                      SECURITIES AND EXCHANGE COMMISSION
                            WASHINGTON, D.C.  20549

                                  FORM 10-K/A
                                        
[X] ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT
    OF 1934

               For the fiscal year ended:  DECEMBER 31, 1996, or
                                        
[ ] TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES
    EXCHANGE ACT OF 1934

                For the transition period from ______ to ______
                                        
Commission file number:   0-23336

                           ELECTRIC FUEL CORPORATION
                     -------------------------------------
             (Exact name of registrant as specified in its charter)
                                        
             DELAWARE                                        95-4302784
- ----------------------------------------           -----------------------------
   (State or other jurisdiction of                        (I.R.S. Employer     
   incorporation or organization)                         Identification No.)

              SUITE 2900
           885 THIRD AVENUE
              NEW YORK, NY                                  10022-4834
- ----------------------------------------           -----------------------------
(Address of principal executive offices)                    (Zip Code)

Registrant's telephone number, including area code:  (212) 230-2172

Securities registered pursuant to Section 12(b) of the Act:  NONE

Securities registered pursuant to Section 12(g) of the Act:  COMMON STOCK, $.01
                                                             PAR VALUE

     Indicate by check mark whether the registrant (1) has filed all reports
required to be filed by Section 13 or 15(d) of the Securities Exchange Act of
1934 during the preceding 12 months (or for such shorter period that the
registrant was required to file such report), and (2) has been subject to such
filing requirements for the past 90 days.

                    Yes   X                        No
                       -------                       -------
                                        
     Indicate by check mark if disclosure of delinquent filers pursuant to Item
405 of Regulation S-K ((S) 229.405) is not contained herein, and will not be
contained, to the best of registrant's knowledge, in definitive proxy or
information statements incorporated by reference in Part III of this Form 10-K
or any amendment to this Form 10-K. [___]

     The aggregate market value of voting stock held by nonaffiliates of the
registrant as of March 27, 1997 was approximately $30,703,899 (based on the last
sale price of such stock as reported by the Nasdaq National Market).

     As of March 17, 1997, 14,193,661 shares of registrant's Common Stock, $.01
par value per share (the "Common Stock"), were issued and outstanding.

                        EXHIBIT INDEX APPEARS ON PAGE 6
                                        
                                 PAGE 1 OF ___
                                        

<PAGE>
 
                           ELECTRIC FUEL CORPORATION
                           -------------------------
                                        

     Item 14 of the Annual Report on Form 10-K is hereby amended and restated as
follows:

ITEM 14.  EXHIBITS, FINANCIAL STATEMENT SCHEDULES AND REPORTS ON FORM 8-K

(a)  1. Financial Statements - See Index to Financial Statements attached
        hereto, page 32.

     2. Financial Statements Schedules - See Index to Financial Statements
        attached hereto, page 32.

     3. Exhibits - The following is a list of exhibits:

<TABLE> 
<CAPTION> 

Exhibit
Number              Description
- ------              -----------
<C>        <S> 
2          Merger Agreement dated as of March 2, 1994 between the Company and
           Advanced Materials Technology, Inc.(1)

3.1        Amended and Restated Certificate of Incorporation of the
           Registrant.(1)

3.2        Amended and Restated By-Laws of the Company.(4)

4          Specimen Certificate for shares of Common Stock, $.01 par value of
           the Registrant.(1)

10.1       Option Agreement dated October 29, 1992 between Electric Fuel B.V.
           ("EFBV") and Electric Storage Advanced Technologies, Sr ("ESAT").(1)

10.2       Sublicense Agreement dated May 20, 1993 between EFBV and ESAT.(1)

10.3       Letter Agreement dated May 20, 1993 between EFBV and ESAT.(1)

10.4       Notice of Edison's assumption of ESAT's obligations under the
           Sublicense Agreement with EFBV.(1)

10.5       Agreement dated December 16, 1992 between EFL and Technischer
           Uberwachungsverein Bayern Sachsen e.V. ("TUV").(1)

10.6       Agreement dated July 29, 1992 between EFL and TUV.(1)

10.7       Letter of Intent between the Company and Deutsche Post AG dated
           November 18, 1993.(1)

10.8       1993 Stock Option and Restricted Stock Purchase Plan.(1)+

10.9.1     Form of Management Employment Agreements. (1)+

10.9.2     General Employee Agreements.(1)*+
</TABLE> 

                                      -2-
<PAGE>
 
<TABLE>         
                
<C>        <S>   
10.10      Office of Chief Scientist documents.(1)*

10.10.1    Letter from the Office of Chief Scientist to the Company dated
           January 4, 1995.(4)

10.11      Lease Agreement dated December 2, 1992 between the Company and Har
           Hotzvim Properties Ltd.(1)*

10.12      Letter of Approval by the Investment Center of the Ministry of
           Trade.(1)*

10.13      Execution Copy of Purchase Agreement dated as of June 9, 1993 among
           the Company, EFL, Advanced Materials Technology, Inc. and the Trustee
           of the Chapter 7 Bankruptcy Estate of Luz International Ltd.(1)
 
10.14      Agreement between EFL and Dr. Walter Trux dated as of March 1,
           1993.(1)

10.15      Cooperation Agreement between EFL and Hoechst GmbH dated as of August
           22, 1994.(2)

10.16      Agreement between Deutsche Post AG and EFL dated as of September 19,
           1994.(2)

10.17      Agreement between Deutsche Post AG and EFL dated as of October 21,
           1994.(2)

10.18      Framework Agreement between Vattenfall AB and EFL dated March 27,
           1995.(3)

10.19      Summary of the terms of the Lease Agreements dated as of November 11,
           1994, November 11, 1994 and April 3, 1995 between EFL and Industries
           Building Company, Ltd.(4)*

10.20      Amended and Restated 1995 Non-Employee Director Stock Option Plan.(5)+

10.21      Framework Contract between the Company and Stadtwerke Bremen AG
           ("Stadtwerke") dated July, 1995.(4)

10.22      Assignment Agreement dated December 31, 1995 between EFL, Hoechst
           GmbH and Uhde GmbH ("Uhde").(4)

10.23      Lease between EFL and Stadtwerke dated __________, 1995.(5)*

10.24      Framework Agreement for Cooperation in Marketing and Establishment of
           Regeneration Plants between EFL and Uhde dated February 11, 1996.(5)

10.25      Letters of Approval of Lines of Credit from First International Bank
           of Israel Ltd. dated March 14, 1996 and March 18, 1996.(5)

10.26      Stock Purchase Agreement between the Company and Leon S. Gross
           ("Gross") dated September 30, 1996.(6)

10.27      Registration Rights Agreement between the Company and Gross dated
           September 30, 1996.(6)

10.28      Voting Rights Agreement between the Company, Gross, Robert Ehrlich
           and Yehuda Harats dated September 30, 1996. (6)
</TABLE> 

                                      -3-
<PAGE>
 
<TABLE>         
                
<C>        <S>   
10.29      Agreement between the Company and Walter Trux dated December 18,
           1996.

10.30      Cooperation Agreement between The Israel Electric Corporation Ltd.
           and Electric Fuel Limited, dated as of October 3, 1996 (with
           Confidential Treatment requested pursuant to Rule 24b-2 under the
           Securities Exchange Act of 1934, as amended.)

10.31      Amended and Restated Employment Agreement, dated as of October 1,
           1996 between the Company, EFL and Yehuda Harats+

10.32      Amended and Restated Employment Agreement dated as of October 1, 1996
           between the Company, EFL and Robert S. Ehrlich+

10.33      Lease Agreement between Mori Investments Ltd. and EFL dated March 18,
           1996.

10.34      Agreement between Electric Fuel Limited and STN Atlas Elektronik
           GmbH, dated as of February 20, 1997 (with Confidential Treatment
           requested pursuant to Rule 24-b-2 under the Securities Exchange Act
           of 1934, as amended.)

21         Subsidiaries.(4)

23.1       Consent of Kesselman & Kesselman (a member of Coopers & Lybrand
           International), independent certified public accountants in Israel.

27         Financial Data Schedule.

99.1       Important factors regarding forward-looking statements.
</TABLE> 
________________

*   English translation or summary from original.
+   Includes management contracts and compensation plans and arrangements.
(1) Incorporated by reference to the Company's Registration Statement on Form 
    S-1 (Registration No. 33-73256), which became effective on February 23, 
    1994.
(2) Incorporated by reference to the Company's Annual Report on Form 10-K for
    the year ended December 31, 1994, as amended.
(3) Incorporated by reference to the Company's Quarterly Report on Form 10-Q
    for the quarter ended June 30, 1995.
(4) Incorporated by reference to the Company's Registration Statement on Form
    S-1 (Registration No. 33-97944), which became effective on February 5, 1996.
(5) Incorporated by reference to the Company's Annual Report on Form 10-K for
    the year ended December 31, 1995.
(6) Incorporated by reference to the Company's Report on Form 8-K dated October
    4, 1996.

