application to become effective may be entered by the Commission.

     It  is  submitted  that  a  recommended  decision  by a  hearing  or  other
responsible officer of the Commission is not needed for approval of the proposed
Merger.  The Division of Investment  Management may assist in the preparation of
the  Commission's  decision.  There  should be no  waiting  period  between  the
issuance  of the  Commission's  order  and the  date on  which  it is to  become
effective.

ITEM 6. Exhibits and Financial Statements

     o    Exhibits

          A-1       Memorandum  and Articles of Association of The National Grid
                    Group plc (previously filed).

          A-2       Agreement and  Declaration of Trust of New England  Electric
                    System  (filed as Exhibit 3 to the 1994 NEES Form 10-K (File
                    No. 1-3446), and incorporated herein by reference).

          A-2.2     Proposed  amendment to the NEES Agreement and Declaration of
                    Trust (included in Exhibit C-1 hereto).

          B-1       Agreement and Plan of Merger, dated as of December 11, 1998,
                    by and among NEES,  National Grid Group and NGG Holdings LLC
                    (included in Exhibit C-1 hereto).

          B-2       NEES   Standard  Form  of  Service   Contract,   as  amended
                    (previously filed).

          B-2.1     List of Direct  and Group  Central  Administrative  Services
                    Provided to NEES (previously filed).


                                      -71-


<PAGE>



          B-2.2     Analysis of Corporate  Cost  Allocation - 1999 Business Plan
                    (previously filed).

          B-2.3     Overhead  Accounts for National Grid Company  Administrative
                    Services (previously filed).

          B-2.4     Re-allocation  of  Estimated  National  Grid  Administrative
                    Service Costs (previously filed)

          B.2.5     NEES/GRID  Domestic  Administrative  Service  Costs  Savings
                    (previously filed)

          B-3       National Grid Group Credit Agreement (previously filed).

          B-4       National Grid Group  Policies and  Procedures  for Affiliate
                    Transactions (revised)

          C-1       Proxy Statement of NEES for the  shareholders  meeting to be
                    held  in   connection   with  the  Merger  (filed  with  the
                    Commission on March 26, 1999 and  incorporated  by reference
                    herein).

          C-2       Circular  of  National  Grid  Group  for  the  extraordinary
                    general  meeting of  shareholders  to be held in  connection
                    with the Merger (previously filed).

          D-1.1     Joint    Application   of   New   England   Power   Company,
                    Massachusetts  Electric Company,  The Narragansett  Electric
                    Company, New England Electric Transmission Corporation,  New
                    England   Hydro-Transmission    Corporation,   New   England
                    Hydro-Transmission    Electric   Company   Inc.,   AllEnergy
                    Marketing  Company,  L.L.C.  and NGG Holdings LLC before the
                    FERC (previously filed).

          D-1.2     Order of the FERC (previously filed).

          D-2.1     Application  of New  England  Power  Company  before the NRC
                    (previously filed).

          D-2.2     Orders of the NRC approving the  transaction  as it pertains
                    to the  Millstone  Nuclear  Power  Station,  Unit 3 and  the
                    Seabrook Station, Unit 1 (previously filed).

          D-3.1     Submission to the MDTE (previously filed).

          D-3.2     Response from the MDTE (previously filed).

          D-4.1     Omitted.

          D-4.2     Omitted.

          D-5.1     Submission to the NHPUC (previously filed).

          D-5.2     Order  of  the  NHPUC  Setting  the  Merger  for  a  Hearing
                    (previously filed).

          D-5.3     Order of the NHPUC Approving the Merger (previously filed).


                                      -72-


<PAGE>



          D-5.4     Order  of the  NHPUC on  Motion  for  Rehearing  (previously
                    filed).

          D-6.1     Submission to the VPSB (previously filed).

          D-6.2     Order of the VPSB (previously filed).

          D-7.1     Submission to the CDPUC (previously filed).

          D-7.2     Order of the CDPUC (previously filed).

          D-8       Rhode Island Public  Utilities  Commission  Certification to
                    the SEC (previously filed).

          E-1       Map of service  territory  of NEES (filed in paper format on
                    Form SE).

          E-2       NGG Corporate  Chart,  as revised  (filed in paper format on
                    Form SE).

          E-3       NEES Corporate Chart (filed in paper format on Form SE).

          E-4       Combined National Grid/NEES  corporate chart (filed in paper
                    format on Form SE).

          F-1.1     Opinion of Counsel - National Grid Group (previously filed).

          F-1.2     Opinion of Counsel - NEES (previously filed).

          F-2       Past tense opinion of counsel (to be filed by amendment).

          G-1       Opinion   of   Merrill   Lynch,   Pierce,   Fenner  &  Smith
                    Incorporated (included in Exhibit C-1).

          H-1       Annual  Report of  National  Grid Group dated March 31, 1998
                    (previously filed).

          H-2       Annual  Report  on  Form  10-K of NEES  for the  year  ended
                    December  31, 1998 (filed with the  Commission  on March 31,
                    1999 and incorporated by reference herein).

          H-3       Form U5S of NEES for the year ended December 31, 1998 (filed
                    with  the  Commission  on May 3,  1999 and  incorporated  by
                    reference herein).

          H-4       Annual  Report of  National  Grid Group dated March 31, 1999
                    (filed under cover of Form SE).

          I-1       Proposed Form of Notice (previously filed).

          J-1       Description of Nonutility  Subsidiaries of National Grid, as
                    revised (previously filed).

          J-2       Merger Structure and Description of Intermediate  Companies,
                    as revised (previously filed).

          J-3       "The  Financial  Strength of the National Grid Group and the
                    Proposed  Acquisitions  of NEES and EUA," Julian  Franks and
                    the Brattle Group  (March,  1999) (filed under cover of Form
                    SE).


                                      -73-


<PAGE>



          K-1       Response to the Comments of Russell G.  Gilmore  (previously
                    filed).

          L-1       Letter  from the  Committee  on  Foreign  Investment  in the
                    United States, dated April 29, 1999 (previously filed).

          M-1       Letter  from Fiona  Smith,  Company  Secretary  and  General
                    Counsel  of  The   National   Grid  Group  plc,  to  Sheldon
                    Whitehouse,  Attorney General of Rhode Island, dated January
                    25, 2000 (previously filed).

          N-1       Comparison  of the Issues  Raised in the Concept  Release on
                    Registered    Public   Utility    Holding    Companies   and
                    Internationalization  and the  Applications  of The National
                    Grid Group plc and New England  Electric System  (previously
                    filed).

          O-1       Appointment of Agent for Service of Process.

     o    Financial Statements

          FS-1      National   Grid   Group   Unaudited   Pro  Forma   Condensed
                    Consolidated  Balance  Sheet (filed with the  Commission  on
                    August 17, 1999 in File No. 70-9519 and incorporated  herein
                    by reference - Confidential Treatment Requested).

          FS-2      National   Grid   Group   Unaudited   Pro  Forma   Condensed
                    Consolidated  Statement of Income (filed with the Commission
                    on August  17,  1999 in File No.  70-9519  and  incorporated
                    herein by reference - Confidential Treatment Requested).

          FS-3      Notes  to  Unaudited   Pro  Forma   Condensed   Consolidated
                    Financial  Statements  (filed with the  Commission on August
                    17,  1999 in File No.  70-9519  and  incorporated  herein by
                    reference - Confidential Treatment Requested).

          FS-4      National Grid Group  Consolidated  Balance Sheet (previously
                    filed).

          FS-5      National  Grid Group  Consolidated  Profit and Loss Account,
                    Cash Flow Statement and Statement of Total  Recognized Gains
                    and Losses (previously filed).

          FS-5.1    Notes  to  National   Grid  Group   Consolidated   Financial
                    Statements (previously filed).

          FS-6      NEES  Consolidated  Balance  Sheet as of  December  31, 1998
                    (included in Exhibit H-2).

          FS-7      NEES Consolidated  Statement of Income for the twelve months
                    ended December 31, 1998 (included in Exhibit H-2).


