SOUTHERN CALIFORNIA EDISON CO
10-K, 1999-03-24
ELECTRIC SERVICES
Previous: SMITH A O CORP, 10-K, 1999-03-24
Next: SOUTHERN NATURAL GAS CO, 10-K405, 1999-03-24




                       SECURITIES AND EXCHANGE COMMISSION
                             Washington, D.C. 20549

                                    FORM 10-K

/X/  Annual report pursuant to Section 13 or 15(d) of the Securities
     Exchange Act of 1934

For the fiscal year ended     December 31, 1998                            

                          Commission File Number 1-2313
                       SOUTHERN CALIFORNIA EDISON COMPANY
             (Exact name of registrant as specified in its charter)

               California                                     95-1240335
     (State or other jurisdiction of                       (I.R.S. Employer
     incorporation or organization)                       Identification No.)

        2244 Walnut Grove Avenue                            (626) 302-1212
          Rosemead, California         91770     (Registrant's telephone number,
(Address of principal executive      (Zip Code)         including area code)
        offices)                                    

           Securities registered pursuant to Section 12(b) of the Act:

                                                      Name of each exchange
             Title of each class                       on which registered 

Capital Stock
        Cumulative Preferred                          American and Pacific
 4.08% Series            4.78% Series
 4.24% Series            5.80% Series
 4.32% Series
        
        Securities registered pursuant to Section 12(g) of the Act: None

Indicate by check mark whether the registrant (1) has filed all reports required
to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during
the  preceding 12 months (or for such  shorter  period that the  registrant  was
required  to file  such  reports),  and  (2) has  been  subject  to such  filing
requirements for the past 90 days. Yes [X] No [ ]

Indicate by check mark if disclosure of delinquent filers pursuant to Item 405
of Regulation S-K is not contained herein, and will not be contained, to the
best of registrant's knowledge, in definitive proxy or information statements
incorporated by reference in Part III of this Form 10-K or any amendment to this
Form 10-K. [X]

As of March 19, 1999 there 434,888,104  shares of Common Stock outstanding,
all of which are held by the registrant's parent holding company.  The aggregate
market  value  of  registrant's   voting  stock  held  by   non-affiliates   was
approximately $355,326,761 on or about March 19, 1999 based upon prices reported
by the American  Stock  Exchange.  The market  values of the various  classes of
voting  stock held by  non-affiliates,  as of March 19,  1999,  were as follows:
CUMULATIVE  PREFERRED  STOCK  $99,626,761;   $100  CUMULATIVE  PREFERRED  STOCK
$255,700,000.

                       DOCUMENTS INCORPORATED BY REFERENCE

Portions of the  following  documents  listed  below have been  incorporated  by
reference into the parts of this report so indicated.

(1)   Designated portions of the Annual Report to
        Shareholders for the year ended
        December 31, 1998................................... Parts I, II and IV
(2)   Designated portions of the Joint Proxy Statement
        relating to registrant's 1999 Annual Meeting
        of Shareholders..................................... Part III
<PAGE>


                                TABLE OF CONTENTS

Item                                                                      Page
                                                  Part I

1.      Business.........................................................    1
             Competitive Environment.....................................    1
             California Electric Utility Restructuring...................    1
             Regulation .................................................    4
             Rate Matters................................................    5
             Fuel Supply and Purchased Power Costs.......................   10
             Environmental Matters.......................................   11
             Year 2000 Issue.............................................   14
2.      Properties.......................................................   14
             Existing Generating Facilities..............................   14
             Construction Program and Capital Expenditures...............   16
             Nuclear Power Matters.......................................   16
3.      Legal Proceedings................................................   19
             Wind Generators' Litigation.................................   19
             Geothermal Generators' Litigation...........................   19
             Electric and Magnetic Fields (EMF) Litigation...............   20
             San Onofre Personal Injury Litigation.......................   21
             Mohave Generating Station Environmental Litigation..........   21
4.      Submission of Matters to a Vote of Security Holders..............   22
        Executive Officers of the Registrant.............................   22

                                     Part II

5.      Market for Registrant's Common Equity and Related
        Stockholder Matters..............................................   25
6.      Selected Financial Data..........................................   25
7.      Management's Discussion and Analysis of Results of
        Operations and Financial Condition...............................   25
7a.     Quantitative and Qualitative Disclosures About Market Risk.......   25
8.      Financial Statements and Supplementary Data......................   25
9.      Changes in and Disagreements with Accountants
        Accounting and Financial Disclosure..............................   25

                                    Part III

10.     Directors and Executive Officers of the Registrant...............   25
11.     Executive Compensation...........................................   26
12.     Security Ownership of Certain Beneficial
        Owners and Management............................................   26
13.     Certain Relationships and Related Transactions...................   26

                                     Part IV

14.     Exhibits, Financial Statement Schedules, and
             Financial Reports...........................................   26
             Reports on Form 8-K.........................................   27
             Report of Independent Public Accountants on
             Supplemental Schedules......................................   28
             Supplemental Schedules......................................   29
             Signatures..................................................   32
             Exhibit Index...............................................   33



<PAGE>






                                     PART I

In this form 10-K, Southern California Edison Company (SCE) uses the words
estimates, expects, anticipates, believes, and other similar expressions that
are intended to identify forward-looking information that involves risks and
uncertainties. Actual results or outcomes could differ materially as a result of
such important factors as further actions by state and federal regulatory bodies
that sets rates and implement the restructuring of the electric utility
industry; the effects of new laws and regulations relating to restructuring and
other matters; the effects of increased competition in the electric utility
business, including the beginning of direct customer access to retail energy
suppliers and the unbundling of revenue cycle services such as metering and
billing; changes in prices of electricity and fuel costs; changes in market
interest rates; new or increased environmental liabilities; the effects of the
Year 2000 on computers; and other unforeseen events.

Item 1.  Business

SCE was incorporated in 1909 under the laws of the State of California. SCE is a
public utility primarily engaged in the business of supplying electric energy to
a 50,000 square-mile area of Central and Southern California, excluding the City
of Los Angeles and certain other cities. This area includes approximately 800
cities and communities and a population of more than 11 million people. SCE had
13,177 full-time employees at year-end 1998. During 1998, 31% of SCE's total
operating revenue was derived from residential customers, 33% from commercial
customers, 15% from sales to the power exchange (PX), 9% from industrial
customers, 6% from public authorities, 5% from agricultural and other customers
and 1% from resale customers. SCE comprises the major portion of the assets and
revenue of its parent holding company, Edison International.

                             Competitive Environment

SCE currently operates in a highly regulated environment in which it has an
obligation to deliver electric service to customers in return for an exclusive
franchise within its service territory. This regulatory environment is changing.
In the generation sector, SCE has experienced competition from nonutility power
producers; and regulators are restructuring California's electric utility
industry to facilitate additional competition. (See "Business of SCE --
California Electric Restructuring" below for a description of these changes.)

                    California Electric Utility Restructuring

Restructuring Decision -- The CPUC's December 1995 decision on restructuring
California's electric utility industry started the transition to a new market
structure; competition and customer choice began on April 1, 1998. Key elements
of the CPUC's restructuring decision included: creation of the PX and
Independent System Operator (ISO); availability of customer choice for
electricity supply and certain billing and metering services; performance-based
ratemaking (PBR) for those utility services not subject to competition;
voluntary divestiture of at least 50% of utilities' gas-fueled generation; and
implementation of the Competition Transition Charge (CTC).

Restructuring Statute -- In September 1996, the State of California enacted
legislation, Assembly Bill 1890 (AB 1890), to provide a transition to a
competitive market structure. The statute substantially adopted the CPUC's
restructuring decision by addressing stranded-cost recovery for utilities and
providing a certain cost-recovery time period for the transition costs
associated with utility-owned generation-related assets. The statute mandated
the implementation of the CTC that provides utilities the opportunity to recover
costs made uneconomic by electric utility restructuring. Transition costs
related to power-purchase contracts are being recovered through the terms of
their contracts while most of the remaining transition costs will be recovered
through 2001. SCE expects to be able to recover its revenue requirement during
the 1998-2001 transition period. The statute also contained provisions for 


                                       1
<PAGE>

the recovery (through 2006) of reasonable employee-related transition costs,
incurred and projected, for retraining, severance, early retirement,
outplacement, and related expenses.

Rate Reduction Notes -- In December 1997, after receiving approval from both the
CPUC and the California Infrastructure and Economic Development Bank, a limited
liability company created by SCE issued approximately $2.5 billion of rate
reduction notes. Residential and small commercial customers, whose 10% rate
reduction began January 1, 1998, are repaying the notes over the expected
ten-year term through non-bypassable charges based on electricity consumption.
There were originally seven classes of Notes. The first class, in the amount of
$246.3 million, matured in December 1998. The remaining notes consist of six
classes with maturities ranging from one to nine years, and bear interest
ranging from 6.14% to 6.42%.

On November 3, 1998, California voters rejected the voter initiative designated
as Proposition 9. Approximately 73% of the total votes cast were voted against
the proposition. Proposition 9 would have prohibited the collection of the
non-bypassable charges for the payment of the rate reduction notes and would
have severely restructured SCE's recovery of transition costs.

1998 Activities -- During 1998, SCE implemented changes to comply with the
restructuring elements required by the CPUC and with the restructuring statute.
Beginning January 1, 1998:

o    SCE's rates were unbundled into separate charges for energy, transmission,
     distribution, the CTC, public benefit programs, and nuclear
     decommissioning. The transmission component is being collected through
     FERC-approved rates, subject to refund.

o    SCE's costs associated with hydroelectric plants are being recovered
     through a performance-based mechanism. The mechanism sets the hydroelectric
     revenue requirements and establishes a formula for the duration of the
     electric industry restructuring transition period, or until market
     valuation of the hydroelectric facilities, whichever occurs first. The
     mechanism provides that power sales revenue from hydroelectric facilities
     in excess of the hydroelectric revenue requirement be credited against the
     costs of transition to a competitive market environment.

o    SCE's transition costs are being recovered through a non-bypassable CTC.
     This charge applies to all customers who were using or began using utility
     services on or after the CPUC's December 1995 restructuring decision date.
     SCE has estimated transition costs to be approximately $10.6 billion (1998
     net present value) from 1998 through 2030. This estimate is based on
     incurred costs, forecasts of future costs, and assumed market prices.
     Changes in the assumed market prices could materially affect these
     estimates. Potential transition costs are comprised of $6.4 billion from
     SCE's qualifying facilities contracts, which resulted from prior
     legislative and regulatory mandates, and $4.2 billion (including the
     effects of the sale of SCE's gas- and oil- fueled generation plants) from
     costs pertaining to certain generating assets and regulatory commitments
     consisting of costs incurred (whose recovery has been deferred by the CPUC)
     from providing service to customers. Such commitments include the recovery
     of income tax benefits previously flowed through to customers,
     postretirement benefit transition costs, accelerated recovery of San Onofre
     Units 2 and 3 and the Palo Verde units, and certain other costs. The issue
     was separated into two phases; Phase 1 addressed the rate-making issues and
     Phase 2 addressed the quantification issues.

o    Major elements of the CPUC's CTC Phase 1 and Phase 2 decisions were: the
     establishment of a transition cost balancing account and annual transition
     cost proceedings; the setting of a market rate forecast for 1998 transition
     costs; the requirement that generation-related regulatory assets be
     amortized ratably over a 48-month period; the establishment of calculation
     methodologies and procedures for SCE to collect its transition costs from
     1998 through the end of the rate freeze; and the reduction of SCE's
     authorized rate of return on certain assets eligible for transition cost
     recovery (primarily fossil- and hydroelectric-generation related assets)
     beginning July 1997, five months earlier than anticipated. SCE has filed an
     application for 


                                       2
<PAGE>


     rehearing on the 1997 rate of return issue. The CPUC recently issued a 
     decision agreeing in part with SCE. Although a lower rate of return was 
     applied to the hydro and fossil assets for the period July 28, 1997 
     through November 21, 1997, the return was set at 7.35% rather than the 
     7.22% that was adopted in the earlier decision. This increase will result 
     in an additional $425,000 in earnings compared to the original decision.

o    Residential and small commercial customers who have begun receiving a 10%
     rate reduction are repaying the rate reduction notes issued in December
     1997 through non-bypassable charges based on electricity consumption. (See
     "California Electric Utility Restructuring-Rate Reduction Notes" above for
     additional discussion.)

Effective April 1, 1998:

o    The ISO assumed operational control of the transmission system on March 31,
     1998, after the ISO and PX began accepting bids and schedules for
     electricity purchases. The restructuring implementation costs related to
     the start-up and development of the PX, which are paid by the utilities,
     will be recovered from all retail customers over the four-year transition
     period. SCE's share of the charge is $45 million, plus interest and fees.
     SCE's share of the ISO's start-up and development costs (approximately $16
     million per year) will be paid over a ten-year period.

o    Customers can choose to purchase energy from new retailers called Electric
     Service Providers (ESPs). As of December 31, 1998, approximately 47,000
     customers are purchasing their energy from ESPs. All other customers are
     purchasing energy from SCE, and SCE is in turn purchasing the energy it
     supplies to them from the PX. Regardless of whom the customers choose to
     supply their energy, SCE provides transmission and distribution services to
     all customers within its service territory. All customers of SCE
     transmission and distribution services also are paying the CTC, regardless
     of their choice of energy supplier.

o    Customers have options regarding metering, billing, and related services
     (referred to as revenue cycle services) provided by California's
     investor-owned utilities. ESPs can provide their customers with one
     consolidated bill for their services and the utility's services, request
     the utility to provide such a consolidated bill to the customer, or elect
     to have both the ESP and the utility bill for respective charges. Customers
     with maximum demand above 20 kWh (primarily industrial and medium and large
     commercial) can choose SCE or any other supplier to provide their metering
     service. Beginning in January 1999, all customers may make these choices.
     SCE may experience a reduction in revenue security as a result of this
     unbundling.

o    In September 1998, the CPUC issued a decision requiring SCE to provide
     credits beginning on January 1, 1999, to customers who elect to obtain
     revenue cycle services from an ESP. The credits are based on the net cost
     savings to SCE as a result of no longer providing these services. The CPUC,
     however, has also begun a proceeding to consider whether the RCS credits
     should be increased to reflect the prices likely to prevail in a
     competitive market for RCS services. If the CPUC adopts credits based on
     this premise, SCE has advocated that the resulting difference between
     payments for the credits and costs actually avoided be recovered from all
     customers in a competitively neutral manner.

During 1998, SCE sold all of its gas- and oil- fueled generation plants. The
total sales price of the 12 plants was $1.2 billion, over $500 million more than
the combined book value. Net proceeds of the sales were used to reduce stranded
costs, which otherwise were expected to be collected through the CTC mechanism.

Accounting for Generation-Related Assets -- If the CPUC's electric industry
restructuring plan continues as described above, SCE would be allowed to recover
its transition costs through non-bypassable charges to its distribution
customers (although its investment in certain generation assets would be subject
to a lower authorized rate of return). In 1997, SCE discontinued application of
accounting principles for rate-regulated enterprises for its investment in
generation facilities based on new 


                                       3
<PAGE>

accounting guidance. The financial reporting effect of this discontinuance was
to segregate these assets on the balance sheet; the new guidance did not require
SCE to write off any of its generation-related assets, including related
regulatory assets. However, the new guidance did not specifically address the
application of asset impairment standards to these assets. SCE has retained
these assets on its balance sheet because AB 1890 and the restructuring plan
referred to above make probable their recovery through a non-bypassable CTC to
distribution customers. The regulatory assets relate primarily to the recovery
of accelerated income tax benefits previously flowed through to customers,
purchased power contract termination payments, and unamortized losses on
reacquired debt. The new accounting guidance also permits the recording of new
generation-related regulatory assets during the transition period that are
probable of recovery through the CTC mechanism.

During the second quarter of 1998, additional guidance was developed related to
the application of asset impairment standards to these assets. Using this
guidance resulted in SCE reducing its remaining nuclear plant investment by $2.6
billion (as of June 30, 1998) and recording a regulatory asset on its balance
sheet for the same amount. For this impairment assessment, the fair value of the
investment was calculated by discounting future net cash flows. This
reclassification had no effect on SCE's results of operations.

If during the transition period events were to occur that make the recovery of
these generation-related regulatory assets no longer probable, SCE would be
required to write off the remaining balance of such assets (approximately $2.4
billion, after tax, at December 31, 1998) as a one-time, non-cash charge against
earnings.

If events occur during the restructuring process that result in all or a portion
of the transition costs being improbable of recovery, SCE could have additional
write-offs associated with these costs if they are not recovered through another
regulatory mechanism. At this time, SCE cannot predict what other revisions will
ultimately be made during the restructuring process in subsequent proceedings or
the effect, after the transition period, that competition will have on its
results of operations or financial position.


Transmission Owners Tariff and Wholesale Distribution Access Tariff -- On March
31, 1997, SCE filed a transmission owners tariff with the FERC, in conjunction
with the ISO and PX tariffs, also filed on that date. Together, these tariffs
set forth the rate design and terms and conditions for transmission service
provided over SCE's facilities over which the ISO will have operational control.
The transmission owners tariff also sets forth SCE's proposed transmission
access charge. Additionally, on March 31, 1997, SCE filed a wholesale
distribution access tariff. The FERC accepted the tariffs for filing, subject to
refund, effective April 1, 1998.

                                   Regulation

SCE's retail operations are subject to regulation by the CPUC. The CPUC has the
authority to regulate, among other things, retail rates, issuances of
securities, and accounting practices. SCE's wholesale operations are subject to
regulation by the FERC. The FERC has the authority to regulate wholesale rates
as well as other matters, including transmission service pricing, accounting
practices, and licensing of hydroelectric projects.

SCE is subject to the jurisdiction of the Nuclear Regulatory Commission (NRC)
with respect to its nuclear power plants. NRC regulations govern the granting of
licenses for the construction and operation of nuclear power plants and subject
those power plants to continuing review and regulation.

The construction, planning, and siting of SCE's power plants within California
are subject to the jurisdiction of the California Energy Commission and the
CPUC. SCE is subject to the rules and regulations of the California Air
Resources Board and local air pollution control districts with respect to the
emission of pollutants into the atmosphere; the regulatory requirements of the
California State Water Resources Control Board and regional boards with respect
to the discharge of pollutants into waters of the state; and the requirements of
the California Department of Toxic Substances Control with respect to 


                                       4
<PAGE>

handling and disposal of hazardous materials and wastes. SCE is also subject to
regulation by the EPA, which administers certain federal statutes relating to
environmental matters. Other federal, state, and local laws and regulations
relating to environmental protection, land use, and water rights also affect
SCE.

The California Coastal Commission has continuing jurisdiction over the coastal
permit for San Onofre Units 2 and 3. Although the units are operating, the
permit's mitigation requirements have not yet been fulfilled. California Coastal
Commission jurisdiction may continue for several years due to implementation and
oversight of permit mitigation conditions, including restoration of wetlands and
construction of an artificial reef for kelp.

The Department of Energy (DOE) has regulatory authority over certain aspects of
SCE's operations and business relating to energy conservation, solar energy
development, power plant fuel use and disposal, coal conversion, electric sales
for export, public utility regulatory policy, and natural gas pricing.

On December 16, 1997, the CPUC adopted a decision which established new rules
governing the relationship between California's natural gas local distribution
companies, electric utilities, and certain of their affiliates. While SCE and
its affiliates have been subject to affiliate transaction rules since the
establishment of its holding company structure in 1988, these new rules are more
detailed and restrictive. On December 31, 1997, SCE filed a preliminary
compliance plan which set forth SCE's implementation of the new affiliate
transaction rules. This preliminary compliance plan was supplemented by an
additional filing made on January 30, 1998. In September 1998, the CPUC issued a
Resolution accepting certain portions of SCE's compliance plan and rejecting
others. SCE filed a revised compliance plan in October 1998 as ordered. No party
protested that revised plan.

The new affiliate transaction rules apply to all utility transactions, including
electric utilities, with affiliates engaging in the production of products that
use electricity or the providing of services that relate to the use of
electricity. Edison International is not subject to these new affiliate
transaction rules and continues to be subject to the prior rules. The new
affiliate transaction rules are structured to address CPUC concerns regarding
market power and cross-subsidization arising out of the new competitive
electricity market in California. The new rules are categorized into
nondiscrimination standards, disclosure and information standards, and
separation standards. The new rules also set forth requirements and restrictions
on the utility's offering of certain products and services.

The CPUC has modified certain of the rules in response to petitions from various
parties. SCE is still awaiting CPUC decisions on its compliance plan (which
includes SCE's interpretation of the rule governing affiliate use of the
utility's name and logo, on a petition for limited exemptions from that rule,
and on SCE's filing relating to utility products and services that produce other
operating revenue. The CPUC decision concerning the name and logo rule may
affect the disposition of a pending complaint against SCE filed by the CPUC's
Office of Ratepayer Advocates (ORA) and The Utility Reform Network with the
CPUC, which complaint alleges a violation of that rule by Edison Source in a
bulk mailing in 1998.

SCE has not yet been materially affected by the new affiliate transaction rules,
and it projects that the rules will not materially affect its results of
operation or its financial position in the future.

                                  Rate Matters

CPUC Retail Ratemaking

The CPUC regulates the charges for services provided by SCE to its retail
customers. As discussed above in the section on California Electric Utility
Restructuring, the nature in which the CPUC regulates SCE is changing. The CPUC
has issued final decisions regarding direct access, transition cost recovery,
and rate unbundling in the restructuring of the electric industry. In 1998,
these decisions affected cost recovery and rate regulation, and authorized new
ratemaking mechanisms which were implemented, 


                                       5
<PAGE>

replacing the Electric Revenue Adjustment Mechanism, Energy Cost Adjustment
Clause (ECAC) and base rates mechanism (collectively, the "pre-restructuring
ratemaking mechanisms") described in prior annual and quarterly reports filed
with the SEC.

Total rates for all customers are frozen at June 10, 1996 levels, although
residential and small commercial customers have received a 10% reduction from
the June 10, 1996 rate levels beginning on January 1, 1998. These rate levels
will remain in effect for the remainder of the transition period. Under these
frozen rates, individual rate components (distribution, transmission, nuclear
decommissioning, and public purpose programs) are determined according to CPUC-
or FERC-authorized mechanisms, with the generation rate determined residually by
subtracting these other components from the total rate. Beginning for rates
effective in 1999, the consolidation of the individual rate component changes
and the calculation of the residual generation rate are set forth for CPUC
approval as part of the Revenue Adjustment Proceeding (RAP). On June 1, 1998,
SCE filed its first annual RAP Report in compliance with Commission directives
to: 1) consolidate authorized rates and revenue requirements associated with
various proceedings and mechanisms; 2) verify the residual CTC revenue
calculation in the Transition Revenue Account; 3) verify the regulatory account
balances which were transferred to the TCBA on January 1, 1998; 4) streamline
certain balancing and memorandum accounts; and 5) review the PX charge/credit
calculation. SCE anticipates a final 1998 RAP decision in the second quarter of
1999.

The CPUC is considering unbundling SCE's cost of capital based on major utility
functions. In May 1998, SCE filed an application on this issue and hearings were
completed in October 1998. A CPUC decision is expected in early to mid 1999.

Distribution Rates

Distribution cost recovery is made through a distribution PBR mechanism
currently authorized through December 2001. Key elements of the distribution PBR
include: distribution rates indexed for inflation based on the Consumer Price
Index less a productivity factor; adjustments for cost changes that are not
within SCE's control; a cost of capital trigger mechanism based on changes in a
bond index; standards for service reliability and safety; and a net
revenue-sharing mechanism that determines how customers and shareholders will
share gains and losses from distribution operations. (See "California Electric
Utility Restructuring-1998 Activities" above for additional discussion.)

Transmission Rates

With the commencement of the ISO and PX on March 31, 1998, transmission cost
recovery is now under FERC authority. Prior to such commencement, transmission
cost recovery was combined with distribution cost recovery through a
transmission and distribution PBR mechanism.

Nuclear Decommissioning and Public Purpose Program Rates

Recovery of SCE's nuclear decommissioning costs and legislatively mandated
public purpose program funding is made through rates set to recover 100% of
these costs. Public purpose programs include cost effective energy efficiency,
research, renewable technology development, and low income programs.

Generation Rates

Effective with the commencement of the ISO and PX operations, generation costs
are subject to recovery through the market price and the CTC. Revenue available
to recover the uneconomic generation costs subject to recovery through the CTC
will be determined residually by subtracting the other rate components from the
total rates. This residual revenue will first be allocated to recovery of
FERC-authorized ISO charges for transmission support and for purchases from the
PX, and then to recovery of transition costs. Transition costs associated with
QF (Qualifying Facilities) and interutility contracts and the acceleration of
sunk cost recovery will be subject to annual reasonableness review by the CPUC.


                                       6
<PAGE>

Transition cost recovery for most utility generation assets will terminate on
the earlier of March 31, 2002, or when these costs are fully collected. (See
"California Electric Utility Restructuring-1998 Activities" above for additional
discussion.)

Annual Transition Cost Proceeding (ATCP)

In 1997, the CPUC established the ATCP as the proceeding to determine whether
SCE's Transition Cost Balancing Account (TCBA) entries are recorded pursuant to
applicable CPUC decisions and AB 1890, and that certain expenses are justified.
This proceeding includes matters that for periods prior to July 1, 1998, were
considered by the CPUC pursuant to ECAC proceedings. (See "Annual Energy Cost
Adjustment Clause Proceedings" below for additional discussion.)

On September 1, 1998, SCE filed its first ATCP Report with the CPUC and
requested that entries made to the TCBA and applicable generation-related
memorandum accounts during the record period of January 1, 1998 through June 30,
1998 be found to be justified and in compliance with applicable Commission
decisions and AB 1890. In addition, SCE requested the Commission to find for the
record period that SCE's: 1) purchased power contract administration is
justified; 2) coal contract costs are justified; 3) gas fuel procurement and
management activities are justified; 4) recorded employee-related costs are
justified; 5) proposal for retaining or eliminating generation-related balancing
and memorandum accounts is justified; and 6) jurisdictional allocation of
transition costs and other generation-related costs should be based upon
recorded kWh. SCE anticipates a final 1998 ATCP decision in December, 1999.

Recovery of Restructuring Implementation Costs

The legislature, recognizing that costs accommodating the implementation of
direct access, the ISO, and the PX would have to be recovered from within the
rates that were frozen at June 1996 levels by other provisions of AB 1890,
provided a mechanism to insure that such recovery could occur without impairing
the utilities' ability to recover their stranded costs from within frozen rates.
This mechanism is contained in Section 376 of the Public Utilities Code. In May
1998, Edison filed an application with the CPUC to identify the categories of
costs which satisfy the conditions of Section 376, and to establish the
reasonableness of those costs incurred in 1997. The CPUC split the application
into two phases. Evidentiary hearings on Phase 1, which addressed the
eligibility of cost categories for recovery pursuant to Section 376, concluded
in November 1998. A proposed decision on Phase 1 was issued by the
administrative law judge (ALJ) on March 11, 1999, accompanied by an alternate
decision drafted by the assigned commissioner in the proceeding. The alternate
decision differs in only minor respects from that of the ALJ. Neither of these
decisions is binding on any party until acted upon by the full CPUC, which may
adopt one or the other of these proposed decisions, modify them, or issue an
entirely new decision. Both of these proposed decisions reject SCE's request for
a determination of eligibility under Section 376 for several major categories of
costs. These proposed decisions further state that even for the cost categories
they approve for Section 376 eligibility, costs incurred in those categories
after December 31, 1998 would not be eligible. Instead, these proposed decisions
would have SCE recover many of the costs identified in its application from
"market revenues," although the decisions fail to identify that market and no
specific mechanism or authority to recover such costs from any market has yet
been established. SCE disagrees with much of the conclusions reached in these
proposed decisions and will file comments to that effect. A final decision from
the CPUC is currently scheduled for April 22, 1999, but may be delayed beyond
that date. Under both of the proposed decisions, the reasonableness of 1997 and
1998 expenditures for eligible costs under Section 376 would be addressed in a
separate application later this year.

Annual Energy Cost Adjustment Clause Proceedings

Ending in 1998, SCE filed ECAC applications each year with the CPUC regarding
its fuel and purchased power expenses, seeking the CPUC's determination that
SCE's fuel and purchased power costs, including payments to QFs, were
reasonable. These matters are respectively referred to herein as "non-QF
matters" and "QF matters."


                                       7
<PAGE>

     QF MATTERS

In a decision issued in September 1998, the CPUC found SCE's administration of
QF contracts and payments to QF projects (hereinafter referred to as "SCE's QF
activities") for the 1992 ECAC to be reasonable. Review of purchases from three
QF projects were deferred because of a pending civil proceeding. The 1992 ECAC
was closed, subject to a petition to reopen or modify the decision regarding the
deferred QF projects.

The 1993 through 1997 ECAC applications were consolidated for purposes of
reviewing QF activities for these years. ORA issued its review in two different
reports in 1998. ORA contested only the reasonableness of SCE's administration
of one QF contract known as the Arbutus project. ORA claimed $3.6 million should
be disallowed from recovery. On January 21, 1999 an administrative law judge
(ALJ) issued a decision finding SCE's actions with respect to the administration
of the Arbutus contract to be reasonable. The ALJ also confirmed a disallowance
of $16.3 million related to the Mojave Cogeneration Company project for the
years 1992 through 1997. On March 4, 1999, the CPUC issued its decision,
upholding the recommendations of the ALJ. Accordingly, SCE will credit its
Electric Deferred Refund Account in the amount of $16.3 million, plus applicable
interest, within 30 calendar days after the effective date of the decision. Any
recovery SCE receives from the Arbutus bankruptcy proceeding will be credited to
SCE's TCBA. This decision closes the 1993, 1994, 1995, 1996, and 1997
Applications, subject to being reopened for the limited purpose of considering
issues related to the three projects deferred from the 1992 ECAC proceeding.

ORA issued its report on the 1998 ECAC period on February 19, 1999. ORA did not
identify any reasonableness issues associated with SCE's QF activities during
the 1998 period.

     NON-QF MATTERS

     1994 Annual ECAC Record Period

SCE filed its non-QF Reasonableness of Operations Report on May 27, 1994 for the
period April 1, 1993 through March 31, 1994. This report addresses power
purchases and exchanges, and the operation of hydroelectric, coal, gas, and
nuclear resources. The non-QF issues were bifurcated, with the gas procurement
issues being separated from other non-QF issues. On August 2, 1996, the CPUC
issued a decision finding that SCE's non-QF, non-gas procurement activities were
reasonable.

ORA recommended a $13.3 million disallowance for costs incurred from November
1993 through March 1994 associated with SCE's Canadian gas supply and
transportation contracts.

On October 17, 1996, the ALJ granted ORA's motion to consolidate the 1994 and
1995 record periods for the limited purpose of addressing the gas reasonableness
issues.

On July 11, 1997, ORA and SCE executed a Settlement Agreement. The basic
elements of the settlement include: 1) a $39 million disallowance for Canadian
gas costs incurred through December 31, 1996; 2) a disallowance of $257,000 per
month, per contract, for each of SCE's four supply contracts for Canadian gas
costs beginning after January 1, 1997, and continuing until each of the
commodity contracts are terminated (one supply agreement was terminated on May
1, 1997, and the remaining three supply agreements were terminated on July 1,
1997); 3) a cost sharing mechanism in lieu of reasonableness review, whereby
shareholders would absorb at least 20% of the termination or restructuring costs
associated with the Canadian supply and transportation contracts and at least 5%
of the termination or restructuring costs associated with the El Paso
transportation contract which the CPUC has already found reasonable (a portion
of these termination or restructuring costs associated with the cost sharing
mechanisms would be flowed through to ratepayers through the Energy Deferred
Refund Account); and 4) agreement that all other costs incurred under these
contracts, including the termination, buy-down and/or buy-out costs are
reasonable and should be determined to be reasonable by the CPUC.


                                       8
<PAGE>

On December 3, 1997, the CPUC issued a decision approving the settlement between
SCE and ORA. On March 12, 1998, the CPUC approved an advice letter ordering SCE
to refund $65 million covering all settlement costs for the 1994, 1995, 1996,
and 1997 ECAC record periods. The settlement has been fully reflected in SCE's
financial statements.

     1995 Annual ECAC Record Period

SCE filed its reasonableness of operations testimony on May 26, 1996 for the
period April 1, 1994 through March 31, 1995 addressing power purchases and
exchanges, and the operation of hydroelectric, coal, gas, and nuclear resources
for the period April 1, 1994, through March 31, 1995. In May 1996, ORA issued
its reasonableness report on several non-QF reasonableness issues. The report
recommended a $6.6 million disallowance for replacement fuel expenses associated
with 64 outage days due to the Palo Verde Unit 2 steam generator tube rupture in
1993, and for nuclear fuel expenses that were later withdrawn by ORA. SCE and
ORA executed a stipulation on December 18, 1997, subsequently approved by the
CPUC on February 19, 1998, resolving the Palo Verde issue by agreeing to a
disallowance of $318,540 plus interest which is the replacement fuel expense
associated with six outage days.

     1997 Annual ECAC Record Period

On May 30, 1997, SCE filed its annual reasonableness report requesting that the
CPUC find reasonable its fuel and purchased-power costs recorded during the
period of April 1, 1996, through March 31, 1997.

ORA's review of the non-QF operations and costs has been consolidated with its
review of the non-QF operations and costs for the 1996 ECAC record period. ORA
filed its report on August 18, 1997. In its report, ORA recommended, among other
things: 1) a disallowance of $360,000 associated with an outage at the
coal-fired Four Corners Generating Station; 2) a $200,000 adjustment to the
costs recorded in SCE's Catastrophic Events Memorandum Account, and 3) a
recommendation that SCE's execution of its natural gas transportation contract
with Southwest Gas Corporation be found unreasonable for purposes of CTC
eligibility. The January 1998 hearings resulted in a CPUC decision issued on
October 22, 1998, adopting the proposed disallowances. The decision found the
execution of the Southwest Gas contract reasonable and therefore, any uneconomic
costs associated with the contract will be subject to CTC recovery. The
remainder of SCE's non-QF costs and expenses were also found reasonable.

On December 21, 1998, SCE filed a petition for modification of the above
decision alleging that it erroneously stated that SCE may seek recovery of its
Nuclear Unit Incentive Procedure (NUIP) rewards in the Revenue Allocation
Proceeding. The CPUC found that SCE's calculation of the NUIP reward was
reasonable and it was an error for the Commission to order another
reasonableness review of these rewards which totaled $15,238,778 plus interest.
The February 18, 1999, CPUC decision granted SCE's petition to modify the 1998
decision and authorized the booking of the NUIP rewards into the TCBA.

     1998 Annual ECAC Record Period

On February 19, 1999, ORA issued its Reasonableness Report and made the
following recommendations. ORA found that SCE's costs ($239.1 million) recorded
in the ISO/PX Implementation Delay Memorandum Account (IPDMA) properly reflected
the ISO/PX expenses that accrued during the three month delay in the
commencement of ISO/PX operations. ORA also required SCE to include a showing
that it undertook all practicable steps to minimize the delay with its request
for the recovery of IPDMA costs. ORA found no evidence to show that SCE caused a
delay in the ISO/PX implementation. ORA found that SCE had correctly calculated
its NUIP rewards for Palo Verde Units 2 and 3. The NUIP rewards calculated for
Unit 2 and 3 were $2.5 million and $1.6 million, respectively. ORA recommended
two coal generation related disallowances seeking replacement fuel costs based
on December 1997 outages of Mojave Units 1 and 2 in the amount of $2.4 million,
and a $1.6 million disallowance related to an outage at Four Corners Unit 5. ORA
also recommended disallowances totaling $5.6 million plus interest, to correct
for audit errors. SCE is investigating the facts behind these recommended


                                       9
<PAGE>

disallowances recommendations and expects to file rebuttal testimony on April
26, 1999. Hearings are scheduled in May 1999.

Palo Verde

In January 1997, the CPUC authorized a further acceleration of the recovery of
SCE's remaining investment of $1.2 billion in Palo Verde Units 1, 2, and 3. The
accelerated recovery will continue through December 2001, earning a 7.35% fixed
rate of return. The future operating costs, including nuclear fuel and nuclear
fuel financing costs, and incremental capital expenditures, are subject to
balancing account treatment through 2001. Beginning January 1, 1998, the
balancing account became part of the CTC mechanism. The existing nuclear unit
incentive procedure will continue only for purposes of calculating a reward for
performance of any unit above an 80% capacity factor for a fuel cycle. Beginning
in 2002, SCE will be required to share the net benefits received from the
operation of Palo Verde equally with ratepayers.