                                      -4-
<PAGE>
 
                                   SIGNATURE
                                        

     Pursuant to the requirements of Section 13 or 15(d) of the Securities
Exchange Act of 1934, the Registrant has duly caused this Amendment to be signed
on its behalf by the undersigned, thereunto duly authorized, in the City of New
York, the State of New York, on this 14th day of April, 1997.

                              ELECTRIC FUEL CORPORATION



                              By: /s/Robert S. Ehrlich
                                 -------------------------------------------
                                 Name:  Robert S. Ehrlich
                                 Title:  Chairman and Chief Financial Officer

Date:  April 14, 1997

                                      -5-
<PAGE>
 
                                 Exhibit Index
<TABLE> 
<CAPTION> 
                                        
Exhibit                                                                                Page
- -------                                                                                ----
<C>     <S>                                                                            <C> 
10.30   Cooperation Agreement between The Israel Electric Corporation Ltd. and
        Electric Fuel Limited, dated as of October 3, 1996 (with Confidential
        Treatment requested pursuant to Rule 24b-2 under the Securities Exchange
        Act of 1934, as amended.)..................................................

10.34   Agreement between Electric Fuel Limited and STN Atlas Elektronik GmbH,
        dated as of February 20, 1997 (with Confidential Treatment requested
        pursuant to Rule 24-b-2 under the Securities Exchange Act of 1934, as
        amended.)..................................................................
</TABLE> 

                                      -6-

<PAGE>
 
                                                                   EXHIBIT 10.30
                             COOPERATION AGREEMENT

This Cooperation Agreement is made as of the 31 day of October, 1996 by and
between The Israel Electric Corporation Ltd. ("IEC") and Electric Fuel (E.F.L.)
Limited ("EFL").


1.  Purpose and Background


1.1  The Electric Fuel System.  EFL has developed and is the owner of a
     proprietary system for powering electric vehicles ("the Electric Fuel
     System") consisting of (i) a zinc-air battery containing a series of zinc
     anode cassettes (such zinc anode cassettes are referred to herein as
     "Electric Fuel"); (ii) systems for using electric power to produce or
     recycle the Electric Fuel ("Regeneration"); and (iii) mechanical systems
     for replacing spent Electric Fuel with fresh Electric Fuel ("Refueling").
     EFL represents and warrants:

     (a)  that it is the owner or holder of all rights deriving from the patents
          and patent applications relating to the Electric Fuel System and
          component parts thereof listed in Schedule A (together with any
          patents obtained and applications filed by EFL in the future in
          connection with the Electric Fuel System, the "Patent Rights");

     (b)  that it has the right to certain technology consisting of all
          confidential and proprietary know-how, data and information, whether
          or not patentable, concerning the Electric Fuel System and all
          component parts thereof (the "Technology"); and

     (c)  that it has the right, under the Patent Rights and Technology, to
          grant the license to use the Electric Fuel System as granted below.

     EFL makes and IEC receives no warranty or representation, express or
     implied, except as specifically set forth above or elsewhere in this
     Agreement.

1.2  The Demonstration Program.  IEC will participate with EFL in the evaluation
     and demonstration of the Electric Fuel System in Israel (the "Demonstration
     Program"), and in consideration will receive from EFL a license for
     production, distribution and marketing of Electric Fuel in Israel and
     neighboring countries subject to the terms and conditions set out below
     (the "License").  EFL reserves the right to modify the scope and timing of
     the Demonstration Program, in its sole discretion, on the basis of such
     technological and business developments as EFL deems relevant, provided
     that EFL will provide IEC with notice and reasonable explanation of any
     modifications to the Demonstration Program, and will make commercially
     reasonable efforts to complete the Demonstration Program.

<PAGE>
 
     The goods and services to be supplied by EFL to IEC hereunder shall be
     supplied on the terms set forth in this Paragraph 10.

10.1 Procurement from EFL. The infrastructure to be developed by IEC is based
     on technology and processes developed by and proprietary to EFL. Basic
     engineering, including process and instrumentation diagrams, and
     proprietary equipment based on EFL technology (as set forth in Schedule D)
     will be procured by IEC, its Affiliated Companies and its permitted
     sublicensees solely from EFL. EFL will make its best efforts to provide the
     required services and equipment as needed, and the prices charged and terms
     of payment provided by EFL to IEC will be no less favorable than those
     charged and provided by EFL to its best customers worldwide.

10.2 Technical Support. At the request of IEC, on terms to be agreed, EFL shall
     provide detailed engineering, technical support and operating services for
     the operation of the Electric Fuel System infrastructure. Subject to the
     terms of Paragraph 10.3, EFL shall have a right of first refusal to provide
     such services if IEC decides to subcontract all, or any portion of, such
     services.

10.3 Sub-contracting by EFL. To the extent that EFL subcontracts the provision
     of any portion of goods or services to be supplied by EFL to IEC, the price
     charged to IEC shall not be greater than the price paid by EFL, plus EFL's
     related expenses, by a factor of more than 10%, subject in all cases to the
     provisions of the last sentence of Paragraph 10.1 above. IEC shall have the
     right to suggest alternative subcontractors for the supply of goods and
     services, subject to the consent of EFL. EFL shall not unreasonably
     withhold consent to any alternate subcontractor that demonstrates that it
     is able to meet EFL's technical and commercial standards, consistently
     applied.

11.  TRADEMARK USE; PRODUCT MARKINGS

11.1 Trademarks.  During the term of this Agreement, IEC is authorized to use
     and shall use the Electric Fuel registered trademark (together with the
     Hebrew translation "ai(divided by) cuiie" or transliteration "ai(divided
     by)ee(divided by) oeai" if desired) for all advertising and point-of-sale
     signage relating to Electric Fuel products and services. All proposed uses
     of EFL trademarks shall be subject to prior review and approval by EFL,
     which approval shall not unreasonably be withheld. This requirement will
     not limit the rights of IEC to use its own trademarks and service marks as
     well.

11.2 Other Markings.  IEC agrees to use any reasonable form of notice and
     manner of affixing such notice as specifically requested by EFL as
     reasonably deemed necessary by EFL to protect EFL's intellectual property
     rights.

12.  BOARD APPROVAL

                                      -2-
<PAGE>
 
              licensees may be made available to IEC without any additional
              payment by IEC.

2.4  Financial Participation. Within thirty (30) days of the submitting by EFL
     of a tax invoice following approval of the Agreement by the Board of
     Directors of EFL and by the competent authorities of IEC, pursuant to
     Paragraph 12 below, IEC will pay to EFL the NIS equivalent at the
     Representative Rate of $960,000 (Nine Hundred Sixty Thousand U.S. Dollars)
     plus V.A.T. IEC will also cover the costs of converting and adapting any
     IEC vehicles for electric operation with EFL zinc-air batteries, and the
     costs of operating said vehicles and exchanging batteries therein. [*]

3.  THE LICENSE

     This License obtained by IEC pursuant to this Agreement will have the terms
     and conditions set out in this Paragraph 3.

3.1  Rights Granted. For the term of the License, in the designated Territory
     (defined below), and subject to the Conditions (defined in Paragraph 4
     below) and Payment (defined in Paragraph 5 below), IEC is granted (i) the
     exclusive right to operate Regeneration facilities for the generation and
     regeneration of Electric Fuel in the Territory, (ii) the exclusive right to
     sell Electric Fuel to third parties in the Territory, and (iii) the
     exclusive right to provide Refueling services to third parties in the
     Territory.  The field of the License shall be limited to on-road and off-
     road electric vehicles.

3.2  Rights Retained. EFL retains all rights not granted to IEC above, as well
     as the rights to produce Electric Fuel for its internal needs, for limited
     demonstration and testing purposes, for limited experimental supply to
     potential customers in the Territory, and for export to customers outside
     of the Territory.

3.3  Term. The initial term of the License shall be 30 years, commencing upon
     the date that this Agreement is executed, extending at the option of IEC
     for an unlimited number of additional periods of ten years each, provided
     in all cases that IEC is in compliance with all of the terms of the
     License, including the Conditions.

3.4  Territory.  The Territory shall include all areas controlled by the State
     of Israel. The Territory will also include the Palestinian Authority,
     Egypt, Jordan, Syria and Lebanon (the "Additional Jurisdictions"), in
     accordance with Paragraph 6 below, and may include Saudi Arabia, Iraq,
     Iran, and the United Arab Emirates (the "First Refusal Countries") as
     described in Paragraph 7 below.

3.5  Sublicense of Refueling. IEC may at its discretion sublicense to third
     parties part or all of its right to provide Refueling services in the
     Territory. Sublicensees are subject to 

- ----------
* THIS CONFIDENTIAL PORTION HAS BEEN SO OMITTED AND FILED SEPARATELY WITH THE
  COMMISSION.