                                      -74-


<PAGE>



ITEM 7. Information as to Environmental Effects

     The Merger  neither  involves a "major federal  action" nor  "significantly
affects the quality of the human environment" as those terms are used in Section
102(2)(C) of the National  Environmental Policy Act, 42 U.S.C. Sec. 4321 et seq.
Consummation  of the Merger will not result in changes in the operations of NEES
and its subsidiaries  that would have any impact on the environment.  No federal
agency is  preparing  an  environmental  impact  statement  with respect to this
matter.


                                      -75-


<PAGE>



                                    SIGNATURE

     Pursuant to the  requirements  of the Public Utility Holding Company Act of
1935, the Applicants have duly caused this Pre-Effective  Amendment No. 7 to the
Application-Declaration,  File No. 70-9473,  to be signed on their behalf by the
undersigned thereunto duly authorized.

     The  signature  of the  Applicants  and of the persons on their  behalf are
restricted to the information  contained in this application  which is pertinent
to the application of the respective companies.

Date: February 15, 2000



                                     /s/ Jonathan M. G. Carlton

                                     Jonathan M. G. Carlton

                                     Business Development Manager -- Regulation
                                     The National Grid Group plc

                                     /s/ Kirk Ramsauer

                                     Kirk L. Ramsauer

                                     Deputy General Counsel
                                     New England Electric System*



*The name "New England  Electric  System"  means the trustee or trustees for the
time being (as trustee or trustees but not  personally)  under an agreement  and
declaration of trust dated January 2, 1926, as amended, which is hereby referred
to, and a copy of which as amended  has been  filed  with the  Secretary  of the
Commonwealth  of  Massachusetts.  Any agreement,  obligation or liability  made,
entered  into or incurred by or on behalf of New England  Electric  System binds
only its trust estate, and no shareholder,  director,  trustee, officer or agent
thereof assumes or shall be held to any liability therefor.


                                      -76-


<PAGE>


                                  EXHIBIT INDEX


Exhibit

B-4  National Grid Group  Policies and  Procedures  for  Affiliate  Transactions
     (revised)

O-1  Appointment of Agent for Service of Process


                                      -77-


                                                                     EXHIBIT B-4


                           THE NATIONAL GRID GROUP PLC

                           NEW ENGLAND ELECTRIC SYSTEM

                        NEW ENGLAND POWER SERVICE COMPANY



                             POLICIES AND PROCEDURES

                           FOR AFFILIATE TRANSACTIONS



                                  JANUARY 2000


<PAGE>




This manual sets forth the policies and procedures  that The National Grid Group
plc  (National  Grid)  companies  will use to  contract,  bill,  and account for
affiliate transactions for goods and services covered by the cost regulations of
the Securities and Exchange  Commission  (SEC) under the Public Utility  Holding
Company Act of 1935 (Act)  following  the  acquisition  of New England  Electric
System (NEES).  The manual also contemplates the closing of the NEES acquisition
of  Eastern  Utilities  Associates  (EUA)  and  reflects  the  merger of the EUA
subsidiaries into the NEES operating companies.

I    Corporate Organisation

     Upon the closing of the National Grid  acquisition  of NEES,  National Grid
     will register as a public  utility  holding  company under the Act. NEES is
     already a registered public utility holding company,  and, as a result, has
     in place  accounting  and  procedures  for inter  company  contracting  and
     billing that comply with the Act. Specifically, NEES has a service company,
     New England Power Service Company (NEPSCO), in place that complies with the
     Act and the SEC  regulations  that are  issued  thereunder.  Following  the
     National Grid  acquisition  of NEES,  NEPSCO will continue as the source of
     most transactions  between affiliates located within the United States (the
     NEES  companies).  In addition,  NEPSCO will be the  exclusive  contracting
     agent  between the NEES  companies and National  Grid  companies  operating
     outside the United States.  NEPSCO will then distribute or allocate charges
     and revenues paid to or received from the National Grid companies operating
     outside the United States in accordance  with the  procedures  set forth in
     this manual.

     Following  the  closing of the NEES and EUA  transaction,  the NEES and EUA
     utility  subsidiaries  will be  merged  together,  as will  NEPSCO  and EUA
     Service Company (EUA's service company). These mergers and the continuation
     of NEPSCO as the surviving  service  company assure that the procedures for
     affiliate contracting and accounting set forth in this manual will continue
     after the closing of the NEES acquisition of EUA.

II   Treatment of Affiliate Transactions

     Following the closing of the National Grid acquisition of NEES, an array of
services  will be provided by the various  affiliates  on the expanded  National
Grid  system.  In the sections  below,  each kind of  affiliate  transaction  is
discussed  in turn.  Transactions  that are not  contemplated  in the  following
sections or are not structured to comply with the standard  procedures set forth
below should be  undertaken  only  following  consultation  with the  Accounting
Departments of NEES and National Grid.

     A    NEPSCO contracts with NEES Affiliates for NEPSCO Services

     Prior to the acquisition by National Grid, NEPSCO used its own personnel to
     provide an array of services to its affiliates within NEES. NEPSCO provides
     administrative,  accounting,  supply  chain  management,  human  resources,
     internal audit,  forecasting,  information  services,  treasury  operations
     including insurance and risk management,  corporate communications,  legal,
     rates and corporate management to the other NEES companies.

     Following  the  acquisition,  many of these  services  will  continue to be
     provided by NEPSCO to other NEES companies,  using established  procedures,
     allocations, and accounting.  Accordingly,  NEES companies will continue to
     contract with NEPSCO for services using a contract similar to that shown in
     Attachment 1. In addition,  NEES companies will continue to use the blanket
     requests for recurring  services or the specific  requests for nonrecurring
     services  shown in Attachment  2.  Attachment 2 also includes the Company's
     policy for making service  requests.  The accounting for such  transactions
     and the allocation of NEPSCO costs and overheads will continue  pursuant to
     Attachment 3. These contracts and procedures have been reviewed and audited
     by the SEC and state  regulators in the past,  and will continue to be used
     for the allocation of NEPSCO costs following the merger.

     Many of the regulatory  commissions  that establish rates for our regulated
     utility operations have implemented standards of conduct that require goods
     and services  supplied by an affiliate to be priced at the lower of cost or
     market.  Under SEC  regulations,  services and goods  provided by NEPSCO to
     NEES  operating  companies  are  priced  at  cost.  Management  of the NEES
     companies has the  responsibility as part of ongoing budgeting and planning
     to assure that  services  procured and  provided by NEPSCO are  competitive
     with  the  cost  of  equivalent  services  available  in the  market.  This
     responsibility is discharged  through  continuing  reviews of the Company's
     structure and staffing and through  benchmarking  analyses for compensation
     and productivity.  Specific project requests may also be tested directly in
     the market by requesting similar services from unaffiliated vendors.

     B    NEPSCO contracting with unaffiliated  suppliers for goods and services
          provided to NEES affiliates

     At times,  NEPSCO will  contract with  unaffiliated  suppliers for goods or
     services  that are  incurred for the benefit of several  subsidiaries.  For
     example,  NEPSCO  may  contract  with a  management  consultant  to  review
     operating procedures that will benefit several operating  companies.  Under
     this  approach,  NEPSCO  executes  a single  contract,  processes  a single
     invoice and pays a single  bill,  and then  allocates  the  contract  costs
     appropriately to the operating  companies  without a mark up. This approach
     to contracting with  unaffiliated  entities is not required but may be used
     when convenient to administer a contract.

     C    NEPSCO  contracting with National Grid for goods and services provided
          to NEES affiliates

     National Grid System  companies  (principally,  National Grid Company) will
     provide services to the NEES companies following the closing.  The services
     will be provided  exclusively pursuant to work orders and contracts between
     the applicable  National Grid System company and NEPSCO.  The contracts and
     service requests will be in a form similar to those included in Attachments
     1 and 2. NEPSCO will in turn  allocate the charges  under the  contracts to
     the  appropriate  NEES Company in  accordance  with  allocators,  which are
     consistent with those that have already been  established for  transactions
     among the NEES  companies.  This approach  assures that all costs billed to
     NEES  companies  from  National  Grid  companies are captured on the NEPSCO
     accounts and are appropriately allocated to NEES companies.1/

     National Grid  companies  will provide the Direct or Group  Services to the
     NEES  companies  that are  shown on  Attachment  4.  The  services  will be
     provided  pursuant to either  blanket or  specific  requests  for  services
     processed  through  NEPSCO to National Grid Company using a form similar to
     that  included in  Attachment  2. The  services  provided by National  Grid
     companies  will be  provided at cost  including  overheads  to NEPSCO.  The
     calculation of overheads is shown on Attachment 5, and is discussed  below.
     NEPSCO will then allocate the costs billed to the appropriate NEES company.
     In addition to the Direct and Group  Services  shown on  Attachment  4, the
     NEES Companies may add other  requests from time to time, as required.