San Onofre Nuclear Generating Station Units 2 and 3

In April 1996, the CPUC authorized a further acceleration of the recovery of
SCE's remaining investment of $2.6 billion in San Onofre Units 2 and 3. The
accelerated recovery will continue through December 2001, earning a 7.35% fixed
rate of return. San Onofre's operating costs, including nuclear fuel, nuclear
fuel financing costs, and incremental capital expenditures, are recovered
through an incentive pricing plan which allows SCE to receive about 4.0(cent)
per kWh through December 31, 2003. Beginning January 1, 1998, the accelerated
plant recovery and incremental cost incentive pricing became part of the CTC
mechanism. Beginning in 2004, SCE will be required to share the net benefits
received from operation of San Onofre Units 2 and 3 equally with ratepayers.

New Accounting Rules

A recently issued accounting rule requires that costs related to start-up
activities be expensed as incurred, effective January 1, 1999. SCE does not
expect this new accounting rule to materially affect its results of operations
or its financial position.

In June 1998, a new accounting standard for derivative instruments and hedging
activities was issued. The new standard, which will be effective January 1,
2000, requires all derivatives to be recognized on the balance sheet at fair
value. Gains or losses from changes in fair value would be recognized in
earnings in the period of change unless the derivative is designated as a
hedging instrument. Gains or losses from hedges of a forecasted transaction or
foreign currency exposure would be reflected in other comprehensive income.
Gains or losses from hedges of a recognized asset or liability, or a firm
commitment would be reflected in earnings for the ineffective portion of the
hedge. SCE anticipates that most of its derivatives under the new standard would
qualify for hedge accounting. SCE expects to recover in rates any market price
changes from its derivatives that could potentially affect earnings.
Accordingly, implementation of this new standard is not expected to affect
earnings.

                      Fuel Supply and Purchased Power Costs

Since April 1, 1998, SCE has been required to purchase all power for
distribution to retail customers from the PX. In 1998, fuel and purchased-power
costs, excluding that purchased from the PX, were approximately $3.1 billion,
which was a 20% decrease from the costs in 1997.

SCE's sources of energy during 1998 were as follows: 54% purchased power; 4%
natural gas; 22% nuclear; 13% coal; and 7% hydro.

Average fuel costs, expressed in (cent) per kWh, for the year ended December 31,
1998, were: oil, 6.03(cent); natural gas, 3.06(cent); nuclear, 0.48(cent); and
coal, 1.23(cent).


                                       10
<PAGE>

Natural Gas Supply

As a result of the sale of all of its gas-fired generating stations, SCE has
terminated four long-term natural gas supply and three long-term gas
transportation contracts which had been used to import gas from Canada. In
addition, SCE has exercised an option under its 15-year gas transportation
commitment with El Paso Natural Gas Company to reduce its capacity obligation
from 200 million to 130 million cubic feet per day.

Nuclear Fuel Supply

SCE has  contractual  arrangements  covering 100% of the projected  nuclear fuel
requirements for San Onofre through the years indicated below:

      Uranium concentrates(*).......................................     2003
           Conversion...............................................     2003
           Enrichment...............................................     2003
           Fabrication..............................................     2005
- ---------------
(*) Assumes  the San Onofre  participants  meet their  supply  obligations  in a
timely manner.

Assuming normal operation and full utilization of existing on-site storage
capacity, San Onofre Units 2 and 3 will maintain full-core offload reserve
through 2005. The Nuclear Waste Policy Act of 1982 requires that the DOE provide
for the disposal of utility spent nuclear fuel beginning January 31, 1998. The
DOE has defaulted on its obligation to begin acceptance of spent nuclear fuel
from the commercial nuclear industry by that date. Additional spent fuel storage
either on-site or at another location will be required to permit continued
operations beyond 2005.

Participants at Palo Verde have contractual agreements for uranium concentrates
to meet projected requirements through 2000. Independent of arrangements made by
other participants, SCE will furnish its share of uranium concentrates
requirement through at least 1999 from existing contracts. Contracts covering
100% requirements are in place for conversion through 1998, enrichment through
2002, and fabrication through 2016.

Assuming normal operation and regulatory approval for more condensed on-site
spent fuel storage, Palo Verde Units 1, 2, and 3 will maintain full-core offload
reserve until the spring of 2002, fall of 2002, and spring of 2003,
respectively. Arizona Public Service, operating agent for Palo Verde, has
commenced construction of an interim fuel storage facility that it projects will
be completed in 2002.

                              Environmental Matters

Legislative and regulatory activities in the areas of air and water pollution,
waste management, hazardous chemical use, noise abatement, land use, aesthetics,
and nuclear control continue to result in the imposition of numerous
restrictions on SCE's operation of existing facilities, on the timing, cost,
location, design, construction, and operation by SCE of new facilities, and on
the cost of mitigating the effect of past operations on the environment. These
activities substantially affect future planning and will continue to require
modifications of SCE's existing facilities and operating procedures. SCE is
unable to predict the extent to which additional regulations may affect its
operations and capital expenditure requirements.

The Clean Air Act (CAA) provides the statutory framework to implement a program
for achieving national ambient air quality standards in areas exceeding such
standards and provides for maintenance of air quality in areas already meeting
such standards.

The CAA as amended in 1990, and as implemented within the South Coast Air
Quality Management District (SCAQMD) and other California districts, required
SCE to reduce emissions of oxides of nitrogen from its generating stations.
During 1998, SCE sold all of its oil- and gas-fueled generating stations 


                                       11
<PAGE>

within the Mohave Desert Air Quality Management District, Ventura County Air
Pollution Control District, and in the Santa Barbara County Air Pollution
Control District. SCE has sold all but one of its oil- and gas-fired generating
stations within the SCAQMD. The remaining plant, the Pebbly Beach Generating
Station, supplies power to Santa Catalina Island. After the sale of its oil- and
gas-fueled generating stations, SCE commenced operation of the facilities under
operation and maintenance contracts with the individual owners except for two
plants that ceased operation during 1998. SCE will continue to operate or, where
applicable, commence operating those divested facilities as active generating
stations for the required two-year period specified by California's
restructuring statute implementing deregulation of electric utilities in the
state. SCE's operation of the stations under these operation and maintenance
contracts is at the direction and expense of the new owners. SCE is responsible
for maintaining the environmental permits for the plants. The new owners, not
SCE, are responsible for the purchase and installation of emissions control
equipment, and for obtaining trading credits required for the plants under the
Regional Clean Air Incentives Market within the SCAQMD.

The CAA does not require any other significant emissions control expenditures
that are identifiable at this time. The Environmental Protection Agency (EPA)
plans to issue its final rulemaking regarding regional haze regulations in
mid-1999. The EPA and SCE are also expected to conclude a cooperative tracer
study of sulfur dioxide emissions from the Mohave Generating Station (Mohave) in
early 1999. The study is currently evaluating potential impact from Mohave
emissions on haze within the Grand Canyon National Park. On February 19, 1998,
the Sierra Club and the Grand Canyon Trust filed suit in the U.S. District Court
of Nevada against SCE and the other co-owners of Mohave alleging violations,
over the last five years of the CAA, the Nevada State Implementation Plan, and
applicable air quality permits relating to opacity and sulfur dioxide emission
limits. (See, "Southern California Edison Company-Mohave Generating Station
Environmental Litigation" below for additional discussion.) SCE has asked
Business for Social Responsibility and Environment Now, two well respected
organizations, to convene a collaborative of interested stakeholders to discuss
the best way to resolve this issue. In anticipation of this dialogue, SCE has
proposed to install a dry scrubber, baghouse, and low-NOx burners at Mohave by
2008. This proposal, however, is subject to discussion and modification as part
of the collaborative. The acid rain provisions of the amended CAA also put an
annual limit on sulfur dioxide emissions allowed from power plants. SCE has
received more sulfur dioxide allowances than required for its projected
operations. Until the collaborative process is completed and a firm requirement
adopted, SCE expects to meet all of the present regulations through improved
operations at Mohave.

The CAA also requires the EPA to carry out a three-year study of risk to public
health from the emissions of toxic air contaminants from electric utility steam
generating plants, and to regulate such emissions if required. The study's final
report to Congress concluded that mercury from coal-fired utilities is the
hazardous air pollutant of greatest potential concern and merits additional
research and monitoring to better understand the risks of mercury exposure.
Other pollutants that may potentially need further study are dioxins and arsenic
from coal-fired plants, and nickel from oil-fired plants. The EPA concluded that
the impacts from emissions from gas-fired utilities are negligible and that
there is no need for further evaluation of the risks of hazardous air
pollutants.

Regulations under the Clean Water Act require permits for the discharge of
certain pollutants into U.S waters. Under this act, the EPA issues effluent
limitation guidelines, pretreatment standards, and new source performance
standards for the control of certain pollutants. Individual states may impose
more stringent limitations. SCE incurs additional expenses and capital
expenditures in order to comply with guidelines and standards applicable to
steam electric power plants. SCE presently has discharge permits for all
applicable facilities.

The Safe Drinking Water and Toxic Enforcement Act prohibits the exposure to
individuals of chemicals known to the State of California to cause cancer or
reproductive harm and the discharge of such listed chemicals into potential
sources of drinking water. Additional chemicals are continuously being put on
the state's list, requiring constant monitoring.


                                       12
<PAGE>

The Resource Conservation and Recovery Act (RCRA) provides the statutory
authority for the EPA to implement a regulatory program for the safe treatment,
recycling, storage, and disposal of solid and hazardous wastes. An unresolved
issue remains regarding the degree to which coal wastes should be regulated
under the RCRA. Increased regulation may result in increased expenses relating
to the operation of Mohave.

The Toxic Substances Control Act and accompanying regulations govern the
manufacturing, processing, distribution in commerce, use, and disposal of
polychlorinated biphenyls, a toxic substance used in certain electrical
equipment. Current costs for disposal of this substance are immaterial.

SCE records its environmental liabilities when site assessments and/or remedial
actions are probable and a range of reasonably likely cleanup costs can be
estimated. SCE reviews its sites and measures the liability quarterly, by
assessing a range of reasonably likely costs for each identified site using
currently available information, including existing technology, presently
enacted laws and regulations, experience gained at similar sites, and the
probable level of involvement and financial condition of other potentially
responsible parties. These estimates include costs for site investigations,
remediation, operations and maintenance, monitoring, and site closure. Unless
there is a probable amount, SCE records the lower end of this reasonably likely
range of costs (classified as other long-term liabilities at discounted
amounts).

SCE's recorded estimated minimum liability to remediate its 49 identified sites
is $171 million. The ultimate costs to clean up SCE's identified sites may vary
from its recorded liability due to numerous uncertainties inherent in the
estimation process, such as: the extent and nature of contamination; the
scarcity of reliable data for identified sites; the varying costs of alternative
cleanup methods; developments resulting from investigatory studies; the
possibility of identifying additional sites; and the time periods over which
site remediation is expected to occur. SCE believes that, due to these
uncertainties, it is reasonably possible that cleanup costs could exceed its
recorded liability by up to $247 million. The upper limit of this range of costs
was estimated using assumptions least favorable to SCE among a range of
reasonably possible outcomes. SCE has sold all of its gas- and oil-fueled
generation plants and has retained some liability associated with the divested
properties.

The CPUC allows SCE to recover environmental-cleanup costs at 41 of its sites,
representing $88 million of its recorded liability, through an incentive
mechanism (SCE may ask to include additional sites). Under this mechanism, SCE
will recover 90% of cleanup costs through customer rates (shareholders fund the
remaining 10%), with the opportunity to recover these costs from insurance
carriers and other third parties. SCE has successfully settled insurance claims
with all responsible carriers. Costs incurred at SCE's remaining sites are
expected to be recovered through customer rates. SCE has recorded a regulatory
asset of $141 million for its estimated minimum environmental-cleanup costs
expected to be recovered through customer rates.

SCE's identified sites include several sites for which there is a lack of
currently available information, including the nature and magnitude of
contamination, and the extent, if any, that SCE may be held responsible for
contributing to any costs incurred for remediating these sites. Thus, no
reasonable estimate of cleanup costs can be made for these sites.

SCE expects to clean up its identified sites over a period of up to 30 years.
Remediation costs in each of the next several years are expected to range from
$4 million to $10 million. Recorded costs for 1998 were $7 million.

Based on currently available information, SCE believes that it is unlikely that
it will incur amounts in excess of the upper limit of the estimated range and,
based upon the CPUC's regulatory treatment of environmental-cleanup costs, SCE
believes that costs ultimately recorded will not materially affect its results
of operations or its financial position. There is no assurance, however, that
future developments, including additional information about existing sites or
the identification of new sites, will not require material revisions to such
estimates.


                                       13
<PAGE>

SCE's projected environmental capital expenditures are $900 million for the
1999-2003 period. These expenditures are mainly for aesthetic treatment,
including undergrounding certain transmission and distribution lines.

                                 Year 2000 Issue

Many of SCE's existing computer systems identify a date by using only six digits
instead of eight. If not appropriately addressed, these programs could fail or
create erroneous results when attempting to process information containing dates
after December 31, 1999. This situation has been referred to generally as the
Year 2000 Issue.

SCE has a comprehensive program in place to address potential Year 2000 impacts.
SCE divides Year 2000 activities into five phases: inventory, impact assessment,
remediation, testing, and implementation. Edison International provides overall
coordination of this effort, working with SCE and their business units.

Remediation of SCE's key financial systems for the Year 2000 Issue was completed
in 1997. SCE's informational and operational systems have been assessed, and
detailed plans have been developed to address modifications required to be
completed, tested, and operational by December 31, 1999. Year 2000 readiness
preparations for SCE's mainframe financial systems were completed in the fourth
quarter of 1997, and preparations for SCE's material management system were
completed in the second quarter of 1998. SCE's customer information and billing
system is in the process of being replaced with a system designed to be Year
2000-ready and final conversion activities are expected to be completed by the
first quarter of 1999. SCE's distributed computing assets include operations and
business information systems. SCE's critical operations information systems
include outage management, power management, and plant monitoring and access
retrieval systems. SCE's business information systems include a data acquisition
system for billing, the computer call center support system, credit support, and
maintenance management. SCE's current estimate of the costs to complete these
modifications, including the cost of new hardware and software application
modification, is $72 million, about 40% of which is expected to be capital
costs. SCE's Year 2000 costs expended through December 31, 1998, were $35
million. SCE expects current rate levels for providing electric service to be
sufficient to provide funding for utility-related modifications. SCE expects its
Year 2000 date conversion project to be completed on a timely basis, with no
material adverse impact to its results of operations or financial position.

Another aspect of SCE's program involves developing contingency plans. Final
drafts of such plans are expected to be completed by March 1999, with management
approval thereof scheduled for May 1, 1999. These plans will continue to be
revised and enhanced as the year 2000 approaches.

SCE's objectives for the Year 2000 readiness of critical systems was to be 75%
complete by year-end 1998, and to be 100% complete by July 1999. SCE was 80%
complete at year-end 1998 and is on track to meet its July 1999 goal.

SCE's Year 2000 date conversion project includes an assessment of critical
interfaces with the computer systems of others, and it does not expect a
material adverse effect on its operating and business functions from the Year
2000 Issue. (See item 7, Management's Discussion and Analysis of Results of
Operations and Financial Condition -- "Year 2000 Issue" below for additional
discussion.)

Item 2.  Properties

                         Existing Generating Facilities

SCE owns and operates one diesel-fueled generating plant located on Santa
Catalina island, 36 hydroelectric plants, and an undivided 75.05% interest
(1,614 MW net) in Units 2 and 3 at San Onofre. 


                                       14
<PAGE>


These plants are located in Central and Southern California. By the end of 1998,
SCE had sold all 12 of its gas-fueled generating plants.

SCE also owns a 15.8% share of the Palo Verde (579 MW net) Nuclear Generating
Station which is located near Phoenix, Arizona. SCE owns a 48% undivided
interest (754 MW) in Units 4 and 5 at the Four Corners Generating Station, which
is a coal-fueled steam electric generating plant located in New Mexico. Palo
Verde and Four Corners are operated by other utilities. SCE operates and owns a
56% undivided interest (885 MW) in the Mohave Generating Station, which consists
of two coal-fueled steam electric generating units in Clark County, Nevada. At
year-end 1998, the existing SCE-owned generating capacity (summer effective
rating) was divided approximately as follows: 43.9% nuclear, 32.8% coal, 23.1%
hydroelectric, and 0.2% oil.

San Onofre, Four Corners, certain of SCE's substations and portions of its
transmission, distribution and communication systems are located on lands of the
U. S. or others under (with minor exceptions) licenses, permits, easements or
leases, or on public streets or highways pursuant to franchises. Certain of such
documents obligate SCE, under specified circumstances and at its expense, to
relocate transmission, distribution, and communication facilities located on
lands owned or controlled by federal, state, or local governments.

The 36 hydroelectric plants, some with related reservoirs, currently having an
effective operating capacity of 1,156 MW, and are, with five exceptions, located
in whole or in part on lands of the U.S. pursuant to, 30 to 50 year governmental
licenses that expire at various times between 1998 and 2026. Such licenses
impose numerous restrictions and obligations on SCE, including the right of the
United States to acquire projects upon payment of specified compensation. When
existing licenses expire, FERC has the authority to issue new licenses to third
parties, but only if their license application is superior to SCE's and then
only upon payment of specified compensation to SCE. Any new licenses issued to
SCE are expected to be issued under terms and conditions less favorable than
those of the expired licenses. SCE's applications for the relicensing of certain
hydroelectric projects with an aggregate effective operating capacity of 115.57
MW are pending. The SCE hydroelectric projects that are undergoing relicensing
and whose long-term licenses have expired, have been issued annual licenses,
which will be renewed until the new licenses are issued.

In 1998, SCE's peak demand was 19,935 MW, set on August 31, 1998. Substantially
all of SCE's properties are subject to the lien of a trust indenture securing
First and Refunding Mortgage Bonds (Trust Indenture), of which approximately
$2.5 billion in principal amount was outstanding on December 31, 1998. Such lien
and SCE's title to its properties are subject to the terms of franchises,
licenses, easements, leases, permits, contracts, and other instruments under
which properties are held or operated, certain statutes and governmental
regulations, liens for taxes and assessments, and liens of the trustees under
the Trust Indenture. In addition, such lien and SCE's title to its properties
are subject to certain other liens, prior rights and other encumbrances, none of
which, with minor or unsubstantial exceptions, affect SCE's right to use such
properties in its business, unless the matters with respect to SCE's interest in
Four Corners and the related easement and lease referred to below may be so
considered.

SCE's rights in the Four Corners Project, which is located on land of The Navajo
Nation of Indians under an easement from the U. S. and a lease from The Navajo
Nation, may be subject to possible defects. These defects include possible
conflicting grants or encumbrances not ascertainable because of the absence of,
or inadequacies in, the applicable recording law and the record systems of the
Bureau of Indian Affairs and The Navajo Nation, the possible inability of SCE to
resort to legal process to enforce its rights against The Navajo Nation without
Congressional consent, possible impairment or termination under certain
circumstances of the easement and lease by The Navajo Nation, Congress, or the
Secretary of the Interior, and the possible invalidity of the Trust Indenture
lien against SCE's interest in the easement, lease, and improvements on the Four
Corners Project.


                                       15
<PAGE>

                  Construction Program and Capital Expenditures

Cash required by SCE for its capital expenditures totaled $861 million in 1998,
and $685 million in 1997 and $616 million in 1996. Construction expenditures for
the 1999-2003 period are forecasted at $3.9 billion.

In addition to cash required for construction expenditures for the next five
years as discussed above, $2.4 billion is needed to meet requirements for
long-term debt maturities and sinking fund redemption requirements.

SCE's estimates of cash available for operations for the five years through 2003
assume, among other things, the receipt of adequate and timely rate relief and
the realization of its assumptions regarding cost increases, including the cost
of capital. SCE's estimates and underlying assumptions are subject to continuous
review and periodic revision.

The timing, type, and amount of all additional long-term financing are also
influenced by market conditions, rate relief, and other factors, including
limitations imposed by SCE's Articles of Incorporation and Trust Indenture.

                              Nuclear Power Matters

SCE's nuclear facilities have been reliable sources of inexpensive,
non-polluting power for SCE's customers for more than a decade. Throughout the
operating life of these facilities, SCE's customers have supported the revenue
requirements of SCE's capital investment in these facilities and for their
incremental costs through traditional cost-of-service ratemaking.

In 1996, the CPUC adopted SCE's San Onofre Unit 2 and 3 proposal under which SCE
would have recovered its remaining investment in these San Onofre Units at a
reduced rate of return of 7.35%, but on an accelerated basis during the
eight-year period from the effective date in 1996 through December 31, 2003. AB
1890, however, requires the recovery of the San Onofre investment to be
completed by December 31, 2001. In addition, the traditional cost-of-service
ratemaking for San Onofre Units 2 and 3 was superseded by an incentive pricing
plan in which SCE's customers pay a preset price for each kWh of energy
generated at San Onofre during the eight-year period. AB 1890 allows for the
continuation of the incentive pricing plan through December 31, 2003. SCE was
compensated for the incremental costs required for the continued operation of
San Onofre Units 2 and 3 with revenue earned through the incentive pricing plan.
SCE also retained the ability to request recovery of the cost of fuel consumed
for generation of replacement energy for periods in which San Onofre will not
generate power through ECAC filings and, beginning in 1998, as part of ATCP. AB
1890 also allows SCE to continue to collect funds for decommissioning expenses
through traditional ratemaking treatment.

On July 16, 1997, the CPUC approved SCE's request to transfer the recorded net
investment in San Onofre Units 2 and 3 step-up transformers to San Onofre Units
2 and 3 sunk costs for recovery by December 31, 2001, at a reduced rate of
return of 7.35%.

On August 21, 1997, the CPUC approved San Diego Gas & Electric's (SDG&E) and
SCE's Joint Petition to Modify, requesting continued recovery of certain
corporate administrative and general costs allocable to San Onofre Units 2 and
3, at rates of 0.28(cent) and 0.21(cent) per kWh, respectively, for the period
January 1, 1998, through December 31, 2003.

In 1996, SCE filed its Palo Verde Proposal Application requesting adoption of a
new rate mechanism for Palo Verde consistent with that of San Onofre Units 2 and
3. On November 15, 1996, SCE, ORA, and TURN entered into a settlement agreement,
which was approved by the CPUC on December 20, 1996, regarding SCE's Palo Verde
Proposal Application which now allows SCE to recover its remaining investment in
the Palo Verde units by December 31, 2001, at a reduced rate of return of 7.35%
consistent with AB 1890. The settling parties agreed that SCE would recover its
share of Palo Verde 


                                       16
<PAGE>

incremental operating costs, except if those costs exceed 95% of the levels
forecast by SCE in its application by more than 30% in any given year in which
case, SCE must demonstrate that the aggregate amount of the costs exceeding the
forecast in that year are reasonable. If the annual Palo Verde site Gross
Capacity Factor (GCF) is less than 55% in a calendar year, SCE will bear the
burden of proof to demonstrate that the site's operations causing the GCF to
fall below 55% were reasonable in that year. If operations are determined to be
unreasonable by the CPUC, SCE's replacement power purchases associated with that
period of Palo Verde operations below 55% GCF may be disallowed.

Beginning in 2002, the benefits of future operation of Palo Verde Units 1, 2,
and 3 will be shared equally between shareholders and customers. Likewise,
beginning in 2004, the benefits of future operation of San Onofre Units 2 and 3
will be shared equally between shareholders and customers.

San Onofre Nuclear Generating Station

In 1992, the CPUC approved a settlement agreement between SCE and the ORA to
discontinue operation of Unit 1 at the end of its then-current fuel cycle. In
November 1992, SCE discontinued operation of Unit 1. As part of the agreement,
SCE recovered its remaining investment over a four-year period ending August
1996. On December 21, 1998, SCE filed an application with the CPUC requesting
authorization to access its Nuclear Decommissioning Trust Funds for Unit 1 for
the purpose of commencing decommissioning of Unit 1 in 2000.

The Units 2 and 3 steam generators have performed relatively well through the
first 15 years of operation, with low rates of ongoing steam generator tube
degradation. During the Unit 2 scheduled refueling and inspection outage, which
was completed in 1997, an increased rate of degradation was identified, which
resulted in the removal of more tubes from service than had been expected. The
present design analysis, which is being reviewed for a potential increase,
allows for the removal of up to 10% of the steam generator tubes before the
unit's capacity must be re-evaluated. As a result of the increased degradation,
a mid-cycle outage was conducted in early 1998 for Unit 2. Continued degradation
was found during this inspection. A favorable (decreasing) trend in degradation
was observed during inspection in the scheduled refueling outage in January
1999. The results of the January 1999 inspection are being analyzed to determine
if there is a need for a mid-cycle inspection outage in early 2000. With the
results from the January 1999 outage, 7.5% of the tubes have now been removed
from service. In September 1998, San Onofre Unit 2 experienced a small amount of
leakage from a steam generator tube plug, which required an 11-day outage to
repair.

During Unit 3's refueling outage, which was completed in July 1997, inspections
of structural supports for steam generator tubes identified several areas where
the thickness of the supports had been reduced, apparently by erosion during
normal plant operation. A follow-up mid-cycle inspection indicated that the
erosion had been stabilized. Additional monitoring inspections are planned
during the next scheduled refueling outage in 1999. To date, 5% of Unit 3's
tubes have been removed from service.

During Unit 2's February 1998 mid-cycle outage, similar tube supports showed no
significant levels of such erosion.

Palo Verde Nuclear Generating Station

Based on latest available data, APS estimates that the Unit 1 and Unit 3 steam
generators should operate for the 40 year licensed operating life of those
units, although APS continues to monitor the situation. APS has disclosed that
it believes that it will be economically desirable to replace the Unit 2 steam
generators, which have been most affected by tube cracking, in four to nine
years. APS has indicated to the participants that it believes that replacement
of the Unit 2 steam generators would cost between $100 million and $150 million.
SCE estimates that this cost could be higher, such that its share of this cost
would be between $16 million and $30 million plus replacement power costs.
Unanimous approval of the Palo Verde participants is required for capital
improvements, including steam generator replacement. In December 1997, the Palo
Verde participants unanimously agreed to purchase two spare 


                                       17
<PAGE>

steam generators at a cost of approximately $82 million; however, SCE has not
yet decided whether it supports replacement of the Unit 2 steam generators.

During 1998, Palo Verde Nuclear Generating Station generated 30 billion kWh of
electricity. It was the first time an American power plant of any kind crossed
the 30-billion-kilowatt-hour threshold in a single year. Palo Verde broke its
own record of 29.5 billion kWh that it set in 1997 and was the nation's top
power producer for the fourth consecutive year. The year-end station capacity
factor was 92.5%. Units 1 and 3 were each refueled in 36-day outages - a site
record. Unit 2 operated on-line the entire year and at year's end had operated
continuously for 430 days.

Nuclear Facility Decommissioning

With the exception of San Onofre Unit 1, SCE plans to decommission its nuclear
generating facilities at the end of each facility's operating license by a
prompt removal method authorized by the NRC. On December 21, 1998, SCE filed an
application with the CPUC requesting the authority to access its decommissioning
trust funds for San Onofre Unit 1 for the purpose of decommissioning commencing
in 2000. Decommissioning is estimated to cost $1.9 billion in current-year
dollars based on site-specific studies performed in 1998 for San Onofre and Palo
Verde. This estimate considers the total cost of decommissioning and dismantling
the plant, including labor, material, burial, and other costs. The site specific
studies are updated approximately every three years. Changes in the estimated
costs, timing of decommissioning, or the assumptions underlying these estimates
could cause material revisions to the estimated total cost to decommission in
the near term. Decommissioning is scheduled to begin in 2000 at San Onofre Unit
1. SCE expects decommissioning San Onofre Units 2 and 3 and Palo Verde to occur
after its generating licenses expire in 2013 and 2024 respectively.

Decommissioning expense was $164 million in 1998 and $154 million in 1997. The
accumulated provision for decommissioning was $1.2 billion at December 31, 1998,
and $1.1 billion at December 31, 1997. The estimated costs to decommission San
Onofre Unit 1 ($368 million in 1998 dollars) are recorded as a liability.

Decommissioning funds collected in rates are placed in independent trusts which,
together with accumulated earnings, will be utilized solely for decommissioning.

Nuclear Insurance

Federal law limits public liability claims from a nuclear incident to $9.8
billion. SCE and other owners of San Onofre and Palo Verde have purchased the
maximum private primary insurance available ($200 million). The balance is
covered by the industry's retrospective rating plan that uses deferred premium
charges to every reactor licensee if a nuclear incident at any licensed reactor
in the U.S. results in claims and/or costs which exceed the primary insurance at
that plant site. Federal regulations require this secondary level of financial
protection. The NRC exempted San Onofre Unit 1 from this secondary level,
effective June 1994. The maximum deferred premium for each nuclear incident is
$88 million per reactor, but not more than $10 million per reactor may be
charged in any one year for each incident. Based on its ownership interests, SCE
could be required to pay a maximum of $175 million per nuclear incident. SCE,
however, would have to pay no more than $20 million per incident in any one
year. Such premium amounts include a 5% surcharge if additional funds are needed
to satisfy public liability claims and are subject to periodic adjustment for
inflation. If the public liability limit above is insufficient, federal
regulations may impose further revenue-raising measures to pay claims, including
a possible additional assessment on all licensed reactor operators.

Property damage insurance covers losses up to $500 million, including
decontamination costs, at San Onofre and Palo Verde. Decontamination liability
and property damage coverage exceeding the primary $500 million has also been
purchased in amounts greater than federal requirements. Additional insurance
covers part of replacement power expenses during an accident-related nuclear
unit outage. These policies are issued primarily by mutual insurance companies
owned by utilities with nuclear 


                                       18
<PAGE>

facilities. If losses at any nuclear facility covered by these arrangements were
to exceed the accumulated funds for these insurance programs, SCE could be
assessed retrospective premium adjustments of up to $22 million per year.
Insurance premiums are charged to operating expense.

Item 3.  Legal Proceedings

                           Wind Generators' Litigation

SCE was named as a defendant in a series of eight lawsuits brought by
independent power producers of wind generation. Seven of the lawsuits were filed
in Los Angeles County Superior Court and one was filed in Kern County Superior
Court. The lawsuits alleged that SCE incorrectly interpreted contracts with the
plaintiffs by limiting fixed energy payments to a single ten-year period rather
than beginning a new ten-year period of fixed energy payments for each stage of
development. In its responses to the complaints, SCE denied the plaintiffs'
allegations. In each of the lawsuits, the plaintiffs sought declaratory relief
regarding the proper interpretation of the contracts. Plaintiffs alleged a
combined total of approximately $189 million in damages, which included
consequential damages claimed in seven of the eight lawsuits. A ninth lawsuit
was subsequently filed in Los Angeles County raising claims similar to those
alleged in the first eight. SCE responded to the complaint in the new lawsuit by
denying its material allegations.

After receiving a favorable decision in the liability phase of the lead case,
SCE agreed to settle with the plaintiffs in seven of the lawsuits on terms
whereby SCE waived its rights to recover costs against such plaintiffs in
exchange for their agreement that there is only one fixed price period under
each of their power purchase contracts with SCE and a mutual dismissal with
prejudice of claims. SCE also entered into a settlement agreement with the
plaintiff in another of the lawsuits which resolved the issue of multiple fixed
price periods on the same terms and which also resolved a related issue unique
to that plaintiff in exchange for a nominal payment by SCE. This settlement was
approved by the bankruptcy court in proceedings involving the plaintiff. On
January 28, 1999, SCE finalized a settlement with the remaining plaintiffs on
terms effectively the same as those in the initial group of settlements except
that the settlement agreement also resolved, on terms favorable to SCE, certain
claims which SCE had asserted in the lead case by way of cross-complaint.

                        Geothermal Generators' Litigation

On June 9, 1997, SCE filed a complaint in Los Angeles County Superior Court
against an independent power producer of geothermal generation and six of its
affiliated entities (Coso parties). SCE alleges that in order to avoid power
production plant shutdowns caused by excessive noncondensable gas in the
geothermal field brine, the Coso parties routinely vented highly toxic hydrogen
sulfide gas from unmonitored release points beginning in 1990 and continuing
through at least 1994, in violation of applicable federal, state, and local
environmental law. According to SCE, these violations constituted material
breaches by the Coso parties of their obligations under their contracts with SCE
and applicable law. The complaint sought termination of the contracts and
damages for excess power purchase payments made to the Coso parties. The Coso
parties' motion to transfer venue to Inyo County Superior Court was granted on
August 31, 1997. On June 1, 1998, the court struck SCE's request for termination
of the contracts, leaving SCE with its claim for damages and other relief. On
February 16, 1999, the court denied the Coso Parties' motion for judgment on the
pleadings directed to SCE's first amended complaint.

The Coso parties have also asserted various claims against SCE, The Mission
Group, and Mission Power Engineering Company (Mission parties) in a cross
complaint filed in the action commenced by SCE as well as in a separate action
filed against SCE by three of the Coso parties in Inyo County Superior Court. In
November 1997, the court struck all but two causes of action asserted in the
separate action on the grounds that they should have been raised as part of the
Coso parties' cross-complaint, and ordered the remaining two causes of action
consolidated for all purposes with the action filed by SCE.


                                       19
<PAGE>

The Coso parties subsequently filed second and third amended cross-complaints.
The third amended cross-complaint names SCE, the Mission parties, and Edison
International. As against SCE, the third amended cross-complaint purports causes
of action for declaratory relief, breach of the covenant of good faith and fair
dealing; inducing breach of agreements between the Coso parties and their former
employees; breach of an earlier settlement agreement between the Mission parties
and the Coso parties; slander and disparagement, injunctive relief and
restitution for unfair business practices; anticipatory breach of the contracts;
and violations of Public Utilities Code ss.ss. 453, 702 and 2106. As against the
Mission parties, the third amended cross-complaint seeks damages for breach of
warranty of authority with respect to the settlement agreement, and for
equitable indemnity. The Coso parties voluntarily dismissed Edison International
from the third amended cross-complaint on December 4, 1998. As against SCE, the
third amended cross-complaint seeks restitution, compensatory damages in excess
of $115 million, punitive damages in an amount not less than $400 million,
interest, attorney's fees, declaratory relief, and injunctive relief.

On September 21, 1998, SCE filed an answer to the third amended cross-complaint
generally denying the allegations contained therein and asserting affirmative
defenses. In addition, SCE filed a cross-complaint for reformation of the
contracts alleging that if they are not susceptible to SCE's interpretation,
they should be reformed to reflect the parties' true intention. The Coso
defendants demurred to SCE's cross-complaint and, in January 1999, their
demurrer was sustained with leave to amend. In light of this new ruling, SCE
recently filed an amended cross-complaint for reformation.

Following various pre-trial motions filed by the Mission parties and Edison
International, the Coso Parties, on December 23, 1998, purported to file a
fourth amended cross-complaint against the Mission Parties only. The Mission
Parties' demurrer to and motion to strike directed to the fourth amended
cross-complaint was heard and taken under submission on March 10, 1999.

On December 15, 1998, the Court granted the Coso parties leave to file a second
amended complaint in the separately filed (now consolidated) action. The second
amended complaint which names SCE and Edison International, alleges that SCE
engaged in anti-competitive conduct, false advertising, and conduct proscribed
by Public Utilities Code ss. 2106, and seeks injunctive relief, restitution, and
punitive damages. On January 20, 1999, SCE filed three motions to strike several
portions of the second amended complaint on the grounds, among others, that the
CPUC or FERC have either exclusive or primary jurisdiction over the matters
asserted therein, and that SCE's alleged conduct was in furtherance of
constitutionally protected rights of free speech and petition and therefore not
actionable. These matters were heard on February 22, 1999, and taken under
submission at that time.

Discovery and motion practice related to discovery is active. The Court has set
a trial date of March 1, 2000. The materiality of net final judgments against
SCE in these actions would be largely dependent on the extent to which any
damages or additional payments which might result therefrom are recoverable
through rates.

                  Electric and Magnetic Fields (EMF) Litigation

SCE is involved in lawsuits alleging that various plaintiffs developed cancer as
a result of exposure to EMF from SCE facilities.

In December 1995, the court granted SCE's motion for summary judgment in the
first lawsuit and dismissed the case. Plaintiffs filed a notice of appeal.
Following a settlement conference ordered by the Court of Appeal, the case was
dismissed in January 1999.

Following dismissal of the second lawsuit by the plaintiffs, a wrongful death
action was filed by the husband and children of one of the original plaintiffs
who had subsequently died. This wrongful death action was dismissed by the court
without leave to amend on September 16, 1998. Plaintiffs' appeal in the wrongful
death action was dismissed following a settlement conference in the Court of
Appeal in January 1999.



                                       20
<PAGE>

                      San Onofre Personal Injury Litigation

SCE is actively involved in three lawsuits claiming personal injuries allegedly
resulting from exposure to radiation at San Onofre. On August 31, 1995, the wife
and daughter of a former San Onofre security supervisor sued SCE and SDG&E in
the U.S. District Court for the Southern District of California. Plaintiffs also
named Combustion Engineering and the Institute of Nuclear Power Operations as
defendants. All trial court proceedings have been stayed pending ruling of the
Ninth Circuit Court of Appeal, on an appeal of a lower court's judgment in favor
of SCE in two earlier cases raising similar allegations. On May 28, 1998, the
Court of Appeal affirmed these judgments. A trial date has not yet been set.