                                      -3-
<PAGE>
 
     the approval of EFL, said approval not to be unreasonably withheld.
     Sublicenses shall only be granted by written agreement which shall include
     the following provisions:

          (a) The sublicensee shall execute a confidentiality undertaking
              substantially in the form of the Confidentiality and Non-
              disclosure Agreement annexed as Schedule C to this Agreement.

          (b) The sublicensee shall agree: (i) to maintain records and books of
              account containing all data reasonably required for the full
              computation of all payments due to IEC under the sublicense; (ii)
              to permit the inspection of such records and books of account in
              accordance with the procedures set forth in Paragraph 5.4 below;
              and (iii) to take all reasonable steps to protect the intellectual
              property of EFL in the Electric Fuel System, including the Patent
              Rights and Technology; (iv) to use relevant Electric Fuel
              trademarks pursuant to Paragraph 11 of this Agreement; (v) to
              maintain all specifications and standards as necessary to meet the
              quality and warranty standards of the Electric Fuel System as well
              be determined pursuant to Paragraph 4.4 below; and (vi) to perform
              the obligations delegated to it by IEC under this Agreement as if
              this Agreement were binding upon it; and (vii) to be bound by all
              other relevant obligations of IEC under this Agreement, including
              without limitation Paragraph 10 below.

          (c) IEC shall remain directly liable to EFL for the performance by the
              sublicensee of all its obligations to IEC and EFL.

3.6  Assignment. Except as expressly provided in Paragraph 3.5 above, the rights
     granted hereunder may not be assigned or sublicensed to any party other
     than as follows:

          (a) IEC may assign all or a substantial portion of its rights and
              obligations under this Agreement to an "Affiliated Company" as
              defined below, subject only to prior written notice to EFL,
              provided that IEC shall continue to be directly liable to EFL for
              compliance by the assignee with this Agreement.

          (b) If at any time an Affiliated Company which is an assignee under
              this Paragraph 3.6 ceases to be an Affiliated Company, then EFL
              shall have the right to revoke the License upon thirty (30) days'
              notice from EFL to both IEC and the assignee, unless within such
              30-day period the assignee once again becomes an Affiliated
              Company.

          (c) For purposes of this Agreement, "Affiliated Company" shall mean
              any company in which IEC owns or controls directly or indirectly
              more than 50% of the shares carrying the right to vote at
              shareholders meetings; provided, however, that no company shall be
              deemed an Affiliated Company if a material portion

                                      -4-
<PAGE>
 
              of its shares is held by (i) a potential technological or business
              competitor of EFL, as reasonably determined by EFL or (ii) a party
              whose involvement may, in EFL's reasonable opinion, prejudice the
              long term interests of EFL.

4.  CONDITIONS

     In order for the License to remain in effect, at all times during the term
     of the License IEC must comply with the Conditions set forth below. If IEC
     does not materially comply with any of the Conditions, then EFL may
     terminate the License or, at its option, convert the exclusive aspects of
     the License to non-exclusive.  Such termination or conversion to non-
     exclusive license may take place only after EFL has given prior written
     notice to IEC of the grounds for termination or conversion to non-
     exclusive, and IEC has failed to remove such grounds within the 45-day
     period following receipt of such notice.

4.1  Development of the Market. IEC shall use all reasonable efforts, both on
     its own and in cooperation with EFL, to engage in activities aimed at
     maximizing the growth of the market in the Territory for Electric Fuel at a
     reasonable rate, based among other things on the rate at which the market
     for Electric Fuel has developed in other territories where EFL or its other
     licensees are active .

4.2  Infrastructure Development Plan. Beginning with the approval of this
     Agreement pursuant to Paragraph 12 below, IEC and EFL will jointly develop
     and annually update a multi-year Infrastructure Development Plan that will
     include agreed-upon projections for deployment of electric vehicles using
     the Electric Fuel System.  The Infrastructure Development Plan will be
     based on actual sales, contracts under negotiation, letter of intent,
     market surveys, and projected growth rates, and will include agreed-upon
     projections for deployment and availability of Electric Fuel in the
     Territory.  To the extent possible and on terms to be agreed, EFL will make
     its Bet Shemesh plant available for expansion if the parties determine that
     this would prove to be the most cost efficient manner for IEC to meet its
     obligation for the initial establishment of infrastructure pursuant to the
     agreed Infrastructure Development Plan.  In this connection, IEC shall at
     its own expense apply for and secure all governmental and regulatory
     approvals necessary to establish the infrastructure, sell Electric Fuel and
     provide Refueling services.  To the extent necessary, and at the expense of
     IEC, EFL shall cooperate in the application for such approvals.

4.3  Supply of Electric Fuel. IEC shall supply on a timely basis to all
     customers and refuelers/distributors in the Territory all demand for
     Electric Fuel so long as that demand, in terms of quantities of zinc anodes
     replaced [*] was projected by an approved Infrastructure Development Plan.
     IEC will use its best efforts to supply all demand for Electric Fuel [*].
     EFL reserves the right to supply Electric Fuel to any interested
     creditworthy

- ----------
* THIS CONFIDENTIAL PORTION HAS BEEN SO OMITTED AND FILED SEPARATELY WITH THE
  COMMISSION.


                                      -5-
<PAGE>
 
     customers in the Territory who IEC refuses or otherwise fails to supply,
     provided EFL has given IEC 45 days' prior written notice and IEC has failed
     to supply the customer during such 45-day period.

4.4  Standards. IEC will cooperate with EFL and, through groups or organizations
     coordinated by EFL, with other EFL licensees in other territories on the
     establishment and maintenance of international standards for the Electric
     Fuel System. Both parties will ensure that equipment, materials and
     processes used in the Territory will comply with international system
     standards.  IEC will not be required to adopt new standards which render
     substantial portions of IEC's infrastructure investment obsolete.

4.5  Competition. During the term of this Agreement, IEC shall actively promote
     and manage the use of the Electric Fuel System as its highest-priority,
     most-favored system for low-emission vehicle systems in the Territory.
     During the term of this Agreement and for a period of five years after the
     termination for any reason of this Agreement, neither IEC nor any
     Affiliated Company of IEC shall be involved, directly or indirectly, in the
     manufacture, marketing or provision of services relating to any zinc air
     battery system for electric vehicles.

4.6  Payments.  IEC shall make all payments to EFL as set forth in Paragraph 5
     below.

5.   PAYMENT

5.1  Customer Prices.  IEC shall be free to set the prices that it charges to
     customers, refuelers and distributors for Electric Fuel and for Refueling
     services.

5.2  Payments to EFL.  During the term of the License, IEC shall pay to EFL an
     amount equal to the Effective Percentage of Relevant Gross Revenues, as
     defined below:

          (i) The Effective Percentage shall be: [*] Relevant Gross Revenues in
              each calendar year; and [*] Relevant Gross Revenues [*] in each
              calendar year. The aforesaid sum of [*] shall be linked to the
              U.S. Consumer Price Index in effect on the date that this
              Agreement receives final approval under Paragraph 12.

         (ii) Because it is anticipated that IEC will make significant
              investments in infrastructure and will experience net losses in
              the earlier part of the License term, all Relevant Gross Revenues
              recorded until June 30, 1999, will be exempted from royalty
              obligations.

        (iii) Relevant Gross Revenues shall mean all revenues, payments and
              receipts from the sale, lease or other disposition of Electric
              Fuel or the provision of Refueling

- ----------
* THIS CONFIDENTIAL PORTION HAS BEEN SO OMITTED AND FILED SEPARATELY WITH THE
  COMMISSION.


                                      -6-
<PAGE>
 
              services, or any other revenue (including payments for
              sublicenses) in connection with the Electric Fuel System received
              by IEC or any Affiliate Company of IEC from unrelated third
              parties (including unaffiliated permitted sublicensees) and, with
              respect to Electric Fuel products or services consumed by IEC or
              any Affiliated Company of IEC, shall include a component for the
              revenue that IEC would have received had such products or services
              been paid for by an unrelated third party on an arm's length
              basis. Relevant Gross Revenues shall not include V.A.T. or any
              similar sales tax collected by IEC, an Affiliated Company or a
              sublicensee, as the case may be.

         (iv) Notwithstanding the provisions of subparagraph "(i)" above, [*].
              The parties acknowledge that the aforesaid reduced royalty rates
              fairly reflect the value of the licensed Technology and do not
              include a component for the licensed Patent Rights.

5.3  Terms of payment. Payments to EFL shall be made quarterly within 60 days of
     the close of each calendar quarter.  Any payment not made when due date
     shall bear interest at the highest rate charged by Bank Leumi Le-Israel
     Ltd. for unauthorized overdrafts of its least creditworthy customers, for
     the period from the due date until the date of actual payment.