______________________
     1 As provided in NEPSCO's service agreements with its affiliates, bills for
services  rendered must be paid within 15 days.  Thereafter,  the amount due and
unpaid accrues  interest from the date of the bill at an annual rate of 2% above
the lowest interest rate then being charged by the First National Bank of Boston
on 90-day commercial loans. See Attachment 1 hereto.  NEPSCO's service contracts
with the National Grid System  companies  will also require  15-day payment with
similar late-payment terms.
________________________


          For example, National Grid Company's billing to NEPSCO for the service
     will depend upon whether the service is Direct or Group.  If the service is
     a Direct  Service,  National  Grid Company will bill NEPSCO for the cost of
     the service plus overheads.  The overhead  percentages will be derived from
     National  Grid  Company's  overhead  costs  and will be  billed  through  a
     percentage  loader  applied to the direct payroll billed for the underlying
     service.  National Grid Company will use overhead loaders developed for the
     department  doing the work,  based on the overhead  costs  allocated to the
     department,  excluding any profit margin. Direct costs, overheads,  and the
     costs  billed from  outside  vendors  (without  any  National  Grid Company
     overhead  loading) will be accumulated in a separate work order for billing
     to NEPSCO.  These  costs will be subject to audit and  confirmation  by the
     National Grid Company and NEES Accounting Departments.

          National  Grid  Company will also provide  Group  Services,  which are
     general administrative and management services for all the companies in the
     Group as a whole, including both NEES Companies and National Grid's foreign
     subsidiaries.  The costs for these Group  Services will be allocated  among
     all  of  National  Grid's  subsidiaries  including  the  consolidated  NEES
     Companies using the following four factors:

     1.   Revenues  (excluding  for the NEES  Companies  revenues for  purchased
          power and stranded cost recovery).

     2.   Operating Profit

     3.   Employee numbers, and

     4.   Net Assets

     These  factors have been adopted for  allocations  of this kind by National
     Grid Company's regulator.  The resulting costs will be billed from National
     Grid Company to NEPSCO using the  methodology  set forth in  Attachment  5.
     These costs will then be reallocated by NEPSCO to NEES  subsidiaries  using
     the allocators  that have already been approved by the SEC for the activity
     involved.

     The budgeting and  procurement  controls  within  National Grid Company are
     summarised on the last page of Attachment 5. As those procedures set forth,
     National Grid Company has budgeting and  monitoring  procedures in place to
     assure that its costs for internal and external  services are efficient and
     competitive  with other  providers in the market.  National Grid  Company's
     costs and efficiency are also subject to a rigorous  regulatory  evaluation
     as part of its periodic price review with significant incentives to improve
     productivity  and produce  efficiency gains during the period between price
     reviews.  These reviews and  incentives  assure that  services  provided by
     National  Grid  Company  to the  NEES  companies  will  be  performed  cost
     effectively. Under the accounting procedures set forth in this manual these
     services  will be provided to the NEES  companies  at cost without a profit
     margin.  Disputes,  if  any,  over  accounting,  billing,  or the  services
     provided  will  be  resolved  using  the  following  procedures:   (1)  any
     accounting  or billing  disputes  between  National Grid Company and NEPSCO
     shall be referred to  representatives of the National Grid Company and NEES
     Accounting Departments for resolution;  (2) any disputes regarding the kind
     and quality of services  provided by National  Grid  Company or NEES to the
     other company will be referred to the management of both companies who will
     confer and resolve the dispute.

     D    NEPSCO Billing to National Grid for Services  Performed by it or other
          NEES Affiliates

     Just as the National  Grid  companies may provide  Direct  Services to NEES
     Companies,  NEES  Companies may provide  Direct  Services to National Grid.
     These services would also be provided  pursuant to a contract and following
     a request for  services  from the National  Grid company to NEPSCO.  NEPSCO
     will then provide the service at cost using either NEPSCO  personnel or the
     personnel of other NEES Companies. Billings will include the same overheads
     that NEPSCO would apply to contracts among NEES companies.

     The  processing of all billings to and from  National  Grid through  NEPSCO
     assures that costs and  overheads are accounted for properly and provided a
     clear audit trail for affiliate transactions between the NEES Companies and
     the balance of the National Grid Companies.

     E    Contracts  for Goods and  Services  between NEES  Operating  Companies
          other than the Service Company

     The NEES Operating Companies also provide services among themselves ranging
     from emergency storm  restoration  services to equipment  transfers.  These
     goods and services are  provided  pursuant to contracts  similar in form to
     that  included in Attachment 6. Pricing for the service or goods is also at
     cost including overheads  established in accordance with SEC policy and set
     forth in  Attachment  7. These  contracts  are only  available for services
     among NEES Companies. Contracts between NEES Companies and other affiliates
     within  National  Grid  should be executed  only by NEPSCO,  and not by any
     other NEES company.

III  Accounting and Modification

     NEPSCO  will  account  for  all  affiliate  transactions  and  billings  in
     accordance  with  established  procedures  and  SEC  requirements.  It will
     maintain  its  accounts in a fashion  that  allows  separate  reporting  of
     transactions  between  NEES  companies  and their other  affiliates  within
     National Grid.

     NEPSCO's  billing  procedures and allocations of costs have been filed with
     the SEC under the Act. These  procedures and cost  allocators  shall not be
     changed  without the  approval of the  Accounting  Departments  of NEES and
     National Grid Company,  which will make  necessary  filings with the SEC at
     least 60 days before modifications are implemented.


<PAGE>


Attachment 1

                        NEW ENGLAND POWER SERVICE COMPANY

                                25 Research Drive

                        Westborough, Massachusetts 01582

                                SERVICE CONTRACT

                                                               December 31, 1998

Massachusetts Electric Company
25 Research Drive
Westborough, MA  01582

     New England Power Service Company (hereinafter called Service Company) is a
company  engaged  primarily in the rendering of services to companies in the New
England Electric System  holding-company  system.  The organization,  conduct of
business and method of cost  allocation  of the Service  Company are designed to
meet the requirements of Section 13 under the Public Utility Holding Company Act
of 1935 and the rules and  regulations  promulgated  thereunder  to the end that
services  performed by the Service Company for said associate  companies will be
rendered  to them at cost,  fairly and  equitably  allocated.  Services  will be
rendered by Service  Company  only upon receipt from time to time of specific or
general request  therefor.  Said requests may always be modified or cancelled by
you at your discretion. The parties hereto agree as follows:

     1. The Service  Company agrees to furnish you upon the terms and conditions
herein set forth such of the services  described in Schedule I hereto as you may
from time to time request. Service Company will also furnish, if available, such
services not  described in Schedule I as you may  request.  Notwithstanding  the
foregoing  the  Service  Company  shall not  furnish  under this  agreement  any
engineering,  construction,  or  maintenance  services for a nuclear  generating
plant.

     2.  The  Service  Company  has  and  will  maintain  a  staff  trained  and
experienced  in  the  engineering,   construction,  operation,  maintenance  and
management of public utility properties.  In addition to the services of its own
staff,  Service Company will, after consultation with you concerning services to
be rendered  pursuant to your  request,  arrange for services of  non-affiliated
experts, consultants, accountants and attorneys.

     3. All of the services rendered under this agreement will be at actual cost
thereof.  Direct charges will be made for services where a direct  allocation of
cost is  possible.  The  methods of  determining  such costs and the  allocation
thereof are set forth in Schedule II hereto. These methods are reviewed annually
and more frequently, if appropriate.  Such methods may be modified or changed by
Service Company without the necessity of an amendment of this agreement provided
that in each  instance all services  rendered  hereunder  will be at actual cost
thereof,  fairly  and  equitably  allocated,  and  all in  accordance  with  the
requirements of the Public Utility Holding Company Act of 1935 and the rules and
regulations and orders thereunder.  You will be advised from time to time of any
material changes in such methods.