On November 17, 1995, an SCE employee and his wife sued SCE in the U.S. District
Court for the Southern District of California. Plaintiffs also named Combustion
Engineering. The trial in this case resulted in a jury verdict for both
defendants. The plaintiffs' motion for a new trial was denied. Plaintiffs filed
an appeal of the trial court's judgment to the Ninth Circuit Court of Appeal.
Briefing on the appeal was completed in January 1999 and the parties are
awaiting a date for oral argument to be set by the court. A decision is not
expected until early 2000.

On November 28, 1995, a former contract worker at San Onofre, her husband, and
her son, sued SCE in the U.S. District Court for the Southern District of
California. Plaintiffs also named Combustion Engineering. On August 12, 1996,
the Court dismissed the claims of the former worker and her husband with
prejudice. This case, with only the son as plaintiff, is expected to go to trial
in late 1999.

On November 20, 1997, a former contract worker at San Onofre and his wife sued
SCE in the Superior Court of California, County of San Diego. The case was
removed to the U.S. District Court for the Southern District of California. On
May 11, 1998, the plaintiffs filed a first amended complaint. On May 22, 1998,
SCE filed an answer denying the material allegations of the first amended
complaint. Pursuant to a stipulation of the parties, the court, on January 4,
1999, dismissed the plaintiffs' complaint in this matter with prejudice.

In March of 1999, SCE reached an agreement with the plaintiffs in both of the
cases at the U.S. District Court level to stay trial pending the results of the
case currently before the Ninth Circuit Court of Appeal. The parties agreed that
if the plaintiffs/petitioners do not receive a favorable determination on appeal
then the two cases at the District Court level will be dismissed. If, however,
the plaintiffs/petitioners receive a favorable determination on appeal, then the
two District Court cases will be set for trial.

SCE was previously involved, along with other defendants, in two earlier cases
raising allegations similar to those described above. Although, as indicated
above, SCE was successful in removing itself from those actions, the impact on
SCE, if any, from further proceedings in these cases against the remaining
defendants can not be determined at this time.

               Mohave Generating Station Environmental Litigation

On February 19, 1997, the Sierra Club and the Grand Canyon Trust filed suit in
the U.S. District Court of Nevada against SCE and the other three co-owners of
Mohave Generating Station. The lawsuit alleges that Mohave has been violating
various provisions of the CAA, the Nevada state implementation plan, certain EPA
orders, and applicable pollution permits relating to opacity and sulfur dioxide
emission limits over the last five years. The plaintiffs seek declaratory and
injunctive relief as well as civil penalties. Under the CAA, the maximum civil
penalty obtainable is $25,000 per day per violation. SCE and the co-owners
obtained an extension to respond to the complaint pending the court's ruling on
a motion to dismiss filed by the defendants.

On June 4, 1998, the plaintiffs served SCE and its co-owners with a 60-day
supplemental notice of intent to sue. This supplemental notice identified
additional causes of action as well as an additional plaintiff (National Parks
and Conservation Association) to be added to the proceedings. On November 12,
1998, the court bifurcated the liability and damage phases of the case.


                                       21
<PAGE>

Item 4.  Submission of Matters to a Vote of Security Holders

Inapplicable

Pursuant to Form 10-K's General Instruction (General Instruction) G(3), the
following information is included as an additional item in Part I:

Executive Officers(1) of the Registrant

<TABLE>
<CAPTION>

                                              Age at
         Executive Officer              December 31, 1998                         Company Position
- ------------------------------------ ------------------------- -------------------------------------------------------
<S>                                             <C>            <C>                                                  
John E. Bryson                                  55             Chairman of the Board, Chief Executive Officer and
                                                               Director

Stephen E. Frank                                57             President, Chief Operating Officer and Director

Bryant C. Danner                                61             Executive Vice President and General Counsel

Alan J. Fohrer                                  48             Executive Vice President and Chief Financial Officer

Harold B. Ray                                   58             Executive Vice President, Generation Business Unit

Pamela A. Bass                                  51             Senior Vice President, Customer Service Business Unit

Theodore F. Craver, Jr.                         47             Senior Vice President and Treasurer

John R. Fielder                                 53             Senior Vice President, Regulatory Policy and Affairs

Robert G. Foster                                51             Senior Vice President, Public Affairs

Lillian R. Gorman                               45             Senior Vice President, Human Resources

Richard M. Rosenblum                            48             Senior Vice President, T&D Business Unit

Bruce C. Foster                                 46             Vice President, San Francisco Regulatory Affairs

Thomas J. Higgins                               53             Vice President, Corporate Communications

Thomas M. Noonan(2)                             47             Vice President and Controller

Anthony L. Smith                                50             Vice President, Tax

</TABLE>

- -------------- 

(1)  Executive Officers are defined by Rule 3b-7 of the General Rules and
     Regulations under the Securities Exchange Act of 1934, as amended.
     Executive Officers, Bryson, Danner, Fohrer, Craver, Robert Foster, Gorman,
     Higgins, Noonan and Smith hold the same positions with Edison
     International. Edison International is the parent holding company of SCE.

(2)  Richard K. Bushey resigned as Vice President and Controller of SCE
     effective March 1, 1999.

     None of SCE's executive officers are related to each other by blood or 
     marriage. As set forth in Article IV of SCE's Bylaws, the officers of SCE 
     are chosen annually by and serve at the pleasure of SCE's Board of 
     Directors and hold their respective offices until their resignation, 
     removal, other disqualification from service, or until their respective
     successors are elected. All of the executive officers have been actively 
     engaged in the business of SCE for more than five years except for 
     Stephen E. Frank, Theodore F. Craver, Jr., Lillian R. Gorman, and Thomas 
     J. Higgins. Those 


                                       22
<PAGE>

     officers who have not held their present position for the past five years 
     had the following business experience.

<TABLE>
<CAPTION>

Executive Officer                              Company Position                             Effective Dates
- -------------------------------- ---------------------------------------------- ----------------------------------------
<S>                              <C>                                                    <C>            
Stephen E. Frank                 President, Chief Operating Officer and         June 1995 to present
                                 Director

                                 President and Chief Operating Officer,         August 1990 to January 1995
                                 Florida Power and Light Company(1)

Bryant C. Danner                 Executive Vice President and General Counsel   June 1995 to present
                                 Senior Vice President and General Counsel      July 1992 to May 1995
                                                                          
Alan J. Fohrer                   Executive Vice President and Chief Financial   September 1996 to present
                                 Officer
                                 Executive Vice President, Chief Financial      February 1996 to August 1996
                                 Officer and Treasurer
                                 Executive Vice President and Chief Financial   May 1995 to January 1996
                                 Officer
                                 Senior Vice President and Chief Financial      January 1993 to April 1995
                                 Officer

Harold B. Ray                    Executive Vice President, Generation           June 1, 1995 to present
                                 Business Unit
                                 Senior Vice President, Power Systems           June 1990 to May 1995

Pamela A. Bass                   Senior Vice President, Customer Service        March 1999 to present
                                 Business Unit
                                 Vice President, Customer Solutions Business    June 1996 to February 1999
                                 Unit
                                 Vice President, Shared Services                January 1996 to May 1996
                                 Division Vice President, ENvest                August 1993 to December 1995

Theodore F. Craver, Jr.          Senior Vice President and Treasurer            February 1998 to present
                                 Vice President and Treasurer                   September 1996 to February 1998
                                 Executive Vice President and Corporate         September 1990 to August 1996
                                 Treasurer, First Interstate Bancorp(1)

John R. Fielder                  Senior Vice President, Regulatory Policy and   February 1998 to present
                                 Affairs
                                 Vice President, Regulatory Policy and Public   February 1992 to January 1998
                                 Affairs

Robert G. Foster                 Senior Vice President, Public Affairs          November 1996 to present
                                 Vice President, Public Affairs                 November 1993 to October 1996

Lillian R. Gorman                Senior Vice President, Human Resources         March 1999 to present
                                 Vice President, Human Resources                July 1996 to February 1999
                                 Executive Vice President and Human Resources   October 1990 to May 1996
                                 Director, First Interstate Bancorp(1)

Richard M. Rosenblum             Senior Vice President, T&D Business Unit       February 1998 to present
                                 Vice President, Distribution Business Unit     January 1996 to January 1998
                                 Vice President, Nuclear Engineering and        June 1993 to December 1995
                                 Technical Services

                                       23
<PAGE>

Bruce C. Foster                  Vice President, San Francisco                  January 1995 to present
                                 Regulatory Affairs
                                 Regional Vice President, San Francisco Office  January 1992 to December 1994

Thomas J. Higgins                Vice President, Corporate Communications       April 1995 to present
                                 Vice President, Corporate Communications       April 1995 to January 1996
                                 President, The Laurel Company(1)(2)            January 1994 to December 1994

Thomas M. Noonan                 Vice President and Controller                  March 1999 to present
                                 Assistant Controller                           September 1993 to February 1999

Anthony L. Smith                 Vice President, Tax                            March 1999 to present
                                 Assistant Controller                           January 1998 to February 1999

</TABLE>

(1)  This entity is not a parent, subsidiary or other affiliate of SCE.

(2)  As President of The Laurel Company, Thomas J. Higgins provided advice on
     planning and financing for mergers and acquisitions for clients in the
     managed health care business.







                                       24
<PAGE>


                                     PART II

Item 5.    Market for Registrant's Common Equity and Related Stockholder Matters

Certain information responding to Item 5 with respect to frequency and amount of
cash dividends is included in SCE's Annual Report to Shareholders for the year
ended December 31, 1998, (Annual Report) under "Quarterly Financial Data" on
page 35 and is incorporated by reference pursuant to General Instruction G(2).
As a result of the formation of a holding company described above in Item 1, all
of the issued and outstanding common stock of SCE is owned by Edison
International and there is no market for such stock.

Item 6.    Selected Financial Data

Information responding to Item 6 is included in the Annual Report under
"Selected Financial and Operating Data: 1994-1998 on page 38 and is incorporated
herein by reference pursuant to General Instruction G(2).

Item 7.    Management's Discussion and Analysis of Results of Operations and 
           Financial Condition

Information responding to Item 7 is included in the Annual Report under
"Management's Discussion and Analysis of Results of Operations and Financial
Condition" on pages 1 through 12 and is incorporated herein by reference
pursuant to General Instruction G(2).

Item 7A.  Quantitative and Qualitative Disclosures About Market Risk

Information responding to Item 7A is included in the Annual Report under
"Management's Discussion and Analysis of Results of Operations and Financial
Condition" on pages 4 through 5 and is incorporated herein by reference to
General Instruction G(2).

Item 8.    Financial Statements and Supplementary Data

Certain information responding to Item 8 is set forth after Item 14 in Part IV.
Other information responding to Item 8 is included in the Annual Report on pages
13 through 35, and is incorporated herein by reference pursuant to General
Instruction G(2).

Item 9.    Changes in and Disagreements with Accountants on Accounting and 
           Financial Disclosure

None.

                                    PART III

Item 10.  Directors and Executive Officers of the Registrant

Information concerning executive officers of SCE is set forth in Part I in
accordance with General Instruction G(3), pursuant to Instruction 3 to Item
401(b) of Regulation S-K. Other information responding to Item 10 is included in
the Joint Proxy Statement (Proxy Statement) filed with the Commission in
connection with SCE's Annual Meeting to be held on April 15, 1999, under the
heading, "Election of Directors of Edison International and SCE" on pages 4
through 7 and "Section 16(a) Beneficial Ownership Reporting Compliance" on page
23, and is incorporated herein by reference pursuant to General Instruction
G(3).


                                       25
<PAGE>

Item 11.  Executive Compensation

Information responding to Item 11 is included in the Proxy Statement beginning
with the section under the heading "Executive Compensation Table - Edison
International and SCE" on pages 10 through 22, and is incorporated herein by
reference pursuant to General Instruction G(3).

Item 12.  Security Ownership of Certain Beneficial Owners and Management

Information responding to Item 12 is included in the Proxy Statement under the
headings "Stock Ownership of Directors and Executive Officers of Edison
International and SCE" on pages 8 through 9 and "Stock Ownership of Certain
Shareholders" on page 26, and is incorporated herein by reference pursuant to
General Instruction G(3).

Item 13.  Certain Relationships and Related Transactions

Information responding to Item 13 is included in the Proxy Statement under the
heading "Certain Relationships and Transactions of Nominees and Executive
Officers" on page 23 and is incorporated herein by reference pursuant to General
Instruction G(3).

                                     PART IV

Item 14.   Exhibits, Financial Statement Schedules, and Reports on Form 8-K

(a)    (1)    Financial Statements

The  following  items  contained in the 1998 Annual Report to  Shareholders  are
incorporated by reference in this report.

       Management's Discussion and Analysis of Results of Operations and
              Financial Condition
       Consolidated Statements of Income -- Years Ended December 31, 1998,
              1997 and 1996
       Consolidated Statements of Retained  Earnings -- Years Ended December 31,
              1998, 1997 and 1996
       Consolidated Balance Sheets -- December 31, 1998, and 1997
       Consolidated Statements of Cash Flows -- Years Ended December 31, 1998, 
       1997 and 1996
       Notes to Consolidated Financial Statements
       Responsibility for Financial Reporting
       Report of Independent Public Accountants

       (2)    Report of Independent Public Accountants and Schedules 
              Supplementing Financial Statements

The  following  documents  may be found in this  report  at the  indicated  page
numbers.
                                                                           Page
         Report of Independent Public Accountants on Supplemental
         Schedules                                                          30
         Schedule II--Valuation and Qualifying Accounts for the Years
         Ended December 31, 1997, 1996 and 1995                             31
              


                                       26
<PAGE>



Schedules I through V, inclusive, except those referred to above, are omitted as
not required or not applicable.

                                    
       (3)    Exhibits

      See Exhibit Index on page 35 of this report.

(b)   Reports on Form 8-K

      November 13, 1998
        Item 5:  Other Events               Proposition 9




                                       27
<PAGE>

                    REPORT OF INDEPENDENT PUBLIC ACCOUNTANTS
                            ON SUPPLEMENTAL SCHEDULES




To Southern California Edison Company:

We have audited in accordance with generally accepted auditing standards, the
consolidated financial statements included in the 1998 Annual Report to
Shareholders of Southern California Edison Company (SCE) incorporated by
reference in this Form 10-K, and have issued our report thereon dated February
4, 1999. Our audits of the consolidated financial statements were made for the
purpose of forming an opinion on those basic consolidated financial statements
taken as a whole. The supplemental schedules listed in Part IV of this Form
10-K, which are the responsibility of SCE's management, are presented for
purposes of complying with the Securities and Exchange Commission's rules and
regulations, and are not part of the basic consolidated financial statements.
These supplemental schedules have been subjected to the auditing procedures
applied in the audits of the basic consolidated financial statements and, in our
opinion, fairly state in all material respects the financial data required to be
set forth therein in relation to the basic consolidated financial statements
taken as a whole.






                               ARTHUR ANDERSEN LLP
                               ARTHUR ANDERSEN LLP

Los Angeles, California
February 4, 1999



                                       28
<PAGE>

                       SOUTHERN CALIFORNIA EDISON COMPANY

                SCHEDULE II -- VALUATION AND QUALIFYING ACCOUNTS

                      For the Year Ended December 31, 1998

<TABLE>
<CAPTION>
                                                         Additions
                                                         ---------  
                               Balance at       Charged to        Charged to                           Balance
                              Beginning of       Costs and           Other                             at End
         Description             Period          Expenses          Accounts        Deductions         of Period
                                                                (In thousands)
- ---------------------------------------------------------------------------------------------------------------

Group A:
<S>                            <C>              <C>              <C>                <C>              <C>  
     Uncollectible accounts--
         Customers              $ 24,245         $  19,808             --           $ 24,457          $ 19,596
     All other                     2,208             2,273             --              1,847             2,634
                             -----------       -----------      ---------        -----------       -----------
            Total               $ 26,453         $  22,081             --           $ 26,304 (a)      $ 22,230
                                 =======           =======         ======            =======           =======

Group B:
     DOE Decontamination
         and Decommissioning    $ 44,336                --        $   (89) (b)     $   4,828 (c)      $ 39,419
     Purchased-power settlements 145,640                --              -             15,943 (d)       129,697
     Pension and benefits        211,200          $170,743         18,988   (e)      161,263 (f)       239,668
     Insurance, casualty and
         other                    78,461            69,275             --             74,487 (g)        73,249
                             -----------        ----------    -----------        -----------       -----------
            Total               $479,637          $240,018       $ 18,899           $256,521          $482,033
                                 =======           =======        =======           ========           =======
</TABLE>

- -----------
(a)      Accounts written off, net.

(b)      Represents revision to estimate based on actual billings.

(c)      Represents amounts paid.

(d)      Represents  the   amortization   of  the  liability   established   for
         purchased-power contract settlement agreements.

(e)      Primarily  represents transfers from the accrued paid absence allowance
         account for required  additions to the  comprehensive  disability  plan
         accounts.

(f)      Includes pension payments to retired employees,  amounts paid to active
         employees  during periods of illness and the funding of certain pension
         benefits.

(g)      Amounts charged to operations that were not covered by insurance.


                                       29
<PAGE>

                       SOUTHERN CALIFORNIA EDISON COMPANY

                SCHEDULE II -- VALUATION AND QUALIFYING ACCOUNTS

                      For the Year Ended December 31, 1997
<TABLE>
<CAPTION>

                                                         Additions
                                                         ---------  
                               Balance at       Charged to        Charged to                           Balance
                              Beginning of       Costs and           Other                             at End
         Description             Period          Expenses          Accounts        Deductions         of Period
                                                                (In thousands)
- ---------------------------------------------------------------------------------------------------------------

Group A:
<S>                             <C>              <C>               <C>             <C>               <C>   
     Uncollectible accounts--
         Customers              $ 24,390          $ 20,597             --           $ 20,742          $ 24,245
     All other                     1,689             1,180             --                661             2,208
                             -----------       -----------      ---------        -----------       -----------
            Total               $ 26,079          $ 21,777             --           $ 21,403(a)       $ 26,453
                                 =======           =======         ======            =======           =======

Group B:
     DOE Decontamination
         and Decommissioning    $ 48,789                --      $   1,089(b)       $   5,542(c)       $ 44,336
     Purchased-power settlements 107,700                --         67,320(d)          29,380(e)        145,640
     Pension and benefits        180,927          $102,193         17,624(f)          89,544(g)        211,200
     Insurance, casualty and
         other                    86,509            57,749             --             65,797(h)         78,461
                             -----------        ----------    -----------        -----------       -----------
            Total               $423,925          $159,942       $ 86,033           $190,263          $479,637
                                 =======           =======        =======           ========           =======
</TABLE>

- -----------
(a)      Accounts written off, net.

(b)      Represents revision to estimate based on actual billings.

(c)      Represents amounts paid.

(d)      Represents  additional  payments to be made under  agreements  to 
         terminate purchased-power contract.

(e)      Represents  the   amortization   of  the  liability   established   for
         purchased-power contract settlement agreements.

(f)      Primarily  represents transfers from the accrued paid absence allowance
         account for required  additions to the  comprehensive  disability  plan
         accounts.

(g)      Includes pension payments to retired employees,  amounts paid to active
         employees  during periods of illness and the funding of certain pension
         benefits.

(h)      Amounts charged to operations that were not covered by insurance.


                                       30
<PAGE>

                       SOUTHERN CALIFORNIA EDISON COMPANY

                SCHEDULE II -- VALUATION AND QUALIFYING ACCOUNTS

                      For the Year Ended December 31, 1996

<TABLE>
<CAPTION>
                                                         Additions
                                                         ---------  
                               Balance at       Charged to        Charged to                           Balance
                              Beginning of       Costs and           Other                             at End
         Description             Period          Expenses          Accounts        Deductions         of Period
                                                                (In thousands)
- ---------------------------------------------------------------------------------------------------------------
Group A:
     Uncollectible accounts--
<S>                             <C>               <C>                 <C>              <C>               <C>     
         Customers              $ 22,126          $ 21,831             --           $ 19,567          $ 24,300
     All other                     2,013               376             --                700             1,689
                             -----------       -----------      ---------        -----------       -----------
            Total               $ 24,139          $ 22,207             --           $ 20,267(a)       $ 26,079
                                 =======           =======         ======            =======           =======

Group B:
     DOE Decontamination
         and Decommissioning    $ 52,742      $         --      $   1,468(b)      $   5,5421(c)       $ 48,789
     Purchased-power settlements      --                --        107,700(d)              --           107,700
     Pension and benefits        196,662             8,547         21,869(e)          46,151(f)        180,927
     Insurance, casualty and
         other                    94,788            59,123             --             67,402(g)         86,509
                             -----------       -----------    -----------        -----------       -----------
            Total               $344,192          $ 67,670       $131,037           $118,974          $423,925
                                 =======           =======        =======           ========           =======
</TABLE>
 
- ------------
(a)      Accounts written off, net.

(b)      Represents revision to estimate based on actual billings.

(c)      Represents amounts paid.

(d)      Represents   payments  to  be  made  under  an  agreement  to  
         terminate  a purchased-power contract.

(e)      Primarily  represents transfers from the accrued paid absence allowance
         account for required  additions to the  comprehensive  disability  plan
         accounts.

(f)      Includes pension payments to retired employees,  amounts paid to active
         employees  during periods of illness and the funding of certain pension
         benefits.

(g)      Amounts charged to operations that were not covered by insurance.



                                       31
<PAGE>

                                   SIGNATURES

Pursuant to the  requirements of Section 13 or 15(d) of the Securities  Exchange
Act of 1934,  the  registrant  has duly  caused  this report to be signed on its
behalf by the undersigned, thereunto duly authorized.

                                       SOUTHERN CALIFORNIA EDISON COMPANY


                                       By   Kenneth S. Stewart
                                            ----------------------------------
                                            Kenneth S. Stewart
                                            Assistant General Counsel

                                            Date: March 24, 1999

Pursuant to the requirements of the Securities Exchange Act of 1934, this report
has been signed below by the following  persons on behalf of the  registrant and
in the capacities and on the dates indicated.

<TABLE>
<CAPTION>

       Signature                                            Title                              Date
       ---------                                            -----                              ----

Principal Executive Officer:
<S>                                            <C>                                      <C> 
     John E. Bryson*                           Chairman of the Board,                   March 24, 1999
                                               Chief Executive Officer
                                                 and Director
Principal Financial Officer:
     Alan J. Fohrer*                           Executive Vice President                 March 24, 1999
                                                 and Chief Financial Officer

Controller or Principal
   Accounting Officer:
     Thomas M. Noonan*                         Vice President and                       March 24, 1999
                                                 Controller
Board of Directors:

     Winston H. Chen*                          Director                                 March 24, 1999
     Warren Christopher*                       Director                                 March 24, 1999
     Stephen E. Frank*                         Director                                 March 24, 1999
     Joan C. Hanley*                           Director                                 March 24, 1999
     Carl F. Huntsinger*                       Director                                 March 24, 1999
     Charles D. Miller*                        Director                                 March 24, 1999
     Luis G. Nogales*                          Director                                 March 24, 1999
     Ronald L. Olson*                          Director                                 March 24, 1999
     James M. Rosser*                          Director                                 March 24, 1999
     E. L. Shannon, Jr.*                       Director                                 March 24, 1999
     Robert H. Smith*                          Director                                 March 24, 1999
     Thomas C. Sutton*                         Director                                 March 24, 1999
     Daniel M. Tellep*                         Director                                 March 24, 1999
     James D. Watkins*                         Director                                 March 24, 1999
     Edward Zapanta*                           Director                                 March 24 1999

     *By            Kenneth S. Stewart
          -----------------------------------------
                    Kenneth S. Stewart
                    Assistant General Counsel


</TABLE>

                                       32
<PAGE>

                                  EXHIBIT INDEX


Exhibit
Number                              Description
- -------                             -----------

3.1           Certificate of Amendment and Restated  Articles of  Incorporation
              of SCE effective June 1, 1993 (File No. 1-2313, Form 10-K for 
              the year ended December 31, 1993)*

3.2           Certificate  of Correction  of Restated  Articles of  
              Incorporation  of SCE dated June 23, 1997 (File
              No. 1-2313, Form 10-Q for the quarter ended September 30, 1997)*

3.3           Bylaws of SCE as adopted by the Board of Directors on 
              February 18, 1999

4.1           SCE First Mortgage Bond Trust Indenture, dated as of 
              October 1, 1923 (Registration No. 2-1369)*

4.2           Supplemental Indenture, dated as of March 1, 1927 
              (Registration No. 2-1369)*

4.3           Third Supplemental Indenture, dated as of June 24, 1935 
              (Registration No. 2-1602)*

4.4           Fourth Supplemental Indenture, dated as of September 1, 1935 
              (Registration No. 2-4522)*

4.5           Fifth Supplemental Indenture, dated as of August 15, 1939 
              (Registration No. 2-4522)*

4.6           Sixth Supplemental Indenture, dated as of September 1, 1940 
              (Registration No. 2-4522)*

4.7           Eighth Supplemental Indenture, dated as of August 15, 1948 
              (Registration No. 2-7610)*

4.8           Twenty-Fourth Supplemental Indenture, dated as of 
              February 15, 1964 (Registration No. 2-22056)*

4.9           Eighty-Eighth  Supplemental  Indenture,  dated as of 
              July 15 1992  (File No.  1-2313,  Form 8-K dated
              July 22, 1992)*

10.1          1981 Deferred Compensation Agreement (File No. 1-2313, 
              Form 10-K for the year ended December 31, 1981)*

10.2          1985 Deferred Compensation Agreement for Executives (File No. 
              1-2313, Form 10-K for the year ended December 31, 1986)*

10.3          1985 Deferred Compensation Agreement for Directors 
              (File No. 1-2313, Form 10-K for the year ended
              December 31, 1986)*

10.4          Director Deferred Compensation Plan (File No. 1-2313, 
              Form 10-Q for the quarter ended June 30, 1998)*

10.5          Director Grantor Trust Agreement (File No. 1-9936, 
              Form 10-K for the year ended December 31, 1995)*

10.6          Executive Deferred Compensation Plan (File No. 1-2313, 
              Form 10-Q for the quarter ended March 31,
              1998)*

10.7          Executive Grantor Trust Agreement (File No. 1-2313, 
              Form 10-K for the year ended December 31, 1995)*

10.8          Executive Supplemental Benefit Program (File No. 1-2313, 
              Form 10-K for the year ended December 31, 1980)*

10.9          Executive Retirement Plan (File No. 1-2313, 
              Form 10-K for the year ended December 31, 1995)*

10.10         Executive Incentive Compensation Plan (File No. 1-2313, 
              Form 10-K for the year ended December 31, 1997)*

10.11         Executive Disability and Survivor Benefit Program 
              (File No. 1-2313, Form 10-K for the year ended
              December 31, 1994)*

10.12         Retirement Plan for Directors (File No. 1-2313, 
              Form 10-Q for the quarter ended June 30, 1998)*

10.13         Officer Long-Term Incentive Compensation Plan 
              (File No. 1-2313, Form 10-Q for the quarter ended
              March 31, 1998)*

10.13.1       Form of Agreement for 1989-1995 Awards under the Officer
              Long-Term Incentive Compensation Plan (File No. 1-2313,
               Form 10-K for the year ended December 31, 1995)*

10.13.2       Form of Agreement for 1996 Awards under the Officer Long-Term  
              Incentive  Compensation Plan (File No. 1-2313, 
              Form 10-K for the year ended December 31, 1996)*

                                       33
<PAGE>



Exhibit
Number                               Description
- -------                              -----------

10.13.3       Form of Agreement for 1997 Awards under the Officer and 
              Management Long-Term Incentive Compensation Plans
              (File No. 1-2313, Form 10-K for the year ended December 31, 1997)*

10.14         Equity Compensation Plan (File No. 1-2313, Form 10-Q for the 
              quarter ended June 30, 1998)*

10.14.1       Form of Agreement for 1998 Employee Awards under the Equity 
              Compensation Plan (File No. 1-2313,
              Form 10-Q for the quarter ended June 30, 1998)*

10.14.2       Form of Agreement for 1998 Director Awards under the Equity 
              Compensation Plan (File No. 1-2313,
              Form 10-Q for the quarter ended June 30, 1998)*

10.15         Estate and Financial Planning Program (File No. 1-2313, 
              Form 10-K for the year ended December 31, 1995)*

10.16         Option Gain Deferral Plan (File No. 1-2313, Form 10-Q for 
              the quarter ended March 31, 1998)*

10.17         Employment Letter Agreement with Bryant C. Danner 
              (File No. 1-2313, Form 10-K for the year ended
              December 31, 1992)*

10.18         Employment Letter Agreement with Stephen E. Frank 
              (File No. 1-2313, Form 10-K for the year ended
              December 31, 1995)*

10.19         Election Terms for Warren Christopher (File No. 1-2313, 
              Form 10-K for the year ended December 31, 1997)*

10.20         Dispute resolution amendment of 1981 Executive Deferred 
              Compensation Plan, 1985 Executive and Director Deferred 
              Compensation Plans and Executive Supplemental Benefit Program

10.21         Retirement Agreement with Richard K. Bushey

12.           Computation of Ratios of Earnings to Fixed Charges

13.           Annual Report to Shareholders for year ended December 31, 1997

23.           Consent of Independent Public Accountants - Arthur Andersen LLP

24.1          Power of Attorney

24.2          Certified copy of Resolution of Board of Directors Authorizing 
              Signature

27.           Financial Data Schedule

- ------------

* Incorporated by reference pursuant to Rule 12b-32.





                                                            EXHIBIT 3.3

                       To Holders of the Company's Bylaws:




                    Effective February 18, 1999, Article II,
                  Section 11, was amended to be consistent with
               California law which provides that proxies include
         electronic and oral telephonic authorizations by shareholders.





                                BEVERLY P. RYDER
                               Corporate Secretary












                                     BYLAWS

                                       OF

                       SOUTHERN CALIFORNIA EDISON COMPANY

                           AS AMENDED TO AND INCLUDING

                                FEBRUARY 18, 1999



<PAGE>

 
                                      INDEX

                                                                        Page
                                                                        ----
                          ARTICLE I -- PRINCIPAL OFFICE
Section   1.  Principal Office...........................................1

                           ARTICLE II -- SHAREHOLDERS
Section   1.  Meeting Locations..........................................1
Section   2.  Annual Meetings............................................1
Section   3.  Special Meetings...........................................2
Section   4.  Notice of Annual or Special Meeting........................2
Section   5.  Quorum.....................................................4
Section   6.  Adjourned Meeting and Notice Thereof.......................4
Section   7.  Voting.....................................................4
Section   8.  Record Date................................................6
Section   9.  Consent of Absentees.......................................7
Section  10.  Action Without Meeting.....................................7
Section  11.  Proxies....................................................8
Section  12.  Inspectors of Election.....................................8

                            ARTICLE III -- DIRECTORS
Section   1.  Powers.....................................................9
Section   2.  Number of Directors.......................................10
Section   3.  Election and Term of Office...............................10
Section   4.  Vacancies.................................................10
Section   5.  Place of Meeting..........................................11
Section   6.  Regular Meetings..........................................11
Section   7.  Special Meetings..........................................11
Section   8.  Quorum....................................................12
Section   9.  Participation in Meetings by Conference Telephone.........12
Section  10.  Waiver of Notice..........................................12
Section  11.  Adjournment...............................................13
Section  12.  Fees and Compensation.....................................13
Section  13.  Action Without Meeting....................................13
Section  14.  Rights of Inspection......................................13
Section  15.  Committees................................................13


<PAGE>

                             ARTICLE IV -- OFFICERS
Section   1.  Officers..................................................14
Section   2.  Election..................................................15
Section   3.  Eligibility of Chairman or President......................15
Section   4.  Removal and Resignation...................................15
Section   5.  Appointment of Other Officers.............................15
Section   6.  Vacancies.................................................15
Section   7.  Salaries..................................................16
Section   8.  Furnish Security for Faithfulness.........................16
Section   9.  Chairman's Duties; Succession to
                      Such Duties in Chairman's Absence or Disability...16
Section  10.  President's Duties........................................16
Section  11.  Chief Financial Officer...................................17
Section  12.  Vice President's Duties...................................17
Section  13.  General Counsel's Duties..................................17
Section  14.  Associate General Counsel's and Assistant General
                      Counsel's Duties..................................17
Section  15.  Controller's Duties.......................................17
Section  16.  Assistant Controllers' Duties.............................17
Section  17.  Treasurer's Duties........................................18
Section  18.  Assistant Treasurers' Duties..............................18
Section  19.  Secretary's Duties........................................18
Section  20.  Assistant Secretaries' Duties.............................19
Section  21.  Secretary Pro Tempore.....................................19
Section  22.  Election of Acting Treasurer or Acting Secretary..........19
Section  23.  Performance of Duties.....................................20

                          ARTICLE V -- OTHER PROVISIONS
Section   1.  Inspection of Corporate Records...........................20
Section   2.  Inspection of Bylaws......................................21
Section   3.  Contracts and Other Instruments, Loans, Notes
                      and Deposits of Funds.............................21
Section   4.  Certificates of Stock.....................................22
Section   5.  Transfer Agent, Transfer Clerk and Registrar..............22
Section   6.  Representation of Shares of Other Corporations............22


<PAGE>


                      ARTICLE V -- OTHER PROVISIONS (Cont.)
Section   7.  Stock Purchase Plans......................................23
Section   8.  Fiscal Year and Subdivisions..............................23
Section   9.  Construction and Definitions..............................23

                          ARTICLE VI -- INDEMNIFICATION
Section   1.  Indemnification of Directors and Officers.................24
Section   2.  Indemnification of Employees and Agents...................25
Section   3.  Right of Directors and Officers to Bring Suit.............26
Section   4.  Successful Defense........................................26
Section   5.  Non-Exclusivity of Rights.................................26
Section   6.  Insurance.................................................26
Section   7.  Expenses as a Witness.....................................27
Section   8.  Indemnity Agreements......................................27
Section   9.  Separability..............................................27
Section 10.  Effect of Repeal or Modification...........................27

                       ARTICLE VII -- EMERGENCY PROVISIONS
Section   1.  General...................................................27
Section   2.  Unavailable Directors.....................................28
Section   3.  Authorized Number of Directors............................28
Section   4.  Quorum....................................................28
Section   5.  Creation of Emergency Committee...........................28
Section   6.  Constitution of Emergency Committee.......................29
Section   7.  Powers of Emergency Committee.............................29
Section   8.  Directors Becoming Available..............................29
Section   9.  Election of Board of Directors............................29
Section 10.  Termination of Emergency Committee.........................30

                           ARTICLE VIII -- AMENDMENTS
Section   1.  Amendments................................................30


<PAGE>



                                     BYLAWS

             Bylaws for the regulation, except as otherwise provided
                   by statute or its Articles of Incorporation

                                       of

                       SOUTHERN CALIFORNIA EDISON COMPANY

                           AS AMENDED TO AND INCLUDING
                                FEBRUARY 18, 1999


                          ARTICLE I -- PRINCIPAL OFFICE

Section 1.        Principal Office.

     The Edison General Office, situated at 2244 Walnut Grove Avenue, in the
City of Rosemead, County of Los Angeles, State of California, is hereby fixed as
the principal office for the transaction of the business of the corporation.


                           ARTICLE II -- SHAREHOLDERS

Section 1.        Meeting Locations.

     All meetings of shareholders shall be held at the principal office of the
corporation or at such other place or places within or without the State of
California as may be designated by the Board of Directors (the "Board"). In the
event such places shall prove inadequate in capacity for any meeting of
shareholders, an adjournment may be taken to and the meeting held at such other
place of adequate capacity as may be designated by the officer of the
corporation presiding at such meeting.

Section 2.        Annual Meetings.

     The annual meeting of shareholders shall be held on the third Thursday of
the month of April of each year at 10:00 a.m. on said day to elect directors to
hold office for the year next ensuing and until their successors shall be
elected, and to consider and act upon such other matters as may lawfully be
presented to such meeting; provided, however, that should said day fall upon a
legal holiday, then any such annual meeting of shareholders shall be held at the
same time and place on the next day thereafter ensuing which is not a legal
holiday.



                                       1
<PAGE>


Section 3.        Special Meetings.

     Special meetings of the shareholders may be called at any time by the
Board, the Chairman of the Board, the President, or upon written request of any
three members of the Board, or by the holders of shares entitled to cast not
less than ten percent of the votes at such meeting. Upon request in writing to
the Chairman of the Board, the President, any Vice President or the Secretary by
any person (other than the Board) entitled to call a special meeting of
shareholders, the officer forthwith shall cause notice to be given to the
shareholders entitled to vote that a meeting will be held at a time requested by
the person or persons calling the meeting, not less than thirty-five nor more
than sixty days after the receipt of the request. If the notice is not given
within twenty days after receipt of the request, the persons entitled to call
the meeting may give the notice.

Section 4.        Notice of Annual or Special Meeting.