5.4  Reports; Audit Rights. Each payment shall be accompanied by a report
     setting forth all information required to confirm the calculation of the
     payment. At least once each calendar year, IEC's outside auditors will
     certify these reports. In case of dispute between EFL and IEC, an
     independent outside auditor acceptable to both parties shall be hired and
     given access to the relevant books and records.  The findings of the
     independent outside auditor shall be binding on the parties, and the fees
     and expenses of the independent outside auditor shall be paid by EFL unless
     an underpayment of a material amount owed to EFL is found, in which case
     such fees and expenses shall be paid by IEC.

5.5  Arrangements with Certain Distributors.  In all arrangements with Major
     Distributors (as defined below) providing Refueling services under sub-
     license, the difference between the Gross Revenues realized by IEC as a
     result of the Electric Fuel transactions with the Major Distributor and the
     total revenue realized by the Major Distributor as a result of Electric
     Fuel transactions with its customers shall be deemed "Relevant Gross
     Revenues" for purposes of Clause 5.2 above.  For purposes of this Paragraph
     5.5, the term "Major Distributor" shall mean any company or other legal
     entity that distributes (i) its products or services to five or more
     stations, stores or other 

- ----------
* THIS CONFIDENTIAL PORTION HAS BEEN SO OMITTED AND FILED SEPARATELY WITH THE
  COMMISSION.


                                      -7-
<PAGE>
 
     similar retailers or (ii) sell to one or more major fleet operator.

6.   ADDITIONAL JURISDICTIONS

     In order to maintain the inclusion of any particular jurisdiction of the
     Additional Jurisdictions in the Territory after December 31, 2000, such
     jurisdiction must not be in a state of belligerency with Israel and must
     maintain diplomatic and trade relations with Israel.

7.   FIRST REFUSAL COUNTRIES

     Following the execution of this Agreement and until December 31, 2000, IEC
     shall have a right of first refusal with respect to the obtaining of a
     license comparable to the License in any of the following First Refusal
     Countries: Saudi Arabia, Iraq, Iran, the United Arab Emirates.

8.   PROTECTION OF THE MARKET

8.1  Patent Protection.  EFL will continue its policy of using best efforts to
     file and prosecute patents in order to ensure to the extent practicable
     that the exclusivity of IEC's License is protected by adequate patent
     protection. In this connection, all costs related to obtaining patents in
     Israel and of obtaining to the extent possible at least one patent of
     general coverage in each of the Additional Jurisdictions will be covered by
     EFL.  Any additional patent coverage in the Additional Jurisdictions, if
     requested by IEC, shall be paid for by IEC.  The parties shall consult with
     regard to the extent of and payment for patent coverage in the First
     Refusal Countries.

8.2  Exclusivity.  Subject to applicable law and Paragraphs 3.2 and 4.3 of this
     Agreement, EFL undertakes not to grant rights to sell or distribute
     Electric Fuel in IEC's Territory as part of any license granted to any
     other licensee so long as the License is in force.

8.3  Third Party Infringement Claims.  To the best knowledge and belief of EFL,
     IEC's contemplated use of the Electric Fuel System, Patent Rights and
     Technology pursuant to the License will not infringe any valid patent,
     trade secret or other intellectual property right in the Territory of any
     third party.  In the event that a third party claims that the use or sale
     of the Electric Fuel System or any component thereof by IEC infringes such
     third party's patent or trade secret rights in the Territory (a "Claim"),
     then:

     (i)  if the Claim relates to Israel, EFL will bear the costs and expenses
          of defending the Claim as well as damages and costs (if any) awarded
          to the third party, provided that IEC gives EFL prompt notice of the
          receipt of the Claim and all reasonable cooperation (at EFL's expense)
          in the defense of the Claim, and that 

                                      -8-
<PAGE>
 
          no settlement is made without prior approval of EFL; and

    (ii)  if the Claim relates to any part of the Territory other than Israel,
          EFL and IEC shall cooperate to defend the suit or proceeding, and
          shall equally share any costs and expense incurred in connection with
          such suits or proceedings as well as damages and costs (if any)
          awarded to the third party.  IEC shall be entitled to deduct all costs
          and expenses incurred by it under this subclause 8.3(ii) from
          royalties paid to EFL under this Agreement

8.4  Infringement by Third Parties.  If either party learns of any possible
     infringement or misappropriation of the Electric Fuel System or of the
     Patent Rights or Technology, it shall give prompt notice thereof to the
     other party. IEC shall have the obligation to bring suit against the
     infringer within 60 (sixty) days from the date that IEC learns of the
     infringement, in which case IEC shall bear the relevant costs and enjoy any
     benefit from any damages awarded.  If IEC does not bring suit within the
     aforesaid 60-day period, then EFL shall have the right to bring suit on the
     account and for the benefit of IEC.  In all cases, the parties shall
     cooperate in good faith in pursuing the suit brought by either of them
     against the infringer.  IEC shall be entitled to deduct all costs and
     expenses incurred by it under this subclause 8.4 (net of any benefits
     received) from royalties paid to EFL under this Agreement

8.5  Unanticipated Competition. If, despite the best efforts of both parties to
     prevent competition within the Territory, such competitive activities
     cannot be lawfully prevented, then the Effective Percentage shall be
     reduced by multiplying the Effective Percentage then in effect by a
     fraction, the numerator of which shall be [*] denominator of which shall be
     [*]. These amounts shall be calculated as accurately as possible, and in
     the event of a dispute, the parties will hire an independent economic
     consultant acceptable to both parties in order to determine the amount.

9.   MARKETING

     Marketing of the Electric Fuel System in the Territory will be the  joint
     obligation of the parties, with each party providing services within its
     own area of expertise. Neither party shall charge the other for marketing
     services except in connection with marketing campaigns for which a budget
     has been approved in advance by both parties.  IEC will use all reasonable
     efforts to assist EFL in obtaining projects in the Territory with the aim
     of increasing the market for the Electric Fuel System.

10.  PROCUREMENT OF EFL GOODS AND SERVICES

- ----------
* THIS CONFIDENTIAL PORTION HAS BEEN SO OMITTED AND FILED SEPARATELY WITH THE
  COMMISSION.

                                      -9-





<PAGE>
 
     The goods and services to be supplied by EFL to IEC hereunder shall be
     supplied on the terms set forth in this Paragraph 10.

10.1 Procurement from EFL. The infrastructure to be developed by IEC is based
     on technology and processes developed by and proprietary to EFL. Basic
     engineering, including process and instrumentation diagrams, and
     proprietary equipment based on EFL technology (as set forth in Schedule D)
     will be procured by IEC, its Affiliated Companies and its permitted
     sublicensees solely from EFL. EFL will make its best efforts to provide the
     required services and equipment as needed, and the prices charged and terms
     of payment provided by EFL to IEC will be no less favorable than those
     charged and provided by EFL to its best customers worldwide.

10.2 Technical Support. At the request of IEC, on terms to be agreed, EFL shall
     provide detailed engineering, technical support and operating services for
     the operation of the Electric Fuel System infrastructure. Subject to the
     terms of Paragraph 10.3, EFL shall have a right of first refusal to provide
     such services if IEC decides to subcontract all, or any portion of, such
     services.

10.3 Sub-contracting by EFL. To the extent that EFL subcontracts the provision
     of any portion of goods or services to be supplied by EFL to IEC, the price
     charged to IEC shall not be greater than the price paid by EFL, plus EFL's
     related expenses, by a factor of more than [*], subject in all cases to the
     provisions of the last sentence of Paragraph 10.1 above. IEC shall have the
     right to suggest alternative subcontractors for the supply of goods and
     services, subject to the consent of EFL. EFL shall not unreasonably
     withhold consent to any alternate subcontractor that demonstrates that it
     is able to meet EFL's technical and commercial standards, consistently
     applied.

11.  TRADEMARK USE; PRODUCT MARKINGS

11.1 Trademarks.  During the term of this Agreement, IEC is authorized to use
     and shall use the Electric Fuel registered trademark (together with the
     Hebrew translation "ai(divided by) cuiie" or transliteration "ai(divided
     by)ee(divided by) oeai" if desired) for all advertising and point-of-sale
     signage relating to Electric Fuel products and services. All proposed uses
     of EFL trademarks shall be subject to prior review and approval by EFL,
     which approval shall not unreasonably be withheld. This requirement will
     not limit the rights of IEC to use its own trademarks and service marks as
     well.

11.2 Other Markings.  IEC agrees to use any reasonable form of notice and
     manner of affixing such notice as specifically requested by EFL as
     reasonably deemed necessary by EFL to protect EFL's intellectual property
     rights.

12.  BOARD APPROVAL

- ----------
* THIS CONFIDENTIAL PORTION HAS BEEN SO OMITTED AND FILED SEPARATELY WITH THE
  COMMISSION.


                                      -10-
<PAGE>
 
     This Agreement will become effective upon the approval of the Board of
     Directors of EFL and the competent authorities of IEC. If such approval is
     not obtained within 90 days of the date hereof, the Agreement will be
     voided, and neither party shall have any claim against the other arising
     out of this Agreement. The parties will use best efforts to obtain the
     requisite approvals prior to March 11, 1996.