     4. Bills  will be  rendered  during  the first week of each month  covering
amounts  due for the month  calculated  on an  estimated  basis using the actual
expenses  incurred to the extent possible during the second previous month. This
estimated  amount would be adjusted on the bill to be rendered by the conclusion
of the following month. Any amount remaining unpaid after fifteen days following
receipt of the bill shall bear interest  thereon from the date of the bill at an
annual rate of 2% above the lowest interest rate then being charged by the First
National Bank of Boston on 90 day commercial  loans.  Services will be performed
hereunder for not more than one year commencing  January 1, 1999, and continuing
through December 31, 1999,  unless terminated at an earlier date by either party
giving thirty days' written  notice to the other of such  termination at the end
of any month.

     5. This agreement will be subject to  termination  or  modification  at any
time to the extent its performance may conflict with any federal or state law or
any rule,  regulation  or order of a federal  or state  regulatory  body  having
jurisdiction. The agreement shall be subject to approval of any federal or state
regulatory  body whose  approval is a legal  prerequisite  to its  execution and
delivery or performance.

NEW ENGLAND POWER SERVICE COMPANY

By:  /s/ John G. Cochrane

        Treasurer

Accepted December 30, 1998


By /s/ Lawrence J. Reilly


<PAGE>


                                   SCHEDULE I

                     Description of Services Available from

                        New England Power Service Company

Accounting:
     The keeping of  accounts  and  collateral  activities,  including  billing,
     payroll and customer relations;  preparation of reports and preservation of
     records.

Auditing:
     Periodic audits by Service  Company  auditors and the furnishing of reports
     and recommendations.

Construction:
     Labor  and  equipment  for   construction   and   maintenance  of  electric
     properties.  Assistance  in obtaining  and  supervision  of  non-affiliated
     contractors.

Corporate and Corporate Records:
     Cooperation  with  attorneys,  officers  and special  counsel of  associate
     companies on corporate matters,  financing,  regulation,  contracts, claims
     and litigation.  Services in connection with  stockholders'  and directors'
     meetings and keeping of corporate records.

Customer Services:
     Services re policy  development and functional  direction of field business
     service  departments,   including  rate  application  and  training,   plus
     specialized residential, commercial and industrial services.

Emergencies:
     Assistance in emergency  maintenance and restoration of utility service and
     in mobilization of personnel and equipment.

Employee Relations:
     Service re labor relations,  personnel, wage and salary schedules, employee
     training and safety and medical programs.

Engineering:
     Civil, mechanical,  electrical,  and other engineering services:  technical
     advice, design,  installation,  supervision,  planning,  research, testing,
     operation  of  communications,   including  microwave,  and  operation  and
     maintenance of specialized technical equipment.

Executive and Administrative:
     Consultation and services in management and  administration  of all aspects
     of electric utility business.

Information Systems:
     Maintenance  and  operation  of  information   systems  and  equipment  for
     accounting, engineering, administration and other functions.

                                   SCHEDULE II

             Determination of Cost of Service and Allocation Thereof

     Cost of service will be determined in  accordance  with the Public  Utility
Holding Company Act of 1935 and the rules and regulations and orders thereunder,
and will include all costs of doing business incurred by the Service Company.

     Records will be maintained for each  Department and Division of the Service
company in order to accumulate  all costs of doing business and to determine the
cost of service.  These costs will include  wages and salaries of employees  and
related expenses such as insurance,  taxes,  pensions and other employee welfare
expenses,  and rent, light, heat,  telephone,  supplies,  and other housekeeping
costs.  In  addition,  records  will be  maintained  of  general  administrative
expenses,  which will  include the costs of operating  the Service  Company as a
corporate entity.

     Charges for  services  rendered  and  related  expenses  and  non-personnel
expenses (e.g. use of automotive equipment, etc.) will be billed directly to the
serviced companies,  either individually or, when the services performed are for
a group of companies,  by means of an equitable allocation formula. Each formula
will have an  appropriate  basis such as  customers,  meters,  employees,  plant
investments, inventories or operating revenues.

     Charges for services will be  determined  from the time sheets of employees
and  will be  computed  on the  basis  of each  employee's  hourly  rate  plus a
percentage factor to cover related expenses and general administrative expenses.
Records of such related  expenses and general  administrative  expenses  will be
maintained and subjected to periodic review.

     Out-of-pocket  expenses which are incurred for the serviced  companies will
be  billed  at cost.  Charges  for  non-personnel  expenses,  such as for use of
automobiles,  trucks and heavy equipment, will normally be computed on the basis
of costs per hour or per mile.


<PAGE>


Attachment 2

LOGO    NEW ENGLAND POWER SERVICE            New England Power Service Company
                                             25 Research Drive
                                             Westborough, MA  01581
                                             Tel.  (617) 366-9011


                                              July 9, 1984




Mr. Robert Wason

Securities & Exchange Commission (SEC)
450 Fifth Street, N.W.
Washington, D.C.  20549

Dear Mr. Wason:

         Attached for your  information  are the two forms that are used by NEES
companies  when  requesting  the services of New England Power  Service  Company
(NEPSCo).  Exhibit A is for Blanket Requests which are recurring in nature. This
form is sent out to each of the operating companies  annually.  Blanket Requests
numbers  that are not wanted are  crossed  out and the form is then  signed by a
"requesting  company"  officer and, in turn, by a NEPSCo officer (never the same
person).

         Exhibit B is used for specific  requests  which are for services  which
are  nonrecurring in nature.  The principal  difference from the Blanket Request
form is the need to describe  in detail the nature of the work to be  performed.
The same approval  procedure,  however,  is followed for specific requests as is
used for Blanket Requests.

         All costs billed to NEES  companies are  referenced  by the  applicable
blanket or specific request number.  The request  procedure,  therefore,  is not
only an approval process but it is also effectively a work order system.

         If you have any further questions, please feel free to call.

                                              Sincerely yours,



                                              Howard W. McDowell
                                                   Controller

Attachments:

A New England Electric System Company


<PAGE>

                                                                      Exhibit  A

- --------------------------------------------------------------------------------
FROM: _______________________     ____________   BLANKET REQUEST No. 1-99_______
            Company Name             Co.  No.

TO:    NEW ENGLAND POWER SERVICE COMPANY               DATE _____________, 19___

YOU ARE REQUESTED TO PERFORM DURING THE YEAR 19___ THE SERVICES OUTLINED BELOW:

- --------------------------------------------------------------------------------
  TYPE OF SERVICE

[ ] ENGINEERING (CLASS 3)
                       (THE EXTENT OF THE SERVICES WILL BE SUBJECT TO ORAL
REQUESTS AND INSTRUCTIONS BY OUR REPRESENTATIVES.)
[ ] SERVICING   (CLASS 4)

- --------------------------------------------------------------------------------
DESCRIPTION OF WORK:

<TABLE>

<C>                                                       <C>
REQUEST 1                                                 REQUEST 8

PROPERTY TAX                                              CONSUMER SERVICES
- ------------                                              -----------------
   PROPERTY TAX ACTIVITIES                                   CONSUMER SERVICES ACTIVITIES

                                                          REQUEST 9
REQUEST 2
                                                          ECONOMIC PLANNING
                                                          ------------------
ENVIRONMENTAL AFFAIRS                                        ECONOMIC PLANNING ACTIVITIES
- ---------------------
   ENVIRONMENTAL AFFAIRS ACTIVITIES
                                                          REQUEST 10

                                                          INFORMATION SERVICES
REQUEST 3                                                 --------------------
                                                             INFORMATION SERVICES
ADMINISTRATIVE SERVICES                                   ACTIVITIES
- -----------------------
   TRANSPORTATION

   COMMUNICATIONS & CONTROL                               REQUEST 11
   BUSINESS INFORMATION SYSTEMS
   OFFICE SERVICES                                        PURCHASING, STORES AND MATERIALS CONTROL
                                                          ----------------------------------------
                                                             PURCHASING, STORES AND MATERIAL
                                                               CONTROL ACTIVITIES
REQUEST 4                                                    FUEL PROCUREMENT ACTIVITIES