     Written notice of each annual or special meeting of shareholders shall be
given not less than ten (or if sent by third-class mail, thirty) nor more than
sixty days before the date of the meeting to each shareholder entitled to vote
thereat. Such notice shall state the place, date, and hour of the meeting and
(i) in the case of a special meeting, the general nature of the business to be
transacted, and no other business may be transacted, or (ii) in the case of an
annual meeting, those matters which the Board, at the time of the mailing of the
notice, intends to present for action by the shareholders, but, subject to the
provisions of applicable law and these Bylaws, any proper matter may be
presented at an annual meeting for such action. The notice of any special or
annual meeting at which directors are to be elected shall include the names of
nominees intended at the time of the notice to be presented by the Board for
election. For any matter to be presented by a shareholder at an annual meeting
held after December 31, 1993, but on or before December 31, 1999, including the
nomination of any person (other than a person nominated by or at the direction
of the Board) for election to the Board, written notice must be received by the
Secretary of the corporation from the shareholder not less than sixty nor more
than one hundred twenty days prior to the date of the annual meeting specified
in these Bylaws and to which the shareholder's notice relates; provided however,
that in the event the annual meeting to which the shareholder's written notice
relates is to be held on a date which is more than thirty days earlier than the
date of the annual meeting specified in these Bylaws, the notice from a
shareholder must be received by the Secretary not later than the close of
business on the tenth day following the date on which public disclosure of the
date of the annual meeting was made or given to the shareholders. For any matter
to be presented by a shareholder at an annual meeting held after December 31,
1999, including the nomination of any person (other than a person


                                       2
<PAGE>


nominated by or at the direction of the Board) for election to the Board,
written notice must be received by the Secretary of the corporation from the
shareholder not more than one hundred eighty days nor less than one hundred
twenty days prior to the date on which the proxy materials for the prior year's
annual meeting were first released to shareholders by the corporation; provided
however, that in the event the annual meeting to which the shareholder's written
notice relates is to be held on a date which is more than thirty days earlier or
later than the date of the annual meeting specified in these Bylaws, the notice
from a shareholder must be received by the Secretary not earlier than two
hundred twenty days prior to the date of the annual meeting to which the
shareholder's notice relates nor later than one hundred sixty days prior to the
date of such annual meeting, unless less than one hundred seventy days' prior
public disclosure of the date of the meeting is made by the earliest possible
quarterly report on Form 10-Q, or, if impracticable, any means reasonably
calculated to inform shareholders including without limitation a report on Form
8-K, a press release or publication once in a newspaper of general circulation
in the county in which the principal office is located, in which event notice by
the shareholder to be timely must be received not later than the close of
business on the tenth day following the date of such public disclosure. The
shareholder's notice to the Secretary shall set forth (a) a brief description of
each matter to be presented at the annual meeting by the shareholder; (b) the
name and address, as they appear on the corporation's books, of the shareholder;
(c) the class and number of shares of the corporation which are beneficially
owned by the shareholder; and (d) any material interest of the shareholder in
the matters to be presented. Any shareholder who intends to nominate a candidate
for election as a director shall also set forth in such a notice (i) the name,
age, business address and residence address of each nominee that he or she
intends to nominate at the meeting, (ii) the principal occupation or employment
of each nominee, (iii) the class and number of shares of capital stock of the
corporation beneficially owned by each nominee, and (iv) any other information
concerning the nominee that would be required under the rules of the Securities
and Exchange Commission in a proxy statement soliciting proxies for the election
of the nominee. The notice shall also include a consent, signed by the
shareholder's nominees, to serve as a director of the corporation if elected.
Notwithstanding anything in these Bylaws to the contrary, and subject to the
provisions of any applicable law, no business shall be conducted at a special or
annual meeting except in accordance with the procedures set forth in this
Section 4.

     Notice of a shareholders' meeting shall be given either personally or by
first-class mail (or, if the outstanding shares of the corporation are held of
record by 500 or more persons on the record date for the meeting, by third-class
mail) or by other means of written communication, addressed to the shareholder
at the address of such shareholder appearing on the books of the corporation or
given by the shareholder to the corporation for the purpose of notice; or, if no
such


                                       3
<PAGE>


address appears or is given, at the place where the principal office of the
corporation is located or by publication at least once in a newspaper of general
circulation in the county in which the principal office is located. Notice by
mail shall be deemed to have been given at the time a written notice is
deposited in the United States mails, postage prepaid. Any other written notice
shall be deemed to have been given at the time it is personally delivered to the
recipient or is delivered to a common carrier for transmission, or actually
transmitted by the person giving the notice by electronic means, to the
recipient.

Section 5.        Quorum.

     A majority of the shares entitled to vote, represented in person or by
proxy, shall constitute a quorum at any meeting of shareholders. The affirmative
vote of a majority of the shares represented and voting at a duly held meeting
at which a quorum is present (which shares voting affirmatively also constitute
at least a majority of the required quorum) shall be the act of the
shareholders, unless the vote of a greater number or voting by classes is
required by law or the Articles; provided, however, that the shareholders
present at a duly called or held meeting at which a quorum is present may
continue to do business until adjournment, notwithstanding the withdrawal of
enough shareholders to have less than a quorum, if any action taken (other than
adjournment) is approved by at least a majority of the shares required to
constitute a quorum.

Section 6.        Adjourned Meeting and Notice Thereof.

     Any shareholders' meeting, whether or not a quorum is present, may be
adjourned from time to time by the vote of a majority of the shares, the holders
of which are either present in person or represented by proxy thereat, but in
the absence of a quorum (except as provided in Section 5 of this Article) no
other business may be transacted at such meeting.

     It shall not be necessary to give any notice of the time and place of the
adjourned meeting or of the business to be transacted thereat, other than by
announcement at the meeting at which such adjournment is taken. At the adjourned
meeting, the corporation may transact any business which might have been
transacted at the original meeting. However, when any shareholders' meeting is
adjourned for more than forty-five days or, if after adjournment a new record
date is fixed for the adjourned meeting, notice of the adjourned meeting shall
be given as in the case of an original meeting.

Section 7.        Voting.

     The shareholders entitled to notice of any meeting or to vote at any such
meeting shall be only persons in whose name shares stand on the stock records


                                       4
<PAGE>


of the corporation on the record date determined in accordance with Section 8 of
this Article.

     Voting shall in all cases be subject to the provisions of Chapter 7 of the
California General Corporation Law, and to the following provisions:

     (a) Subject to clause (g), shares held by an administrator, executor,
guardian, conservator or custodian may be voted by such holder either in person
or by proxy, without a transfer of such shares into the holder's name; and
shares standing in the name of a trustee may be voted by the trustee, either in
person or by proxy, but no trustee shall be entitled to vote shares held by such
trustee without a transfer of such shares into the trustee's name.

     (b) Shares standing in the name of a receiver may be voted by such
receiver; and shares held by or under the control of a receiver may be voted by
such receiver without the transfer thereof into the receiver's name if authority
to do so is contained in the order of the court by which such receiver was
appointed.

     (c) Subject to the provisions of Section 705 of the California General
Corporation Law and except where otherwise agreed in writing between the
parties, a shareholder whose shares are pledged shall be entitled to vote such
shares until the shares have been transferred into the name of the pledgee, and
thereafter the pledgee shall be entitled to vote the shares so transferred.

     (d) Shares standing in the name of a minor may be voted and the corporation
may treat all rights incident thereto as exercisable by the minor, in person or
by proxy, whether or not the corporation has notice, actual or constructive, of
the non-age unless a guardian of the minor's property has been appointed and
written notice of such appointment given to the corporation.

     (e) Shares standing in the name of another corporation, domestic or
foreign, may be voted by such officer, agent or proxyholder as the bylaws of
such other corporation may prescribe or, in the absence of such provision, as
the Board of Directors of such other corporation may determine or, in the
absence of such determination, by the chairman of the board, president or any
vice president of such other corporation, or by any other person authorized to
do so by the chairman of the board, president or any vice president of such
other corporation. Shares which are purported to be voted or any proxy purported
to be executed in the name of a corporation (whether or not any title of the
person signing is indicated) shall be presumed to be voted or the proxy executed
in accordance with the provisions of this subdivision, unless the contrary is
shown.

     (f) Shares of the corporation owned by any of its subsidiaries shall not be
entitled to vote on any matter.


                                       5
<PAGE>


     (g) Shares of the corporation held by the corporation in a fiduciary
capacity, and shares of the corporation held in a fiduciary capacity by any of
its subsidiaries, shall not be entitled to vote on any matter, except to the
extent that the settlor or beneficial owner possesses and exercises a right to
vote or to give the corporation binding instructions as to how to vote such
shares.

     (h) If shares stand of record in the names of two or more persons, whether
fiduciaries, members of a partnership, joint tenants, tenants in common, husband
and wife as community property, tenants by the entirety, voting trustees,
persons entitled to vote under a shareholder voting agreement or otherwise, or
if two or more persons (including proxyholders) have the same fiduciary
relationship respecting the same shares, unless the secretary of the corporation
is given written notice to the contrary and is furnished with a copy of the
instrument or order appointing them or creating the relationship wherein it is
so provided, their acts with respect to voting shall have the following effect:

         (i)  If only one votes, such act binds all;

         (ii) If more than one vote,  the act of the  majority  so voting  binds
              all;

         (iii)If more  than one vote,  but the vote is  evenly  split on any
              particular  matter,  each faction may vote the  securities  in
              question proportionately.

If the instrument so filed or the registration of the shares shows that any such
tenancy is held in unequal  interests,  a majority or even split for the purpose
of this section shall be a majority or even split in interest.

     No shareholder of any class of stock of this corporation shall be entitled
to cumulate votes at any election of directors of this corporation.

     Elections for directors need not be by ballot; provided, however, that all
elections for directors must be by ballot upon demand made by a shareholder at
the meeting and before the voting begins.

     In any election of directors, the candidates receiving the highest number
of votes of the shares entitled to be voted for them up to the number of
directors to be elected by such shares are elected.

Section 8.        Record Date.

     The Board may fix, in advance, a record date for the determination of the
shareholders entitled to notice of any meeting or to vote or entitled to receive
payment of any dividend or other distribution, or any allotment of rights, or to



                                       6
<PAGE>

exercise rights in respect of any other lawful action. The record date so fixed
shall be not more than sixty days nor less than ten days prior to the date of
the meeting nor more than sixty days prior to any other action. When a record
date is so fixed, only shareholders of record at the close of business on that
date are entitled to notice of and to vote at the meeting or to receive the
dividend, distribution, or allotment of rights, or to exercise the rights, as
the case may be, notwithstanding any transfer of shares on the books of the
corporation after the record date, except as otherwise provided by law or these
Bylaws. A determination of shareholders of record entitled to notice of or to
vote at a meeting of shareholders shall apply to any adjournment of the meeting
unless the Board fixes a new record date for the adjourned meeting. The Board
shall fix a new record date if the meeting is adjourned for more than forty-five
days.

     If no record date is fixed by the Board, the record date for determining
shareholders entitled to notice of or to vote at a meeting of shareholders shall
be at the close of business on the business day next preceding the day on which
notice is given or, if notice is waived, at the close of business on the
business day next preceding the day on which the meeting is held. The record
date for determining shareholders for any purpose other than as set forth in
this Section 8 or Section 10 of this Article shall be at the close of business
on the day on which the Board adopts the resolution relating thereto, or the
sixtieth day prior to the date of such other action, whichever is later.

Section 9.        Consent of Absentees.

     The transactions of any meeting of shareholders, however called and
noticed, and wherever held, are as valid as though had at a meeting duly held
after regular call and notice, if a quorum is present either in person or by
proxy, and if, either before or after the meeting, each of the persons entitled
to vote, not present in person or by proxy, signs a written waiver of notice or
a consent to the holding of the meeting or an approval of the minutes thereof.
All such waivers, consents or approvals shall be filed with the corporate
records or made a part of the minutes of the meeting. Neither the business to be
transacted at nor the purpose of any regular or special meeting of shareholders
need be specified in any written waiver of notice, consent to the holding of the
meeting or approval of the minutes thereof, except as provided in Section 601
(f) of the California General Corporation Law.

Section 10.       Action Without Meeting.

     Subject to Section 603 of the California General Corporation Law, any
action which, under any provision of the California General Corporation Law, may
be taken at any annual or special meeting of shareholders may be taken without a
meeting and without prior notice if a consent in writing, setting forth the


                                       7
<PAGE>


action so taken, shall be signed by the holders of outstanding shares having not
less than the minimum number of votes that would be necessary to authorize or
take such action at a meeting at which all shares entitled to vote thereon were
present and voted. Unless a record date for voting purposes be fixed as provided
in Section 8 of this Article, the record date for determining shareholders
entitled to give consent pursuant to this Section 10, when no prior action by
the Board has been taken, shall be the day on which the first written consent is
given.

Section 11.       Proxies.

     Every person entitled to vote shares has the right to do so either in
person or by one or more persons, not to exceed three, designated by a proxy
authorized by such shareholder or the shareholder's attorney in fact and filed
with the corporation, in accordance with Cal. Corp. Code ss.178. Subject to the
following sentence, any proxy duly authorized continues in full force and effect
until revoked by the person authorizing it prior to the vote pursuant thereto by
a writing delivered to the corporation stating that the proxy is revoked or by a
subsequent proxy authorized by the person authorizing the prior proxy and
presented to the meeting, or by attendance at the meeting and voting in person
by the person authorizing the proxy; provided, however, that a proxy is not
revoked by the death or incapacity of the maker unless, before the vote is
counted, written notice of such death or incapacity is received by this
corporation. No proxy shall be valid after the expiration of eleven months from
the date of its authorization unless otherwise provided in the proxy.

Section 12.       Inspectors of Election.

     In advance of any meeting of shareholders, the Board may appoint any
persons other than nominees as inspectors of election to act at such meeting and
any adjournment thereof. If inspectors of election are not so appointed, or if
any persons so appointed fail to appear or refuse to act, the chairman of any
such meeting may, and on the request of any shareholder or shareholder's proxy
shall, make such appointments at the meeting. The number of inspectors shall be
either one or three. If appointed at a meeting on the request of one or more
shareholders or proxies, the majority of shares present shall determine whether
one or three inspectors are to be appointed.

     The duties of such inspectors shall be as prescribed by Section 707 (b) of
the California General Corporation Law and shall include: determining the number
of shares outstanding and the voting power of each, the shares represented at
the meeting, the existence of a quorum, and the authenticity, validity and
effect of proxies; receiving votes, ballots or consents; hearing and



                                       8
<PAGE>



determining all challenges and questions in any way arising in connection
with the right to vote; counting and tabulating all votes or consents;
determining when the polls shall close; determining the result; and doing such
acts as may be proper to conduct the election or vote with fairness to all
shareholders. If there are three inspectors of election, the decision, act or
certificate of a majority is effective in all respects as the decision, act or
certificate of all. Any report or certificate made by the inspectors of election
is prima facie evidence of the facts stated therein.

                            ARTICLE III -- DIRECTORS

Section 1.        Powers.

     Subject to limitations of the Articles, of these Bylaws and of the
California General Corporation Law relating to action required to be approved by
the shareholders or by the outstanding shares, the business and affairs of the
corporation shall be managed and all corporate powers shall be exercised by or
under the direction of the Board. The Board may delegate the management of the
day-to-day operation of the business of the corporation provided that the
business and affairs of the corporation shall be managed and all corporate
powers shall be exercised under the ultimate direction of the Board. Without
prejudice to such general powers, but subject to the same limitations, it is
hereby expressly declared that the Board shall have the following powers in
addition to the other powers enumerated in these Bylaws:

     (a) To select and remove all the other officers, agents and employees of
the corporation, prescribe the powers and duties for them as may not be
inconsistent with law, with the Articles or these Bylaws, fix their compensation
and require from them security for faithful service.

     (b) To conduct, manage and control the affairs and business of the
corporation and to make such rules and regulations therefor not inconsistent
with law, or with the Articles or these Bylaws, as they may deem best.

     (c) To adopt, make and use a corporate seal, and to prescribe the forms of
certificates of stock, and to alter the form of such seal and of such
certificates from time to time as in their judgment they may deem best.

     (d) To authorize the issuance of shares of stock of the corporation from
time to time, upon such terms and for such consideration as may be lawful.

     (e) To borrow money and incur indebtedness for the purposes of the
corporation, and to cause to be executed and delivered therefor, in the
corporate


                                       9
<PAGE>


name, promissory notes, bonds, debentures, deeds of trust, mortgages,
pledges, hypothecations or other evidences of debt and securities therefor.

Section 2.        Number of Directors.

     The authorized number of directors shall be not less than fifteen nor more
than twenty until changed by amendment of the Articles or by a Bylaw duly
adopted by the shareholders. The exact number of directors shall be fixed,
within the limits specified, by the Board by adoption of a resolution or by the
shareholders in the same manner provided in these Bylaws for the amendment
thereof.

Section 3.        Election and Term of Office.

     The directors shall be elected at each annual meeting of the shareholders,
but if any such annual meeting is not held or the directors are not elected
thereat, the directors may be elected at any special meeting of shareholders
held for that purpose. Each director shall hold office until the next annual
meeting and until a successor has been elected and qualified.

Section 4.        Vacancies.

     Any director may resign effective upon giving written notice to the
Chairman of the Board, the President, the Secretary or the Board, unless the
notice specifies a later time for the effectiveness of such resignation. If the
resignation is effective at a future time, a successor may be elected to take
office when the resignation becomes effective.

     Vacancies in the Board, except those existing as a result of a removal of a
director, may be filled by a majority of the remaining directors, though less
than a quorum, or by a sole remaining director, and each director so elected
shall hold office until the next annual meeting and until such director's
successor has been elected and qualified. Vacancies existing as a result of a
removal of a director may be filled by the shareholders as provided by law.

     A vacancy or vacancies in the Board shall be deemed to exist in case of the
death, resignation or removal of any director, or if the authorized number of
directors be increased, or if the shareholders fail, at any annual or special
meeting of shareholders at which any director or directors are elected, to elect
the full authorized number of directors to be voted for at that meeting.

     The Board may declare vacant the office of a director who has been declared
of unsound mind by an order of court or convicted of a felony.


                                       10
<PAGE>


     The shareholders may elect a director or directors at any time to fill any
vacancy or vacancies not filled by the directors. Any such election by written
consent other than to fill a vacancy created by removal requires the consent of
a majority of the outstanding shares entitled to vote. If the Board accepts the
resignation of a director tendered to take effect at a future time, the Board or
the shareholders shall have power to elect a successor to take office when the
resignation is to become effective.

     No reduction of the authorized number of directors shall have the effect of
removing any director prior to the expiration of the director's term of office.

Section 5.        Place of Meeting.

     Regular or special meetings of the Board shall be held at any place within
or without the State of California which has been designated from time to time
by the Board or as provided in these Bylaws. In the absence of such designation,
regular meetings shall be held at the principal office of the corporation.

Section 6.        Regular Meetings.

     Promptly following each annual meeting of shareholders the Board shall hold
a regular meeting for the purpose of organization, election of officers and the
transaction of other business.

     Regular meetings of the Board shall be held at the principal office of the
corporation without notice on the third Thursday of the months of February,
April, May, July and September, and on the second Thursday in December, at the
hour of 9:00 a.m. or as soon thereafter as the regular meeting of the Board of
Directors of Edison International is adjourned, and on the third Thursday in
March, at the hour of 8:00 a.m. or as soon thereafter as the regular meeting of
the Board of Directors of Edison International is adjourned. Call and notice of
all regular meetings of the Board are not required.

Section 7.        Special Meetings.

     Special meetings of the Board for any purpose or purposes may be called at
any time by the Chairman of the Board, the President, any Vice President, the
Secretary or by any two directors.

     Special meetings of the Board shall be held upon four days' written notice
or forty-eight hours' notice given personally or by telephone, telegraph, telex,
facsimile, electronic mail or other similar means of communication. Any such
notice shall be addressed or delivered to each director at such director's
address as it is shown upon the records of the corporation or as may have been
given to


                                       11
<PAGE>

the  corporation by the director for purposes of notice or, if such address
is not shown on such  records or is not readily  ascertainable,  at the place in
which the meetings of the  directors  are  regularly  held.  The notice need not
specify the purpose of such special meeting.

     Notice by mail shall be deemed to have been given at the time a written
notice is deposited in the United States mail, postage prepaid. Any other
written notice shall be deemed to have been given at the time it is personally
delivered to the recipient or is delivered to a common carrier for transmission,
or actually transmitted by the person giving the notice by electronic means to
the recipient. Oral notice shall be deemed to have been given at the time it is
communicated, in person or by telephone, radio or other similar means to the
recipient or to a person at the office of the recipient who the person giving
the notice has reason to believe will promptly communicate it to the recipient.

Section 8.        Quorum.

     One-third of the number of authorized directors constitutes a quorum of the
Board for the transaction of business, except to adjourn as provided in Section
ll of this Article. Every act or decision done or made by a majority of the
directors present at a meeting duly held at which a quorum is present shall be
regarded as the act of the Board, unless a greater number is required by law or
by the Articles; provided, however, that a meeting at which a quorum is
initially present may continue to transact business notwithstanding the
withdrawal of directors, if any action taken is approved by at least a majority
of the required quorum for such meeting.

Section 9.        Participation in Meetings by Conference Telephone.

     Members of the Board may participate in a meeting through use of conference
telephone or similar communications equipment, so long as all members
participating in such meeting can hear one another. Such participation
constitutes presence in person at such meeting.

Section 10.       Waiver of Notice.

     The transactions of any meeting of the Board, however called and noticed or
wherever held, are as valid as though had at a meeting duly held after regular
call and notice if a quorum is present and if, either before or after the
meeting, each of the directors not present signs a written waiver of notice, a
consent to holding such meeting or an approval of the minutes thereof. All such
waivers, consents or approvals shall be filed with the corporate records or made
a part of the minutes of the meeting.





                                       12
<PAGE>


Section 11.       Adjournment.

     A majority of the directors present, whether or not a quorum is present,
may adjourn any directors' meeting to another time and place. Notice of the time
and place of holding an adjourned meeting need not be given to absent directors
if the time and place is fixed at the meeting adjourned. If the meeting is
adjourned for more than twenty-four hours, notice of any adjournment to another
time or place shall be given prior to the time of the adjourned meeting to the
directors who were not present at the time of the adjournment.

Section 12.       Fees and Compensation.

     Directors and members of committees may receive such compensation, if any,
for their services, and such reimbursement for expenses, as may be fixed or
determined by the Board.

Section 13.       Action Without Meeting.

     Any action required or permitted to be taken by the Board may be taken
without a meeting if all members of the Board shall individually or collectively
consent in writing to such action. Such written consent or consents shall have
the same force and effect as a unanimous vote of the Board and shall be filed
with the minutes of the proceedings of the Board.

Section 14.       Rights of Inspection.

     Every director shall have the absolute right at any reasonable time to
inspect and copy all books, records and documents of every kind and to inspect
the physical properties of the corporation and also of its subsidiary
corporations, domestic or foreign. Such inspection by a director may be made in
person or by agent or attorney and includes the right to copy and make extracts.

Section 15.       Committees.

     The Board may appoint one or more committees, each consisting of two or
more directors, to serve at the pleasure of the Board. The Board may delegate to
such committees any or all of the authority of the Board except with respect to:

     (a) The approval of any action for which the California General Corporation
Law also requires shareholders' approval or approval of the outstanding shares;

     (b) The filling of vacancies on the Board or in any committee;




                                       13
<PAGE>


     (c) The fixing of compensation of the directors for serving on the Board or
on any committee;

     (d) The amendment or repeal of Bylaws or the adoption of new Bylaws;

     (e) The amendment or repeal of any resolution of the Board which by its
express terms is not so amendable or repealable;

     (f) A distribution to the shareholders of the corporation except at a rate
or in a periodic amount or within a price range determined by the Board; or

     (g) The appointment of other committees of the Board or the members
thereof.

     Any such committee, or any member or alternate member thereof, must be
appointed by resolution adopted by a majority of the exact number of authorized
directors as specified in Section 2 of this Article. The Board shall have the
power to prescribe the manner and timing of giving of notice of regular or
special meetings of any committee and the manner in which proceedings of any
committee shall be conducted. In the absence of any such prescription, such
committee shall have the power to prescribe the manner in which its proceedings
shall be conducted. Unless the Board or such committee shall otherwise provide,
the regular and special meetings and other actions of any such committee shall
be governed by the provisions of this Article applicable to meetings and actions
of the Board. Minutes shall be kept of each meeting of each committee.


                             ARTICLE IV -- OFFICERS

Section 1.        Officers.

     The officers of the corporation shall be a Chairman of the Board, a
President, a Chief Financial Officer, one or more Vice Presidents, a General
Counsel, one or more Associate General Counsel, one or more Assistant General
Counsel, a Controller, one or more Assistant Controllers, a Treasurer, one or
more Assistant Treasurers, a Secretary and one or more Assistant Secretaries,
and such other officers as may be elected or appointed in accordance with
Section 5 of this Article. The Board, the Chairman of the Board or the President
may confer a special title upon any Vice President not specified herein. Any
number of offices of the corporation may be held by the same person.


                                       14
<PAGE>


Section 2.        Election.

     The officers of the corporation, except such officers as may be elected or
appointed in accordance with the provisions of Section 5 or Section 6 of this
Article, shall be chosen annually by, and shall serve at the pleasure of the
Board, and shall hold their respective offices until their resignation, removal,
or other disqualification from service, or until their respective successors
shall be elected.

Section 3.        Eligibility of Chairman or President.

     No person shall be eligible for the office of Chairman of the Board or
President unless such person is a member of the Board of the corporation; any
other officer may or may not be a director.

Section 4.        Removal and Resignation.

     Any officer may be removed, either with or without cause, by the Board at
any time or by any officer upon whom such power or removal may be conferred by
the Board. Any such removal shall be without prejudice to the rights, if any, of
the officer under any contract of employment of the officer.

     Any officer may resign at any time by giving written notice to the
corporation, but without prejudice to the rights, if any, of the corporation
under any contract to which the officer is a party. Any such resignation shall
take effect at the date of the receipt of such notice or at any later time
specified therein and, unless otherwise specified therein, the acceptance of
such resignation shall not be necessary to make it effective.

Section 5.        Appointment of Other Officers.

     The Board may appoint such other officers as the business of the
corporation may require, each of whom shall hold office for such period, have
such authority, and perform such duties as are provided in the Bylaws or as the
Board may from time to time determine.

Section 6.        Vacancies.

     A vacancy in any office because of death, resignation, removal,
disqualification or any other cause shall be filled at any time deemed
appropriate by the Board in the manner prescribed in these Bylaws for regular
election or appointment to such office.



                                       15
<PAGE>


Section 7.         Salaries.

     The salaries of the Chairman of the Board, President, Chief Financial
Officer, Vice Presidents, General Counsel, Controller, Treasurer and Secretary
of the corporation shall be fixed by the Board. Salaries of all other officers
shall be as approved from time to time by the chief executive officer.

Section 8.        Furnish Security for Faithfulness.

     Any officer or employee shall, if required by the Board, furnish to the
corporation security for faithfulness to the extent and of the character that
may be required.

Section 9.        Chairman's Duties; Succession to Such Duties in Chairman's 
                  Absence or Disability.

     The Chairman of the Board shall be the chief executive officer of the
corporation and shall preside at all meetings of the shareholders and of the
Board. Subject to the Board, the Chairman of the Board shall have charge of the
business of the corporation, including the construction of its plants and
properties and the operation thereof. The Chairman of the Board shall keep the
Board fully informed, and shall freely consult them concerning the business of
the corporation.

     In the absence or disability of the Chairman of the Board, the President
shall act as the chief executive officer of the corporation; in the absence or
disability of the Chairman of the Board and the President, the next in order of
election by the Board of the Vice Presidents shall act as chief executive
officer of the corporation.

     In the absence or disability of the Chairman of the Board, the President
shall act as Chairman of the Board at meetings of the Board; in the absence or
disability of the Chairman of the Board and the President, the next, in order of
election by the Board, of the Vice Presidents who is a member of the Board shall
act as Chairman of the Board at any such meeting of the Board; in the absence or
disability of the Chairman of the Board, the President, and such Vice Presidents
who are members of the Board, the Board shall designate a temporary Chairman to
preside at any such meeting of the Board.

Section 10.       President's Duties.

     The President shall perform such other duties as the Chairman of the Board
shall delegate or assign to such officer.



                                       16
<PAGE>


Section 11.       Chief Financial Officer.

     The Chief Financial Officer of the corporation shall be the chief
consulting officer in all matters of financial import and shall have control
over all financial matters concerning the corporation.

Section 12.       Vice Presidents' Duties.

     The Vice Presidents shall perform such other duties as the chief executive
officer shall designate.

Section 13.       General Counsel's Duties.

     The General Counsel shall be the chief consulting officer of the
corporation in all legal matters and, subject to the chief executive officer,
shall have control over all matters of legal import concerning the corporation.

Section 14.       Associate General Counsel's and Assistant General Counsel's 
                  Duties.

     The Associate General Counsel shall perform such of the duties of the
General Counsel as the General Counsel shall designate, and in the absence or
disability of the General Counsel, the Associate General Counsel, in order of
election to that office by the Board at its latest organizational meeting, shall
perform the duties of the General Counsel. The Assistant General Counsel shall
perform such duties as the General Counsel shall designate.

Section 15.       Controller's Duties.

     The Controller shall be the chief accounting officer of the Corporation
and, subject to the Chief Financial Officer, shall have control over all
accounting matters concerning the Corporation and shall perform such other
duties as the Chief Executive Officer shall designate.

Section 16.       Assistant Controllers' Duties.

     The Assistant Controllers shall perform such of the duties of the
Controller as the Controller shall designate, and in the absence or disability
of the Controller, the Assistant Controllers, in order of election to that
office by the Board at its latest organizational meeting, shall perform the
duties of the Controller.


                                       17
<PAGE>


Section 17.       Treasurer's Duties.

     It shall be the duty of the Treasurer to keep in custody or control all
money, stocks, bonds, evidences of debt, securities and other items of value
that may belong to, or be in the possession or control of, the corporation, and
to dispose of the same in such manner as the Board or the chief executive
officer may direct, and to perform all acts incident to the position of
Treasurer.

Section 18.       Assistant Treasurers' Duties.

     The Assistant Treasurers shall perform such of the duties of the Treasurer
as the Treasurer shall designate, and in the absence or disability of the
Treasurer, the Assistant Treasurers, in order of election to that office by the
Board at its latest organizational meeting, shall perform the duties of the
Treasurer, unless action is taken by the Board as contemplated in Article IV,
Section 22.

Section 19.       Secretary's Duties.

     The Secretary shall keep or cause to be kept full and complete records of
the proceedings of shareholders, the Board and its committees at all meetings,
and shall affix the corporate seal and attest by signing copies of any part
thereof when required.

     The Secretary shall keep, or cause to be kept, a copy of the Bylaws of the
corporation at the principal office in accordance with Section 213 of the
California General Corporation Law.

     The Secretary shall be the custodian of the corporate seal and shall affix
it to such instruments as may be required.

     The Secretary shall keep on hand a supply of blank stock certificates of
such forms as the Board may adopt.

     The Secretary shall serve or cause to be served by publication or
otherwise, as may be required, all notices of meetings and of other corporate
acts that may by law or otherwise be required to be served, and shall make or
cause to be made and filed in the principal office of the corporation, the
necessary certificate or proofs thereof.

     An affidavit of mailing of any notice of a shareholders' meeting or of any
report, in accordance with the provisions of Section 601 (b) of the California
General Corporation Law, executed by the Secretary shall be prima facie evidence
of the fact that such notice or report had been duly given.


                                       18
<PAGE>


     The Secretary may, with the Chairman of the Board, the President, or a Vice
President, sign certificates of ownership of stock in the corporation, and shall
cause all certificates so signed to be delivered to those entitled thereto.

     The Secretary shall keep all records required by the California General
Corporation Law.

     The Secretary shall generally perform the duties usual to the office of
secretary of corporations, and such other duties as the chief executive officer
shall designate.

Section 20.       Assistant Secretaries' Duties.

     Assistant Secretaries shall perform such of the duties of the Secretary as
the Secretary shall designate, and in the absence or disability of the
Secretary, the Assistant Secretaries, in the order of election to that office by
the Board at its latest organizational meeting, shall perform the duties of the
Secretary, unless action is taken by the Board as contemplated in Article IV,
Sections 21 and 22 of these Bylaws.

Section 21.       Secretary Pro Tempore.

     At any meeting of the Board or of the shareholders from which the Secretary
is absent, a Secretary pro tempore may be appointed and act.

Section 22.       Election of Acting Treasurer or Acting Secretary.

     The Board may elect an Acting Treasurer, who shall perform all the duties
of the Treasurer during the absence or disability of the Treasurer, and who
shall hold office only for such a term as shall be determined by the Board.

     The Board may elect an Acting Secretary, who shall perform all the duties
of the Secretary during the absence or disability of the Secretary, and who
shall hold office only for such a term as shall be determined by the Board.

     Whenever the Board shall elect either an Acting Treasurer or Acting
Secretary, or both, the officers of the corporation as set forth in Article IV,
Section 1 of these Bylaws, shall include as if therein specifically set out, an
Acting Treasurer or an Acting Secretary, or both.





                                       19
<PAGE>



Section 23.       Performance of Duties.

     Officers shall perform the duties of their respective offices as stated in
these Bylaws, and such additional duties as the Board shall designate.


                          ARTICLE V -- OTHER PROVISIONS

Section 1.        Inspection of Corporate Records.

     (a) A shareholder or shareholders holding at least five percent in the
aggregate of the outstanding voting shares of the corporation or who hold at
least one percent of such voting shares and have filed a Schedule 14B with the
United States Securities and Exchange Commission relating to the election of
directors of the corporation shall have an absolute right to do either or both
of the following:

        (i) Inspect and copy the record of shareholders' names and addresses and
shareholdings during usual business hours upon five business days' prior written
demand upon the corporation; or

        (ii) Obtain from the transfer agent, if any, for the corporation, upon 
five business days' prior written demand and upon the tender of its usual 
charges for such a list (the amount of which charges shall be stated to the 
shareholder by the transfer agent upon request), a list of the shareholders' 
and their names and addresses who are entitled to vote for the election of 
directors shareholdings, as of the most recent record date for which it has been
compiled or as of a date specified by the shareholder subsequent to the date 
of demand.

     (b) The record of shareholders shall also be open to inspection and copying
by any shareholder or holder of a voting trust certificate at any time during
usual business hours upon written demand on the corporation, for a purpose
reasonably related to such holder's interest as a shareholder or holder of a
voting trust certificate.

     (c) The accounting books and records and minutes of proceedings of the
shareholders and the Board and committees of the Board shall be open to
inspection upon written demand on the corporation of any shareholder or holder
of a voting trust certificate at any reasonable time during usual business
hours, for a purpose reasonably related to such holder's interests as a
shareholder or as a holder of such voting trust certificate.


                                       20
<PAGE>


     (d) Any such inspection and copying under this Article may be made in
person or by agent or attorney.

Section 2.        Inspection of Bylaws.

     The corporation shall keep in its principle office the original or a copy
of these Bylaws as amended to date, which shall be open to inspection by
shareholders at all reasonable times during office hours.

Section 3.        Contracts and Other Instruments, Loans, Notes and Deposits 
                  of Funds.

     The Chairman of the Board, the President, or a Vice President, either alone
or with the Secretary or an Assistant Secretary, or the Secretary alone, shall
execute in the name of the corporation such written instruments as may be
authorized by the Board and, without special direction of the Board, such
instruments as transactions of the ordinary business of the corporation may
require and, such officers without the special direction of the Board may
authenticate, attest or countersign any such instruments when deemed
appropriate. The Board may authorize any person, persons, entity, entities,
attorney, attorneys, attorney-in-fact, attorneys-in-fact, agent or agents, to
enter into any contract or execute and deliver any instrument in the name of and
on behalf of the corporation, and such authority may be general or confined to
specific instances.

     No loans shall be contracted on behalf of the corporation and no evidences
of such indebtedness shall be issued in its name unless authorized by the Board
as it may direct. Such authority may be general or confined to specific
instances.

     All checks, drafts, or other similar orders for the payment of money,
notes, or other such evidences of indebtedness issued in the name of the
corporation shall be signed by such officer or officers, agent or agents of the
corporation and in such manner as the Board or chief executive officer may
direct.

     Unless authorized by the Board or these Bylaws, no officer, agent, employee
or any other person or persons shall have any power or authority to bind the
corporation by any contract or engagement or to pledge its credit or to render
it liable for any purpose or amount.

     All funds of the corporation not otherwise employed shall be deposited from
time to time to the credit of the corporation in such banks, trust companies, or
other depositories as the Board may direct.


                                       21
<PAGE>

Section 4.        Certificates of Stock.