13.  CONFIDENTIALITY

     Each party agrees not to publicize the contents of this Agreement without
     the approval of the other party, subject to their respective statutory
     reporting requirements.

14.  TERMINATION

14.1 Termination for Breach.  Either party may terminate this Agreement at any
     time for material default or breach by the other party, effective on the
     date specified in a notice of termination, provided the defaulting party
     has been given at least 60 (sixty) days' notice in writing of the default
     and has failed to cure the default during such 60-day period.  It is agreed
     that any failure by IEC to make any payment due to EFL under this Agreement
     in a timely manner shall be deemed a material default and in such cases the
     aforesaid 60-day period shall run from the date that payment was due under
     this Agreement.

14.2 Termination for Convenience.  IEC may terminate this Agreement at any time
     upon 60 days' prior written notice to EFL, in which case:  (i) the License
     shall terminate; (ii) EFL shall be entitled to retain all payments,
     including payments made under Paragraph 2.4 above, received from IEC; (iii)
     EFL shall remain entitled to any payments due to it under Paragraph 5; and
     (iv) neither party shall have any claim against the other of any nature
     arising out of the termination.

14.3 Effect of Termination.  Upon termination for any reason: (i) IEC will
     return to EFL any and all prototypes, documentation or other materials
     reflecting or embodying the Technology ; (ii)  IEC will pay all amounts
     then due and owing to EFL; and (iii) the confidentiality and noncompetition
     undertakings of IEC shall survive.

15.  DISPUTE RESOLUTION

15.1 Amicable Settlement.  The parties shall endeavour to settle amicably any
     controversies which might arise between them in connection with
     interpretation and performance of this Agreement.

                                      -11-
<PAGE>
 
15.2 Arbitration.  In the event that a settlement cannot be reached within 30
     (thirty) days, either party may request that such controversy be finally
     settled by arbitration pursuant to the Arbitration Law, 1968, by one or
     more arbitrators (not to include retired judges) appointed and acting in
     accordance with such law.  This paragraph constitutes an agreement to
     arbitrate for purposes of the Arbitration Law, 1968.

16.  GENERAL

16.1 Entire Agreement.  This Agreement, together with its schedules and
     exhibits,  constitutes the entire agreement of the parties with regard to
     the subject matter hereof, and replaces and supersedes any other previous
     understandings and agreements relating to such subject matter.

16.2 Amendments.  In order to be valid and effective, any amendments to this
     Agreement must be made in writing and duly executed by the parties hereto.

16.3 Waivers.  The waiver by either party hereto of any breach or default of
     the other party or the failure of either party to promptly exercise its
     rights hereunder shall not be construed as a waiver of any subsequent
     breach or default or as a waiver of any of the terms, provisions or
     conditions of this Agreement.

16.4 Notices.  Any notice by one party to the other in connection with this
     Agreement shall be delivered in person or sent by registered mail or
     facsimile as follows:

If to EFL:                                  Electric Fuel (E.F.L.) Ltd.
                                            Attention: President and CEO
                                            5 Kiryat Mada Street
                                            Har Hotzvim Science Park
                                            POB 23073
                                            Jerusalem 91320
                                            Fax: 02-322252

If to IEC                                   The Israel Electric Corporation Ltd.
                                            P.O. Box 10
                                            Haifa 31000
                                            Attention:  Head of Research & 
                                            Development Division
                                            Fax: 04-

     Notices delivered in person or sent by facsimile shall be effective after
     eight working

                                      -12-
<PAGE>
 
     hours at the place of business of the addressee immediately.
     Notices sent by registered mail shall be effective five days after deposit
     in the mail. Notices sent by facsimile will be followed by copies sent by
     registered mail posted on the same day as that on which the facsimile
     notice was sent or on the next business day, if the facsimile notice is
     sent after the close of postal offices.

     IN WITNESS WHEREOF, the authorized representatives of the parties have
     signed this Agreement as of the date first above written.

THE ISRAEL ELECTRIC                     ELECTRIC FUEL (E.F.L.) LIMITED
CORPORATION LTD.

By:   ..............................    By:   ..............................
 
Name: ..............................    Name: ..............................
 
Title:..............................    Title:..............................


                                   SCHEDULES

A        EFL Patents and Patent Applications

B        Details of Demonstration Program

C        Confidentiality and Non-Disclosure Agreement

D        EFL Proprietary Equipment
 

                                      -13-
<PAGE>
 
               SCHEDULE A - EFL PATENTS AND PATENT APPLICATIONS
<TABLE>
<CAPTION>

ISRAELI PATENT
APPLICATION
NUMBER             TITLE/DESCRIPTION
<S>                <C> 
100,625            Electrically and Mechanically Rechargeable Metal/Air Cell

100,903            Improved Performance Zinc Anode for Batteries (now approved)

107,930            A Metal-Air Battery-Powered Electric Vehicle

116,344            A Battery Connector Unit for Use with an Electric Vehicle and a Metal-Air Battery

116,345            A Battery Connector Unit for Use with an Electric Vehicle and a Metal-Air Battery

116,346            A Process and Scraper for Removing Deposits from an Electrode

116,347            Means for Storage and Transportation of Electric Fuel

116,348            Electrolyte cooling Device for Use with a Metal-Air Battery

116,349            Recharging of Zinc Batteries

116,350            Air-cooled Metal-Air Battery

116,351            Improved Co\\2\\-Absorbent Particles for Co\\2\\ Scrubber System
</TABLE>

<PAGE>
 
                 SCHEDULE B - DETAILS OF DEMONSTRATION PROGRAM

I.   PURPOSE OF THE PROGRAM

     To establish the foundation for the industrialization and broad application
     of the EFL zinc-air technology in Israel by:

     A.   operation of the pilot systems for the purpose of learning how to
continue on to the later commercial stages

     B.   operation of the pilot systems for purposes of marketing and
developing relationships with first customers

II.  VEHICLES

    [A.*]

     B.   IEC may, if it so desires, provide one or more additional vehicles of
its own for the program, as per Paragraph 2.4 of this Cooperation e Memorandum
of Understanding. It is recommended that this vehicle be of a type that is
likely to be used by early commercial users in Israel (for example: commercial
van, bus, etc.)

II.  REFUELING AND REGENERATION

     A.   EFL will operate the Ber Shernesh equipment on a regular basis

     B.   The regeneration plant will produce and regenerate as much zinc as
possible

     C.   During the operation of the equipment, all of the key relevant data
will be collected and analyzed for the purpose of understanding the economic and
operational feasibility of the systems. This activity will be carried out
through a cooperative effort of EFL and IEC.

IV.  PLANNED SCHEDULE

     A.   Completion and run-in:  already completed

     B.   Final vehicle selection and assignment and beginning of vehicle
driving program: expected [*]

     C.   Overall program completion: by [*]


- ----------
* THIS CONFIDENTIAL PORTION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE 
COMMISSION.
<PAGE>
 
V.   DETAILED VEHICLE DRIVING PROGRAM

       A.   The vehicle driving program will be appropriate for the need to
demonstrate the behavior of the vehicles, the operation of the refueling and
regeneration equipment, and demonstrations for commercial purposes.

VI.  DATA COLLECTION

       A.   Vehicle/battery:  via the battery controller

       B.   Regeneration:  via the control computer of the plant

       C.   Refueling, etc:  manually

VII. DATA ANALYSIS

       A.   EFL and IEC will be jointly responsible for planning and
implementation of a data analysis approach.

VII. ANALYSES AND REPORTS (JOINT RESPONSIBILITY OF EFL AND IEC)

       A.   economic

       B.   environmental impact

       C.   extrapolations for industrialization and broad implementation in
            Israel

       D.   impacts on the electricity network

       E.   Periodic reports will be issued.


                                      -2-
<PAGE>
 
                     SCHEDULE C - NON-DISCLOSURE AGREEMENT


This SECRECY AGREEMENT is entered into between Electric Fuel Limited, 5 Kiryat
Mada Street, Har Hotzvim, P.O. Box 23073, Jerusalem 91230, Israel - on behalf of
itself, its parent company and its wholly owned subsidiaries, hereinafter
referred to as EFL - and Israel Electric Corporation Ltd., hereinafter "IEC",
having a place of business at 2 Ha'hagana Street, Haifa, Israel.

EFL is a developer and owner of proprietary technology in the areas of electric
energy generation and storage, batteries and Electric Fuel/(R)/ hereinafter "The
EFL System."

IEC and EFL mutually wish to enter into a limited period of information exchange
for the purpose of evaluating a business relationship related to EFL's
Technology.

Accordingly, IEC and EFL hereby agree as follows:

DEFINITIONS

PROGRAM as used herein means an exploratory exchange and evaluation of technical
and business information among the Parties pertaining to the EFL System.