CORPORATE                                                 REQUEST 12
- ---------
   CORPORATE AND LEGAL ACTIVITIES
                                                          RATE
                                                          ----
                                                            RATE ACTIVITIES
REQUEST 5

EMPLOYEE RELATIONS                                        REQUEST 13
- ------------------
   EMPLOYEE RELATIONS ACTIVITIES
                                                          SAFETY
                                                          ------
                                                             SAFETY ACTIVITIES
REQUEST 6

MEDICAL                                                   REQUEST 14
- -------
  MEDICAL ACTIVITIES
                                                          BUDGETING
                                                          ---------
                                                             BUDGETING ACTIVITIES
REQUEST 7

LABOR RELATIONS
- ---------------
   LABOR RELATIONS ACTIVITIES



REQUEST 8

CONSUMER SERVICES
- -----------------
   CONSUMER SERVICES ACTIVITIES


REQUEST 9

ECONOMIC PLANNING
- -----------------
   ECONOMIC PLANNING ACTIVITIES


REQUEST 10

INFORMATION SERVICES
- --------------------
   INFORMATION SERVICES ACTIVITIES





- --------------------------------------------------------------------------------
REQUEST 15                                                REQUEST 37

TREASURY                                                  INVESTOR RELATIONS
- --------                                                  ------------------
   TREASURY ADMINISTRATION AND                               INVESTOR RELATIONS ACTIVITIES
   FINANCIAL ACTIVITIES

                                                          REQUEST 38
REQUEST 16
                                                          AUDIT
                                                          -----
RESEARCH AND DEVELOPMENT                                     GENERAL AUDIT ACTIVITIES
- ------------------------
   RESEARCH AND DEVELOPMENT ACTIVITIES

REQUEST 17                                                REQUESTS 39-49 (VACANT)

MANAGEMENT EXEC.  AND ADMIN.                              REQUEST 50
- ----------------------------
   MANAGEMENT EXECUTIVE AND ADMIN. ACTIVITIES
                                                          ENGINEERING - STEAM POWER GENERATION
                                                          ------------------------------------
REQUEST 18                                                   OPERATION
                                                             MAINTENANCE
TRANSMISSION AND DISTRIBUTION
- -----------------------------
   TRANSMISSION AND DISTRIBUTION ACTIVITIES
                                                          REQUEST 51
REQUEST 19
                                                          ENGINEERING - HYDRAULIC POWER GENERATION
                                                          ----------------------------------------
INDUSTRIAL ENGINEERING                                       OPERATION
- ----------------------                                       MAINTENANCE
  INDUSTRIAL ENGINEERING ACTIVITIES

REQUEST 20 - 29 (VACANT)                                  REQUEST 52

                                                          ENGINEERING - OTHER POWER GEN. & SUPPLY
                                                          ---------------------------------------
REQUEST 30                                                   OPERATION
                                                             MAINTENANCE
TREASURY EXEC. AND ADMIN.
- -------------------------
   TREASURY EXECUTIVE AND ADMIN. ACTIVITIES
                                                          REQUEST 53

REQUEST 31                                                ENGINEERING - TRANSMISSION
                                                          --------------------------
                                                             OPERATION
GENERAL ACCOUNTING                                           MAINTENANCE
- ------------------
   GENERAL ACCOUNTING ACTIVITIES

                                                          REQUEST 54
REQUEST 32
                                                          ENGINEERING - DISTRIBUTION
                                                          --------------------------
PLANT ACCOUNTING                                             OPERATION
- ----------------                                             MAINTENANCE
   PLANT ACCOUNTING ACTIVITIES


REQUEST 33                                                REQUEST 55 - 99 (VACANT)

PAYROLL ACCOUNTING
- ------------------
  PAYROLL ACCOUNTING ACTIVITIES


REQUEST 34

CUSTOMER SERVICE
- ----------------
  CUSTOMER SERVICE ACTIVITIES
  SYSTEM DIVERSIONS


REQUEST 35

REVENUE ACCOUNTING
- ------------------
  REVENUE ACCOUNTING ACTIVITIES


REQUEST 36

SHAREHOLDERS SERVICES
- ---------------------
   SHAREHOLDER SERVICES ACTIVITIES


REQUEST 37

INVESTOR RELATIONS
- ------------------
   INVESTOR RELATIONS ACTIVITIES


REQUEST 38

AUDIT
- ------
   GENERAL AUDIT ACTIVITIES
</TABLE>


<TABLE>
<C>                                                <C>            <C>
- -------------------------------------------------- -------------- --------------------------------------------------
FOR THE REQUESTING COMPANY                             NOTED      ACCEPTED FOR

Originated BY___________ Date_____                                   NEW ENGLAND POWER SERVICE COMPANY

Approved by_____________ Date_____                                By_______________ Date______________

           _____________ Date ____                                Date              Date
                                                                  Started___________completed_________
- -------------------------------------------------- -------------- --------------------------------------------------

- --------------------------------------------------------------------------------------------------------------------
FROM ___________________________     CL. ______  CO.______  REQUEST NO. ____________
            COMPANY

TO NEW ENGLAND POWER SERVICE COMPANY              DATE ____________________ 19 _____

YOU ARE REQUESTED TO PERFORM THE SERVICES OUTLINED BELOW
- --------------------------------------------------------------------------------------------------------------------
            TYPE OF SERVICE

[ ]  ENGINEERINAND CONSTRUCTION DIVISION   TOTAL ESTIMATE $____________________
     -----------------------------------

       [ ]  CONSTRUCTION                 DATE OF ESTIMATE ___________________

       [ ]    ENGINEERING                  TO BE COMPLETED BY __________ 19 ___
                                            NOTE FOR CONSTRUCTION AND ENGINEERING
                                            REQUESTS, SHOW TOTAL NEPSCO. COST OF
[ ] SERVICING DIVISION                      PROJECT, INCLUDING ANY
                                            PREVIOUS EXPENDITURES FOR PRELIMINARY
                                            ENGINEERING, INVESTIGATIONS, ETC.
- --------------------------------------------------------------------------------------------------------------------
JOB TITLE:
DESCRIPTION OF WORK




JUSTIFICATION
(DETAIL ON REVERSE SIDE
 OR ATTACHED SHEET)

- ------------    ---------
    CMS         PROJECT
   REF.           REF.
- ------------    ---------
                                    CLASSIFICATION
                                    --------------
                                CAPITAL [ ] O&M [ ] R&D [ ]

- ---------------------------- -- ------------ --- ------------ -- -------- -------- ---------- ---------- -----------
         LOCATION            A    CHARGED    W     CHARGED    W   ENGRC.   FIELD    INTEREST   CONSTR./   ACCOUNT
(CONSTRUCTION WORK ORDERS)   R   WORK UNIT   O    WORK UNIT   O   FORM     ENGRG.   & REAL     OPER./     OR PLANT
                             E   \NEPSCO/        \OPER.COS./      ORDER      &       ESTATE    MAINT.     UNIT CODE
                             A               C                C             SUPV.    TAXES     WORK
                                             D                D             WORK     WORK      ORDER
                                                                            ORDER    ORDER
                                             N                N
                                             E                E
                                             P                P
                                             S                S
                                             C                C
                                             O                O

- ---------------------------- -- ------------ --- ------------ -- -------- -------- ---------- ---------- -----------

- ---------------------------- -- ------------ --- ------------ -- -------- -------- ---------- ---------- -----------

- ---------------------------- -- ------------ --- ------------ -- -------- -------- ---------- ---------- -----------

- ---------------------------- -- ------------ --- ------------ -- -------- -------- ---------- ---------- -----------

- ---------------------------- -- ------------ --- ------------ -- -------- -------- ---------- ---------- -----------

- --------------------------------------------------------------------------------------------------------------------
                                         FOR FURTHER INFORMATION REFER TO:
====================================================================================================================
- --------------------------------------------------------------------------------------------------------------------
FOR THE REQUESTING COMPANY                       NOTED   ACCEPTED FOR NEW ENGLAND POWER SERVICE COMPANY
ORIGINATED BY _____________ DATE __________              BY _____________________________ DATE _______________
                                                             (VICE PRESIDENT N.E.P.S.CO.)
APPROVED BY _______________ DATE __________              BY _____________________________ DATE _______________
                                                           (FUNCTIONAL ACCEPTANCE - ENGINEERING)
                 _______________ DATE __________         BY _____________________________ DATE _______________
                                                           (FUNCTIONAL ACCEPTANCE - CONSTRUCTION)
                                                         ===========================================================
                 _______________ DATE __________         (FOR ENGINEERING/CONSTRUCTION USE ONLY)
                                                         ESTIMATED                  ESTIMATED
                                                         START DATE ______________COMPLETION DATE ____________

</TABLE>


<PAGE>




LOGO  New England Power Service
             A NEES Company

MEMORANDUM

To:     List                                          Phone:    (508) 389-2549

From:   A.D. Houston                                  File:     Projapr2.wpd

Subject: Service Company Request Approval             Date:     May 22, 1997



As part of a continuing  effort to ensure  compliance  with  various  regulatory
agencies,  I would like to reiterate the Security and Exchange  Commission (SEC)
rules for NEPSCO Request approvals.

