                          SECURITIES AND EXCHANGE COMMISSION

                                Washington, D.C. 20549


                                       FORM 8-K


                                    CURRENT REPORT


                        Pursuant to Section 13 or 15(d) of the
                           Securities Exchange Act of 1934



          Date of  Report (Date  of earliest  event reported):  December 4,
          1995



                             CENTRAL MAINE POWER COMPANY
                (Exact name of registrant as specified in its charter)




                   Maine             1-5139          01-0042740
          (State of Incorporation)   (Commission     (IRS Employer
                                     File Number)    Identification Number)




                        83 Edison Drive, Augusta, Maine 04336
                 (Address of principal executive offices) (zip code)



        Registrant's telephone number, including area code:  (207) 623-3521<PAGE>





          Item 1 through Item 4.  Not applicable.

          Item 5.  Other Events.

               Maine  Yankee  Atomic  Power  Company  Plant  Outage.    The
          Company, through  its  equity investment  totaling  approximately
          $26.8  million at  September 30,  1995, owns  a  38-percent stock
          interest in  Maine Yankee Atomic Power  Company ("Maine Yankee"),
          which owns and operates  an 860-megawatt nuclear generating plant
          in Wiscasset, Maine  (the "Maine Yankee  Plant" or the  "Plant"),
          and  is   entitled  under  a  cost-based  power  contract  to  an
          approximately equal  percentage of the Plant's  output. The Maine
          Yankee Plant,  like other pressurized water reactors, experienced
          degradation of its steam generator tubes, principally in the form
          of  circumferential  cracking,  which,   until  early  1995,  was
          believed to be  limited to  a relatively small  number of  tubes.
          During the  refueling-and-maintenance shutdown that  commenced in
          early February 1995, Maine Yankee detected through new inspection
          methods  increased  degradation of  the  Plant's  steam generator
          tubes  to the extent that approximately 60 percent of the Plant's
          17,000 steam  generator tubes  appeared to  have defects  to some
          degree.    Because of  the large  number  of affected  tubes, the
          remedy of plugging the degraded tubes to take them out of service
          was no longer a viable option.

               Following a detailed  analysis of the safety, technical  and
          financial  considerations  associated  with  the  degraded  steam
          generator tubes,  Maine Yankee  elected  to repair  the tubes  by
          inserting and  welding short  reinforcing sleeves of  an improved
          material  in substantially  all  of the  Plant's steam  generator
          tubes.    Similar repairs  have been  completed at  other nuclear
          plants in the  United States and abroad, but not  on the scale of
          the Maine Yankee project.  With Westinghouse Electric Corporation
          as the general  contractor, the sleeving project started in early
          June of 1995, after approval of the Westinghouse sleeving process
          by the Nuclear Regulatory Commission ("NRC"), and was essentially
          complete in early December.   The project caused Maine  Yankee to
          incur  additional  costs  during  1995, with  the  Company  being
          responsible  for its pro-rata share.   The Company  has also been
          incurring substantial incremental costs for replacement power.

               With   the   termination   of  the   reconcilable  fuel-and-
          purchased-power   adjustment   under   the    Company's   indexed
          Alternative Rate Plan ("ARP"),  which became effective January 1,
          1995, the Company's costs of  replacement power during the  Maine
          Yankee  outage have  in general been  treated like  other Company
          expenses, i.e., recoverable only  to the extent permitted by  the
          ARP's  price-index  mechanism, and  are  not  being deferred  and
          collected through a specific  fuel-rate adjustment, as under pre-
          1995  ratemaking.   Under  the ARP  no additional  price increase
          other than the 2.43  percent increase that was effective  July 1,
          1995, associated with the  price index could take effect  in 1995
          as  a result  of  the  Maine Yankee  outage.    Although the  ARP
          contains provisions  that could result in  rate adjustments based<PAGE>





          on  low earnings or the  incurring of extraordinary  costs by the
          Company, neither provision affected the Company's prices in 1995.

               Maine Yankee is recording the costs of the  sleeving project
          as maintenance  expense.  In  mid-1995 the Company  estimated its
          share of  such costs to be $15.0  million and recorded a one-time
          charge for  that amount  to Purchased Power--Capacity  expense in
          the second quarter  of 1995.  Maine Yankee has billed the Company
          $9.6 million as  of November 30, 1995, for costs  incurred.  Both
          the  Company  and  Maine  Yankee  implemented  significant  cost-
          reduction measures to partially offset the additional costs.  The
          Company's    incremental    replacement-power    costs    totaled
          approximately $25  million for  the eleven months  ended November
          30, 1995. 

               On  December  4,   1995,  when  the  sleeving  project   was
          substantially complete, Maine Yankee obtained  a copy of a letter
          from  an organization with  a history  of opposing  nuclear power
          development  to a State of Maine nuclear safety official based on
          documentation from  an anonymous  employee or former  employee of
          Yankee Atomic  Electric Company ("Yankee"), an  affiliate of both
          the Company and Maine Yankee that has regularly performed nuclear
          engineering  and  related services  for  Maine  Yankee and  other
          nuclear plant  operators.  The letter  contained allegations that
          Yankee knowingly  performed inadequate  analyses  to support  two
          license amendments to  increase the rated thermal  power at which
          the Maine Yankee Plant could operate.  It  was further alleged in
          the  letter that   Maine  Yankee deliberately  misrepresented the
          analyses  to  the NRC  in seeking  the  license amendments.   The
          allegedly  inadequate analyses  related to  the operation  of the
          Plant's   emergency  core   cooling  system   ("ECCS")  and   the
          calculation of the  Plant containment's peak  postulated accident
          pressure, both  under certain  assumed accident conditions.   The
          analyses  were  used  in   support  of  license  amendments  that
          authorized  Plant power  uprates from  2440 megawatts  thermal, a
          level equal to approximately 90 percent of the maximum electrical
          capability of the Plant, to its current 100-percent rated level.