PROPRIETARY INFORMATION - any information disclosed by one PARTY to the
respective other PARTY, which is transferred:

(a) by means of documents including, but not limited to, agreements, drawings or
    pictures, designated as confidential at the time of disclosure and marked
    accordingly;

(b) any specimen, physical item or any other object, whether it be marked
    "confidential" or not;

(c) visual or verbal disclosure which is subsequently contained in a document
    marked "confidential" and delivered to the receiving PARTY within 60 days
    from its disclosure.

PROGRAM OBJECTIVE

The objective of the PROGRAM is to provide a mechanism for the sharing of
PROPRIETARY INFORMATION which will enable IEC to evaluate the benefits of the
EFL System.

NONDISCLOSURE OF PROPRIETARY INFORMATION

Each Party agrees to protect PROPRIETARY INFORMATION of the other Party, not to
use proprietary information for any purpose other than stated in the PROGRAM
OBJECTIVE and not to disclose PROPRIETARY INFORMATION to any third party.  The
Parties shall each secure



                                       1
<PAGE>
 
in writing a similar non-disclosure agreement from each of its employees prior
to any disclosure of PROPRIETARY INFORMATION to that person. IEC shall employ in
general the same standard of care as it employs with respect to its own
proprietary or confidential information of like kind and character.

There shall be no obligation with respect to PROPRIETARY INFORMATION which:

a)  is or becomes publicly available without fault of the receiving Party;

b)  can be shown by competent written proof to have been in the possession of
    the receiving Party as of the date of the disclosure;

c)  is disclosed without restriction to the receiving Party by a third party
    having the legal right to make such disclosures.

TERM

The PROGRAM shall have a nominal term of one year commencing with the effective
date of this Agreement, and may be extended at the mutual written agreement of
IEC and EFL.

Either IEC or EFL may terminate the PROGRAM at any time without cause on written
notice to the other.

Following the expiration of the PROGRAM, or a termination of the PROGRAM as
provided for above, the rights and obligations respecting NONDISCLOSURE OF
PROPRIETARY INFORMATION set forth in this Agreement will survive and remain in
effect for a period of five years.

NOTICE

Any notice required or permitted under this Agreement shall be submitted in
writing, shall become effective at the time of its receipt, and shall be
addressed as follows, or to such other addresses either party designates from
time to time:

If to EFL:

Mr. Yehuda Harats
Electric Fuel Ltd.
Har Hotzvim, P.O. Box 23073
Jerusalem 91230 Israel
Fax:  02-322-252




                                       2
<PAGE>
 
If to IEC:

Mr. Yigal Porat
Israel Electric Corporation Ltd.
2 Ha'hagana Street
Haifa, Israel
Fax:  04-370-690

ASSIGNMENT

This Agreement shall not be assigned by either Party without the prior written
consent of the other Party, except that either Party may assign its rights under
the Agreement to the successors or assigns of all or substantially all of its
business assets relating to the subject matter of this Agreement.

ENTIRE AGREEMENT

This Agreement constitutes the entire understanding of the Parties and may only
be modified by an amendment in writing executed by authorized persons on behalf
of both IEC and EFL.

IN WITNESS WHEREOF the parties hereto, through their authorized representatives,
have executed this Agreement.

ELECTRIC FUEL LTD.                            ISRAEL ELECTRIC CORPORATION LTD.

By /s/Yehuda Harats                           By  /s/Yigal Porat
   ------------------------------                 ------------------------------

Title  President and Chief                    Title  Head Research and
       Exectutive Officer                            Development Division
                                 

Date  15.5.95                                 Date  14.5.95




                                       3
<PAGE>
 
                     SCHEDULE D - EFL PROPRIETARY EQUIPMENT


[*]





- ----------
* THIS CONFIDENTIAL PORTION HAS BEEN SO OMITTED AND FILED SEPARATLY WITH THE 
COMMISSION.



<PAGE>
                                                                   EXHIBIT 10.34
                                                                   -------------

                              STN Atlas Elektronik

                     Project "Zinc-Oxygen Torpedo-Battery"

Contract No.: M80/20029260                              Page 1 of 15
________________________________________________________________________________


STN ATLAS Elektronik GmbH
Industriestrabe 23-33
D-22880 Wedel
Germany

represented by         Mr. Ulrich Sasse
                   --------------------------------------

and                    Mr. Holger Bork
                   --------------------------------------

- - hereinafter called STN ATLAS (or Customer) -

and

Electric Fuel Limited
5 Kiryat Mada Street
Har Hotzvim Science Park
IL - 91230 Jerusalem
Israel

represented by         Mr. Yehuda Harats
                   --------------------------------------

and                    Mr. Binyamie Koretz
                   --------------------------------------

- - hereinafter called EFL (or Contractor) -


the following contract is concluded under the STN ATLAS contract no.
M80/20029260 for duties and deliveries concerning

                     ZINC-OXYGEN TORPEDO BATTERY - PHASE 2

as part of the scope of duties and deliveries concerning the

               Pre-Development of Zinc-Oxygen Battery for Torpedo
               as per contract [*].

- ----------
* THIS CONFIDENTIAL PORTION HAS BEEN SO OMITTED AND FILED SEPARATELY WITH THE
  COMMISSION.


                                      -1-
        

<PAGE>
 
                                                                  EXHIBIT 10.34 
                                                                  -------------


                              STN Atlas Elektronik

                     Project "Zinc-Oxygen Torpedo-Battery"

Contract No.: M80/20029260                              Page 2 of 15
________________________________________________________________________________

                               TABLE OF CONTENTS


          Preamble ................................................... 3
 
Art 1     Scope of Duties and Deliveries ............................. 4
 
Art 2     Packing .................................................... 6
 
Art 3     Dates of Performance ....................................... 6
 
Art 4     Provision of Supplies and Services ......................... 6
 
Art 5     Shipping Instructions ...................................... 7
 
Art 6     Security ................................................... 7
 
Art 7     Remuneration ............................................... 7
 
Art 8     Most-Favoured-Customer Clause .............................. 8
 
Art 9     Special Tooling and Test Equipment ......................... 9
 
Art 10    Payment .................................................... 9
 
Art 11    Right of User ............................................. 10
 
Art 12    Intellectual Property Rights .............................. 10
 
Art 13    Contractor's Quality Control .............................. 11
 
Art 14    Termination for Convenience, Settlement of Residual 
            Claims .................................................. 11
 
Art 15    Warranty .................................................. 12
 
Art 16    Subcontracts .............................................. 13

Art 17    General Terms and Conditions .............................. 13

          LIST OF ANNEXES ........................................... 15

                                      -2-
<PAGE>
 
                              STN Atlas Elektronik

                     Project "Zinc-Oxygen Torpedo-Battery"

Contract No.: M80/20029260                              Page 3 of 15
________________________________________________________________________________



                                   Preamble


                                      [*]

                           STN ATLAS Elektronik GmbH

   has received a contract for supplies and services relating to the project

                      "Zinc-Oxygen Battery for Torpedo".

This contract, covering an essential part of this project, is based on the
contract from the [*] to STN ATLAS and substitutes the Letter of Intent dated
03.09.1996.

- ----------
* THIS CONFIDENTIAL PORTION HAS BEEN SO OMITTED AND FILED SEPARATELY WITH THE
  COMMISSION.

                                      -3-
<PAGE>
 
                              STN Atlas Elektronik

                     Project "Zinc-Oxygen Torpedo-Battery"

Contract No.: M80/20029260                              Page 4 of 15
________________________________________________________________________________

ART 1  SCOPE OF DUTIES AND DELIVERIES

1.     The Contractor undertakes to fulfil the performances of this contract
       based on the results and knowledge of the participation in the "Phase 1 -
       Study" (STN ATLAS P.O. No. M80/20004731) concerning the "Feasibility
       Phase of a Zinc-Oxygen Compact Battery" and former activities in the
       field of ZnO battery systems.

2.     The scope of work is described and specified in the Work Package
       Description (ANNEX 1).

       The parties agree that the Contractor shall, in any case, present a
       result that allows to be properly evaluated by the Customer and [*],
       respectively.

3.     The Contractor shall mark reports, including the Final Report, as
       follows:

                  "Right of Use in accordance with VG 95 034"

4.     The results of activities that have been performed beginning 01. July
       1996 as part of the work package description as per Annex 1 before the
       conclusion of this contract are transferred to the Customer under the
       conditions of this contract.

5.     The Contractor further agrees to inform the Customer of the progress of
       work in accordance with the Scope of Work (ANNEX 1) and the agreed dates.

       Furthermore the Contractor agrees

       .  to summarize the results of work in a Final Report
       .  to submit this report in six (6) copies

       The Contractor shall, upon the Customer's request, participate in three
       (3) reviews, [*].

- ----------
* THIS CONFIDENTIAL PORTION HAS BEEN SO OMITTED AND FILED SEPARATELY WITH THE
  COMMISSION.