     Every holder of shares of the corporation shall be entitled to have a
certificate signed in the name of the corporation by the Chairman of the Board,
the President, or a Vice President and by the Treasurer or an Assistant
Treasurer or the Secretary or an Assistant Secretary, certifying the number of
shares and the class or series of shares owned by the shareholder. Any or all of
the signatures on the certificate may be facsimile. In case any officer,
transfer agent or registrar who has signed or whose facsimile signature has been
placed upon a certificate shall have ceased to be such officer, transfer agent
or registrar before such certificate is issued, it may be issued by the
corporation with the same effect as if such person were an officer, transfer
agent or registrar at the date of issue.

     Certificates for shares may be used prior to full payment under such
restrictions and for such purposes as the Board may provide; provided, however,
that on any certificate issued to represent any partly paid shares, the total
amount of the consideration to be paid therefor and the amount paid thereon
shall be stated.

     Except as provided in this Section, no new certificate for shares shall be
issued in lieu of an old one unless the latter is surrendered and canceled at
the same time. The Board may, however, if any certificate for shares is alleged
to have been lost, stolen or destroyed, authorize the issuance of a new
certificate in lieu thereof, and the corporation may require that the
corporation be given a bond or other adequate security sufficient to indemnify
it against any claim that may be made against it (including expense or
liability) on account of the alleged loss, theft or destruction of such
certificate or the issuance of such new certificate.

Section 5.        Transfer Agent, Transfer Clerk and Registrar.

     The Board may, from time to time, appoint transfer agents, transfer clerks,
and stock registrars to transfer and register the certificates of the capital
stock of the corporation, and may provide that no certificate of capital stock
shall be valid without the signature of the stock transfer agent or transfer
clerk, and stock registrar.

Section 6.        Representation of Shares of Other Corporations.

     The chief executive officer or any other officer or officers authorized by
the Board or the chief executive officer are each authorized to vote, represent
and exercise on behalf of the corporation all rights incident to any and all
shares of any other corporation or corporations standing in the name of the
corporation.

                                       22
<PAGE>

The authority herein granted may be exercised either by any such officer in
person or by any other person  authorized so to do by proxy or power of attorney
duly executed by said officer.

Section 7.        Stock Purchase Plans.

     The corporation may adopt and carry out a stock purchase plan or agreement
or stock option plan or agreement providing for the issue and sale for such
consideration as may be fixed of its unissued shares, or of issued shares
acquired, to one or more of the employees or directors of the corporation or of
a subsidiary or to a trustee on their behalf and for the payment for such shares
in installments or at one time, and may provide for such shares in installments
or at one time, and may provide for aiding any such persons in paying for such
shares by compensation for services rendered, promissory notes or otherwise.

     Any such stock purchase plan or agreement or stock option plan or agreement
may include, among other features, the fixing of eligibility for participation
therein, the class and price of shares to be issued or sold under the plan or
agreement, the number of shares which may be subscribed for, the method of
payment therefor, the reservation of title until full payment therefor, the
effect of the termination of employment and option or obligation on the part of
the corporation to repurchase the shares upon termination of employment,
restrictions upon transfer of the shares, the time limits of and termination of
the plan, and any other matters, not in violation of applicable law, as may be
included in the plan as approved or authorized by the Board or any committee of
the Board.

Section 8.        Fiscal Year and Subdivisions.

     The calendar year shall be the corporate fiscal year of the corporation.
For the purpose of paying dividends, for making reports and for the convenient
transaction of the business of the corporation, the Board may divide the fiscal
year into appropriate subdivisions.

Section 9.        Construction and Definitions.

     Unless the context otherwise requires, the general provisions, rules of
construction and definitions contained in the General Provisions of the
California Corporations Code and in the California General Corporation Law shall
govern the construction of these Bylaws.




                                       23
<PAGE>


                          ARTICLE VI -- INDEMNIFICATION

Section 1.        Indemnification of Directors and Officers.

     Each person who was or is a party or is threatened to be made a party to or
is involved in any threatened, pending or completed action, suit or proceeding,
formal or informal, whether brought in the name of the corporation or otherwise
and whether of a civil, criminal, administrative or investigative nature
(hereinafter a "proceeding"), by reason of the fact that he or she, or a person
of whom he or she is the legal representative, is or was a director or officer
of the corporation or is or was serving at the request of the corporation as a
director, officer, employee or agent of another corporation or of a partnership,
joint venture, trust or other enterprise, including service with respect to
employee benefit plans, whether the basis of such proceeding is an alleged
action or inaction in an official capacity or in any other capacity while
serving as a director or officer, shall, subject to the terms of any agreement
between the corporation and such person, be indemnified and held harmless by the
corporation to the fullest extent permissible under California law and the
corporation's Articles of Incorporation, against all costs, charges, expenses,
liabilities and losses (including attorneys' fees, judgments, fines, ERISA
excise taxes or penalties and amounts paid or to be paid in settlement)
reasonably incurred or suffered by such person in connection therewith, and such
indemnification shall continue as to a person who has ceased to be a director or
officer and shall inure to the benefit of his or her heirs, executors and
administrators; provided, however, that (A) the corporation shall indemnify any
such person seeking indemnification in connection with a proceeding (or part
thereof) initiated by such person only if such proceeding (or part thereof) was
authorized by the Board of the corporation; (B) the corporation shall indemnify
any such person seeking indemnification in connection with a proceeding (or part
thereof) other than a proceeding by or in the name of the corporation to procure
a judgment in its favor only if any settlement of such a proceeding is approved
in writing by the corporation; (C) that no such person shall be indemnified (i)
except to the extent that the aggregate of losses to be indemnified exceeds the
amount of such losses for which the director or officer is paid pursuant to any
directors' and officers' liability insurance policy maintained by the
corporation; (ii) on account of any suit in which judgment is rendered against
such person for an accounting of profits made from the purchase or sale by such
person of securities of the corporation pursuant to the provisions of Section
16(b) of the Securities Exchange Act of 1934 and amendments thereto or similar
provisions of any federal, state or local statutory law; (iii) if a court of
competent jurisdiction finally determines that any indemnification hereunder is
unlawful; and (iv) as to circumstances in which indemnity is expressly
prohibited by Section 317 of the General Corporation Law of California (the
"Law"); and (D) that no such person shall be indemnified with regard to any
action brought by or in the right of the



                                       24
<PAGE>


corporation for breach of duty to the corporation and its  shareholders (a)
for acts or omissions involving  intentional  misconduct or knowing and culpable
violation  of law;  (b) for acts or  omissions  that  the  director  or  officer
believes  to be  contrary  to  the  best  interests  of the  corporation  or its
shareholders  or that  involve  the  absence  of good  faith  on the part of the
director or officer;  (c) for any transaction from which the director or officer
derived an improper  personal  benefit;  (d) for acts or  omissions  that show a
reckless  disregard for the director's or officer's  duty to the  corporation or
its shareholders in circumstances in which the director or officer was aware, or
should have been aware,  in the ordinary course of performing his or her duties,
of a risk of serious injury to the corporation or its shareholders; (e) for acts
or omissions that constitute an unexcused pattern of inattention that amounts to
an abdication of the  director's or officer's  duties to the  corporation or its
shareholders;  and (f) for  costs,  charges,  expenses,  liabilities  and losses
arising  under  Section  310 or 316 of the Law.  The  right  to  indemnification
conferred in this Article shall include the right to be paid by the  corporation
expenses   incurred  in  defending  any  proceeding  in  advance  of  its  final
disposition;  provided,  however,  that if the Law  permits  the payment of such
expenses  incurred by a director or officer in his or her capacity as a director
or officer (and not in any other capacity in which service was or is rendered by
such person while a director or officer, including, without limitation,  service
to  an  employee  benefit  plan)  in  advance  of  the  final  disposition  of a
proceeding, such advances shall be made only upon delivery to the corporation of
an  undertaking,  by or on  behalf of such  director  or  officer,  to repay all
amounts to the corporation if it shall be ultimately determined that such person
is not entitled to be indemnified.

Section 2.        Indemnification of Employees and Agents.

     A person who was or is a party or is threatened to be made a party to or is
involved in any proceeding by reason of the fact that he or she is or was an
employee or agent of the corporation or is or was serving at the request of the
corporation as an employee or agent of another enterprise, including service
with respect to employee benefit plans, whether the basis of such action is an
alleged action or inaction in an official capacity or in any other capacity
while serving as an employee or agent, may, subject to the terms of any
agreement between the corporation and such person, be indemnified and held
harmless by the corporation to the fullest extent permitted by California law
and the corporation's Articles of Incorporation, against all costs, charges,
expenses, liabilities and losses, (including attorneys' fees, judgments, fines,
ERISA excise taxes or penalties and amounts paid or to be paid in settlement)
reasonably incurred or suffered by such person in connection therewith.



                                       25
<PAGE>


Section 3.        Right of Directors and Officers to Bring Suit.

     If a claim under Section 1 of this Article is not paid in full by the
corporation within 30 days after a written claim has been received by the
corporation, the claimant may at any time thereafter bring suit against the
corporation to recover the unpaid amount of the claim and, if successful in
whole or in part, the claimant shall also be entitled to be paid the expense of
prosecuting such claim. Neither the failure of the corporation (including its
Board, independent legal counsel, or its shareholders) to have made a
determination prior to the commencement of such action that indemnification of
the claimant is permissible in the circumstances because he or she has met the
applicable standard of conduct, if any, nor an actual determination by the
corporation (including its Board, independent legal counsel, or its
shareholders) that the claimant has not met the applicable standard of conduct,
shall be a defense to the action or create a presumption for the purpose of an
action that the claimant has not met the applicable standard of conduct.

Section 4.        Successful Defense.

     Notwithstanding any other provision of this Article, to the extent that a
director or officer has been successful on the merits or otherwise (including
the dismissal of an action without prejudice or the settlement of a proceeding
or action without admission of liability) in defense of any proceeding referred
to in Section 1 or in defense of any claim, issue or matter therein, he or she
shall be indemnified against expenses (including attorneys' fees) actually and
reasonably incurred in connection therewith.

Section 5.        Non-Exclusivity of Rights.

     The right to indemnification provided by this Article shall not be
exclusive of any other right which any person may have or hereafter acquire
under any statute, bylaw, agreement, vote of shareholders or disinterested
directors or otherwise.

Section 6.        Insurance.

     The corporation may maintain insurance, at its expense, to protect itself
and any director, officer, employee or agent of the corporation or another
corporation, partnership, joint venture, trust or other enterprise against any
expense, liability or loss, whether or not the corporation would have the power
to indemnify such person against such expense, liability or loss under the Law.



                                       26
<PAGE>


Section 7.        Expenses as a Witness.

     To the extent that any director, officer, employee or agent of the
corporation is by reason of such position, or a position with another entity at
the request of the corporation, a witness in any action, suit or proceeding, he
or she shall be indemnified against all costs and expenses actually and
reasonably incurred by him or her on his or her behalf in connection therewith.

Section 8.        Indemnity Agreements.

     The corporation may enter into agreements with any director, officer,
employee or agent of the corporation providing for indemnification to the
fullest extent permissible under the Law and the corporation's Articles of
Incorporation.

Section 9.        Separability.

     Each and every paragraph, sentence, term and provision of this Article is
separate and distinct so that if any paragraph, sentence, term or provision
hereof shall be held to be invalid or unenforceable for any reason, such
invalidity or unenforceability shall not affect the validity or enforceability
of any other paragraph, sentence, term or provision hereof. To the extent
required, any paragraph, sentence, term or provision of this Article may be
modified by a court of competent jurisdiction to preserve its validity and to
provide the claimant with, subject to the limitations set forth in this Article
and any agreement between the corporation and claimant, the broadest possible
indemnification permitted under applicable law.

Section 10.       Effect of Repeal or Modification.

     Any repeal or modification of this Article shall not adversely affect any
right of indemnification of a director or officer existing at the time of such
repeal or modification with respect to any action or omission occurring prior to
such repeal or modification.


                       ARTICLE VII -- EMERGENCY PROVISIONS

Section 1.        General.

     The provisions of this Article shall be operative only during a national
emergency declared by the President of the United States or the person
performing the President's functions, or in the event of a nuclear, atomic or
other attack on the United States or a disaster making it impossible or
impracticable for the corporation to conduct its business without recourse to
the provisions of

                                       27
<PAGE>


this Article. Said provisions in such event shall override all other Bylaws
of the corporation in conflict with any provisions of this Article, and shall
remain operative so long as it remains impossible or impracticable to continue
the business of the corporation otherwise, but thereafter shall be inoperative;
provided that all actions taken in good faith pursuant to such provisions shall
thereafter remain in full force and effect unless and until revoked by action
taken pursuant to the provisions of the Bylaws other than those contained in
this Article.

Section 2.        Unavailable Directors.

     All directors of the corporation who are not available to perform their
duties as directors by reason of physical or mental incapacity or for any other
reason or who are unwilling to perform their duties or whose whereabouts are
unknown shall automatically cease to be directors, with like effect as if such
persons had resigned as directors, so long as such unavailability continues.

Section 3.        Authorized Number of Directors.

     The authorized number of directors shall be the number of directors
remaining after eliminating those who have ceased to be directors pursuant to
Section 2, or the minimum number required by law, whichever number is greater.

Section 4.        Quorum.

     The number of directors necessary to constitute a quorum shall be one-third
of the authorized number of directors as specified in the foregoing Section, or
such other minimum number as, pursuant to the law or lawful decree then in
force, it is possible for the Bylaws of a corporation to specify.

Section 5.        Creation of Emergency Committee.

     In the event the number of directors remaining after eliminating those who
have ceased to be directors pursuant to Section 2 is less than the minimum
number of authorized directors required by law, then until the appointment of
additional directors to make up such required minimum, all the powers and
authorities which the Board could by law delegate, including all powers and
authorities which the Board could delegate to a committee, shall be
automatically vested in an emergency committee, and the emergency committee
shall thereafter manage the affairs of the corporation pursuant to such powers
and authorities and shall have all other powers and authorities as may by law or
lawful decree be conferred on any person or body of persons during a period of
emergency.



                                       28
<PAGE>

Section 6.        Constitution of Emergency Committee.

     The emergency committee shall consist of all the directors remaining after
eliminating those who have ceased to be directors pursuant to Section 2,
provided that such remaining directors are not less than three in number. In the
event such remaining directors are less than three in number the emergency
committee shall consist of three persons, who shall be the remaining director or
directors and either one or two officers or employees of the corporation, as the
remaining director or directors may in writing designate. If there is no
remaining director, the emergency committee shall consist of the three most
senior officers of the corporation who are available to serve, and if and to the
extent that officers are not available, the most senior employees of the
corporation. Seniority shall be determined in accordance with any designation of
seniority in the minutes of the proceedings of the Board, and in the absence of
such designation, shall be determined by rate of remuneration. In the event that
there are no remaining directors and no officers or employees of the corporation
available, the emergency committee shall consist of three persons designated in
writing by the shareholder owning the largest number of shares of record as of
the date of the last record date.

Section 7.        Powers of Emergency Committee.

     The emergency committee, once appointed, shall govern its own procedures
and shall have power to increase the number of members thereof beyond the
original number, and in the event of a vacancy or vacancies therein, arising at
any time, the remaining member or members of the emergency committee shall have
the power to fill such vacancy or vacancies. In the event at any time after its
appointment all members of the emergency committee shall die or resign or become
unavailable to act for any reason whatsoever, a new emergency committee shall be
appointed in accordance with the foregoing provisions of this Article.

Section 8.        Directors Becoming Available.

     Any person who has ceased to be a director pursuant to the provisions of
Section 2 and who thereafter becomes available to serve as a director shall
automatically become a member of the emergency committee.

Section 9.        Election of Board of Directors.

     The emergency committee shall, as soon after its appointment as is
practicable, take all requisite action to secure the election of a board of
directors,


                                       29
<PAGE>

 
and upon such election all the powers and authorities of the emergency
committee shall cease.

Section 10.       Termination of Emergency Committee.

     In the event, after the appointment of an emergency committee, a sufficient
number of persons who ceased to be directors pursuant to Section 2 become
available to serve as directors, so that if they had not ceased to be directors
as aforesaid, there would be enough directors to constitute the minimum number
of directors required by law, then all such persons shall automatically be
deemed to be reappointed as directors and the powers and authorities of the
emergency committee shall be at an end.


                           ARTICLE VIII -- AMENDMENTS

Section 1.        Amendments.

     These Bylaws may be amended or repealed either by approval of the
outstanding shares or by the approval of the Board; provided, however, that a
Bylaw specifying or changing a fixed number of directors or the maximum or
minimum number or changing from a fixed to a variable Board or vice versa may
only be adopted by approval of the outstanding shares. The exact number of
directors within the maximum and minimum number specified in these Bylaws may be
amended by the Board alone.












                                                       EXHIBIT 10.20

                    RESOLUTION OF THE COMPENSATION COMMITTEE

                          OF THE BOARD OF DIRECTORS OF

                       SOUTHERN CALIFORNIA EDISON COMPANY

                            Adopted November 30, 1989

                 RE: AMENDMENT OF DISPUTE RESOLUTION PROCEDURES
                         IN NON-QUALIFIED BENEFIT PLANS

     WHEREAS, the Board of Directors ("Board") has previously adopted certain
non-qualified benefit plans (the "Plans") for eligible executives and directors
of the corporation, including the (a) 1981, 1987, 1988, and 1989 Deferred
Compensation Plans for executives, (b) the Executive Supplemental Benefit
Program, (c) the Executive Retirement Plan, (d) the 1985 Deferred Compensation
Plan for executives, (e) the Retirement Plan for Directors, and (f) the 1985,
1987, 1988 and 1989 Deferred Compensation Plans for directors; and

     WHEREAS, these Plans have been adopted, among other things, to attract and
retain the corporation's team of executives and directors, provide financial
incentives to reinforce and recognize performance and accomplishments, and make
the corporation's compensation programs for executives and directors more
competitive within the electric utility industry and general industry; and

     WHEREAS, it is now deemed desirable to amend these Plans to provide dispute
resolution procedures which will guarantee speedy and fair review of any claims
that may arise under the Plans;

     NOW, THEREFORE, BE IT RESOLVED, that the Plans, be and they hereby are,
amended as set forth in the attached "Exhibit A".


                                       
<PAGE>

                                    EXHIBIT A

                  RE:     AMENDMENT OF DISPUTE RESOLUTION PROCEDURES

1.      1981, 1987, 1988. and 1989 Deferred Compensation Plans.
        ------------------------------------------------------

        Section 11 of each of these plans is amended to read as follows:

     "The Board (either directly or through its designees) will have power and
authority to interpret, construe, and administer this Agreement; provided that,
the Board's authority to interpret this Agreement shall not cause the Board's
decisions in this regard to be entitled to a deferential standard of review in
the event that a Participant or beneficiary seeks review of the Board's decision
as described below. In addition, the Board shall have the power to prospectively
modify or terminate this Agreement, provided that any such modification or
termination does not result in the elimination of any rights that the
Participant or beneficiary may have under this Agreement. Absent the consent of
the Participant, however, the Board shall in no event have any authority to
modify this section.

     "No member of the Board, nor its designee, shall be liable to any person
for any action taken or omitted in connection with the interpretation and
administration of this Agreement.

     "In the event of Plan amendment or termination, the benefit payable from
the account balance of a retired or deceased Participant shall not be impaired,
and the benefit from the account balances of other Participants shall not be
less than the benefit to which each such Participant would have been entitled
from his or her account balance immediately prior to such amendment or
termination.

     "Because it is agreed that time will be of the essence in determining
whether any payments are due to Participant or his or her beneficiary under this
Agreement, a Participant or beneficiary may, if he or she desires, submit any
claim for payment under this Agreement to arbitration. This right to select
arbitration shall be solely that of the Participant or beneficiary and the
Participant or beneficiary may decide whether or not to arbitrate in his or ber
discretion. The "right to select arbitration" is not mandatory on the
Participant or beneficiary, and the Participant or beneficiary may choose in
lieu thereof to bring an action in an appropriate civil court. Once an
arbitration is commenced, however, it may not be discontinued without the mutual
consent of both parties to the arbitration. During the lifetime of the
Participant only he or she can use the arbitration procedure set forth in this
section.

     "Any claim for arbitration may be submitted as follows: if Participant or
beneficiary has submitted a request to be paid under this Agreement and the
claim is finally denied by the

                                      
<PAGE>

Company in whole or in part, such claim may be filed in writing with an
arbitrator of Participant's or beneficiary's choice who is selected by the
method described in the next three sentences. The first step of the selection
shall consist of the Participant or beneficiary submitting a list of five
potential arbitrators to the Company. Each of the five arbitrators must be
either (1) a member of the National Academy of Arbitrators located in the State
of California or (2) a retired California Superior Court or Appellate Court
judge. Within one week after receipt of the list, the Company shall select one
of the five arbitrators as the arbitrator for the dispute in question. If the
Company fails to select an arbitrator within one week after receipt of the list,
the Participant or beneficiary shall then designate one of the five arbitrators
for the dispute in question.

     "The arbitration hearing shall be held within seven days (or as soon
thereafter as possible) after the picking of the arbitrator. No continuance of
said hearing shall be allowed without the mutual consent of Participant or
beneficiary and the Company. Absence from or nonparticipation at the hearing by
either party shall not prevent the issuance of an award. Hearing procedures
which will expedite the hearing may be ordered at the arbitrator's discretion,
and the arbitrator may close the hearing in his or her sole discretion when he
or she decides he or she has heard sufficient evidence to satisfy issuance of an
award.

     "The arbitrator's award shall be rendered as expeditiously as possible and
in no event later than one week after the close of the hearing.

     "In the event the arbitrator finds that the Company has breached this
Agreement, he or she shall order the Company to pay to Participant or
beneficiary within two business days after the decision is rendered the amount
then due the Participant or beneficiary, plus, notwithstanding anything to the
contrary in this Agreement, an additional amount equal to 20% of the amount
actually in dispute. This additional amount shall constitute an additional
benefit under this Agreement. The award of the arbitrator shall be final and
binding upon the parties.

     "The award may be enforced in any appropriate court as soon as possible
after its rendition. The Company will be considered the prevailing party in a
dispute if the arbitrator determines (1) that the Company has not breached this
Agreement and (2) the claim by Participant or his or her beneficiary was not
made in good faith. Otherwise, the Participant or his or her beneficiary will be
considered the prevailing party. In the event that the Company is the prevailing
party, the fee of the arbitrator and all necessary expenses of the hearing
(excluding any attorneys' fees incurred by the Company) including stenographic
reporter, if employed, shall be paid by the losing party. In the event that the
Participant or his or her beneficiary is the prevailing party, the fee of the
arbitrator and all necessary expenses of the hearing (including all attorneys,
fees incurred by Participant or his or her beneficiary in pursuing his or her 


<PAGE>


claim), including the fees of a stenographic reporter if employed, shall be
paid by the Company."

2.     Executive Supplemental Benefit Program.
       --------------------------------------

     Section 7 of Part E of the Program is amended by inserting the words
"Subject to Section 8 of Part E," at the beginning.

     Section 8 of Part E is amended to read identically to the amendment set
forth in Section 1 of this Exhibit A, except that (1) instead of the word
"Agreement" the word "Program" shall be used and (2), in lieu of paragraph three
of said amendment, the following paragraph shall be substituted:

     "In the event of an amendment or termination of any Part of this Program,
the benefits payable on account of a retired or deceased Participant shall not
be impaired, and the benefits of other Participants shall not be less than the
benefits to which each such Participant would have been entitled immediately
prior to such amendment or termination of any Part (or Parts) of the Program."

3.     Executive Retirement Plan.
       -------------------------

     Section 12 of the plan is amended to read identically to the amendment set
forth in Section 1 of this Exhibit A, except that (1) instead of the word
"Agreement" the word "Plan" shall be used, the words "Eligible Employee" shall
be used in lieu of the word "Participant," and (3), in lieu of paragraph three
of said amendment, the following paragraph shall be substituted:

"In the event of Plan amendment or termination which has the effect of
eliminating or reducing a benefit under the Plan, the benefit payable on account
of a retired Eligible Employee or survivor or other beneficiary shall not be
impaired, and the benefits of other Eligible Employees shall not be less than
the benefit to which each such Eligible Employee would have been entitled if he
or she had retired immediately prior to such amendment or termination."

4.      1985 Deferred Compensation Plan for Executives.
        ----------------------------------------------

     Section 10 of the plan is amended to read identically to the amendment set
forth in Section 1 of this Exhibit A.

5.     Retirement Plan for Directors.
       -----------------------------

     Article V of the plan is amended to delete the third and fourth sections
thereof. New Article VI entitled "Plan Interpretation" is added to read
identically to the amendment set forth in Section 1 of this Exhibit A, except
that (1) instead of the word "Agreement" the word "Plan" shall be used, the
words "Eligible Director" shall be used in lieu of the word


<PAGE>



"Participant," and (3), in lieu of paragraph three of said amendment, the
following paragraph shall be substituted: "In the event of Plan amendment or
termination which has the effect of eliminating or reducing a benefit under the
Plan, the benefit payable on account of a retired Eligible Director or survivor
or other beneficiary shall not be impaired, and the benefits of other Eligible
Directors shall not be less than the benefit to which each such Eligible
Director would have been entitled if he or she had retired immediately prior to
such amendment or termination."

6.    1995, 1987, 1988 and 1989 Deferred Compensation Plans for Directors
      -------------------------------------------------------------------

     Section 9 of each of these plans is amended to read identically to the
amendment set forth in Section 1 of this Exhibit A.




                                                     

                                                       EXHIBIT 10.21

                              RETIREMENT AGREEMENT



This Retirement Agreement ("Agreement"), is entered into by and between Richard
K. Bushey ("RKB") an individual, and Edison International ("EI"), a corporation.

In consideration of the covenants undertaken and the releases contained in this
Agreement and of RKB's more than 35 years of valued service, RKB on the one
hand, and EI on the other hand, agree as follows:

1.   RKB will irrevocably resign as an officer of EI and Southern California
     Edison ("SCE") effective December 31, 1998, by executing a letter
     substantially in the form attached hereto as Exhibit A and incorporated
     herein by reference. RKB will irrevocably retire from employment with EI
     and SCE effective on the later of (a) April 1, 1999, or (b) the date when
     an amendment providing for a lump sum payment option from the SCE Qualified
     Retirement Plan (the "Qualified Plan") becomes effective. The date of RKB's
     retirement as an employee of EI and SCE shall be referred to in this
     Agreement as the "Effective Date". RKB will continue as an employee of EI
     and SCE at no less than his current salary until the Effective Date and
     agrees to provide services to EI and SCE, or to others on behalf of EI or
     SCE, as mutually agreed upon by RKB and EI's Chief Financial Officer from
     January 1, 1999, to the Effective Date. 

2.   RKB will be entitled to severance benefits equal to RKB's final annual
     salary which will be credited to RKB's account under the Edison
     International Executive Deferred Compensation Plan (the "Executive DCP") as
     of the Effective Date.

3.   Notwithstanding his resignation as an officer, RKB shall be considered an
     SCE vice president-level executive for all executive benefit plan purposes
     during the remainder of his employment, and upon his retirement, he shall
     be entitled to benefits under such plans on the same basis as any SCE vice
     president retiring


                                       1
<PAGE>

     in 1999. RKB and his dependents will be entitled to health care benefits on
     the same basis as other active SCE executives retiring in 1999. 

4.   RKB will be eligible for bonus award consideration under the Executive
     Incentive Plan for 1998 and for the portion of 1999 that he works in
     accordance with the terms of the plan.

5.   RKB has Edison International nonqualified stock options outstanding under
     the Equity Compensation Plan or predecessor plans. Notwithstanding any
     terms in the option agreements to the contrary, and subject to approval of
     the EI Compensation and Executive Personnel Committee ("CEP Committee"),
     all of RKB's outstanding unvested options will vest on the Effective Date
     and be exercisable for the full original terms of the agreements granting
     such options.

6.   RKB will receive retirement benefits under the Qualified Plan and the SCE
     Executive Retirement Plan ("ERP"). With respect to RKB's benefits under the
     Qualified Plan and the ERP, the parties understand and agree as follows:

     a.   RKB will receive, at his option, either a joint and survivor life
          annuity or a lump sum payment under the Qualified Plan. The monthly
          pension benefit payment available to RKB under the Qualified Plan
          determined in accordance with plan practice assuming an April 1, 1999
          Effective Date, is estimated to be approximately $6,609; the
          actuarially determined lump sum payment equivalent to the joint and
          survivor annuity is estimated to be approximately $885,000 based on
          current interest rates. The lump sum amount that will be available to
          RKB on the Effective Date will be based on the interest rate,
          determined in accordance with plan practice, used for discounting
          purposes that is in effect on the Effective Date.

     b.   RKB has elected the 120-month benefit payment option under the ERP.
          The monthly benefit payments to RKB under the ERP will commence one
          month after the Effective Date and will be payable for 120 months. The
          initial monthly payment will be approximately $6,975 assuming an April
          1, 1999 Effective Date. In accordance with plan practice, interest
          will be credited 

                                       2
<PAGE>


          annually at the end of each calendar year and the monthly payment for 
          the following year will be recomputed to reflect the credited 
          interest.

     c.   Benefits under the Qualified Plan will continue for RKB's lifetime,
          and upon his death, his eligible surviving spouse will commence
          receiving a 50% survivor annuity payable under the terms of the
          Qualified Plan for the balance of her life, unless RKB elects a lump
          sum payment option for the Qualified Plan benefit, in which event RKB
          shall be ineligible for the lifetime annuity and his surviving spouse
          will not be eligible for a survivor annuity.

     d.   Based upon RKB's projected accrued sick leave, the total unused sick
          leave allowance payable under the Qualified Plan and/or the ERP is
          estimated to be $93,000. This amount is subject to change depending
          upon sick leave usage prior to the Effective Date.

     e.   The maximum benefits payable under the Qualified Plan are subject to
          IRS limitations. Because of these limitations, the portions of the
          retirement benefits payable from the Qualified Plan and the ERP may
          vary from the amounts shown in this Paragraph 6; however, the total of
          the retirement benefits payable under the Qualified Plan and the ERP
          will remain approximately as estimated.

7.   Subject to approval of the CEP Committee of RKB's request to defer
     commencement of payments from the EI Executive Deferred Compensation Plan,
     the 1981A Deferred Compensation Plan and the 1985 Deferred Compensation
     Plan, payments will commence on May 1, 2000. Interest will be credited to
     RKB's Plan accounts at the rate of 8.16% per annum from the Effective Date
     to April 30, 2000. Thereafter, interest will be credited at the rates and
     subject to the terms and conditions of the respective plans.

8.   EI will credit to RKB's Executive DCP account the sum of $100,000 on the
     Effective Date, and will pay to RKB an additional $100,000 one year later,
     and an additional $100,000 two years later, as retainer fees for RKB to
     remain available as a consultant for a period of 36 months commencing on
     the Effective Date to provide upon request by the EI Chief Financial
     Officer, or his delegate, 


                                       3
<PAGE>

     information and assistance to EI or its affiliates with respect to any 
     matters handled by RKB or with which he became familiar while he was 
     employed by EI and SCE. RKB will receive no additional hourly or other 
     compensation for performing these consulting services, but EI will 
     reimburse RKB for any expenses incurred in connection with the providing 
     of such information and assistance as a consultant. EI agrees that it will 
     give RKB reasonable prior notice of its need for his assistance or 
     provision of information, which shall be no more than 39 hours per month, 
     and EI agrees that it shall set all meetings at reasonable times convenient
     to RKB's schedule. RKB shall submit written statements accounting for his 
     expenses on a monthly basis, and EI will reimburse RKB for these expenses 
     within two weeks after each submittal.

9.   On the Effective Date RKB will become the owner at no cost to RKB of the
     personal computer and related equipment, the facsimile machine and selected
     furniture and office decorations that EI provided for his use as identified
     on the schedule attached hereto as Exhibit B and selected by RKB. The
     values of such items are taxable income to RKB and subject to applicable
     withholding of taxes pursuant to Paragraph 13 of this Agreement.

10.  For the 36-month period immediately following the Effective Date, RKB will
     not engage in any activity which is directly competitive with EI or any of
     its affiliates, or serve on the Board of Directors of any corporation
     engaged in any such business, or render services to any organization or
     individual in connection with any matter in which the position of such
     organization or individual is known to RKB to be adverse to the position of
     EI, or any affiliate of EI, except with the written consent of the Chief
     Executive Officer or General Counsel of EI.

11.  RKB acknowledges that he is in possession of confidential trade secret and
     business information not publicly available concerning EI and its
     affiliates. RKB specifically agrees that he will not at any time, in any
     fashion, form, or manner use or divulge, disclose or communicate to any
     person, firm, or corporation, in any manner whatsoever, any confidential
     information concerning any matters affecting or relating to the business of
     EI and any of its affiliates.


                                       4
<PAGE>


12.  RKB and EI expressly agree that, except to the extent this Agreement
     imposes obligations upon the parties, this Agreement will never, at any
     time, for any purpose whatsoever, be considered as an admission of
     liability or responsibility of the parties or any of them. Moreover,
     neither this Agreement nor anything in this Agreement will be construed to
     be nor will be admissible in any proceeding as evidence of or an admission
     by EI or any of its affiliates of any violation of its or their policies or
     procedures, or of state or federal laws or regulations. This Agreement may
     be introduced, however, in any proceeding to enforce the terms of this
     Agreement. Such introduction must be pursuant to an order protecting the
     confidentiality of this Agreement.

13.  EI may withhold from any compensation or benefits payable under this
     Agreement all federal, state and other taxes as may be required pursuant to
     any law or governmental regulation or ruling. RKB agrees that he will be
     exclusively liable for the payment of all federal and state taxes that may
     be due from him as the result of the consideration received from EI herein.

14.  If RKB has a right as a former employee and retiree to receive other plan
     benefits not specifically addressed herein (by way of example and not by
     way of limitation, benefits under the Stock Savings Plus Plan and other
     executive retirement and post-retirement survivor benefits), RKB and his
     beneficiaries will continue to have the right to such other benefits in
     accordance with the terms of the respective plans.

15.  This Agreement will be administered by EI, which will have the general
     responsibility of reasonably interpreting this Agreement. Any controversy
     or claim arising out of or relating to this Agreement or breach or alleged
     breach of this Agreement, or to enforce or interpret this Agreement, which
     cannot be resolved by the parties will be settled by arbitration to be held
     in the County of Los Angeles in accordance with the Rules of the American
     Arbitration Association, and judgment upon the award rendered by the
     arbitrator(s) may be entered in any court having jurisdiction thereof. The
     parties will equally divide the arbitrators' fees. The prevailing party
     will be entitled to recover against the 


                                       5
<PAGE>

     other party reasonable attorney's fees, expenses and costs incurred in 
     connection with such proceedings including his or its one-half share 
     of the arbitrators' fees.

16.  This Agreement will be binding upon any successor in interest of EI.
     Neither this Agreement nor any right or interest hereunder will be
     assignable by RKB without EI's prior written consent. Nothing herein will
     restrict RKB's right to designate beneficiaries under any of the plans in
     which he is a participant, provided such designations are not prohibited by
     the applicable plan documents and are otherwise lawful, or to transfer
     rights to income to any trust or other entity which he may establish for
     estate planning purposes. Except as required by law, no right to receive
     payments under this Agreement will be subject to anticipation, commutation,
     alienation, sale, assignment, encumbrance, charge, pledge, or hypothecation
     or to execution, attachment, levy, or similar process or assignment by
     operation of law, and any attempt to effect such action will be null, void
     and of no effect.

17.  No provision of this Agreement may be amended, modified, or waived except
     by written agreement signed by the parties hereto.

18.  RKB acknowledges and understands that the confidentiality of this Agreement
     is of the utmost concern to EI and that this Agreement would not have been
     entered into by EI without his promise to keep such matter confidential.
     Accordingly, RKB agrees that, except to the extent disclosure is required
     by law or formal government demand, he will keep the terms and conditions
     of this Agreement and the Agreement document itself confidential and he
     will not disclose them to any other person, other than his wife, immediate
     family members, legal advisors and/or other professional advisors, who will
     also be advised of its confidentiality and who will agree to be bound by
     this confidentiality agreement.

19.  RKB acknowledges and understands that EI would not enter into this
     Agreement without it serving as the means to compromise, resolve, settle,
     and terminate any dispute or claim that may exist between them with respect
     to RKB's 


                                       6
<PAGE>


     employment with EI and SCE and his retirement therefrom. RKB and
     EI therefore agree that all of the payments, benefits and rights accruing
     to RKB from EI pursuant to the terms of this Agreement are hereby made
     expressly contingent upon RKB's delivery to EI of a fully executed and
     valid release in the form attached as Exhibit C (the "Release") no earlier
     than 30 days, nor later than 7 days, prior to the Effective Date.

20.  This Agreement will be deemed to have been entered into in the State of
     California and all questions concerning its validity, interpretation or
     performance of any of its terms or provisions, or of any rights or
     obligations of the parties hereto, will be governed and resolved in
     accordance with the laws of the State of California. Furthermore, no
     provision of this Agreement is to be interpreted for or against either
     party because that party, or his legal representative, drafted such
     provision.