               In response to  technical issues raised by the  allegations,
          the  NRC  initiated  a special  technical  review  of the  safety
          analyses performed  by Yankee relating to  Maine Yankee's license
          amendment  applications for the power uprates.  At the same time,
          Maine    Yankee   and   Yankee   initiated   intensive   internal
          investigations  of   the  allegations  and   provided  responsive
          information and documentation to the NRC.

               On December  18, 1995, a public meeting was  held at the NRC
          to  discuss  the  findings  resulting from  the  NRC's  technical
          review.  At the meeting the NRC informed Maine Yankee that it had
          concerns regarding  the adequacy  of a proprietary  computer code
          used in ECCS  safety analyses supporting Maine Yankee's  last two
          applications for license amendments that authorized power uprates
          to levels above  90 percent of its current maximum  capacity.  At
          the meeting the NRC also indicated that operation of the Plant at<PAGE>





          a  level up to  90 percent could  be acceptable if  operation was
          based on methods previously found acceptable by the NRC staff and
          not on the computer  code that is currently  under review by  the
          NRC,  and  further  informed  Maine  Yankee   of  the  terms  and
          conditions under which Maine  Yankee could resume power operation
          of the Plant.   Subsequently, the NRC informed Maine  Yankee that
          the allegations  would be  the subject  of investigations by  the
          NRC's Office  of Investigations and  the Office of  the Inspector
          General.

               On  January 3, 1996,  the NRC  issued a  "Confirmatory Order
          Suspending  Authority  For  And  Limiting   Power  Operation  And
          Containment  Pressure  (Effective  Immediately)  And  Demand  For
          Information" (the "Order") confirming  the conclusions of the NRC
          from the  public meeting and follow-up  communications with Maine
          Yankee.  The Order limited  the power output of the Maine  Yankee
          Plant  to approximately 90 percent of its rated maximum until the
          NRC  shall  have reviewed  and  approved Plant-specific  analyses
          meeting  the NRC's  criteria  for  operation  of the  ECCS  under
          certain postulated  accident conditions, in lieu  of the analyses
          based  on  the  questioned  computer code.    The  Order  further
          required that prior  to operating  the Plant at  any level  Maine
          Yankee should submit under oath specified information relating to
          operating   the  Plant  at   up  to  the   90-percent  level  and
          descriptions  of measures  taken  to assure  compliance with  the
          limitations on operating level and containment pressure.  

               With  respect to  subsequently returning  the  Plant to  its
          100-percent operating  level, the Order required  Maine Yankee to
          submit a  Plant-specific analysis meeting  the NRC's requirements
          for  ECCS operation  under  specified conditions  at Plant  power
          levels up to  100 percent of its  maximum rated capability.   The
          Order   also   required   an   integrated   containment  analysis
          demonstrating  that the  maximum calculated  containment pressure
          under certain postulated accident  conditions does not exceed the
          design  pressure of the  Plant's containment.   In  addition, the
          Order required Maine  Yankee to submit  a schedule for  providing
          the requested analyses and  related information to the NRC.   The
          Order is subject to  the limited rights of any  person "adversely
          affected" by the Order  to request a hearing or to seek a stay of
          the effectiveness of the Order.

               On  January 10,  1996,  Maine  Yankee  filed  with  the  NRC
          information  specified in  the  Order that  it believes  supports
          operation  of  the  Plant at  up  to 90  percent  of  the Plant's
          capability.   In its submittal Maine Yankee also notified the NRC
          that it expected to  proceed  with initial operation of the Plant
          on  January 11, 1996, and  the Plant commenced  operation on that
          day.   Under ordinary circumstances, raising  the operating level
          of  the Plant  incrementally  to the  90-percent  level could  be
          accomplished  in as short a  period as approximately  a week, but
          Maine Yankee  believes that  after the eleven-month  shutdown the
          Plant has experienced the process could take longer.  The Company
          estimates that its incremental replacement power costs at the 90-<PAGE>





          percent  level of  operation  would range,  depending on  overall
          energy  requirements and  market  conditions, from  approximately
          $300,000 to $500,000 per  month as a result of the reduced energy
          output of the Plant.

               The Company cannot predict  when the Plant will attain a 90-
          or  100-percent operating level, the  results of the internal and
          external  investigations  of  the allegations  brought  to  Maine
          Yankee's attention on December 4, 1995, or whether any party will
          seek an NRC  hearing or  any appeal  with respect  to the  Order.
          Maine Yankee has stated,  however, that it intends to  pursue its
          internal   investigation  diligently   and  cooperate   with  the
          governmental investigations,  and that it believes  that after it
          develops the  information requested by  the NRC for  operation of
          the Plant at full capacity  it will be able to operate  the Plant
          at   that  level   while  meeting   all  applicable   NRC  safety
          requirements. 

          Item 6 through Item 8.  Not applicable.



                                      SIGNATURE



               Pursuant to the requirements of the  Securities Exchange Act
          of 1934, the Registrant has duly caused this report to  be signed
          on its behalf by the undersigned thereunto duly authorized.

                                     CENTRAL MAINE POWER COMPANY


                                     By:                               
                                         D. E. Marsh
                                         Vice President, Corporate
                                         Services, Treasurer and Chief
                                         Financial Officer

          Dated:  January 12, 1996 <PAGE>