                                      -4-
<PAGE>
 
                              STN Atlas Elektronik

                     Project "Zinc-Oxygen Torpedo-Battery"

Contract No.: M80/20029260                              Page 5 of 15
________________________________________________________________________________

6.     The parties agree that the result of this study includes all material,
       components and assemblies (including their technical documentation), if
       any.

       This shall not be the case if the mentioned material, components and
       assemblies are

       a.  commercial products; i.e. products generally available in the market
           at market prices,

       b.  modified commercial products; i.e. products which have been made from
           commercial products without essential modification to their general
           design and function.

7.     The hardware items (including cells and stacks used for tests/trials)
       procured or manufactured by the Contractor for the execution of this
       contract, including materials used for manufacture, components and
       assemblies, shall be listed, indicating the appropriate values and
       application, and shall be offered by the Contractor for transfer of
       property at the time of submission of the final report. The Customer may
       request transfer of property in a period of up to one year after
       submission of the final report. In case the Customer is not liable to pay
       or is liable to pay only part of the costs incurred by the Contractor for
       procuring or manufacturing such hardware items, he is entitled to
       transfer of property only if all the costs and/or remaining costs plus
       profit are reimbursed.

       The Contractor will not be held liable for any hardware items or
       materials that are disposed of as part of its normal handling practices.

8.     The development tools procured or manufactured by the Contractor for the
       execution of this contract will be transferred to the property of the
       Customer and shall remain at the Contractors premises in the frame of
       this contract.

       The Contractor undertakes to keep the development tools in a correct
       and operating condition and to use them free of charge for future
       development and/or procurement contracts between the Parties, if any.



                                      -5-
<PAGE>
 
                              STN Atlas Elektronik

                     Project "Zinc-Oxygen Torpedo-Battery"

Contract No.: M80/20029260                              Page 6 of 15
________________________________________________________________________________

9.     The Contractor declares his willingness to perform the development of the
       Zinc-Oxygen Torpedo-Battery if this is requested by the Customer.

10.    The Contractor declares that the scope of delivery does not contain
       radioactive material; he undertakes the obligation to avoid the use of
       radioactive material wherever possible.

       If the Contractor realizes that the use of radioactive material is
       necessary, the Contractor has to apply for the written consent of the [*]
       via the Customer indicating the cogent reasons.

       In case the Contractor will deliver other dangerous material he
       undertakes to inform the Customer prior to each delivery and mark each
       item according to the international regulations.

ART 2  PACKING

1.     Hardware items to be delivered to STN ATLAS shall be packed according to
       the technical necessities and relevant rules.

2.     Documents to be sent to the Customer shall be packed according to company
       standard.


ART 3  DATES OF PERFORMANCE

       The duties and deliveries to be rendered by the Contractor in accordance
       with Art 1 will cover the period from 01.July '96 to 15.July '97.

       The Contractor shall render his performances in accordance with the Bar
       Chart as per ANNEX 2.

ART 4  PROVISION OF SUPPLIES AND SERVICES

- ----------
* THIS CONFIDENTIAL PORTION HAS BEEN SO OMITTED AND FILED SEPARATELY WITH THE
  COMMISSION.

                                      -6-
<PAGE>
 
                              STN Atlas Elektronik

                     Project "Zinc-Oxygen Torpedo-Battery"

Contract No.: M80/20029260                              Page 7 of 15 
________________________________________________________________________________

1.     The supplies and services to be provided by the Customer for the
       performance of the contract as per Annex 1 are to be mutually agreed upon
       in due time.

       The provisions are to be performed free of charge.

2.     The Contractor shall check the material furnished after arrival without
       delay.

ART 5  SHIPPING INSTRUCTIONS

       The Contractor shall mail reports and documents "postage prepaid" and
       take the necessary security precautions.

       Consignee will be for reports, documents and hardware

          STN ATLAS Elektronik GmbH
          MTV4 - Project Management DM 2 A4
          IndustriestraBe 23-33
          D - 22880 Wedel
          Germany



ART 6  SECURITY

       The Contractor shall meet his company confidential requirements.

ART 7  REMUNERATION

       For the Contractor's services and deliveries under this contract a price
       with a maximum ceiling of

                                     [ * ]
       is agreed.

- ----------
* THIS CONFIDENTIAL PORTION HAS BEEN SO OMITTED AND FILED SEPARATELY WITH THE
  COMMISSION.


                                      -7-
<PAGE>
 
                              STN Atlas Elektronik

                     Project "Zinc-Oxygen Torpedo-Battery"

Contract No.: M80/20029260                              Page 8 of 15
________________________________________________________________________________

                                      [*]

ART 8  MOST-FAVOURED-CUSTOMER CLAUSE

1.     The following Most-Favoured-Customer Clause is agreed:

       a. EFL gives her assurance that, taking due account of the general price
          development and converting the price to comparable circumstances, that
          the agreed price is not less favourable than those that have been
          granted by EFL or that will be granted by EFL to third parties during
          the period of validity of this contact, whereby the export benefits
          applying in Israel - if any - are or will be taken into account in
          favour of STN ATLAS.

       b. If despite this EFL should grant or has granted more favourable prices
          to third parties, EFL undertakes to reduce the agreed price
          accordingly and to reimburse [*] STN ATLAS for excess payments.

       c. EFL undertakes to provide STN ATLAS at the latter's request with proof
          of the assurance given in letter a) above.

       For this purpose EFL shall at the option [*] or their authorized
       representatives the right and opportunity to inspect all essential
       business papers which are of relevance, to have copies made of these and
       to provide all requisite information or to submit the written attestation
       of an independent auditor or chartered accountant. This shall not result
       in additional costs for STN ATLAS.

    d. In case EFL refuses the application of this most-favoured-customer-clause
       on certain contracts with third parties by conclusion of contract,
       because EFL regards the cost relations this contract is based on as not
       comparable with the relations of this contract, EFL undertakes the
       obligation to inform STN ATLAS about these contracts in writing without
       delay and to state the reasons for EFL opinion.

- ----------
* THIS CONFIDENTIAL PORTION HAS BEEN SO OMITTED AND FILED SEPARATELY WITH THE
  COMMISSION.

                                      -8-
<PAGE>
 
                              STN Atlas Elektronik

                     Project "Zinc-Oxygen Torpedo-Battery"

Contract No.: M80/20029260                              Page 9 of 15
________________________________________________________________________________

2.     EFL undertakes, if subcontracts are issued to subcontractors established
       outside Israel and outside the Federal Republic of Germany, to agree with
       them the conditions as per Para. (1) above, as far as the total amount
       exceeds the equivalent of DM 100.000,00 per subcontractor.

ART 9  SPECIAL TOOLING AND TEST EQUIPMENT

       Special tooling and equipment procured or manufactured in the frame of
       this contract which can be used for activities within this contract and
       further steps are to be listed. The Contractor shall submit this list to
       the Customer.

ART 10 PAYMENT

       For the payments to be effected by the Customer the following provisions
       shall apply:

1.     EFL is entitled to invoice monthly for the cost plus fee incurred for the
       supplies and services as per Art. 1. The invoices shall indicate
       separately the amounts for the relevant work packages.

       Invoices shall be detailed according to EFL's budget breakdown dated
       24.Oct.1996.

2.     Any payments shall be effected after receipt of the invoices [*] within
       45 days.

       In any case the payment for the final invoice scheduled 15.07.1997 is
       depending on the delivery of the final report.

3.     A final invoice will be presented by EFL not later than two (2) months
       after conclusion of the contractual performances. In the final invoice
       EFL will indicate separately the prices for the development performances
       as well as payments to third parties, if any, according to cooperation -
       or license -contracts.

- ----------
* THIS CONFIDENTIAL PORTION HAS BEEN SO OMITTED AND FILED SEPARATELY WITH THE
  COMMISSION.

                                      -9-
<PAGE>
 
                              STN Atlas Elektronik

                     Project "Zinc-Oxygen Torpedo-Battery"

Contract No.: M80/20029260                              Page 10 of 15
________________________________________________________________________________

ART 11 RIGHT OF USER

1.     The rights related to the specific zinc-oxygen basis-technology necessary
       to manufacture zinc-oxygen batteries are industrial property rights of
       EFL.

2.     A right of use on the property rights as per para (1) above will not
       transfer [*].

3.     In case EFL will by any reason stop their activities in the field of
       zinc-air battery cells, EFL will transfer the rights [*] for the sole use
       in torpedo application via STN ATLAS.
       
       As compensation for the above STN ATLAS will make a payment in the amount
       of [*]. This payment comes due with coming into force of a development
       contract.

ART 12 INTELLECTUAL PROPERTY RIGHTS

1.     The Customer is entitled to

       .    reproduce
       .    handle, especially modify, transform and translate
       .    publish
       and
       .    use in any other known type of utilization

       the reports, documentation and technical papers submitted in accordance
       with Art 1 of the contract.