21.  RKB represents and agrees that he has carefully read and understands this
     Agreement, and agrees that neither EI nor any officer, agent, or employee
     of EI or any of its affiliates has made any representations other than
     those contained herein. EI agrees that neither RKB nor any of his
     representatives has made any representations other than those contained
     herein. Further, RKB and EI expressly agree that they have entered into
     this Agreement freely and voluntarily and without pressure or coercion from
     the other or from their respective officers, agents, employees, or anyone
     else acting on their behalf. RKB further expressly agrees that prior to the
     execution of this Agreement, he was advised to seek independent legal
     advice concerning the terms, conditions and effect of this Agreement.

22.  RKB and EI represent and agree that this Agreement and the Release contain
     the entire agreement and understanding between the parties hereto
     concerning RKB's employment with and retirement from EI and SCE, and other
     subject matters addressed herein. RKB and EI further represent and agree
     that the Agreement and Release supersede and replace all prior negotiations
     and agreements, proposed or otherwise, whether written or oral, concerning
     the 


                                       7
<PAGE>


     subject matter hereof and that the Agreement and Release constitute an
     integrated agreement, the terms of which are contractual in nature and not
     a mere recital.

23.  If any provision of this Agreement or the application thereof is held
     invalid, the invalidity will not affect the other provisions or
     applications, and to this extent, the provisions of this Agreement are
     declared to be severable.

24.  This Agreement may be executed in counterparts, and each counterpart, when
     executed, will have the efficacy of a signed original. Photographic copies
     of such signed counterparts may be used in lieu of the original for any
     purpose.


IN WITNESS WHEREOF, RKB and EI have executed this Agreement on the dates
opposite their signatures.


I declare under penalty of perjury under the laws of the State of California
that I have carefully read the foregoing Agreement and know and fully understand
the terms and content thereof and I accept and agree to the provisions it
contains and hereby execute it voluntarily and as my own free act with full
understanding of its consequences.


Dated:  September 15, 1998, at                     Richard K. Bushey
                                             -----------------------------
          Arcadia, California                      Richard K. Bushey

I warrant and represent that I have the authority to execute this Agreement on
behalf of EI. 

EDISON INTERNATIONAL


Dated: October 5, 1998 at                           Alan J. Fohrer
                                             -----------------------------
       Rosemead, California                         Alan J. Fohrer
                                             Its: Executive Vice President 
                                               & Chief Financial Officer




                                       8
<PAGE>

                               SPOUSE'S STATEMENT

I have carefully read the foregoing Agreement and I know and fully understand
the terms and content thereof. I understand that California is a community
property state, and to the extent I now or in the future may have any right,
title or interest in anything released, bargained for, received, or agreed to in
the Agreement, I hereby expressly agree to be completely bound by all provisions
of the Agreement. I have signed this statement as my own free act.


Dated: September 15, 1998                              Janeil D. Bushey
                                               -------------------------------
       Arcadia, California                             Janeil D. Bushey

WITNESSED BY:


Dated: September 15, 1998                             Karen M. Whitehill
                                              ---------------------------------
                                                      Karen M. Whitehill



                                       9
<PAGE>
                                   EXHIBIT A

                               RICHARD K. BUSHEY
                            1030 Don Alvarado Drive
                           Arcadia, California 91006


                               February 18, 1999

Edison International
2244 Walnut Grove Avenue
Rosemead, California 91770

ATTENTION:  Corporate Secretary

Ladies and Gentlemen:

This is to advise you that effective March 1, 1999, I hereby irrevocably and
voluntartily elect to resign as controller of Edison International ("EI"), and
Southern California Edison Company ("SCE") and that effective April 1, 1999, I
hereby irrevocably and voluntarily elect to resign as vice president of EI and
SCE and from other officer and/or director positions held with other affiliates
of EI and SCE. I am also electing to retire as an employee of EI and SCE
effective April 2, 1999. Subsequent to my retirement as an employee of EI and
SCE, I will not seek reemployment with EI, SCE or any of its other affiliates.

With your agreement and acceptance below, this letter will serve to supersede
and (1) amend the effective dates of my retirement and resignation as set forth
in the Retirement Agreement ("Agreement") which I executed on September 15,
1998, and Alan J. Fohrer executed on behalf of EI on October 5, 1998, and (2)
further amend such effective dates as set forth in a letter dated December 19,
1998, which amended the Agreement.

Please return one signed copy of this letter to me for my files.

                                        Sincerely,


                                        Richard K. Bushey
                                        -----------------
                                        Richard K. Bushey
                                        SSN ###-##-####

AGREED TO AND ACCEPTED:

EDISON INTERNATIONAL


By:  Beverly P. Ryder         Date: March 1, 1999
     ----------------
     Beverly P. Ryder

Its: Corporate Secretary


                                       10
<PAGE>



                                     EXHIBIT B

Description of Computer Equipment, Facsimile and Office Furnishings
Available to RKB at No Cost


1.       Computer Equipment:

         Dell Notebook
         Dell Docking Station
         Monitor, Speakers and Headphones
         Keyboard
         Mouse
         HP Printer
         Printer Table

2.       Facsimile:
         Brothers Model 6550MC

3.       Office Furnishings:
         Desk Unit
         Sofa, Wing Chair, Coffee Table, End Table, Chow Table
         Desk Chair
         Side Chairs (4)
         Pictures (3)
         Desk Pad, Pen Set, Memo Pad Holders, Water Carafe, Clock
         Lamps (2)




                                       11
<PAGE>



                                     RELEASE



Richard K. Bushey ("RKB") and Edison International ("EI"), have entered into a
retirement agreement ("Retirement Agreement") whereby RKB has agreed to
irrevocably retire from employment with EI and Southern California Edison
("SCE") effective on the later of (a) April 1, 1999, or (b) the date when an
amendment providing for a lump sum payment option from the SCE Qualified
Retirement Plan becomes effective. As part of RKB's consideration under the
Retirement Agreement, and as a condition precedent to the additional payments
and benefits he will be entitled to receive pursuant to the Retirement
Agreement, RKB promised to deliver this executed Release to EI no sooner than 30
days nor later than 7 days prior to the effective date of the Retirement
Agreement. Now, therefore, RKB agrees as follows:

1.   Except for obligations granted by or arising out of the Retirement
     Agreement, and any applicable retirement, deferred compensation, stock
     option, or welfare benefit plan, RKB, on his own behalf, and on the behalf
     of his descendants, dependents, heirs, executors, administrators, assigns
     and successors, as such, does hereby covenant not to sue and acknowledges
     complete satisfaction of and hereby releases, absolves and discharges EI,
     and its successors, assigns, subsidiaries, divisions and affiliated
     corporations, past and present (including without limitation SCE and its
     affiliates), and their trustees, directors, officers, shareholders, agents,
     attorneys, insurers, and employees, past and present, and each of them, as
     such (hereinafter in this Release collectively referred to as "EI
     Releasees") with respect to and from any and all claims, demands, liens,
     agreements, contracts, covenants, actions, suits, causes of action, wages,
     obligations, debts, expenses, attorney's fees, damages, judgments, orders
     and liabilities of whatever kind or nature in law, equity or otherwise,
     without any exception whatsoever, and any and all claims, demands,
     agreements, obligations, and causes of action, known or unknown, suspected
     or 


                                       12
<PAGE>

     unsuspected, by RKB arising out of or in any way concerning the events
     and/or circumstances surrounding his employment with EI and SCE or
     separation and retirement therefrom.

2.   RKB understands and expressly agrees that the release given by him in
     Paragraph 1, above, without any exception whatsoever, extends to all
     claims, injuries, damages or losses to his person and property, whether
     known, unknown, foreseen, patent or latent, which he may have against the
     EI Releasees or any of them. RKB specifically and expressly waives all his
     rights under SECTION 1542 of the CALIFORNIA CIVIL CODE which provides as
     follows:

     "A GENERAL RELEASE DOES NOT EXTEND TO CLAIMS WHICH THE CREDITOR DOES NOT 
     KNOW OR SUSPECT TO EXIST IN HIS FAVOR AT THE TIME OF EXECUTING THE RELEASE,
     WHICH IF KNOWN BY HIM MUST HAVE MATERIALLY AFFECTED HIS SETTLEMENT WITH THE
     DEBTOR."

3.   RKB expressly acknowledges and agrees that by entering into this Release,
     he is waiving any and all rights or claims that he may have arising from
     the Age Discrimination in Employment Act of 1967, as amended, which have
     arisen on or before the date of execution of this Release. RKB further
     acknowledges and agrees that:

     o    In return for executing this Release, he will receive compensation
          beyond that which he was already entitled to receive before entering
          into this Release;

     o    He is hereby advised in writing to consult with an attorney before
          signing this Release;

     o    He was given a copy of this Release on February 5, 1999, and informed
          that he has 21 days within which to consider the release and
          voluntarily executed this Release before expiration of that 21-day
          period; and



                                       13
<PAGE>


     o    He was informed that he has seven days following the date of execution
          of this Release in which to revoke it.

IN WITNESS WHEREOF, RKB has executed this Release on the date opposite his
signature.

I declare under penalty of perjury under the laws of the State of California
that I have carefully read the foregoing Release and know and fully understand
the terms and content thereof and I accept and agree to the provisions it
contains and hereby execute it voluntarily and as my own free act with full
understanding of its consequences.


Dated: February 23, 1999, at                            Richard K. Bushey
Rosemead, California                             ------------------------------
                                                        Richard K. Bushey


                                       14
<PAGE>








                                                                    EXHIBIT 12

SOUTHERN CALIFORNIA EDISON COMPANY AND CONSOLIDATED UTILITY-RELATED SUBSIDIARIES

     RATIOS OF EARNINGS TO FIXED CHARGES AND PREFERRED AND PREFERENCE STOCK

                             (Thousands of Dollars)
<TABLE>
<CAPTION>

                                                            Year Ended December 31,
- --------------------------------------------------------------------------------------------------------------------------
                                     1993            1994           1995            1996         1997            1998
- --------------------------------------------------------------------------------------------------------------------------

EARNINGS BEFORE INCOME TAXES
  AND FIXED CHARGES:

<S>                               <C>             <C>            <C>            <C>           <C>            <C>       
Income before interest expense(1) $1,127,275      $1,081,800     $1,143,477     $1,108,410    $1,049,866     $  999,910
Add:
   Taxes on income (2)               408,033         452,091        509,632        511,819       520,468        442,356
   Rentals(3)                          3,463           3,512          4,018          3,269         2,639          2,208
   Allocable portion of interest
     on long-term-term Contracts for
     the purchase of power(4)          1,890           1,870          1,848          1,824         1,797          1,767
Spent nuclear fuel interest(6)           487              68              -              -             -              -
Amortization of previously capitalized
   fixed charges                       4,878           2,271          1,185            814         1,127          1,571
- --------------------------------------------------------------------------------------------------------------------------
Total earnings before income
Taxes and fixed charges(A)        $1,546,026      $1,541,612     $1,660,160     $1,626,136    $1,575,897     $1,447,812
- --------------------------------------------------------------------------------------------------------------------------


FIXED CHARGES:
- --------------------------------------------------------------------------------------------------------------------------
   Interest and amortization     $   449,230     $   443,219     $  463,786    $   453,015    $  444,272     $  484,788
   Rentals(3)                          3,463           3,512          4,018          3,269         2,639          2,208
Capitalized fixed charges-
     nuclear fuel(5)                     978             254          1,531          1,711         2,398          1,294
Allocable portion of interest on
     long-term contracts for
     the purchase of power(4)          1,890           1,870          1,848          1,824         1,797          1,767
Spent nuclear fuel interest(6)           487              68              -              -             -              -
Preferred and preference stock dividend
   Requirements - pre-tax basis       65,228          68,455         64,330         61,256        54,831         45,784
- --------------------------------------------------------------------------------------------------------------------------

Total fixed charges(B)            $  521,276      $  517,378     $  535,513     $  521,075    $  505,937     $  535,841
- --------------------------------------------------------------------------------------------------------------------------


RATIO OF EARNINGS TO
FIXED CHARGES(A) (B)                    2.97            2.98           3.10           3.12          3.11           2.70
- --------------------------------------------------------------------------------------------------------------------------
</TABLE>


(1)  Includes allowance for funds used during construction and accrual of
     unbilled revenue.
  
(2)  Includes allocation for federal income and state franchise taxes to other
     income.
 
(3)  Rentals include the interest factor relating to certain significant rentals
     plus one-third of all remaining annual rentals.
  
(4)  Allocable portion of interest included in annual minimum debt service
     requirement of supplier.

(5)  Includes fixed charges associated with Nuclear Fuel.

(6)  Represents interest on spent nuclear fuel disposal obligation.





                                                            EXHIBIT 13

Southern California Edison Company Logo



                                             Southern California Edison Company




















                                                             1998 Annual Report
<PAGE>



- --------------------------------------------------------------------------------
A Profile of Southern California Edison Company








Southern  California Edison (SCE) is the nation's second largest  investor-owned
electric utility.  Headquartered in Rosemead, California, SCE is a subsidiary of
Edison International, which is primarily an energy-services company.

SCE, a 113-year old electric utility, serves 4.3 million customers and more than
11 million  people  within a  50,000-square-mile  area of  central,  coastal and
Southern California.



       Contents

1      Management's Discussion and Analysis of
       Results of Operations and Financial Condition
13     Consolidated Financial Statements
17     Notes to Consolidated Financial Statements
35     Quarterly Financial Data
36     Responsibility for Financial Reporting
37     Report of Independent Public Accountants
38     Selected Financial and Operating Data: 1994-1998
39     Board of Directors
39     Management Team




<PAGE>



- --------------------------------------------------------------------------------
Management's Discussion and Analysis of Results of Operations
and Financial Condition

Results of Operations

Earnings

Southern  California  Edison  Company's  (SCE) 1998  earnings were $490 million,
compared with $576 million in 1997 and $621 million in 1996. SCE's 1996 earnings
included  special  charges of $18 million  for  workforce  management  costs and
reserves.  The $86 million  earnings  decline in 1998 was primarily due to lower
authorized revenue, which resulted from reduced authorized returns on generating
assets and a lower earning asset base resulting from the accelerated recovery of
investments and divestiture of gas- and oil-fueled generation assets,  partially
offset by superior  operating  performance at the San Onofre Nuclear  Generating
Station.  Before special charges, 1997 earnings declined $63 million compared to
the prior  year,  mainly  due to the  extended  outage  and lower  return at San
Onofre.  The decline was partially offset by higher sales and lower  non-nuclear
operating expenses.

Operating Revenue

Since April 1, 1998, SCE has been required to sell all of its generated power to
the  power  exchange  (PX).  For  more  details,  see  Competitive  Environment.
Excluding the sales to the PX,  operating  revenue  decreased 6% from 1997.  The
decrease  reflects  lower average  residential  rates  (mandated by  legislation
enacted in September  1996),  partially  offset by an increase in other  revenue
resulting  from  maintenance  work SCE is  providing  for the new  owners of the
divested  gas-  and  oil-fueled   plants,   as  required  by  the  restructuring
legislation.  Operating  revenue  increased  5% in  1997  over  1996,  due to an
increase in sales volume and customer  refunds in 1996. There were no comparable
refunds in 1997.  The increase in volume is mainly  attributable  to the overall
increase in retail  sales among  residential  and  commercial  customers  due to
unusually  warm weather  during the third quarter of 1997. In 1998,  over 99% of
operating  revenue  (excluding  sales to the PX) was from retail  sales.  Retail
rates are regulated by the California  Public  Utilities  Commission  (CPUC) and
wholesale  rates are  regulated  by the  Federal  Energy  Regulatory  Commission
(FERC).

Due to warmer  weather during the summer months,  operating  revenue  (excluding
sales to the PX) during the third quarter of each year is  significantly  higher
than other quarters.

The changes in operating revenue (excluding sales to the PX) resulted from:
<TABLE>
<CAPTION>

In millions                         Year ended December 31,          1998             1997              1996
- -------------------------------------------------------------------------------------------------------------------

Operating revenue --
<S>                                                                 <C>               <C>              <C>   
   Rate changes (including refunds)                                 $(527)            $173             $(522)
   Sales volume changes                                               (44)             193               206
   Other                                                              117                4                26
- -------------------------------------------------------------------------------------------------------------------

Total                                                               $(454)            $370             $(290)
- -------------------------------------------------------------------------------------------------------------------
</TABLE>

Legislation  enacted in September 1996 provided for,  among other things,  a 10%
rate  reduction  (financed  through the  issuance of rate  reduction  notes) for
residential  and small  commercial  customers  in 1998 and other rates to remain
frozen at June 1996 levels (system average of 10.1(cent) per kilowatt-hour). See
discussion in Competitive Environment.

Operating Expenses

Fuel expense  decreased  63% in 1998,  primarily due to the sale of the gas- and
oil-fueled  generation plants, as well as significantly  lower gas prices in the
first  quarter  of 1998.  Fuel  expense  increased  40% in 1997 over  1996.  The
increase was due to a $174 million gas contract  termination  payment during the
third  quarter  of 1997,  combined  with  higher  gas  prices  and the  extended
refueling  outages at San  Onofre.  San Onofre  Unit 2 was shut down  during the
entire first quarter of 1997, Unit 3 was shut down 80 days of the second quarter
and both units had a combined outage time of 30 days during the third



                                       1
<PAGE>


- --------------------------------------------------------------------------------
                                              Southern California Edison Company

quarter,  which resulted in an overall  increase in  gas-powered  generation for
1997. There were no comparable outages in 1996.

Since April 1, 1998, SCE has been required to purchase all of its power from the
PX for distribution to its retail customers. SCE is continuing to purchase power
from certain  nonutility  generators (known as qualifying  facilities) and under
existing  inter-utility  contracts.  This  purchased  power  is  sold to the PX.
Excluding the power  purchased from the PX,  purchased-power  expense  decreased
slightly  in 1998,  while  increasing  slightly in 1997.  SCE is required  under
federal law to purchase  power from certain  qualifying  facilities  even though
energy prices under these contracts are generally higher than other sources.  In
1998, SCE paid about $1.5 billion  (including energy and capacity payments) more
for these power purchases than the cost of power available from other sources.
The CPUC has mandated the prices for these contracts.

Provisions for regulatory  adjustment  clauses  decreased in 1998, mainly due to
the  rate-making  treatment  of  the  rate  reduction  notes.  This  rate-making
treatment  has allowed for the  deferral of the  collection  of a portion of the
transition-related  revenue,  from a four-year period to a 10-year period.  This
decrease was almost completely offset by overcollections resulting from the gain
on sales of the gas- and  oil-fueled  generation  plants  during  1998 and other
transition costs, as well as  overcollections  related to the  administration of
public-purpose funds. The provisions for regulatory adjustment clauses decreased
substantially  in 1997,  due to  undercollections  in the energy cost  balancing
account as actual energy costs (including the gas termination  payment discussed
above) exceeded  CPUC-authorized  fuel and  purchased-power  cost estimates.  In
addition,  there  were  undercollections  associated  with SCE's  direct  access
activities (see discussion in Competitive Environment), research and development
activities,   and  San   Onofre.   These   undercollections   were   offset   by
overcollections  related to actual base-rate  revenue from  kilowatt-hour  sales
exceeding  CPUC-authorized  estimates and the final settlement of SCE's Canadian
supply and transportation contracts.

Other  operating  expenses  increased  22% in 1998,  primarily  due to  must-run
reliability  services,  direct access activities,  and PX and independent system
operator (ISO) costs incurred by SCE. Also, storm damage expense  resulting from
the harsh winter in 1998 contributed to the increase.

Maintenance  expense  increased 23% in 1997, due to higher  maintenance costs at
the  transmission  and  distribution  operating  facilities,  and the  scheduled
refueling outages at the San Onofre units.

Depreciation,  decommissioning  and amortization  expense increased 25% in 1998,
primarily due to the further  acceleration of recovery of San Onofre Units 2 and
3 and the Palo Verde Nuclear Generating Station units,  accelerated  recovery of
the gas- and oil-fueled  generation  plants, and the amortization of the loss on
plant  sales.  The  amortization  of the  loss on  plant  sales,  as well as the
accelerated   recoveries  implemented  in  1998  are  part  of  the  competition
transition   charge   (CTC)   mechanism.   Depreciation,   decommissioning   and
amortization  expense  increased  17% in 1997,  mainly due to increases in plant
assets and the accelerated  recovery of the Palo Verde units,  effective January
1997.

Income taxes decreased 23% in 1998,  primarily due to lower pre-tax  income,  as
well as additional amortization related to the CTC mechanism.

Property and other taxes  decreased 32% in 1997,  due to a  reclassification  of
payroll taxes to operation and maintenance expense.

Gain on sale of utility  plant  represents  the net result  from the sale of the
gas- and oil-fueled  generation  plants in 1998.  Gains on sales of the gas- and
oil-fueled  plants were used to reduce stranded  costs.  Losses on sales will be
recovered from customers over the transition period.

Other Income and Deductions

The provision for rate phase-in plan reflected a  CPUC-authorized,  10-year rate
phase-in  plan,  which  deferred the collection of revenue during the first four
years of operation  for the Palo Verde units.  The deferred  revenue  (including
interest) was collected evenly over the final six years of each unit's plan.

                                       2
<PAGE>

- --------------------------------------------------------------------------------
Management's Discussion and Analysis of Results of Operations
and Financial Condition

The plan ended in February 1996,  September 1996 and January 1998 for Units 1, 2
and 3,  respectively.  The provision was a non-cash  offset to the collection of
deferred revenue.

Interest and dividend income increased 49% in 1998, reflecting higher investment
balances due to the sale of the gas- and oil-fueled  generation  plants, as well
as increases in interest earned on higher balancing account undercollections. In
1997,  interest and dividend  income  increased 18% due to increases in interest
earned on  balancing  accounts  and  increases  in  dividend  income from equity
investments.

Other  nonoperating  income  increased  81% in  1998,  when  compared  to  1997,
primarily due to the additional accruals in 1997 for regulatory  matters.  These
accruals  caused a substantial  decrease in other  nonoperating  income in 1997,
when compared to 1996.

Interest Expense

Interest on long-term debt increased 22% in 1998,  mainly due to the issuance of
the rate reduction  notes in December 1997. In 1997,  interest on long-term debt
decreased  due to the early  retirement  of $400 million of first and  refunding
mortgage bonds in July 1997, partially offset by the additional interest expense
associated  with the rate reduction  notes issued in December 1997.  Interest on
the rate reduction notes was $148 million in 1998 and $9 million in 1997.

Other interest  expense  decreased  substantially  in 1998,  mostly due to lower
overall short-term debt balances,  particularly  short-term debt used to finance
fuel  inventories.  These fuel  inventories  are no longer needed because of the
divestiture of the gas- and oil-fueled plants.  Other interest expense increased
substantially  in 1997,  due to higher levels of short-term  debt used to retire
first and refunding mortgage bonds.

Financial Condition

SCE's liquidity is primarily affected by debt maturities,  dividend payments and
capital  expenditures.  Capital  resources  include  cash  from  operations  and
external financings.

Edison International's board of directors has authorized the repurchase of up to
$2.8  billion  (increased  from $2.3  billion in July  1998) of its  outstanding
shares of common stock.  Edison  International  repurchased 100.4 million shares
($2.4 billion)  between  January 1995 and February 4, 1999,  funded by dividends
from its subsidiaries and the issuance of rate reduction notes.

SCE's cash flow  coverage of dividends  was 0.9 times for both 1998 and 1997 and
2.2 times in 1996. The 1998 decrease  reflects the $680 million special dividend
SCE paid to  Edison  International  in 1998 from the gas- and  oil-fueled  plant
sales proceeds,  as well as the  rate-making  treatment of the gains on sales of
the gas- and  oil-fueled  plants.  The 1997  decrease  reflects the $1.2 billion
special  dividend SCE paid to Edison  International  in December  1997 from rate
reduction note proceeds.

Cash Flows from Operating Activities

Net cash  provided by operating  activities  totaled $1.0 billion in 1998,  $1.7
billion in 1997 and $1.8 billion in 1996.  Cash from  operations  exceed capital
requirements for all years presented.

Cash Flows from Financing Activities

At December 31, 1998, SCE had available lines of $1.3 billion, with $800 million
for  general  purpose,  short-term  debt  and  $500  million  for the  long-term
refinancing of its variable-rate  pollution-control bonds. These unsecured lines
of credit are at negotiated or bank index rates and expire in 2002.



                                       3
<PAGE>

- --------------------------------------------------------------------------------
                                              Southern California Edison Company

Short-term   debt  is  used  to  finance  fuel   inventories  and  general  cash
requirements.  Long-term  debt is used mainly to finance  capital  expenditures.
External  financings  are  influenced by market  conditions  and other  factors,
including  limitations  imposed by SCE's  articles  of  incorporation  and trust
indenture.  As of December 31, 1998, SCE could issue approximately $13.9 billion
of additional  first and refunding  mortgage bonds and $4.4 billion of preferred
stock at current interest and dividend rates.

California  law  prohibits  SCE  from  incurring  or  guaranteeing  debt for its
nonutility affiliates. Additionally, the CPUC regulates SCE's capital structure,
limiting the  dividends it may pay Edison  International.  At December 31, 1998,
SCE had the capacity to pay $794 million in additional dividends and continue to
maintain its authorized capital structure.

In December 1997, SCE Funding LLC, a special  purpose entity (SPE), of which SCE
is the sole member, issued approximately $2.5 billion of rate reduction notes to
Bankers Trust Company of California,  as certificate  trustee for the California
Infrastructure  and  Economic  Development  Bank  Special  Purpose  Trust  SCE-1
(Trust),  which  is a  special  purpose  entity  established  by  the  State  of
California.  The terms of the rate reduction notes generally mirror the terms of
the  pass-through  certificates  issued  by the  Trust,  which are known as rate
reduction  certificates.  The proceeds of the rate reduction  notes were used by
the SPE to purchase from SCE an enforceable right known as transition  property.
Transition  property  is a  current  property  right  created  pursuant  to  the
restructuring  legislation  and a  financing  order of the  CPUC,  and  consists
generally  of the  right to be paid a  specified  amount  from a  non-bypassable
tariff levied on residential and small commercial customers. Notwithstanding the
legal sale of the transition  property by SCE to the SPE, the amounts  reflected
as assets on SCE's  balance  sheet  have not been  reduced  by the amount of the
transition property sold to the SPE, and the liabilities of the SPE for the rate
reduction notes are for accounting  purposes reflected as long-term  liabilities
on the consolidated balance sheet of SCE. SCE used the proceeds from the sale of
the transition property to retire debt and equity securities.

The rate reduction  notes have  maturities  ranging from one to nine years,  and
bear interest at rates ranging from 6.14% to 6.42%. The rate reduction notes are
secured solely by the  transition  property and certain other assets of the SPE,
and there is no recourse to SCE or Edison International.

Although  the SPE is  consolidated  with  SCE in the  financial  statements,  as
required  by  generally  accepted  accounting  principles,  the  SPE is  legally
separate  from SCE, the assets of the SPE are not  available to creditors of SCE
or Edison International,  and the transition property is legally not an asset of
SCE or Edison International.

Cash Flows from Investing Activities

Cash flows from  investing  activities are affected by additions to property and
plant,   proceeds  from  the  sale  of  plant  (see  discussion  in  Competitive
Environment)  and  funding of nuclear  decommissioning  trusts.  Decommissioning
costs  are  accrued  and  recovered  in  rates  over  the  term of each  nuclear
generating facility's operating license through charges to depreciation expense.
SCE estimates that it will spend  approximately  $8.6 billion between 2000--2070
to  decommission  its  nuclear  facilities.  This  estimate  is  based  on SCE's
current-dollar   decommissioning  costs  ($1.9  billion),   escalated  at  rates
averaging 5.6% annually.  These costs are expected to be funded from independent
decommissioning   trusts,   which  currently   receive  SCE   contributions   of
approximately  $100 million per year.  However,  SCE has  requested  the CPUC to
authorize a reduction in the annual contributions to the decommissioning  trusts
beginning  January 1, 2000. The plan to decommission San Onofre Unit 1 beginning
in 2000, which is pending CPUC approval,  is not expected to affect SCE's annual
contributions to the decommissioning trusts.

Market Risk Exposures

SCE's primary market risk exposures arise from fluctuations in energy prices and
interest  rates.  SCE's risk  management  policy  allows  the use of  derivative
financial  instruments to manage its financial exposures,  but prohibits the use
of these instruments for speculative or trading purposes.


                                       4
<PAGE>

- --------------------------------------------------------------------------------
Management's Discussion and Analysis of Results of Operations
and Financial Condition

As a result of the rate freeze  established  in the  restructuring  legislation,
SCE's transition costs are recovered as the residual component of rates once the
costs  for  distribution,   transmission,   public  purpose  programs,   nuclear
decommissioning  and the cost of supplying power to its customers through the PX
and ISO have already been recovered. Accordingly, more revenue will be available
to cover transition costs when market prices in the PX and ISO are low than when
PX and ISO prices are high.  The PX and ISO market prices to date have generally
been reasonable, although some irregular price spikes have occurred. The ISO has
responded to price spikes in the market for reliability services (referred to as
ancillary  services)  by  imposing a price cap of $250/MW on the market for such
services until certain actions have been completed to improve the functioning of
those markets.  Similarly,  the ISO currently maintains a cap of $250/MWh on its
market for  imbalance  energy while a software  problem  affecting the efficient
operation of that market  persists.  The caps in these markets mitigate the risk
of costly  price  spikes that would  reduce the revenue  available to SCE to pay
transition costs. During the upcoming year, the ISO will be considering removing
these price caps,  which could increase the risk of high market prices.  SCE has
entered into hedges against high natural gas prices,  since increases in natural
gas prices tend to raise the price of electricity purchased from the PX.

A 10% increase in market interest rates would result in a $7 million increase in
the fair value of SCE's interest rate hedge agreements. A 10% decrease in market
interest rates would result in a $7 million  decline in the fair market value of
interest  rate hedge  agreements.  A 10%  increase in natural  gas prices  would
result in a $21 million increase in the fair market value of gas call options. A
10% decrease in natural gas prices would result in a $14 million  decline in the
fair market value of gas call options.  A 10% change in market rates is expected
to have an immaterial effect on SCE's other financial instruments.

Projected Capital Requirements

SCE's projected  construction  expenditures for the next five years are: 1999 --
$922 million;  2000 -- $831 million; 2001 -- $726 million; 2002 -- $699 million;
and 2003 -- $689 million.

Long-term debt maturities and sinking fund  requirements for the next five years
are: 1999-- $401 million;  2000-- $571 million; 2001-- $646 million; 2002-- $446
million; and 2003-- $371 million.

Preferred stock  redemption  requirements  for next five years are: 1999 through
2001 -- zero; 2002 -- $105 million; and 2003 -- $9 million.

Regulatory Matters

Legislation  enacted in September 1996 provided for,  among other things,  a 10%
rate reduction for residential and small commercial  customers in 1998 and other
rates to remain frozen at June 1996 levels  (system  average of  10.1(cent)  per
kilowatt-hour).

In 1999,  revenue  will be  determined  by various  mechanisms  depending on the
utility operation. Revenue related to distribution operations will be determined
through a  performance-based  rate-making  mechanism (PBR) and the  distribution
assets will have the  opportunity to earn a  CPUC-authorized  9.49% return.  The
distribution-only  PBR will extend through December 2001.  Transmission  revenue
will be determined through  FERC-authorized  rates and transmission  assets will
earn a 9.43%  return.  These  rates are subject to refund.  Key  elements of PBR
include:  transmission and distribution  (T&D) rates indexed for inflation based
on the Consumer Price Index less a  productivity  factor;  adjustments  for cost
changes that are not within SCE's control;  a cost-of-capital  trigger mechanism
based on changes in a bond index;  standards for service reliability and safety;
and  a  net   revenue-sharing   mechanism  that  determines  how  customers  and
shareholders will share gains and losses from T&D operations.

Revenue  from  generation-related  operations  will be  determined  through  the
competitive  market  and the CTC  mechanism,  which  now  includes  the  nuclear
rate-making agreements.  Revenue related to fossil and hydroelectric  generation
operations is recovered from two sources. The portion that is made uneconomic by
electric  industry  restructuring  is recovered  through the CTC mechanism.  The
portion that is economic is recovered  through the market.  In 1999,  fossil and
hydroelectric generation assets will earn a 7.22% return.


                                       5
<PAGE>

- --------------------------------------------------------------------------------
                                              Southern California Edison Company

In 1996 and  1997,  the CPUC  authorized  revised  rate-making  plans  for SCE's
nuclear  facilities,  which call for the  accelerated  recovery  of the  nuclear
investments  in exchange for a lower  authorized  rate of return.  SCE's nuclear
assets  are  earning an annual  rate of return of 7.35%.  In  addition,  the San
Onofre plan authorizes a fixed rate of approximately  4(cent) per  kilowatt-hour
generated for operating costs including  incremental  capital costs, and nuclear
fuel and nuclear fuel  financing  costs.  The San Onofre plan commenced in April
1996,  and ends in December  2001 for the  accelerated  recovery  portion and in
December 2003 for the  incentive-pricing  portion. Palo Verde's operating costs,
including incremental capital costs, and nuclear fuel and nuclear fuel financing
costs, are subject to balancing account treatment. The Palo Verde plan commenced
in January 1997 and ends in December 2001.  Beginning  January 1, 1998, both the
San Onofre and Palo Verde rate-making plans became part of the CTC mechanism.

The changes in revenue from the regulatory mechanisms discussed above, excluding
the effects of other rate  actions,  are expected to have an  approximately  $20
million negative impact on 1999 earnings.

The CPUC is considering  unbundling SCE's cost of capital based on major utility
function.  In May 1998, SCE filed an application on this issue and hearings were
completed in October 1998. A CPUC decision is expected in early to mid-1999.

Competitive Environment

SCE  currently  operates in a highly  regulated  environment  in which it has an
obligation to deliver  electric  service to customers in return for an exclusive
franchise within its service territory. This regulatory environment is changing.
The  generation  sector  has  experienced   competition  from  nonutility  power
producers  and  regulators  are  restructuring   California's  electric  utility
industry.

California Electric Utility Industry Restructuring

Restructuring  Decision  and  Statute -- The CPUC's  December  1995  decision on
restructuring California's electric utility industry started the transition to a
new market structure  involving  competition and customer  choice.  The State of
California enacted  legislation in 1996 to provide a transition to a competitive
market structure.  The Statute  substantially  adopted the CPUC's  restructuring
decision by  addressing  stranded-cost  recovery for  utilities  and providing a
certain  cost-recovery  time period for the  transition  costs  associated  with
utility-owned   generation-related   assets.   Transition   costs   related   to
power-purchase  contracts  are  being  recovered  through  the  terms  of  their
contracts while most of the remaining transition costs will be recovered through
2001. The Statute also included  provisions to finance a portion of the stranded
costs that  residential and small  commercial  customers would have paid between
1998 and  2001,  which  allowed  SCE to  reduce  rates by at least  10% to these
customers, effective January 1, 1998. The Statute included a rate freeze for all
other customers, including large commercial and industrial customers, as well as
provisions for continued funding for energy  conservation,  low-income  programs
and  renewable  resources.  Despite the rate  freeze,  SCE expects to be able to
recover its revenue  requirement  during the 1998--2001  transition  period.  In
addition,  the Statute  mandated  the  implementation  of the CTC that  provides
utilities the opportunity to recover costs made  uneconomic by electric  utility
restructuring.  Finally,  the  Statute  contained  provisions  for the  recovery
(through 2006) of reasonable  employee-related  transition  costs,  incurred and
projected, for retraining, severance, early retirement, outplacement and related
expenses. The new market structure and customer choice began on April 1, 1998.

1998  Activities  --  During  1998,  SCE  implemented  changes  to  comply  with
restructuring  elements required by the CPUC and the Statute.  Beginning January
1, 1998:

o    SCE's rates were unbundled into separate charges for energy,  transmission,
     distribution, the CTC, public benefit programs and nuclear decommissioning.
     The transmission  component is being collected through FERC-approved rates,
     subject to refund.

o    SCE's costs  associated with its  hydroelectric  plants are being recovered
     through a performance-based mechanism. The mechanism sets the hydroelectric
     revenue  requirement and establishes a formula for extending it through the
     duration of the electric industry restructuring transition


                                       6
<PAGE>

- --------------------------------------------------------------------------------
Management's Discussion and Analysis of Results of Operations
and Financial Condition

     period, or until market  valuation of the  hydroelectric  facilities,  
     whichever occurs  first.  The  mechanism  provides  that  power  sales  
     revenue  from hydroelectric facilities in excess of the hydroelectric 
     revenue requirement be credited against the costs to transition to a 
     competitive market.

o    SCE transition costs are being recovered through a non-bypassable CTC. This
     charge  applies  to all  customers  who were using or began  using  utility
     services on or after the CPUC's December 1995 restructuring  decision date.
     SCE has estimated its transition  costs to be  approximately  $10.6 billion
     (1998 net present value) from 1998 through 2030. This estimate was based on
     incurred  costs,  forecasts  of future  costs and  assumed  market  prices.
     However, changes in the assumed market prices could materially affect these
     estimates.  The  potential  transition  costs are comprised of $6.4 billion
     from SCE's qualifying facilities contracts,  which are the direct result of
     prior legislative and regulatory mandates, and $4.2 billion (which reflects
     the sale of  SCE's  gas-  and  oil-fueled  generation  plants)  from  costs
     pertaining  to  certain   generating  assets  and  regulatory   commitments
     consisting of costs incurred (whose recovery has been deferred by the CPUC)
     to provide service to customers.  Such commitments  include the recovery of
     income tax benefits previously flowed through to customers,  postretirement
     benefit transition costs,  accelerated recovery of San Onofre Units 2 and 3
     and the Palo Verde units (as discussed in Regulatory Matters),  and certain
     other costs.

o    Residential and small  commercial  customers who began receiving a 10% rate
     reduction  are repaying the rate  reduction  notes issued in December  1997
     (see further  discussion in Cash Flows from Financing  Activities)  through
     non-bypassable charges based on electricity consumption.