The SEC and NEPSCo have an agreement that requires a NEPSCO Request be signed by
a minimum of two people:
1) A Requesting Company Officer
2) An officer of NEPSCo

The two  people  listed  above  can  never be the  same  person.  If  individual
organizations/functions   wish  to  require  additional  signatures  for  review
purposes,  there  are  already  lines  in  place on the  NEPSCo  Request  Report
(NEW0/340)  for more  signatures.  Please note,  the SEC does not require  these
additional signatures.

Once a NEPSCo Request has the required signatures,  the original must be sent to
NEPSCo Accounting,  located in General Accounting in Westborough.  If the NEPSCO
Request  does not have the  appropriate  signatures,  it will be returned to the
originator for completion.

Attached  for your  convenience  is a list of  company  officers  for the Retail
Companies,  NEP and  NEPSCo.  All people  listed  have the  ability to approve a
NEPSCo Request for their respective companies.

If you  have  any  questions  or  comments,  you can  contact  Howard  McDowell,
Controller at 22021 or Bill Richer, Manager of General Accounting at 22311.

List:  See Attached


<PAGE>




Distribution List

A.H. Aitken                      M.E. Jesanis                   A.C. Pini
J.C. Amoroso                     D.C. Kennedy                   R.A. Racine
L.E. Bailey                      R.J. Korsak                    K.L. Ramsauer
E.A. Capommachio                 S.M. Larson                    W.R. Richer
J.G. Cochrane                    C.A. LaFleur                   L.J. Reilly
E.P. Cody                        J.L. Levett                    T.G. Robinson
D.C. Delurey                     R.E. Loomis                    T.E. Rogers
J.A. Donahue                     J.D. Luchini                   C.E. Root
R.L. Dumouchel                   J.F. Malley                    J.W. Rowe
C.L. Eaton                       R.L. McCabe                    M.F. Ryan
P.G. Flynn                       H.W. McDowell                  N.H. Sala
R.L. Francazio                   R.H. McLaren                   R.P. Sergel
R.W. Frost                       R.M. Mellor                    D.E. Snay
D.F. Goodwin                     C.H. Moser                     J.D. Tranen
D.F. Grant                       F.A. Nangle                    A.H. Turner
M.E. Hachey                      R.  Nadeau                     J.W. VanSant
R.M. Holmes                      J.L. Palmer                    W.  Watkins, Jr.
D.L. Holt                        C.O. Paradise                  D.G. Webster
B.E. Huston                      L.M. Pastuszek                 R.K. Wulff




<PAGE>




                         Massachusetts Electric Company

                          Officers (As of May 1, 1997)

Title                                               Name

Chairman                                            Richard P. Sergel
President                                           Lawrence J. Reilly
Vice President                                      John C. Amoroso
Vice President                                      Eric P. Cody
Vice President                                      Charles H. Moser
Vice President                                      Lydia M. Pastuszek
Vice President                                      Anthony C. Pini
Vice President                                      Christopher E. Root
Vice President                                      Nancy H. Sala
Vice President                                      Dennis E. Snay
Treasurer                                           Michael E. Jesanis
Clerk                                               Robert King Wulff
Assistant Treasurer and Controller                  Howard W. McDowell
Assistant Clerk                                     Thomas G. Robinson




<PAGE>




                            New England Power Company

                          Officers (As of May 1, 1997)

Title                                               Name

Chairman                                            John W. Rowe
President                                           Jeffrey D. Tranen
Vice President                                      Andrew H. Aitken
Vice President                                      Lawrence E. Bailey
Vice President                                      Jeffrey A. Donahue
Vice President                                      Cheryl A. LaFleur
Vice President                                      John L. Levett
Vice President                                      John F. Malley
Vice President                                      Arnold H. Tumer
Vice President                                      Jeff W. VanSant
Vice President                                      Michael E. Hachey
Treasurer                                           Michael E. Jesanis
Clerk                                               Robert King Wulff
Assistant Treasurer                                 John G. Cochrane
Controller                                          Howard W. McDowell
Assistant Clerk                                     Kirk L. Ramsauer




<PAGE>



                         Granite State Electric Company

                          Officers (As of May 1, 1997)

Title                                               Name

Chairman                                            Richard P. Sergel
President                                           Lawrence J. Reilly
Executive Vice President                            Cynthia A. Arcate
Treasurer and Assistant Secretary                   Howard W. McDowell
Secretary                                           Paul R. Marshall
Assistant Treasurer                                 John G. Cochrane



<PAGE>




                        The Narragansett Electric Company

                          Officers (As of May 1, 1997)

Title                                               Name

Chairman                                            Richard P. Sergel
President                                           Robert L. McCabe
Executive Vice President                            William Watkins, Jr.
Vice President                                      Richard W. Frost
Vice President and Treasurer                        Alfred D. Houston
Vice President                                      Shannon M. Larson
Vice President                                      Richard Nadeau
Vice President                                      Michael F. Ryan
Secretary                                           Thomas G. Robinson
Assistant Secretary                                 Craig L. Eaton
Assistant Treasurer                                 John G. Cochrane
Controller                                          Howard W. McDowell




<PAGE>




New England Power Service Company

Officers (As of May 1, 1997)

- -------------------------------------------------- -----------------------------
Title                                              Name

Chairman                                            John W. Rowe
President                                           Alfred D. Houston
Executive Vice President                           *David L. Holt
Vice President                                      Andrew H. Aitken
Vice President                                      Ralph E. Loomis
Vice President                                      John G. Cochrane
Vice President                                      Dan C. Delurey
Vice President                                      Peter G. Flynn
Vice President                                      Don F. Goodwin
Vice President                                     *David C. Kennedy
Vice President                                      Cheryl A. LaFleur
Vice President                                      Robert H. McLaren
Vice President                                     *Chester O. Paradise
Vice President                                      Thomas E. Rogers
Treasurer                                           Michael E. Jesanis
Assistant Clerk                                     Kirk L. Ramsauer
Assistant Treasurer                                 John L. Palmer
Controller                                          Howard W. McDowell
- --------------------------------------------------- ----------------------------


*    Considered Primary Signers


<PAGE>


Attachment 3

NEPSCO Accounting System

The following is a basic  description  of how the NEPSCO  accounting and billing
system operates:

There are five ways that costs are billed out to the companies served by NEPSCO

1. Direct charges
2. Allocated charges
3. Clearing accounts
4. Service company operating costs
5. Compensation for use of capital

Direct charges
- --------------
These costs include payroll, outside vendor costs, materials,  personal expense,
etc. When the costs are incurred,  an identification is made as to which company
or companies  benefited from the services provided.  This identification is made
on a source  document such as a time sheet,  vendor invoice or expense  account.
All NEPSCO  employees fill out time sheets  indicating the account to be charged
including the company for whom the work was performed.