       In doing so the Customer will, in consultation with the Contractor,
       consider the latter's legitimate interests as well with respect to his
       proprietary rights as with regard to his business or trade secrets
       designated to the Customer or recognizable as such. The Contractor, on
       the Customer's request, shall make available to the Customer a printing
       copy, if existing.

- ----------
* THIS CONFIDENTIAL PORTION HAS BEEN SO OMITTED AND FILED SEPARATELY WITH THE
  COMMISSION.

                                      -10-
<PAGE>
 
                              STN Atlas Elektronik

                     Project "Zinc-Oxygen Torpedo-Battery"

Contract No.: M80/20029260                              Page 11 of 15
________________________________________________________________________________

2.     If the Contractor intends to pass on to third parties, to publish or have
       published to third parties the reports not yet published by the Customer,
       he shall previously obtain the Customer's written approval.

       Furthermore the Contractor shall, after printing, furnish to the Customer
       three copies of his publication without delay.
 
ART 13 CONTRACTOR'S QUALITY CONTROL

       The Contractor undertakes the obligation to maintain a quality assurance
       system.

ART 14 TERMINATION FOR CONVENIENCE, SETTLEMENT OF RESIDUAL CLAIMS

       The following extraordinary right of termination including the settlement
       of residual claims is agreed:

1.     The Contractor shall terminate immediately any sub-contracts awarded
       under this contract, at the same time safeguarding the Customer's
       interests. In the case of sub-contracts which provide for the right of
       the Contractor to give notice of termination, the contract shall be
       terminated, if possible, prior to the next permissible cancellation date,
       if this involves a cost saving for the Customer.

2.     The Customer shall notify the Contractor in writing whether any work
       commenced should be completed, and if so, which; the Contractor is
       obligated to carry out this work at the terms and conditions of the
       terminated contract.

3.     The Contractor shall have a right to claim reimbursement of all
       inevitable costs incurred under the contract plus the profit fee
       proportional to the costs to be reimbursed.

       All payments to be made under the contract, including the settlement of
       residual claims, shall not exceed the amount which would have been due to
       the Contractor for the performance of the contract, if it had not been
       terminated.

                                      -11-
<PAGE>
 
                              STN Atlas Elektronik

                     Project "Zinc-Oxygen Torpedo-Battery"

Contract No.: M80/20029260                              Page 12 of 15
________________________________________________________________________________

4.     The Contractor shall submit sufficient proof for the facts on which his
       claims are based.

5.     With respect to the items and rights the costs of which shall be fully
       reimbursed, the Customer shall be obligated to make payment only insofar
       as the Contractor transfers title to, or assigns, these items and rights
       to the Customer, free of third party rights, provided that violation of
       existing contracts is not involved.

6.     The Contractor is obligated to inform his subcontractors of this
       agreement and to endeavoUr to make corresponding arrangements, as far as
       subcontracts are concerned which are exceeding the value of [*].

       In case the Contractor concludes with a subcontractor several
       subcontracts, this shall apply to all such subcontracts, if their total
       amount exceeds the quoted value.

7.     In the event that a subcontractor is not prepared to accept this
       obligation, the Contractor shall notify the Customer accordingly before
       placing the subcontract. If in such cases the Contractor does not receive
       any written instruction from the Customer within 2 weeks after receipt of
       such notification, he shall have the right to conclude subcontracts to
       the best of his judgement, making the best possible use of the then
       prevailing market situation.

ART 15 WARRANTY

       The Contractor warrants that the supplies and services will be in
       correspondence with the Work Package Description (ANNEX 1).

       The warranty period ends 12 months after acceptance of the Final Report
       (according to ANNEX 1).

- ----------
* THIS CONFIDENTIAL PORTION HAS BEEN SO OMITTED AND FILED SEPARATELY WITH THE
  COMMISSION.


                                      -12-
<PAGE>
 
                              STN Atlas Elektronik

                     Project "Zinc-Oxygen Torpedo-Battery"

Contract No.: M80/20029260                              Page 13 of 15
________________________________________________________________________________

ART 16 SUBCONTRACTS

       If, for the purpose of fulfilling his contractual duties, the Contractor
       subcontracts part of the duties and deliveries to third parties, he
       undertakes the obligation to safeguard the Customers interests in the
       best possible way.

ART 17 GENERAL TERMS AND CONDITIONS

1.     This contract is concluded in English language.

       For working papers, reports and the final report the English language is
       to be used.

2.     This contract is subject to German law.

3.     The following provision is excluded:

       -    "Ubereinkommen der Vereinten Nationen vom 11.04.1980 uber Vertrage
            uber den internationalen Warenkauf"

            ("United Nations Convention of 11.04.1980 on contracts for the
            International Sale of Goods.")

4.     The Contractor's General Terms and Conditions are excluded.

5.     The Contractor agrees to obtain, without delay, the official licenses
       necessary for the performance of this contract and to inform the Customer
       promptly in case any difficulties or delays should arise.

6.     Arbitration
       -----------

       This contract shall be lead by the spirit of good confidence and harmonic
       cooperation.

                                      -13-
<PAGE>
 
                              STN Atlas Elektronik

                     Project "Zinc-Oxygen Torpedo-Battery"

Contract No.: M80/20029260                              Page 14 of 15
________________________________________________________________________________

       If in spite of that, any differences or discords are created by this
       contract that cannot be settled amicably, they shall be settled finally
       by an arbitration according to the rules of arbitration of the
       International Chamber of Commerce, 38 Cours Albert ler, Paris, by three
       arbitrators appointed according to the rules, who shall arbitrate in
       accordance with the present contract and under the principle of equality
       and justice.

       German substantive law shall apply.  The place of jurisdiction shall be
       Bern, Switherland.  The proceedings shall be made in English.

7.     The Annexes 1 and 2 as well as

       (a)  the Agreement on the confidential treatment of information dated 05.
            Nov. 1993

       (b)  the Cooperation Agreement dated 12. Jan. 1995

       are part of this contract.



Wedel,    17. 02.    1997                     Jerusalem,     20. 02.    1997

STN ATLAS Elektronik GmbH                     Electric Fuel Limited

                                      -14-
<PAGE>
 
                              STN Atlas Elektronik

                     Project "Zinc-Oxygen Torpedo-Battery"

Contract No.: M80/20029260                              Page 15 of 15
________________________________________________________________________________

LIST OF ANNEXES

Annex 1   Scope of Work/Work Package Description

Annex 2   Bar Chart

                                      -15-
<PAGE>
 
                                                                         ANNEX 1
                              STN Atlas Elektronik

                     Project "Zinc-Oxygen Torpedo-Battery"

Contract No.: M80/20029260                              Page 1 of 5
________________________________________________________________________________

                    Scope of Work/Work Package Description

                                      [*]









* THIS CONFIDENTIAL PORTION HAS BEEN SO OMITTED AND FILED SEPARATELY WITH THE
  COMMISSION.







                                     -16-
<PAGE>
 
                                                                         ANNEX 1
                              STN Atlas Elektronik

                     Project "Zinc-Oxygen Torpedo-Battery"

Contract No.: M80/20029260                              Page 2 of 5
________________________________________________________________________________

                                      [*]






* THIS CONFIDENTIAL PORTION HAS BEEN SO OMITTED AND FILED SEPARATELY WITH THE 
  COMMISSION.
                                      -17-
<PAGE>
 
                                                                         ANNEX 1
                              STN Atlas Elektronik

                     Project "Zinc-Oxygen Torpedo-Battery"

Contract No.: M80/20029260                              Page 3 of 5
________________________________________________________________________________

                                      [*]





* THIS CONFIDENTIAL PORTION HAS BEEN SO OMITTED AND FILED SEPARATELY WITH THE
  COMMISSION.





   
                                      -18-
<PAGE>
 
                                                                         ANNEX 1
                              STN Atlas Elektronik

                     Project "Zinc-Oxygen Torpedo-Battery"

Contract No.: M80/20029260                              Page 4 of 5
________________________________________________________________________________

                                      [*]






* THIS CONFIDENTIAL PORTION HAS BEEN SO OMITTED AND FILED SEPARATELY WITH THE
  COMMISSION. 








                                      -19-
<PAGE>
 
                                                                         ANNEX 1
                              STN Atlas Elektronik

                     Project "Zinc-Oxygen Torpedo-Battery"

Contract No.: M80/20029260                              Page 5 of 5
________________________________________________________________________________

                                      [*]





* THIS CONFIDENTIAL PORTION HAS BEEN SO OMITTED AND FILED SEPARATELY WITH THE 
  COMMISSION.
                                      -20-
<PAGE>
 
                                                                         ANNEX 2
                              STN Atlas Elektronik

                     Project "Zinc-Oxygen Torpedo-Battery"

Contract No.: M80/20029260                              Page 1 of 1
________________________________________________________________________________

                                   BAR CHART

                                      [*]


- ----------
* THIS CONFIDENTIAL PORTION HAS BEEN SO OMITTED AND FILED SEPARATELY WITH THE
  COMMISSION.



                                      -21-