Effective April 1, 1998:

o    The ISO assumed  operational  control of the transmission  system after the
     ISO and PX had begun accepting bids and schedules for electricity purchases
     on March 31, 1998. The  restructuring  implementation  costs related to the
     start-up and  development of the PX, which are paid by the utilities,  will
     be  recovered  from all  retail  customers  over the  four-year  transition
     period.  SCE's share of the charge is $45 million,  plus interest and fees.
     SCE's share of the ISO's start-up and development costs  (approximately $16
     million per year) will be paid over a 10-year period.

o    Customers  can  choose to remain  utility  customers  with  either  bundled
     electric  service  or an  hourly  PX  pricing  option  from SCE  (which  is
     purchasing its power through the PX), or choose direct access,  which means
     the customer can contract directly with either  independent power producers
     or energy service  providers  (ESPs) such as power  brokers,  marketers and
     aggregators.   Electric  utilities  are  continuing  to  provide  the  core
     distribution service of delivering energy through their distribution system
     regardless  of a customer's  choice of  electricity  supplier.  The CPUC is
     continuing  to  regulate  the prices  and  service  obligations  related to
     distribution  services.  As of December 31, 1998,  approximately  47,000 of
     SCE's 4.3 million customers have requested the direct access option.

o    Customers have options  regarding  metering,  billing and related  services
     (referred  to as  revenue  cycle  services)  that  have  been  provided  by
     California's  investor-owned  utilities.  ESPs can provide their  customers
     with one consolidated  bill for their services and the utility's  services,
     request the utility to provide such a consolidated  bill to the customer or
     elect to have  both the ESP and the  utility  bill the  customer  for their
     respective  charges.  Customers  with maximum demand above 20 kW (primarily
     industrial  and  medium and large  commercial)  can choose SCE or any other
     supplier to provide their metering service.  Beginning in January 1999, all
     customers  can make these  choices.  In September  1998,  the CPUC issued a
     decision  regarding the credits that would be provided to customers if they
     elect to  obtain  revenue  cycle  services  from  someone  other  than SCE.
     Although the decision adopted SCE's recommendation of using the net avoided
     cost,  it also adopted a  methodology  which  results in higher  credits to
     customers but requires

                                       7
<PAGE>

- --------------------------------------------------------------------------------
                                              Southern California Edison Company

     ESPs to pay  service  fees to SCE for the costs  that SCE  incurs as a 
     result of dealing with the ESP. SCE may experience a reduction in revenue 
     security asa result of this unbundling.

During 1998,  SCE sold all of its gas- and  oil-fueled  generation  plants.  The
total sales price of the 12 plants was $1.2 billion, over $500 million more than
the combined book value.  Net proceeds of the sales were used to reduce stranded
costs, which otherwise were expected to be collected through the CTC mechanism.

Accounting  for  Generation-Related  Assets -- If the CPUC's  electric  industry
restructuring plan continues as described above, SCE would be allowed to recover
its  transition  costs  through   non-bypassable  charges  to  its  distribution
customers (although its investment in certain generation assets would be subject
to a lower authorized rate of return). In 1997, SCE discontinued  application of
accounting  principles  for  rate-regulated  enterprises  for its  investment in
generation facilities based on new accounting guidance.  The financial reporting
effect of this  discontinuance  was to  segregate  these  assets on the  balance
sheet;  the  new  guidance  did  not  require  SCE  to  write  off  any  of  its
generation-related assets, including related regulatory assets. However, the new
guidance  did not  specifically  address  the  application  of asset  impairment
standards to these  assets.  SCE has retained  these assets on its balance sheet
because the Statute and restructuring plan referred to above make probable their
recovery through a non-bypassable CTC to distribution customers.  The regulatory
assets  relate  primarily  to the  recovery of  accelerated  income tax benefits
previously  flowed through to customers,  purchased  power contract  termination
payments and unamortized losses on reacquired debt. The new accounting  guidance
also permits the recording of new  generation-related  regulatory  assets during
the transition period that are probable of recovery through the CTC mechanism.

During the second quarter of 1998,  additional guidance was developed related to
the  application  of asset  impairment  standards  to these  assets.  Using this
guidance resulted in SCE reducing its remaining nuclear plant investment by $2.6
billion (as of June 30, 1998) and  recording a  regulatory  asset on its balance
sheet for the same amount. For this impairment assessment, the fair value of the
investment  was  calculated  by   discounting   future  net  cash  flows.   This
reclassification had no effect on SCE's results of operations.

If during the  transition  period events were to occur that made the recovery of
these  generation-related  regulatory  assets no longer  probable,  SCE would be
required to write off the remaining balance of such assets  (approximately  $2.4
billion, after tax, at December 31, 1998) as a one-time, non-cash charge against
earnings.

If events occur during the restructuring process that result in all or a portion
of the transition costs being improbable of recovery,  SCE could have additional
write-offs associated with these costs if they are not recovered through another
regulatory mechanism. At this time, SCE cannot predict what other revisions will
ultimately be made during the restructuring process in subsequent proceedings or
the effect,  after the  transition  period,  that  competition  will have on its
results of operations or financial position.

Environmental Protection

SCE is subject to numerous environmental laws and regulations,  which require it
to incur substantial costs to operate existing facilities, construct and operate
new  facilities,  and  mitigate or remove the effect of past  operations  on the
environment.

As further discussed in Note 10 to the Consolidated  Financial  Statements,  SCE
records its  environmental  liabilities  when site  assessments  and/or remedial
actions are  probable  and a range of  reasonably  likely  cleanup  costs can be
estimated.  SCE reviews  its sites and  measures  the  liability  quarterly,  by
assessing a range of reasonably  likely costs for each identified  site.  Unless
there is a probable  amount,  SCE records the lower end of this likely  range of
costs.


                                       8
<PAGE>

- --------------------------------------------------------------------------------
Management's Discussion and Analysis of Results of Operations
and Financial Condition

SCE's recorded  estimated minimum liability to remediate its 49 identified sites
is $171  million.  One of SCE's  sites,  a  former  pole-treating  facility,  is
considered  a  federal  Superfund  site  and  represents  41%  of  its  recorded
liability.  The ultimate costs to clean up SCE's  identified sites may vary from
its recorded liability due to numerous  uncertainties inherent in the estimation
process.  SCE  believes  that,  due to  these  uncertainties,  it is  reasonably
possible  that cleanup  costs could exceed its recorded  liability by up to $247
million.  The upper limit of this range of costs was estimated using assumptions
least favorable to SCE among a range of reasonably  possible  outcomes.  SCE has
sold all of its gas- and oil-fueled power plants and has retained some liability
associated with the divested properties.

The CPUC allows SCE to recover  environmental-cleanup  costs at 41 of its sites,
representing  $88  million  of its  recorded  liability,  through  an  incentive
mechanism.  Under this mechanism,  SCE will recover 90% of cleanup costs through
customer  rates;  shareholders  fund the remaining 10%, with the  opportunity to
recover these costs from  insurance  carriers and other third  parties.  SCE has
successfully  settled  insurance  claims with all  responsible  carriers.  Costs
incurred at SCE's remaining sites are expected to be recovered  through customer
rates.  SCE has  recorded a regulatory  asset of $141 million for its  estimated
minimum  environmental-cleanup  costs expected to be recovered  through customer
rates.

SCE's  identified  sites  include  several  sites for  which  there is a lack of
currently  available   information,   including  the  nature  and  magnitude  of
contamination,  and the extent,  if any,  that SCE may be held  responsible  for
contributing  to any costs  incurred  for  remediating  these  sites.  Thus,  no
reasonable estimate of cleanup costs can be made for these sites.

SCE  expects to clean up its  identified  sites over a period of up to 30 years.
Remediation  costs in each of the next several  years are expected to range from
$4 million to $10 million. Recorded costs for 1998 were $7 million.

Based on currently  available  information,  SCE believes it is unlikely that it
will incur  amounts  in excess of the upper  limit of the  estimated  range and,
based upon the CPUC's regulatory treatment of  environmental-cleanup  costs, SCE
believes that costs ultimately  recorded will not materially  affect its results
of operations or financial position.  There can be no assurance,  however,  that
future developments,  including  additional  information about existing sites or
the  identification  of new sites,  will not require material  revisions to such
estimates.

The 1990  federal  Clean Air Act  requires  power  producers  to have  emissions
allowances to emit sulfur dioxide.  Power companies receive emissions allowances
from the federal government and may bank or sell excess allowances.  SCE expects
to have excess  allowances under Phase II of the Clean Air Act (2000 and later).
The act also calls for a study to determine if additional regulations are needed
to reduce regional haze in the southwestern  U.S. In addition,  another study is
in progress to determine the specific impact of air  contaminant  emissions from
the Mohave Coal Generating  Station on visibility in Grand Canyon National Park.
The potential  effect of these studies on sulfur dioxide  emissions  regulations
for Mohave is unknown.

SCE's  projected  environmental  capital  expenditures  are $900 million for the
1999--2003 period,  mainly for aesthetics  treatment,  including  undergrounding
certain transmission and distribution lines.

The  possibility  that exposure to electric and magnetic  fields (EMF) emanating
from power lines,  household appliances and other electric sources may result in
adverse health effects has been the subject of scientific  research.  After many
years of research, scientists have not found that exposure to EMF causes disease
in humans. Research on this topic is continuing.  However, the CPUC has issued a
decision,  which provides for a  rate-recoverable  research and public education
program  conducted  by  California  electric  utilities,  and  authorizes  these
utilities  to take  no-cost  or  low-cost  steps to reduce  EMF in new  electric
facilities. SCE is unable to predict when or if the scientific community will be
able to reach a consensus on any health  effects of EMF, or the effect that such
a consensus, if reached, could have on future electric operations.


                                       9
<PAGE>

- --------------------------------------------------------------------------------
                                              Southern California Edison Company

San Onofre Steam Generator Tubes

The San Onofre Units 2 and 3 steam  generators  have performed  relatively  well
through  the  first 15 years of  operation,  with  low  rates of  ongoing  steam
generator tube degradation.  However,  during the Unit 2 scheduled refueling and
inspection outage in 1997, an increased rate of tube degradation was identified,
which resulted in the removal of more tubes from service than had been expected.
The steam  generator  design  allows  for the  removal of up to 10% of the tubes
before  the  rated  capacity  of the unit  must be  reduced.  As a result of the
increased degradation, a mid-cycle inspection outage was conducted in early 1998
for Unit 2. Continued degradation was found during this inspection.  A favorable
or  decreasing  trend in  degradation  was  observed  during  inspection  in the
scheduled  refueling  outage in January  1999.  The results of the January  1999
inspection  are being  analyzed to  determine if there is a need for a mid-cycle
inspection  outage in early 2000. With the results from the January 1999 outage,
7.5% of the tubes have now been removed from  service.  In September  1998,  San
Onofre Unit 2 experienced a small amount of leakage from a steam  generator tube
plug, which required an 11-day outage to repair.

During Unit 3's refueling outage, which was completed in July 1997,  inspections
of structural  supports for steam generator tubes identified several areas where
the  thickness of the supports had been reduced,  apparently  by erosion  during
normal plant  operation.  A follow-up  mid-cycle  inspection  indicated that the
erosion  had been  stabilized.  Additional  monitoring  inspections  are planned
during the next  scheduled  refueling  outage in 1999.  To date,  5% of Unit 3's
tubes have been removed from service.

During Unit 2's February 1998 mid-cycle outage,  similar tube supports showed no
significant levels of such erosion.

New Accounting Rules

A recently  issued  accounting  rule  requires  that costs  related to  start-up
activities  be expensed as  incurred,  effective  January 1, 1999.  SCE does not
expect this new accounting  rule to materially  affect its results of operations
or financial position.

In  June  1997,  a new  accounting  standard  for  reporting  operating  segment
information was issued.  The new standard,  which became effective for financial
reports  issued  after  December  15,  1998,  requires  that  operating  segment
information be disclosed in the Notes to the Consolidated  Financial Statements.
Since,  in  management's  view,  SCE  currently  operates as one  segment,  this
standard is not expected to affect SCE's consolidated  financial  statements and
the accompanying notes to the consolidated financial statements.

In June 1998, a new accounting  standard for derivative  instruments and hedging
activities  was issued.  The new  standard,  which will be effective  January 1,
2000,  requires all  derivatives  to be  recognized on the balance sheet at fair
value.  Gains or losses  from  changes  in fair  value  would be  recognized  in
earnings  in the  period of change  unless the  derivative  is  designated  as a
hedging instrument.  Gains or losses from hedges of a forecasted  transaction or
foreign  currency  exposure  would be reflected in other  comprehensive  income.
Gains or  losses  from  hedges  of a  recognized  asset or  liability  or a firm
commitment  would be reflected in earnings  for the  ineffective  portion of the
hedge. SCE anticipates that most of its derivatives under the new standard would
qualify for hedge  accounting.  SCE expects to recover in rates any market price
changes  from  its  derivatives   that  could   potentially   affect   earnings.
Accordingly,  implementation  of this new  standard  is not  expected  to affect
earnings.

Year 2000 Issue

Many of SCE's existing computer systems were originally  programmed to represent
any date by using six digits  (e.g.,  12/31/99)  rather than eight digits (e.g.,
12/31/1999).  Accordingly,  such programs, if not appropriately addressed, could
fail  or  create  erroneous  results  when  attempting  to  process  information
containing  dates after  December 31, 1999.  This situation has been referred to
generally as the Year 2000 Issue.

                                       10
<PAGE>

- --------------------------------------------------------------------------------
Management's Discussion and Analysis of Results of Operations
and Financial Condition

SCE has a comprehensive program in place to address potential Year 2000 impacts.
Edison International  provides overall coordination of this effort, working with
SCE and its business  units.  SCE divides Year 2000 activities into five phases:
inventory,  impact assessment,  remediation,  testing and implementation.  SCE's
objective for the Year 2000 readiness of critical systems is to be 100% complete
by July 1999. A critical  system is defined as those  applications  and systems,
including embedded processor technology,  which if not appropriately remediated,
may have a significant impact on customers,  the health and safety of the public
and/or  personnel,  the revenue stream,  or regulatory  compliance.  SCE was 80%
complete at  year-end  1998 (the goal was 75%) and is on track to meets its July
1999 goal.

A system, application or physical asset is deemed to be Year 2000-ready if it is
determined  by SCE to be suitable  for  continued  use through the year 2028 (or
through the last year of the  anticipated  life of the asset,  whichever  occurs
first), even though it is not fully Year 2000-compliant.  A system, application,
or physical asset is Year  2000-compliant if it accurately  processes  date/time
data.

SCE has  structured  the  scope of the  program  to  focus  on  three  principal
categories: mainframe computing, distributed computing and physical assets (also
known as embedded  processors).  The mainframe and distributed  computing assets
consist of computer  application  systems  (software).  Physical  assets include
information technology infrastructure (hardware,  operating system software) and
embedded processor  technology in generation,  transmission,  distribution,  and
facilities components.

Year  2000-readiness  preparations  for SCE's mainframe  financial  systems were
completed in the fourth  quarter of 1997,  and  preparations  for SCE's material
management  system were completed in the second quarter of 1998.  SCE's customer
information and billing system is in the process of being replaced with a system
designed to be Year 2000-ready and final  conversion  activities are expected to
be  completed  during the first  quarter of 1999.  SCE's  distributed  computing
assets  include  operations  and business  information  systems.  SCE's critical
operations information systems include outage management,  power management, and
plant  monitoring  and access  retrieval  systems.  SCE's  business  information
systems include a data acquisition system for billing,  the computer call center
support system, credit support and maintenance management.

Ongoing   efforts  in  1999  will   continue  to  focus  on   guarding   against
reintroduction  of components  that are not Year 2000-ready into Year 2000-ready
systems.

The other  essential  component  of the SCE Year  2000-readiness  program  is to
identify  and  assess  vendor  products  and  business  partners  for Year  2000
readiness, as these external parties may have the potential to impact SCE's Year
2000  readiness.  SCE has  implemented a process to identify and contact vendors
and business partners to determine their Year 2000 status, and is evaluating the
responses. As of January 31, 1999, Edison International has contacted over 4,300
critical  vendors and business  partners  (the largest  percentage  of which are
SCE's vendors and business  partners).  SCE's general  policy  requires that all
newly purchased  products and services be Year 2000-ready or otherwise  designed
to allow SCE to determine  whether such products and services  present Year 2000
issues.  SCE is also working to address Year 2000 issues  related to all ISO and
PX  interfaces,  as well as  joint  ownership  facilities.  SCE  exchanges  Year
2000-readiness  information  (including,  but not limited  to, test  results and
related data) with certain of its affiliates and other external  parties as part
of its Year 2000-readiness efforts.

SCE's current estimate of the costs to complete these  modifications,  including
the cost of new hardware and software application modification,  is $72 million,
about 40% of which is  expected  to be  capital  costs.  SCE's  Year 2000  costs
expended through  December 31, 1998, were $35 million.  SCE expects current rate
levels for providing  electric  service to be sufficient to provide  funding for
utility-related modifications.

Although  SCE expects that its  critical  systems will be fully Year  2000-ready
prior to  year-end  1999,  there can be no  assurance  that the systems of other
companies on which the systems and operations of SCE rely will be converted on a
timely basis. SCE believes that prudent business practices call for the

                                       11
<PAGE>

- --------------------------------------------------------------------------------
                                              Southern California Edison Company

development  of  contingency   plans.   Such  contingency  plans  shall  include
developing  strategies  for dealing with the most  reasonably  likely worst case
scenario concerning Year 2000-related processing failures or malfunctions caused
by SCE's internal systems or from external parties.  As noted above, SCE has, in
many cases,  completed  its Year  2000-readiness  work and is  currently  in the
remediation  and testing phases for certain of their other  internal  systems as
well as assessing risks posed by external parties.  SCE is working with industry
groups in an effort to help define a reasonably  likely worst case  scenario and
in the development of contingency  plans.  SCE's contingency  plans,  which will
include scheduling of key personnel, are expected to be completed by March 1999.
As of January  31,  1999,  draft  component  and system  contingency  plans were
completed  and being  evaluated,  draft  plans were in progress  for  generating
units, and a draft of the grid operations plan had been submitted to the Western
Systems  Coordinating  Council.  However,  contingency plans will continue to be
revised  and  enhanced  as  2000  approaches.  SCE  also  plans  to  test  these
contingency plans by conducting or participating in exercises during 1999. Also,
SCE is scheduled to participate in industry-wide drills during 1999.

SCE does not expect the Year 2000 Issue to have a material adverse effect on its
results  of  operation  or  financial  position;  however,  if  not  effectively
remediated,  negative effects from Year 2000 issues,  including those related to
internal  systems,  vendors,  business  partners,  the ISO, the PX or customers,
could cause results to differ.

Forward-looking Information

In the preceding  Management's  Discussion and Analysis of Results of Operations
and  Financial  Condition  and  elsewhere  in  this  annual  report,  the  words
estimates,  expects,  anticipates,  believes,  and other similar expressions are
intended  to  identify  forward-looking  information  that  involves  risks  and
uncertainties. Actual results or outcomes could differ materially as a result of
such important factors as further actions by state and federal regulatory bodies
setting  rates  and  implementing  the  restructuring  of the  electric  utility
industry;  the effects of new laws and regulations relating to restructuring and
other  matters;  the effects of increased  competition  in the electric  utility
business,  including  direct customer access to retail energy  suppliers and the
unbundling  of revenue cycle  services such as metering and billing;  changes in
prices of electricity and fuel costs;  changes in market interest rates;  new or
increased  environmental  liabilities;  the effects of the Year 2000 Issue;  and
other unforeseen events.


                                       12
<PAGE>

- --------------------------------------------------------------------------------
Consolidated Statements of Income             Southern California Edison Company
<TABLE>
<CAPTION>


In thousands             Year ended December 31,                   1998               1997               1996
- -----------------------------------------------------------------------------------------------------------------
<S>                                                             <C>                <C>               <C>        
Sales to ultimate consumers                                     $ 7,104,800        $ 7,639,417       $ 7,272,919
Sales to power exchange                                           1,347,579                 --                --
Other                                                               394,719            313,969           310,463
- -----------------------------------------------------------------------------------------------------------------
Operating revenue                                                 8,847,098          7,953,386         7,583,382
- -----------------------------------------------------------------------------------------------------------------
Fuel                                                                323,716            881,471           630,512
Purchased power-- contracts                                       2,625,900          2,854,002         2,705,880
Purchased power-- power exchange                                  1,983,922                 --                --
Provisions for regulatory adjustment clauses-- net                 (472,519)          (410,935)         (225,908)
Other operating expenses                                          1,480,644          1,216,317         1,181,641
Maintenance                                                         410,566            405,545           329,371
Depreciation, decommissioning and amortization                    1,545,735          1,239,878         1,063,505
Income taxes                                                        445,642            582,031           578,329
Property and other taxes                                            128,402            129,038           190,284
Net gains on sale of utility plant                                 (542,608)            (3,849)           (3,325)
- -----------------------------------------------------------------------------------------------------------------
Total operating expenses                                          7,929,400          6,893,498         6,450,289
- -----------------------------------------------------------------------------------------------------------------
Operating income                                                    917,698          1,059,888         1,133,093
- -----------------------------------------------------------------------------------------------------------------
Provision for rate phase-in plan                                         --            (48,486)          (84,288)
- -----------------------------------------------------------------------------------------------------------------
Allowance for equity funds used during construction                  11,826              7,651            15,579
Interest and dividend income                                         66,725             44,636            37,855
Other nonoperating income (deductions)-- net                         (4,385)           (23,036)           (3,623)
Total other income (deductions)-- net                                74,166            (19,235)          (34,477)
- -----------------------------------------------------------------------------------------------------------------
Income before interest expense                                      991,864          1,040,653         1,098,616
- -----------------------------------------------------------------------------------------------------------------
- -----------------------------------------------------------------------------------------------------------------
Interest on long-term debt                                          421,857            345,592           380,812
Other interest expense                                               64,225            101,078            73,914
Allowance for borrowed funds used during construction                (8,046)            (9,213)           (9,794)
Capitalized interest                                                 (1,294)            (2,398)           (1,711)
- -----------------------------------------------------------------------------------------------------------------
Total interest expense-- net                                        476,742            435,059           443,221
- -----------------------------------------------------------------------------------------------------------------
Net income                                                          515,122            605,594           655,395
Dividends on preferred stock                                         24,632             29,488            34,395
- -----------------------------------------------------------------------------------------------------------------
Earnings available for common stock                              $  490,490         $  576,106         $ 621,000
- -----------------------------------------------------------------------------------------------------------------
</TABLE>



Consolidated Statements of Comprehensive Income
<TABLE>
<CAPTION>

In thousands                   Year ended December 31,               1998               1997               1996
- -----------------------------------------------------------------------------------------------------------------
<S>                                                               <C>                 <C>               <C>     
Net income                                                        $ 515,122           $605,594          $655,395
Unrealized gain on securities - net                                   9,275             14,641            14,900
Reclassification adjustment for gains included in net income        (17,836)                --                --
- -----------------------------------------------------------------------------------------------------------------

Comprehensive income                                              $ 506,561           $620,235          $670,295
- -----------------------------------------------------------------------------------------------------------------
</TABLE>

The accompanying notes are integral part of these financial statements.


                                       13
<PAGE>

<TABLE>
<CAPTION>

- -----------------------------------------------------------------------------------------------------------------
Consolidated Balance Sheets

In thousands                                     December 31,                       1998                1997
- -----------------------------------------------------------------------------------------------------------------
ASSETS
- -----------------------------------------------------------------------------------------------------------------

Transmission and distribution:
    
    Utility plant, at original cost, subject to
<S>                                                                               <C>              <C>        
       cost-based rate regulation                                                 $11,771,678      $11,213,352
    Accumulated provision for depreciation                                         (6,062,562)        (5,573,742)
    Construction work in progress                                                     455,233            492,614
- -----------------------------------------------------------------------------------------------------------------
                                                                                    6,164,349          6,132,224
- -----------------------------------------------------------------------------------------------------------------

Generation:
    Utility plant, at original cost, not subject to
       cost-based rate regulation                                                   1,689,469          9,522,127
    Accumulated provision for depreciation, decommissioning
       and amortization                                                              (833,917)        (4,970,137)
    Construction work in progress                                                      61,431            100,283
    Nuclear fuel, at amortized cost                                                   172,250            154,757
- -----------------------------------------------------------------------------------------------------------------
                                                                                    1,089,233          4,807,030
- -----------------------------------------------------------------------------------------------------------------

Total utility plant                                                                 7,253,582         10,939,254
- -----------------------------------------------------------------------------------------------------------------

Nonutility property -- less accumulated provision
   for depreciation of $25,682 and $24,730
   at respective dates                                                                 56,681             67,869
Nuclear decommissioning trusts                                                      2,239,929          1,831,460
Other investments                                                                     179,480            171,399
- -----------------------------------------------------------------------------------------------------------------

Total other property and investments                                                2,476,090          2,070,728
- -----------------------------------------------------------------------------------------------------------------

Cash and equivalents                                                                   81,500            962,272
Receivables, including unbilled revenue, less allowances
   of $22,230 and $26,453 for uncollectible accounts
   at respective dates                                                              1,112,630            906,388
Fuel inventory                                                                         51,299             58,059
Materials and supplies, at average cost                                               116,259            132,980
Accumulated deferred income taxes-- net                                               274,833            123,146
Regulatory balancing accounts-- net                                                   648,781            193,311
Prepayments and other current assets                                                   91,992             93,098
- -----------------------------------------------------------------------------------------------------------------

Total current assets                                                                2,377,294          2,469,254
- -----------------------------------------------------------------------------------------------------------------

Regulatory asset-- unamortized nuclear investment-- net                             2,161,998                 --
Regulatory asset-- income tax-related deferred charges                              1,463,256          1,543,380
Unamortized debt issuance and reacquisition expense                                   348,816            359,304
Other deferred charges                                                                865,892            677,378
- -----------------------------------------------------------------------------------------------------------------

Total deferred charges                                                              4,839,962          2,580,062
- -----------------------------------------------------------------------------------------------------------------

Total assets                                                                      $16,946,928      $18,059,298
- -----------------------------------------------------------------------------------------------------------------
</TABLE>

The accompanying notes are an integral part of these financial statements.

                                       14
<PAGE>

- --------------------------------------------------------------------------------
                                              Southern California Edison Company

<TABLE>
<CAPTION>

In thousands, except share amounts                   December 31,                   1998                1997
- -----------------------------------------------------------------------------------------------------------------
CAPITALIZATION AND LIABILITIES
- -----------------------------------------------------------------------------------------------------------------

Common shareholder's equity:
   Common stock (434,888,104 shares outstanding
<S>                                                                               <C>            <C>          
      at each date)                                                               $ 2,168,054    $   2,168,054
   Additional paid-in capital                                                         334,031          334,031
   Accumulated other comprehensive income                                              39,462           48,023
   Retained earnings                                                                  793,625        1,407,834
- -----------------------------------------------------------------------------------------------------------------
                                                                                    3,335,172        3,957,942
Preferred stock:
   Not subject to mandatory redemption                                                128,755          183,755
   Subject to mandatory redemption                                                    255,700          275,000
Long-term debt                                                                      5,446,638        6,144,597
- -----------------------------------------------------------------------------------------------------------------

Total capitalization                                                                9,166,265       10,561,294
- -----------------------------------------------------------------------------------------------------------------

Other long-term liabilities                                                           467,109          479,637
- -----------------------------------------------------------------------------------------------------------------
Current portion of long-term debt                                                     400,810          692,875
Short-term debt                                                                       469,565          322,028
Accounts payable                                                                      447,484          406,704
Accrued taxes                                                                         678,955          509,270
Accrued interest                                                                       89,828           85,406
Dividends payable                                                                      91,742           95,146
Deferred unbilled revenue and other current liabilities                             1,096,332          931,856
- -----------------------------------------------------------------------------------------------------------------

Total current liabilities                                                           3,274,716        3,043,285
- -----------------------------------------------------------------------------------------------------------------

Accumulated deferred income taxes-- net                                             2,993,142        2,939,471
Accumulated deferred investment tax credits                                           250,116          326,728
Customer advances and other deferred credits                                          795,266          708,745
- -----------------------------------------------------------------------------------------------------------------

Total deferred credits                                                              4,038,524        3,974,944
- -----------------------------------------------------------------------------------------------------------------

Minority interest                                                                         314              138
- -----------------------------------------------------------------------------------------------------------------



Commitments and contingencies
   (Notes 2, 8, 9 and 10)


Total capitalization and liabilities                                            $  16,946,928    $  18,059,298
- -----------------------------------------------------------------------------------------------------------------
</TABLE>

The accompanying notes are an integral part of these financial statements.


                                       15
<PAGE>

- --------------------------------------------------------------------------------
Consolidated Statements of Cash Flows         Southern California Edison Company
<TABLE>
<CAPTION>

In thousands                   Year ended December 31,               1998             1997                1996
- -----------------------------------------------------------------------------------------------------------------
Cash flows from operating activities:
<S>                                                              <C>               <C>                <C>       
Net income                                                       $  515,122        $  605,594         $  655,395
Adjustments for non-cash items:
   Depreciation, decommissioning and amortization                 1,545,735         1,239,878          1,063,505
   Other amortization                                               163,063            81,363             90,931
   Deferred income taxes and investment tax credits                 (94,504)           63,379             46,122
   Regulatory asset related to the sale of
     oil and gas plant                                             (220,232)               --                 --
   Net gains on sale of oil and gas plant                          (564,623)               --                 --
   Other-- net                                                      (78,668)         (105,986)             5,710
Changes in working capital:
   Receivables                                                     (206,242)           14,695             (9,120)
   Regulatory balancing accounts                                   (455,470)         (374,799)          (156,379)
   Fuel inventory, materials and supplies                            23,481            35,707             38,791
   Prepayments and other current assets                               1,106            12,039              9,152
   Accrued interest and taxes                                       174,107            16,625            (58,827)
   Accounts payable and other current liabilities                   205,256           120,464             93,362
- -----------------------------------------------------------------------------------------------------------------

Net cash provided by operating activities                         1,008,131         1,708,959          1,778,642
- -----------------------------------------------------------------------------------------------------------------

Cash flows from financing activities:
Long-term debt issued                                                    --                --            396,309
Long-term debt repaid                                              (776,030)         (916,145)          (403,957)
Rate reduction notes issued                                              --         2,449,289                 --
Rate reduction notes repaid                                        (251,591)               --                 --
Preferred stock redeemed                                            (74,300)         (100,000)                --
Nuclear fuel financing-- net                                         16,244           (20,140)            41,803
Short-term debt financing-- net                                     147,537            91,879           (129,359)
Capital transferred                                                      --           153,000                 --
Dividends paid                                                   (1,129,812)       (1,871,944)          (799,593)
- -----------------------------------------------------------------------------------------------------------------

Net cash used by financing activities                            (2,067,952)         (214,061)          (894,797)
- -----------------------------------------------------------------------------------------------------------------

Cash flows from investing activities:
Additions to property and plant                                    (860,837)         (685,320)          (616,427)
Proceeds from sale of oil and gas plant                           1,203,039                --                 --
Funding of nuclear decommissioning trusts                          (162,925)         (153,756)          (148,158)
Unrealized gain (loss) in equity investments-- net                   (8,561)           14,641             14,900
Other-- net                                                           8,333           (28,133)           (75,985)
- -----------------------------------------------------------------------------------------------------------------

Net cash provided (used) by investing activities                    179,049          (852,568)          (825,670)
- -----------------------------------------------------------------------------------------------------------------

Net increase (decrease) in cash and equivalents                    (880,772)          642,330             58,175
Cash and equivalents, beginning of year                             962,272           319,942            261,767
- -----------------------------------------------------------------------------------------------------------------

Cash and equivalents, end of year                               $    81,500        $  962,272         $  319,942
- -----------------------------------------------------------------------------------------------------------------
</TABLE>

The accompanying notes are an integral part of these financial statements.

                                       16
<PAGE>

- --------------------------------------------------------------------------------
Notes to Consolidated Financial Statements    Southern California Edison Company

Note 1.    Summary of Significant Accounting Policies

Accounting Principles

Southern  California  Edison  Company's (SCE)  accounting  policies conform with
generally accepted accounting  principles,  including the accounting  principles
for  rate-regulated  enterprises  which reflect the rate-making  policies of the
California Public Utilities  Commission (CPUC) and the Federal Energy Regulatory
Commission (FERC). As a result of industry restructuring  legislation enacted by
the State of California  and a related  change in the  application of accounting
principles for rate-regulated  enterprises  adopted by the Financial  Accounting
Standards Board's Emerging Issues Task Force,  during the third quarter of 1997,
SCE began  accounting for its investment in generation  facilities in accordance
with  accounting  principles  applicable  to  enterprises  in general  and SCE's
balance  sheets  display a separate  caption for its  investment in  generation.
Application of such  accounting  principles to SCE's  generation  assets did not
result  in any  adjustment  of their  carrying  value;  however,  SCE's  nuclear
investments were reclassified as a regulatory asset in second quarter 1998.

Competition Transition Charge (CTC)

Beginning  January  1,  1998,  a  non-bypassable  charge is being  billed to all
customers, which provides SCE the opportunity to recover its costs to transition
to a competitive market.

Consolidation Policy

The  consolidated   financial  statements  include  SCE  and  its  subsidiaries.
Intercompany transactions have been eliminated.

Estimates

Financial  statements  prepared in compliance with generally accepted accounting
principles  require management to make estimates and assumptions that affect the
amounts  reported in the financial  statements and disclosure of  contingencies.
Actual results could differ from those estimates.  Certain significant estimates
related to electric utility restructuring, decommissioning and contingencies are
further discussed in Notes 2, 9 and 10 to the Consolidated Financial Statements,
respectively.

Fuel Inventory

Fuel  inventory is valued under the last-in,  first-out  method for fuel oil and
natural gas, and under the first-in, first-out method for coal.

Nature of Operations

SCE is a  rate-regulated  public utility,  which produces and supplies  electric
energy  for  its  4.3  million  customers  in  central,   coastal  and  Southern
California.  SCE operates in a highly  regulated  environment in which it has an
obligation to deliver  electric  service to customers in return for an exclusive
franchise within its service territory. This regulatory environment is changing,
as further discussed in Note 2 to the Consolidated  Financial  Statements.  As a
result of these changes,  effective April 1, 1998, SCE sells all electric energy
produced  to the power  exchange  (PX),  as mandated  by state  legislation  and
purchases  electric  energy  from  the  PX to  supply  to its  customers.  SCE's
outstanding  common  stock is  owned  entirely  by its  parent  company,  Edison
International.

Nuclear

CPUC-authorized  rate phase-in plans,  which deferred  collection of revenue for
each unit at the Palo Verde  Nuclear  Generating  Station  during the first four
years of operation,  ended in February 1996, September 1996 and January 1998 for
Units 1, 2 and 3, respectively.

                                       17
<PAGE>

- --------------------------------------------------------------------------------
Notes to Consolidated Financial Statements

Under  federal  law,  SCE is  liable  for its  share of the  estimated  costs to
decommission three federal nuclear  enrichment  facilities (based on purchases).
These costs,  which will be paid over 15 years,  are recorded as a fuel cost and
recovered through non-bypassable customer rates.

In 1996 and 1997,  the CPUC  authorized  acceleration  of the  recovery of SCE's
remaining  investment of $2.6 billion in San Onofre Nuclear  Generation  Station
Units 2 and 3 and $1.2 billion in Palo Verde Units 1, 2 and 3, respectively. The
accelerated  recovery will continue through December 2001, earning a 7.35% fixed
rate of return. San Onofre's operating costs, including nuclear fuel and nuclear
fuel financing costs, and incremental capital expenditures are recovered through
an  incentive  pricing  plan  which  allows  SCE to receive  about  4(cent)  per
kilowatt-hour  through  2003.  Any  differences  between  these  costs  and  the
incentive price will flow through to the shareholders.  Palo Verde's accelerated
plant recovery,  as well as operating costs,  including nuclear fuel and nuclear
fuel financing  costs,  and  incremental  capital  expenditures,  are subject to
balancing account treatment through 2001.