Allocated charges
- -----------------
The same type of costs  described under direct charges can be billed out using a
predetermined allocation formula which are shown on attachment 1. The allocation
formulas  are  calculated  annually  and  provided to all  department  heads and
managers in NEPSCO with the instructions that:

Instructions  are  issued  to  all  NEPSCO  employees  that  the   predetermined
allocation formulas "should only be used when the resulting breakdown accurately
reflects both the nature of the effort  performed and the companies that benefit
from  such  effort.  However,  when it is  clear  that the  charges  apply to an
individual  company,  then that company should be charged directly.  In addition
there may be instances in which the percentage allocation is not appropriate. In
those  instances,  the companies  should be listed  individually on the document
along with the  appropriate  allocation  of charges."  The burden of making this
determination  is on the person  preparing  and the person  approving the source
document.

Clearing accounts
- -----------------
A clearing account accumulates costs for a one month period and then distributes
these costs at the end of the month. Clearing accounts are classified into three
types:

The  first  type  accumulates  overhead  costs  such as fringe  benefits  (e.g.,
pensions,  health insurance,  other  postretirement  benefits,  etc) and various
support groups (e.g., personnel, reproduction,  buildings and grounds, etc). The
costs in these clearing accounts are distributed out to an individual department
overhead  clearing  account which is the second type of clearing  account.  This
distribution is based  primarily on either each  department's  manpower  (fringe
benefits,  personnel) or floor space  occupied  (building  and  grounds).  These
department  overhead clearing  accounts also accumulate  charges from within the
department  itself,  such as office supplies and office  equipment.  The amounts
accumulated in these department  overhead  accounts is then charged out to those
companies to whom the  department's  payroll is charged in the same  proportions
calculated on a monthly basis.

The third type of clearing account  accumulates and allocates costs based on the
usage of  specific  services  performed  by NEPSCO  such as the  computer  room,
transportation,  etc.  The  computer  room  costs  are  charged  out based on an
identification for each job that is run on the computer as to which company such
job is being run for.  Transportation  costs are  charged  out based on  vehicle
usage  tickets on which the user must identify  which company  should be charged
for such usage.

A complete listing of all the clearing accounts is listed in Attachment 2.

NEPSCO operating costs
- ----------------------
These  costs  are  costs  that are  incurred  for the  operating  of NEPSCO as a
corporate entity. All costs in this category are allocated to each company based
on the percent of total NEPSCO payroll charged to each company.

NEPSCO compensation for use of capital
- --------------------------------------
NEPSCO is  allowed  by the SEC to earn a utility  (NEP's)  rate of return on its
common equity.  This rate of return is updated whenever NEP's return changes and
this return  including  related income taxes is billed out to each company based
on the percent of NEPSCO payroll charged to each company.

Attachment 1
Allocation Methods

0232     Retails only                   Transmission and Distribution (T&D)
                                        operation and maintenance (O&M)
                                        ex wheeling costs plus customer service
                                        and sales expenses

0235     Retails & NEP                  Same as 0232
0243     Material control               Inventory ex fuel
0247     Cust Acctg                     # of customers All retails
0249     Diversions                     # of customers - All retails
0253     Engineering Dist               Capital budgets - All retails
0256     T&D supv                       T&D O&M Budget by company
0257     T&D supv(Ex Narra)             T&D O&M budgets by company (ex Narra)
0272     Shareholders Svcs              Total NEPSCO billings - assoc. companies
0282     Other Svcs NEES                NEES 25%; remainder based on 0235
0297     Shared Microwave Sys           Air line circuit miles
0342     Payroll acctg                  # of employees
0345     Empl Info system               # of employees
0346     Time entry                     # of employees
0352     Personnel & Labor              # of employees
0354     Purchasing                     # of purchase orders
0358     Dielectric testing             # of aerial devices
0369     HR                             # of nonunion employees
0375     Purch,Mtl & payable            Checks process, purchase orders,
                                        inventory ex fuel
0380     All Company Alloc.             Same formula as 0232 but including all
                                        companies
0471     Archives                       # of records stored
0447     Customer acctg (I/S)           # of customers - All retails -
                                        same as 0247
0435     Legal/Prop. Records (I/S)      Same as 0235
0472     Shareholder Svcs (I/S)         Same as 0272


Attachment 2

Clearing accounts

Building & grounds
Thrift Plan
Fringe  benefits (Group Ins, Health Ins,  Medicare,  Pension,  FAS 106, FAS 112,
etc)
General Liability Insurance & Workers Comp
Office service
Reproduction
Computer Operations
Remote computer operations
Engineering supervision

Department overhead

Rubber gloves testing
Construction department clearing accounts*
Communications and controls
Transportation supervision
R&D
Transportation expense
Heavy equipment expense
Shared Microwave System
Millbury Training Center
Central Warehouse

Although labelled as the Construction  department,  this group does a variety of
physical work which may be construction or maintenance related.


<PAGE>


Attachment 4

Incorporated  by reference to Exhibit  B-2.1  (Central  Administrative  Services
Provided to NEES) to SEC File No. 70-9473.

Attachment 5

Incorporated   by  reference  to  Exhibit  B-2.2  (Analysis  of  Corporate  Cost
Allocation - 1999 Business Plan),  Exhibit B-2.3 (Overhead Accounts for National
Grid Company Services),  Exhibit B-2.4  (Reallocation of Estimated National Grid
Bill),  and Exhibit  B-2.5  (NEES/Grid  Domestic  Cost  Savings) to SEC File No.
70-9473.

Cost Collection and Control within NGC
- --------------------------------------
Individual  departmental costs are the responsibility of departmental  managers,
and are subject to a range of internal  controls  from  initial  procurement  to
final payment.

Procurement Controls

Access to raise  purchase  orders  for  goods  and  services  is  restricted  to
personnel with relevant authority,  as delegated from management.  The levels of
authority  are  detailed,  and  are  subject  to  periodic  review.  Furthermore
individuals are restricted in the budgets against which orders are raised.

Segregation of duties ensures that  individuals who raise purchase orders cannot
approve invoices relating to that order.

Invoices are coded to specific  budgets based on the information on the purchase
requisition.

In the case of invoices  approved by goods receipt notes, once again segregation
of duties  ensures  that  individuals  who raised  orders  cannot  raise a goods
receipt note for that purchase order.

Payment Controls

Invoices  are not paid unless  supported by a purchase  order and goods  receipt
note.

Cost Controls

Individual  departmental  budgets are approved by senior management  through the
business  planning  and budget  process.  Each  departmental  budget is reviewed
individually by senior management staff. Following this review, the consolidated
plans and budgets are presented for approval to the Board of Directors.

Throughout  the year,  departmental  results are  continually  measured  against
budget,  and latest  forecast,  with  detailed  variance  analyses  required for
inclusion in senior management reports.  Departmental managers receive dedicated
support from finance staff in order to monitor costs, and investigate variances.

Audit

Individual  departmental  expenditure  is subject to annual  review by  external
auditors, and periodic review by internal auditors.

Regulatory Review

In  addition  to the above  controls,  it should  be noted  that NGCs  costs are
subject  to  rigorous  review  by OFGEM,  the UK  regulator,  a process  that is
currently underway.


<PAGE>


Attachment 6

                           MUTUAL ASSISTANCE AGREEMENT

     WHEREAS,  the Massachusetts  Electric Company,  Nantucket Electric Company,
The Narragansett  Electric Company,  Granite State Electric Company, New England
Power Company, New England Electric Transmission, New England Hydro-Transmission
Corporation  and  New  England   Hydro-Transmission   Electric   Company,   Inc.
(individually,  a Company and  together,  the  Companies)  are each an operating
electric  utility and an  affiliated  company  within the New  England  Electric
System, Massachusetts,

     WHEREAS,  each of the  Companies  from time to time have  required  and may
continue to require  limited  incidental  assistance and services to ensure that
their  electric  utility  operations and equipment are maintained and perform in
accordance with good utility practice,

     WHEREAS,  each of the  Companies may find it from time to time economic and
efficient to obtain from one another such needed services and assistance, and to
provide the same to one another at cost,

     NOW, THEREFORE, the Companies enter into this Mutual Assistance Agreement.

                                    COVENANTS

     1. Each Company will, to the extent possible,  respond to requests from any
other Company for specific or general incidental  assistance and services.  Such
requests  may be  modified  or cancelled  by the  requesting  Company and may be
refused by the responding Company.

     2. Requests for incidental  assistance and services shall  generally be for
the types of services set forth in Exhibit A, attached  hereto and  incorporated
by reference.

     3. All  incidental  assistance  and  services  rendered  under this  Mutual
Assistance Agreement will be at actual cost thereof. Direct charges will be made
for assistance and services.

     4. Bills for incidental assistance and services will be rendered as soon as
practicable  after the close of each  month.  Bills shall be paid as promptly as
practicable following receipt.

     5.  This  Mutual  Assistance   Agreement  is  subject  to  modification  or
termination at any time to the extent that its performance may conflict with any
federal  or state law or any  rule,  regulation  or order of a federal  or state
regulatory  body having  jurisdiction  thereover.  This Agreement is furthermore
subject to approval of any federal or state  regulatory body whose approval is a
legal prerequisite to its execution and performance.

     6. This Agreement shall be in effect for calendar year 2000.

     7. Any number of  counterparts of this Mutual  Assistance  Agreement may be
executed,  and  each  shall  have the  same  force  and  effect  as an  original
instrument,  as  if  all  parties  to  all  counterparts  had  signed  the  same
instrument.

MASSACHUSETTS ELECTRIC COMPANY

By  s/Larry Reilly

Title    President

NANTUCKET ELECTRIC COMPANY

By  s/ Larry Reilly

Title    President

  THE NARRAGANSETT ELECTRIC COMPANY

By  s/ Larry Reilly

Title    President

GRANITE STATE ELECTRIC COMPANY

By  s/ Larry Reilly

Title    President

NEW ENGLAND POWER COMPANY

By s/ John G. Cochrane

Title    Treasurer

NEW ENGLAND ELECTRIC TRANSMISSION

By s/ John G. Cochrane

Title    Treasurer

NEW ENGLAND HYDRO-TRANSMISSION CORPORATION

By s/ John G. Cochrane

Title    Treasurer

NEW ENGLAND HYDRO-TRANSMISSION ELECTRIC COMPANY

By s/ John G. Cochrane

Title    Treasurer


<PAGE>



                                    Exhibit A

                Description of Assistance and Services Available

Construction and Maintenance

     Manpower  and   equipment   for   construction,   extension,   improvement,
maintenance or repair of electric properties.

Emergencies

     Assistance in emergency  maintenance and restoration of utility service and
in mobilization of personnel and equipment.

Engineering

     Engineering services; technical advice, design, installation,  supervision,
planning,  research,  testing,  operation of  communications,  and operation and
maintenance of specialized technical equipment.

Stores

     Services re storing of materials, supplies and equipment.

Miscellaneous

     Consulting and monitoring  services;  land and/or real  facilities  rentals
related to transmission or wholesale power sales;  reimbursement  of convenience
expenses.


<PAGE>


                                    Exhibit B

                        Determination of Cost of Service

     Cost  of  service  will  be  determined  in  accordance   with  the  rules,
regulations and orders of the Securities Exchange  Commission,  and will include
all costs of doing business incurred by the providing Company.

     Records will be maintained for each unit of the providing  Company in order
to accumulate  all costs of doing business and to determine the cost of service.
These costs will include  wages and salaries of employees  and related  expenses
such as insurance,  taxes,  pensions and other employee  welfare  expenses,  and
general administrative costs.

     Charges for  services  rendered  and  related  expenses  and  non-personnel
expenses (e.g.,  use of automotive  equipment,  etc.) will be billed directly to
the requesting Company.

     Charges for services will be  determined  from the time sheets of employees
and  will be  computed  on the  basis  of each  employee's  hourly  rate  plus a
percentage factor to cover related expenses and general administrative expenses.
Records of such related  expenses and general  administrative  expenses  will be
maintained and subjected to periodic review.

     Out-of-pocket  expenses which are incurred for the requesting  Company will
be  billed  at cost.  Charges  for  non-personnel  expenses,  such as for use of
automobiles,  trucks and heavy equipment, will normally be computed on the basis
of costs per hour or per mile.


<PAGE>


Attachment 7

       Overhead Rates for Indirect Charges of NEES's Intercompany Billing

Types of Costs Billed to Associated Companies

          Direct Charges - include  payroll,  outside  vendor costs,  materials,
          transportation, personal expense and computer expenses. When costs are
          incurred,  an  identification is made as to which company or companies
          benefited from the services provided.  The identification is made on a
          source  document such as an employee time sheet,  vendor  invoice,  or
          transportation ticket.

          Indirect Charges - applied as a percentage to payroll dollars or value
          of inventory issued and include overhead costs such as:

               a.   Time not worked:        (an accrual for the payment of hours
                                            an employee does not work, examples
                                            are paid vacation, holidays, and
                                            sick time).

               b.   Bonus & Goals programs: (employee compensation programs.)

               c.   Stores handling:        (loading percentage added to
                                            inventory issues to recover the cost
                                            of operating the stockrooms.)

               d.   Employee Benefits:      (pensions, health insurance, payroll
                                            taxes, etc.)

               e.   Supervision & Admin:    (loading percentage to recover
                                            supervision, support departments,
                                            other general and administrative
                                            costs that support the employee
                                            performing the service.)



                                                                     Exhibit O-1

                   Appointment of Agent for Service of Process

     The National Grid Group plc ("National Grid) is organized under the laws of
England and Wales and has its principal place of business at:

                  National Grid House
                  Kirby Corner Road
                  Coventry CV48JY
                  United Kingdom
                  (44) 24 7653 7777 (tel).

     National  Grid,  on  behalf  of its  officers  and  directors  who  are not
residents of the United States, ("Officers and Directors") hereby designates and
appoints:

                  Cheryl A. LaFleur ("Agent")
                  Senior Vice President and General Counsel
                  New England Electric System
                  25 Research Drive
                  Westborough, MA 01582 USA
                  (508) 589-2000 (tel)

as the agent for the Officers and Directors upon whom may be served any process,
pleadings, subpoenas, or other papers in:

          (a) any  investigation or administrative  proceeding  conducted by the
          Commission; and

          (b) any civil  suit or action  brought  against  National  Grid or the
          Officers and  Directors or to which  National Grid or the Officers and
          Directors  have  been  joined  as  defendant  or  respondent,  in  any
          appropriate  court in any place  subject  to the  jurisdiction  of any
          state  or of  the  United  States  or of any  of  its  territories  or
          possessions or of the District of Columbia,  where the  investigation,
          proceeding  or cause of action arises out of or relates to or concerns
          the provisions of the acts  administered by the  Commission.  National
          Grid  stipulates  and  agrees  that any such  civil  suit or action or
          administrative  proceeding  may be commenced by the service of process
          upon, and that service of an administrative subpoena shall be effected
          by service upon such agent for service of process, and that service as
          aforesaid  shall be taken and held in all  courts  and  administrative
          tribunals to be valid and binding as if personal  service  thereof had
          been made.

     National  Grid  stipulates  and  agrees to  appoint a  successor  agent for
service  of  process  if  National  Grid  discharges  the  Agent or the Agent is
unwilling  or unable to accept  service on behalf of  National  Grid at any time
until National Grid is no longer a registered  holding  company under the Public
Utility Holding Company Act of 1935. National Grid further



<PAGE>


undertakes to advise the  Commission  promptly of any change to the Agent's name
and address.

     National  Grid  undertakes  to make  available,  in person or by telephone,
representatives  to respond to inquiries  made by the Commission  staff,  and to
furnish promptly,  when requested to do so by the Commission staff,  information
relating to the provisions of the acts administered by the Commission.

     National Grid has duly caused this exhibit to Application-Declaration  File
No.  70-9473  to be  signed  on its  behalf by the  undersigned  thereunto  duly
authorized.

     The  signature  of  National  Grid and of the  persons on their  behalf are
restricted  to the  information  contained in this exhibit which is pertinent to
the Application-Declaration File No. 70-9473 of the respective companies.


                                      /s/ Fiona B. Smith
                                      ---------------------------
                                      Fiona B. Smith
                                      Company Secretary and General Counsel
                                      The National Grid Group plc
                                      February 14, 2000


     This statement has been signed by the following  person in the capacity and
on the date indicated.


                                      /s/ Cheryl A. LaFleur
                                      ---------------------------
                                      Cheryl A. LaFleur
                                      Senior Vice President and General Counsel
                                      New England Electric System
                                      February 14, 2000