Beginning  January 1, 1998, San Onofre's  incentive pricing plan and accelerated
plant  recovery  and the Palo Verde  balancing  account  became  part of the CTC
mechanism.  SCE  will be  required  to share  equally  with  ratepayers  the net
benefits received from operation of Palo Verde,  beginning in 2002, and from the
operation of the San Onofre units in 2004.  Palo Verde's  existing  nuclear unit
incentive  procedure will continue only for purposes of calculating a reward for
performance of any unit above an 80% capacity factor for a fuel cycle.

Reclassifications

Certain  prior-year  amounts  were  reclassified  to conform to the December 31,
1998, financial statement presentation.

Regulatory Balancing Accounts

Prior to January 1, 1998, the  differences  between  CPUC-authorized  and actual
base-rate revenue from kilowatt-hour sales and CPUC-authorized and actual energy
costs were  accumulated  in balancing  accounts  until they were refunded to, or
recovered from,  customers through  authorized rate adjustments (with interest).
On January 1, 1998, the balances in these balancing accounts were transferred to
a transition  cost  balancing  account.  Also,  beginning  January 1, 1998,  the
difference between  generation-related  revenue and generation-related  costs is
being  accumulated  in  the  transition  cost  balancing  account,   effectively
eliminating  all other  balancing  accounts  except  those used to assist in the
administration of public purpose funds.  Additionally,  gains resulting from the
divestiture  of the gas- and oil-fueled  generation  plants were credited to the
transition  cost  balancing  account;  the losses are being  amortized  over the
remaining  transition  period and  accumulated in the transition  cost balancing
account. These transition costs are being recovered from utility customers (with
interest) through the CTC. For further details,  see discussion under California
Electric Utility Industry  Restructuring in Note 2 to the Consolidated Financial
Statements. Income tax effects on all balancing account changes are deferred.

In  January   1997,   in   compliance   with  the   restructuring   legislation,
overcollections in the kilowatt-hour sales and energy cost balancing accounts at
December 31, 1996,  were  transferred to an interim  balancing  account and were
subsequently credited to the transition cost balancing account in January 1998.

Research, Development and Demonstration (RD&D)

SCE capitalizes RD&D costs that are expected to result in plant construction. If
construction does not occur,  these costs are charged to expense.  RD&D expenses
were $2 million in 1998, $39 million in 1997 and $21 million in 1996.


                                       18
<PAGE>

- --------------------------------------------------------------------------------
                                              Southern California Edison Company

Revenue

Operating revenue includes amounts for services rendered but unbilled at the end
of each year.  Beginning April 1, 1998,  operating revenue also includes amounts
for sales to the PX.

Supplemental Cash Flows Information

SCE's supplemental cash flows information was:
<TABLE>
<CAPTION>

In millions                  Year ended December 31,                1998                   1997              1996
- --------------------------------------------------------------------------------------------------------------------

Payments for interest and taxes:
<S>                                                                <C>                   <C>                <C>   
Interest-- net of amounts capitalized                              $  264                $  342             $  347
Taxes                                                                 405                   438                546
- --------------------------------------------------------------------------------------------------------------------
</TABLE>

Utility Plant

Plant additions,  including replacements and betterments, are capitalized.  Such
costs include direct material and labor,  construction overhead and an allowance
for funds used during construction (AFUDC).  AFUDC represents the estimated cost
of debt and  equity  funds that  finance  utility-plant  construction.  AFUDC is
capitalized during plant construction and reported in current earnings. AFUDC is
recovered  in rates  through  depreciation  expense  over the useful life of the
related  asset.  Depreciation  of utility plant is computed on a  straight-line,
remaining-life basis.

Replaced or retired  property and removal  costs less salvage are charged to the
accumulated provision for depreciation. Depreciation expense stated as a percent
of average  original cost of depreciable  utility plant was 4.2% for 1998,  5.2%
for 1997 and 4.2% for 1996.

During the third quarter of 1997, SCE discontinued accounting for its investment
in   generation   facilities   using   accounting   principles   applicable   to
rate-regulated  enterprises  and  began  accounting  for such  investment  using
accounting  principles  applicable to enterprises in general. The carrying value
of  such  investment  was  unaffected  by  this  change.  However,  the  nuclear
investments were reclassified as a regulatory asset in second quarter 1998.

Note 2.    Regulatory Matters

California Electric Utility Industry Restructuring

Restructuring  Decision  and  Statute -- The CPUC's  December  1995  decision on
restructuring California's electric utility industry started the transition to a
new market structure  involving  competition and customer  choice.  The State of
California enacted  legislation in 1996 to provide a transition to a competitive
market structure.  The Statute  substantially  adopted the CPUC's  restructuring
decision by  addressing  stranded-cost  recovery for  utilities  and providing a
certain  cost-recovery  time period for the  transition  costs  associated  with
utility-owned   generation-related   assets.   Transition   costs   related   to
power-purchase  contracts  are  being  recovered  through  the  terms  of  their
contracts while most of the remaining transition costs will be recovered through
2001. The Statute also included  provisions to finance a portion of the stranded
costs that  residential and small  commercial  customers would have paid between
1998 and  2001,  which  allowed  SCE to  reduce  rates by at least  10% to these
customers, effective January 1, 1998. The Statute included a rate freeze for all
other customers, including large commercial and industrial customers, as well as
provisions for continued funding for energy  conservation,  low-income  programs
and  renewable  resources.  Despite the rate  freeze,  SCE expects to be able to
recover its revenue  requirement  during the  1998-2001  transition  period.  In
addition,  the Statute  mandated  the  implementation  of the CTC that  provides
utilities the opportunity to recover costs made  uneconomic by electric  utility
restructuring.  Finally,  the  Statute  contained  provisions  for the  recovery
(through 2006) of

                                       19
<PAGE>

- --------------------------------------------------------------------------------
Notes to Consolidated Financial Statements

reasonable  employee-related  transition  costs,  incurred  and  projected,  for
retraining, severance, early retirement,  outplacement and related expenses. The
new market structure and customer choice began on April 1, 1998.

1998  Activities  --  During  1998,  SCE  implemented  changes  to  comply  with
restructuring  elements required by the CPUC and the Statute.  Beginning January
1, 1998:

o    SCE's rates were unbundled into separate charges for energy,  transmission,
     distribution, the CTC, public benefit programs and nuclear decommissioning.
     The transmission  component is being collected through FERC-approved rates,
     subject to refund.

o    SCE's costs  associated with its  hydroelectric  plants are being recovered
     through a performance-based mechanism. The mechanism sets the hydroelectric
     revenue  requirement and establishes a formula for extending it through the
     duration of the electric industry restructuring transition period, or until
     market valuation of the hydroelectric  facilities,  whichever occurs first.
     The  mechanism   provides  that  power  sales  revenue  from  hydroelectric
     facilities in excess of the hydroelectric  revenue  requirement be credited
     against the costs to transition to a competitive market.

o    SCE's  transition costs are being recovered  through a non-bypassable  CTC.
     This charge  applies to all customers who were using or began using utility
     services on or after the CPUC's December 1995 restructuring  decision date.
     SCE has estimated its transition  costs to be  approximately  $10.6 billion
     (1998 net present value) from 1998 through 2030. This estimate was based on
     incurred  costs,  forecasts  of future  costs and  assumed  market  prices.
     However, changes in the assumed market prices could materially affect these
     estimates.  The  potential  transition  costs are comprised of $6.4 billion
     from SCE's qualifying facilities contracts,  which are the direct result of
     prior legislative and regulatory mandates, and $4.2 billion (which reflects
     the  sale of SCE's  gas- and oil-  fueled  generation  plants)  from  costs
     pertaining  to  certain   generating  assets  and  regulatory   commitments
     consisting of costs incurred (whose recovery has been deferred by the CPUC)
     to provide service to customers.  Such commitments  include the recovery of
     income tax benefits previously flowed through to customers,  postretirement
     benefit transition costs,  accelerated recovery of San Onofre Units 2 and 3
     and the Palo Verde units, and certain other costs.

o    Residential and small  commercial  customers who began receiving a 10% rate
     reduction  are repaying the rate  reduction  notes issued in December  1997
     (see further discussion in Note 3 to the Consolidated Financial Statements)
     through non-bypassable charges based on electricity consumption.

Effective April 1, 1998:

o    The ISO assumed  operational  control of the transmission  system after the
     ISO and PX had begun accepting bids and schedules for electricity purchases
     on March 31, 1998. The  restructuring  implementation  costs related to the
     start-up and  development of the PX, which are paid by the utilities,  will
     be  recovered  from all  retail  customers  over the  four-year  transition
     period.  SCE's share of the charge is $45 million,  plus interest and fees.
     SCE's share of the ISO's start-up and development costs  (approximately $16
     million per year) will be paid over a 10-year period.

o    Customers  can  choose to remain  utility  customers  with  either  bundled
     electric  service  or an  hourly  PX  pricing  option  from SCE  (which  is
     purchasing its power through the PX), or choose direct access,  which means
     the customer can contract directly with either  independent power producers
     or energy service  providers  (ESPs) such as power  brokers,  marketers and
     aggregators.   Electric  utilities  are  continuing  to  provide  the  core
     distribution service of delivering energy through their distribution system
     regardless  of a customer's  choice of  electricity  supplier.  The CPUC is
     continuing  to  regulate  the prices  and  service  obligations  related to
     distribution services.

                                       20
<PAGE>

- --------------------------------------------------------------------------------
                                              Southern California Edison Company

o    Customers have options  regarding  metering,  billing and related  services
     (referred  to as  revenue  cycle  services)  that  have  been  provided  by
     California's  investor-owned  utilities.  ESPs can provide their  customers
     with one consolidated  bill for their services and the utility's  services,
     request the utility to provide such a consolidated  bill to the customer or
     elect to have  both the ESP and the  utility  bill the  customer  for their
     respective  charges.  Customers with maximum  demand above 20kW  (primarily
     industrial  and  medium and large  commercial)  can choose SCE or any other
     supplier to provide their metering service.  Beginning in January 1999, all
     customers  can make these  choices.  In September  1998,  the CPUC issued a
     decision  regarding the credits that would be provided to customers if they
     elect to  obtain  revenue  cycle  services  from  someone  other  than SCE.
     Although the decision adopted SCE's recommendation of using the net avoided
     cost,  it also adopted a  methodology  which  results in higher  credits to
     customers  but requires  ESPs to pay service fees to SCE for the costs that
     SCE incurs as a result of dealing with the ESP.

During 1998,  SCE sold all of its gas- and  oil-fueled  generation  plants.  The
total sales price of the 12 plants was $1.2 billion, over $500 million more than
the combined book value.  Net proceeds of the sales were used to reduce stranded
costs, which otherwise were expected to be collected through the CTC mechanism.

Accounting  for  Generation-Related  Assets -- If the CPUC's  electric  industry
restructuring plan continues as described above, SCE would be allowed to recover
its  transition  costs  through   non-bypassable  charges  to  its  distribution
customers (although its investment in certain generation assets would be subject
to a lower authorized rate of return). In 1997, SCE discontinued  application of
accounting  principles  for  rate-regulated  enterprises  for its  investment in
generation facilities based on new accounting guidance.  The financial reporting
effect of this  discontinuance  was to  segregate  these  assets on the  balance
sheet;  the  new  guidance  did  not  require  SCE  to  write  off  any  of  its
generation-related assets, including related regulatory assets. However, the new
guidance  did not  specifically  address  the  application  of asset  impairment
standards to these  assets.  SCE has retained  these assets on its balance sheet
because the Statute and restructuring plan referred to above make probable their
recovery through a non-bypassable CTC to distribution customers.  The regulatory
assets  relate  primarily  to the  recovery of  accelerated  income tax benefits
previously  flowed through to customers,  purchased  power contract  termination
payments and unamortized losses on reacquired debt. The new accounting  guidance
also permits the recording of new  generation-related  regulatory  assets during
the transition period that are probable of recovery through the CTC mechanism.

During the second quarter of 1998,  additional guidance was developed related to
the  application  of asset  impairment  standards  to these  assets.  Using this
guidance resulted in SCE reducing its remaining nuclear plant investment by $2.6
billion (as of June 30, 1998) and  recording a  regulatory  asset on its balance
sheet for the same amount. For this impairment assessment, the fair value of the
investment  was  calculated  by   discounting   future  net  cash  flows.   This
reclassification had no effect on SCE's results of operations.

If during the  transition  period events were to occur that made the recovery of
these  generation-related  regulatory  assets no longer  probable,  SCE would be
required to write off the remaining balance of such assets  (approximately  $2.4
billion, after tax, at December 31, 1998) as a one-time, non-cash charge against
earnings.

If events occur during the restructuring process that result in all or a portion
of the transition costs being improbable of recovery,  SCE could have additional
write-offs associated with these costs if they are not recovered through another
regulatory mechanism. At this time, SCE cannot predict what other revisions will
ultimately be made during the restructuring process in subsequent proceedings or
the effect,  after the  transition  period,  that  competition  will have on its
results of operations or financial position.

                                       21
<PAGE>

- --------------------------------------------------------------------------------
Notes to Consolidated Financial Statements

Note 3.    Financial Instruments

Cash Equivalents

Cash and equivalents include tax-exempt investments ($78 million at December 31,
1998,  and $936  million at December  31,  1997),  and time  deposits  and other
investments  ($4 million at December 31,  1998,  and $26 million at December 31,
1997) with maturities of three months or less.

Derivative Financial Instruments

SCE's risk management policy allows the use of derivative financial  instruments
to manage  financial  exposure on its investments  and  fluctuations in interest
rates,  but prohibits the use of these  instruments  for  speculative or trading
purposes.

SCE  uses the  hedge  accounting  method  to  record  its  derivative  financial
instruments,   except  for  gas  call  options.  Hedge  accounting  requires  an
assessment that the transaction  reduces risk, that the derivative be designated
as a hedge at the inception of the derivative contract,  and that the changes in
the  market  value of a hedge  move in an  inverse  direction  to the item being
hedged.  Under hedge accounting,  the derivative itself is not recorded on SCE's
balance sheet.  Mark-to-market  accounting would be used if the hedge accounting
criteria were not met. Interest rate  differentials and amortization of premiums
for interest rate caps are recorded as adjustments to interest  expense.  If the
derivatives  were  terminated  before the  maturity  of the  corresponding  debt
issuance,  the realized gain or loss on the transaction  would be amortized over
the remaining term of the debt.

SCE has gas call options that  mitigate its exposure to increases in natural gas
prices.  Increases  in  natural  gas  prices  tend  to  increase  the  price  of
electricity  purchased from the PX. The options cover various  periods from 1998
through 2001.

SCE uses the  mark-to-market  accounting method for its gas call options.  Gains
and losses  from  monthly  changes in market  prices are  recorded  as income or
expense.  However,  the costs of the  options and the market  price  changes are
included  in  the  transition  cost  balancing   account.   As  a  result,   the
mark-to-market gains or losses have no effect on earnings.

Interest  rate swaps are used to reduce the  potential  impact of interest  rate
fluctuations  on  floating-rate  long-term  debt.  At the balance sheet dates of
December  31,  1998,  and  December  31,  1997,  SCE had an  interest  rate swap
agreement  which fixed the interest  rate at 5.585% for $196 million of debt due
2008; it expires  February 28, 2008. The interest rate swap  agreement  requires
the parties to pledge  collateral  according to bond rating and market  interest
rate  changes.  At December 31, 1998,  SCE had pledged $25 million as collateral
due to a decline in market interest rates.  SCE is exposed to credit loss in the
event of  nonperformance  by the  counterparty  to the  agreement,  but does not
expect the counterparty to fail to meet its obligation.

Fair Value of Financial Instruments

Fair values of financial instruments were:
<TABLE>
<CAPTION>

In millions                           December 31,                       1998                      1997
- ------------------------------------------------------------------------------------------------------------------
                                                                 Cost          Fair          Cost         Fair
                                                                 Basis         Value         Basis        Value
- ------------------------------------------------------------------------------------------------------------------
Financial assets:
<S>                                                              <C>          <C>          <C>           <C>   
Decommissioning trusts                                           $1,534       $2,240       $1,371        $1,831
Equity investments                                                    7           72            9            90
Gas call options                                                     39           31           34            34

Financial liabilities:
DOE decommissioning and
  decontamination fees                                               45           40           50            43
Interest rate hedges                                                 --           28           --            24
Long-term debt                                                    5,447        5,699        6,145         6,456
Preferred stock subject to
  mandatory redemption                                              256          274          275           293
- -----------------------------------------------------------------------------------------------------------------
</TABLE>

                                       22
<PAGE>

- --------------------------------------------------------------------------------
                                              Southern California Edison Company

Financial  assets are carried at their fair value based on quoted  market prices
for  decommissioning  trusts and equity  investments and on financial models for
gas  call  options.  Financial  liabilities  are  recorded  at  cost.  Financial
liabilities'  fair values are based on:  termination costs for the interest rate
swap;  brokers'  quotes for long-term debt and preferred  stock;  and discounted
future  cash  flows for U.S.  Department  of Energy  (DOE)  decommissioning  and
decontamination  fees. Due to their short maturities,  amounts reported for cash
equivalents and short-term debt approximate fair value.

Gross unrealized holding gains (losses) on financial assets were:

In millions                           December 31,       1998              1997
- --------------------------------------------------------------------------------

Decommissioning trusts:
  Municipal bonds                                        $196              $131
  Stocks                                                  365               190
  U.S. government issues                                  115                91
  Short-term and other                                     30                48
- --------------------------------------------------------------------------------
                                                          706               460
Equity investments                                         65                81
- --------------------------------------------------------------------------------
Gas call options                                          (8)                --
Total                                                    $763              $541
- --------------------------------------------------------------------------------


There  were no  unrealized  holding  losses on  financial  assets  for the years
presented,  other than the  unrealized  holding  loss on the gas call options in
1998.

In June 1998, a new accounting  standard for derivative  instruments and hedging
activities  was issued.  The new  standard,  which will be effective  January 1,
2000,  requires all  derivatives  to be  recognized on the balance sheet at fair
value.  Gains or losses  from  changes  in fair  value  would be  recognized  in
earnings  in the  period of change  unless the  derivative  is  designated  as a
hedging instrument.  Gains or losses from hedges of a forecasted  transaction or
foreign  currency  exposure  would be reflected in other  comprehensive  income.
Gains or  losses  from  hedges  of a  recognized  asset or  liability  or a firm
commitment  would be reflected in earnings  for the  ineffective  portion of the
hedge. SCE anticipates that most of its derivatives under the new standard would
qualify for hedge  accounting.  SCE expects to recover in rates any market price
changes  from  its  derivatives   that  could   potentially   affect   earnings.
Accordingly,  implementation  of this new  standard  is not  expected  to affect
earnings.

Investments

Net unrealized  gains (losses) on equity  investments are recorded as a separate
component  of  shareholder's   equity  under  the  caption:   Accumulated  other
comprehensive income. Unrealized gains and losses on decommissioning trust funds
are recorded in the accumulated provision for decommissioning.

All investments are classified as available-for-sale.

Long-Term Debt

California  law  prohibits  SCE  from  incurring  or  guaranteeing  debt for its
nonutility affiliates.

Almost all SCE properties are subject to a trust indenture lien. SCE has pledged
first and refunding  mortgage bonds as security for borrowed funds obtained from
pollution-control  bonds issued by government agencies.  SCE uses these proceeds
to  finance  construction  of  pollution-control  facilities.  Bondholders  have
limited  discretion in redeeming  certain  pollution-control  bonds, and SCE has
arranged with securities dealers to remarket or purchase them if necessary.

                                       23
<PAGE>

- --------------------------------------------------------------------------------
Notes to Consolidated Financial Statements

Debt premium, discount and issuance expenses are amortized over the life of each
issue.  Under CPUC  rate-making  procedures,  debt  reacquisition  expenses  are
amortized over the remaining life of the reacquired debt or, if refinanced,  the
life of the new debt.

Commercial  paper intended to be refinanced for a period  exceeding one year and
used to finance  nuclear fuel  scheduled to be used more than one year after the
balance sheet date is classified as long-term debt.

Long-term debt maturities and sinking-fund  requirements for the five years are:
1999-- $401  million;  2000-- $571  million;  2001-- $646  million;  2002-- $446
million; and 2003-- $371 million.

In December 1997, SCE Funding LLC, a special  purpose entity (SPE), of which SCE
is the sole member, issued approximately $2.5 billion of rate reduction notes to
Bankers Trust Company of California,  as certificate  trustee for the California
Infrastructure  and  Economic  Development  Bank  Special  Purpose  Trust  SCE-1
(Trust),  which  is a  special  purpose  entity  established  by  the  State  of
California.  The terms of the rate reduction notes generally mirror the terms of
the  pass-through  certificates  issued  by the  Trust,  which are known as rate
reduction  certificates.  The proceeds of the rate reduction  notes were used by
the SPE to purchase from SCE an enforceable right known as transition  property.
Transition  property  is a  current  property  right  created  pursuant  to  the
restructuring  legislation  and a  financing  order  of the  CPUC  and  consists
generally  of the  right to be paid a  specified  amount  from a  non-bypassable
tariff levied on residential and small commercial customers. Notwithstanding the
legal sale of the transition  property by SCE to the SPE, the amounts  reflected
as assets on SCE's  balance  sheet  have not been  reduced  by the amount of the
transition property sold to the SPE, and the liabilities of the SPE for the rate
reduction notes are for accounting  purposes reflected as long-term  liabilities
on the consolidated balance sheet of SCE. SCE used the proceeds from the sale of
the transition property to retire debt and equity securities. The rate reduction
notes are secured solely by the transition  property and certain other assets of
the SPE, and there is no recourse to SCE or Edison International.

Although  the SPE is  consolidated  with  SCE in the  financial  statements,  as
required  by  generally  accepted  accounting  principles,  the  SPE is  legally
separate  from SCE, the assets of the SPE are not  available to creditors of SCE
or Edison International,  and the transition property is legally not an asset of
SCE or Edison International.

Long-term debt consisted of:

In millions                            December 31,      1998          1997
- --------------------------------------------------------------------------------

First and refunding mortgage bonds:
   1999 - 2026 (5.625% to 7.5%)                         $1,550         $1,825
Rate reduction notes:
   1999 - 2007 (6.14% to 6.42%)                          2,217          2,463
Pollution-control bonds:
   1999 - 2027 (5.4% to 7.2% and variable)               1,201          1,202
Funds held by trustees                                      (2)            (2)
Debentures and notes:
   1999 - 2006 (5.6% to 8.25%)                             700          1,195
Subordinated debentures:
   2044 (8.375%)                                           100            100
Commercial paper for nuclear fuel                          108             92
Long-term debt due within one year                        (401)          (693)
Unamortized debt discount-- net                            (26)           (37)
- --------------------------------------------------------------------------------

Total                                                   $5,447         $6,145
- --------------------------------------------------------------------------------

                                       24
<PAGE>

- --------------------------------------------------------------------------------
                                              Southern California Edison Company

Short-Term Debt

SCE has  lines of  credit  it can use at  negotiated  or bank  index  rates.  At
December 31, 1998, these lines totaled $1.3 billion, with $800 million available
for short-term debt and $500 million available for the long-term  refinancing of
certain variable-rate pollution-control debt.

Short-term debt consisted of commercial  paper used to finance fuel  inventories
and general cash  requirements.  Commercial  paper  outstanding  at December 31,
1998,  and December 31, 1997,  was $581 million and $415 million,  respectively.
Commercial paper intended to finance nuclear fuel scheduled to be used more than
one year  after the  balance  sheet  date is  classified  as  long-term  debt in
connection  with  refinancing  terms under  five-year  term lines of credit with
commercial banks. Weighted-average interest rates were 5.3% and 6.0% at December
31, 1998, and December 31, 1997, respectively.

Note 4.    Equity

The CPUC regulates  SCE's capital  structure,  limiting the dividends it may pay
Edison  International.  At December 31,  1998,  SCE had the capacity to pay $794
million in additional  dividends and continue to maintain its authorized capital
structure.

In 1998, SCE  implemented a recently  issued  accounting  standard that requires
companies to report comprehensive income. Implementation of the new standard had
no effect on SCE's results of operations or financial position.

Changes in SCE's common shareholder's equity were as follows:
<TABLE>
<CAPTION>

                                                                           Accumulated                    Total
                                                          Additional          Other                      Common
                                              Common        Paid-in       Comprehensive   Retained    Shareholder's
In millions                                    Stock        Capital          Income       Earnings       Equity
- -------------------------------------------------------------------------------------------------------------------

<S>                                        <C>               <C>             <C>          <C>             <C>   
Balance at December 31, 1995               $  2,168          $ 178           $   18       $ 2,780         $5,144

   Net income                                                                                 655            655
   Unrealized gain on securities                                                 25                           25
     Tax effect                                                                 (10)                         (10)
   Dividends declared on common stock                                                        (735)          (735)
   Dividends declared on preferred stock                                                      (34)           (34)
- -----------------------------------------------------------------------------------------------------------------
Balance at December 31, 1996                  2,168            178               33         2,666          5,045 
- -----------------------------------------------------------------------------------------------------------------

   Net income                                                                                 606            606
   Unrealized gain on securities                                                 24                           24
     Tax effect                                                                  (9)                          (9)
   Dividends declared on common stock                                                      (1,829)        (1,829)
   Dividends declared on preferred stock                                                      (30)           (30)
   Reacquired capital stock expense                                                            (5)            (5)
   Additional investment from
     parent company                                            156                                           156
- ----------------------------------------------------------------------------------------------------------------
Balance at December 31, 1997                  2,168            334               48         1,408          3,958
- ----------------------------------------------------------------------------------------------------------------

   Net income                                                                                 515            515
   Unrealized gain on securities                                                 14                           14
     Tax effect                                                                  (5)                          (5)
   Reclassified adjustment for gain
     Included in net income                                                     (30)                         (30)
     Tax efffect                                                                 12                           12
   Dividends declared on common stock                                                      (1,101)        (1,101)
   Dividends declared on preferred stock                                                      (24)           (24)
   Stock option appreciation                                                                   (4)            (4)
- -----------------------------------------------------------------------------------------------------------------
Balance at December 31, 1998               $  2,168          $ 334           $   39       $   794         $3,335
- -----------------------------------------------------------------------------------------------------------------
</TABLE>

                                       25
<PAGE>

- --------------------------------------------------------------------------------
Notes to Consolidated Financial Statements

Authorized  common  stock is 560 million  shares  with no par value.  Authorized
shares of preferred and  preference  stock are: $25  cumulative  preferred -- 24
million;  $100 cumulative preferred -- 12 million; and preference -- 50 million.
All cumulative preferred stocks are redeemable. Mandatorily redeemable preferred
stocks  are  subject  to  sinking-fund  provisions.  When  preferred  shares are
redeemed, the premiums paid are charged to common equity.

Preferred  stock  redemption  requirements  for the next five  years  are:  1999
through 2001-- zero; 2002--$105 million; and 2003-- $9 million.

Cumulative preferred stock consisted of:
<TABLE>
<CAPTION>

Dollars in millions, except per share amounts               December 31,                       1998         1997
- -------------------------------------------------------------------------------------------------------------------

                                             December 31, 1998 
                                          Shares         Redemption
                                       Outstanding         Price 

Not subject to mandatory redemption:
$25 par value:
<C>                                      <C>                <C>                             <C>            <C>  
4.08% Series                             1,000,000          $25.50                          $  25          $  25
4.24                                     1,200,000           25.80                             30             30
4.32                                     1,653,429           28.75                             41             41
4.78                                     1,296,769           25.80                             33             33
5.80                                            --            --                               --             55
- -------------------------------------------------------------------------------------------------------------------
Total                                                                                        $129           $184
- -------------------------------------------------------------------------------------------------------------------

Subject to mandatory redemption:
$100 par value:
6.05% Series                               750,000         $100.00                          $  75          $  75
6.45                                     1,000,000          100.00                            100            100
7.23                                       807,000          100.00                             81            100
- -------------------------------------------------------------------------------------------------------------------
Total                                                                                        $256           $275
- -------------------------------------------------------------------------------------------------------------------
</TABLE>

In 1998,  193,000  shares of Series 7.23% and 2.2 million  shares of Series 5.8%
preferred  stock  were  redeemed.  In 1997,  4 million  shares  of Series  7.36%
preferred  stock were redeemed.  There were no preferred stock issuances for the
years presented.

Note 5.    Income Taxes

SCE and its subsidiaries will be included in Edison International's consolidated
federal  income tax and combined state  franchise tax returns.  Under income tax
allocation agreements, each subsidiary calculates its own tax liability.

Income tax expense  includes the current tax liability  from  operations and the
change in deferred  income  taxes  during the year.  Investment  tax credits are
amortized over the lives of the related properties.

                                       26
<PAGE>

- --------------------------------------------------------------------------------
                                              Southern California Edison Company

The components of the net accumulated deferred income tax liability were:

In millions                      December 31,                1998        1997
- --------------------------------------------------------------------------------

Deferred tax assets:
Property-related                                           $  197    $    227
Unrealized gains or losses                                    387         273
Investment tax credits                                        152         192
Regulatory balancing accounts                                  96         180
Decommissioning-related                                       126         114
Fixed costs                                                   188         109
Other                                                         285         226
- --------------------------------------------------------------------------------
Total                                                      $1,431      $1,321
- --------------------------------------------------------------------------------
Deferred tax liabilities:
Property-related                                           $3,005      $3,272
Capitalized software costs                                    196         127
Regulatory balancing accounts                                 162         202
Other                                                         786         536
- --------------------------------------------------------------------------------
Total                                                      $4,149      $4,137
- --------------------------------------------------------------------------------
Accumulated deferred income taxes-- net                    $2,718      $2,816
- --------------------------------------------------------------------------------

Classification of accumulated deferred income taxes:
Included in deferred credits                               $2,993      $2,939
Included in current assets                                    275         123

The current and deferred components of income tax expense were:
<TABLE>
<CAPTION>

In millions                   Year ended December 31,                1998             1997          1996
- ----------------------------------------------------------------------------------------------------------

Current:
<S>                                                                  <C>              <C>           <C> 
Federal                                                              $450             $375          $386
State                                                                 101              100           129
- ----------------------------------------------------------------------------------------------------------

                                                                      551              475           515
- ----------------------------------------------------------------------------------------------------------
Deferred--federal and state:
Accrued charges                                                       (43)             (33)          (14)
Property related                                                     (106)             (47)          (14)
Investment and energy tax credits-- net                               (74)             (20)          (24)
Pension reserve                                                        (3)              (5)           45
Rate phase-in plan                                                     --              (19)          (32)
Regulatory balancing accounts                                         177              141            34
Unbilled revenue                                                      (67)               6            --
Other                                                                   7               22             1
- ----------------------------------------------------------------------------------------------------------

                                                                     (109)              45            (4)
- ----------------------------------------------------------------------------------------------------------
Total income tax expense                                             $442             $520          $511
- ----------------------------------------------------------------------------------------------------------

Classification of income taxes:
Included in operating income                                         $446             $582          $578
Included in other income                                               (4)             (62)          (67)
</TABLE>

The composite  federal and state statutory  income tax rate was 40.551% for 1998
and 1997, and 41.045% for 1996.


                                       27
<PAGE>

- --------------------------------------------------------------------------------
Notes to Consolidated Financial Statements

The federal  statutory  income tax rate is  reconciled to the effective tax rate
below:
<TABLE>
<CAPTION>

                              Year ended December 31,                1998             1997              1996
- ----------------------------------------------------------------------------------------------------------------
<S>                                                                  <C>              <C>               <C>  
Federal statutory rate                                               35.0%            35.0%             35.0%
Capitalized software                                                 (0.7)            (0.9)             (0.8)
Property related and other                                           11.4              6.9               4.5
Investment and energy tax credits                                    (6.8)            (1.8)             (2.0)
State tax-- net of federal deduction                                  6.9              7.0               7.1
- ----------------------------------------------------------------------------------------------------------------
Effective tax rate                                                   45.8%            46.2%             43.8%
- ----------------------------------------------------------------------------------------------------------------
</TABLE>


Note 6.    Employee Compensation and Benefit Plans

Stock Option Plans

In  April  1998,   Edison   International   shareholders   approved  the  Edison
International   Equity  Compensation  Plan.  The  plan  replaces  the  Long-Term
Incentive Compensation Program,  consisting of officer, director, and management
plans,  which was adopted by Edison  International  shareholders in 1992. No new
awards will be made under the prior program;  however,  it will remain in effect
as long as any awards remain outstanding under the prior program.

The  prior  program  participated  in the use of 8.2  million  shares  of parent
company  common stock  reserved  for  potential  issuance  under  various  stock
compensation  programs  to  directors,  officers  and senior  managers of Edison
International and its affiliates.  Under these programs,  options on 3.0 million
shares  of  Edison  International  common  stock are  currently  outstanding  to
officers and senior managers of SCE.

The new plan  authorizes  the annual  issuance of shares equal to one percent of
the issued and  outstanding  shares of Edison  International  common stock as of
December 31 of the prior year. This  authorization  is cumulative so that to the
extent  shares are not  needed to meet new plan  requirements  in any year,  the
excess  authorized  shares  will  carry  over to  subsequent  years  until  plan
termination.  One  percent of the issued and  outstanding  Edison  International
common stock on December 31, 1997, was 3.8 million  shares.  Under the new plan,
options on 1.4 million shares of Edison International common stock are currently
outstanding to officers and senior managers of SCE.

Each  option may be  exercised  to  purchase  one share of Edison  International
common stock,  and is exercisable at a price equivalent to the fair market value
of the underlying stock at the date of grant. Edison International stock options
include a dividend  equivalent  feature.  Generally,  for options  issued before
1994,  amounts equal to dividends  accrue on the options at the same time and at
the  same  rate  as  would  be  payable  on  the  number  of  shares  of  Edison
International  common  stock  covered by the  options.  The  amounts  accumulate
without  interest.  For Edison  International  stock options  issued after 1993,
dividend  equivalents are subject to reduction unless certain shareholder return
performance criteria are met.

The new plan's stock  options have a 10-year term with  one-fourth  of the total
award  vesting  after each of the first four years of the award term.  The prior
program's  stock  options have a 10-year term with  one-third of the total award
vesting  after each of the first three  years of the award term.  If an optionee
retires,  dies or is permanently and totally disabled during the vesting period,
the unvested  options will vest and be  exercisable to the extent of 1/36 (prior
program)  or 1/48 (the new plan) of the  grant  for each full  month of  service
during the vesting period.

Unvested  options  of any  person  who has  served  in the  past  on the  Edison
International  or SCE  Management  Committee  (which was dissolved in 1993) will
vest and be  exercisable  upon the member's  retirement,  death or permanent and
total disability. Upon retirement,  death or permanent and total disability, the
vested  options may continue to be exercised  within their original terms by the
recipient or beneficiary. If an optionee is terminated other than by retirement,
death or  permanent  and total  disability,  options  which had vested as of the
prior  anniversary  date of the grant are forfeited  unless exercised within 180
days of the date of termination.  All unvested options are forfeited on the date
of termination.


                                       28
<PAGE>

- --------------------------------------------------------------------------------
                                              Southern California Edison Company

SCE measures  compensation  expense  related to stock-based  compensation by the
intrinsic   value   method.    Compensation    expense    recorded   under   the
stock-compensation  program  was $8  million,  $5 million and $8 million for the
years 1998, 1997 and 1996, respectively.

Stock-based compensation expense under the fair-value method of accounting would
have  resulted in pro forma  earnings  of $516  million,  $602  million and $653
million for the years 1998, 1997 and 1996, respectively.

The  weighted-average  fair value of options  granted  during  1998 and 1997 was
$6.44  per  share  option  and  $7.62  per  share  option,   respectively.   The
weighted-average  remaining life of options outstanding as of December 31, 1998,
and December 31, 1997, was 7 years.

The fair value for each option  granted,  reflecting the basis for the above pro
forma  disclosures,  was determined on the date of grant using the Black-Scholes
option-pricing  model.  The following  assumptions were used in determining fair
value through the model:

                                             1998                1997
- --------------------------------------------------------------------------------

Expected life                               7 years             7 years
Risk-free interest rate                  4.7% - 5.6%           6.3% - 6.8%
Expected volatility                             17%                 17%
- --------------------------------------------------------------------------------

The application of fair-value  accounting to calculate the pro forma disclosures
above is not an  indication of future income  statement  effects.  The pro forma
disclosures  do not reflect the effect of fair-value  accounting on  stock-based
compensation awards granted prior to 1995.

Pension Plan

SCE has a  noncontributory,  defined-benefit  pension plan that covers employees
meeting  minimum  service  requirements.   SCE  recognizes  pension  expense  as
calculated by the actuarial  method used for  ratemaking.  In 1996, SCE recorded
pension gains from a special  voluntary early retirement  program.  In 1998, SCE
adopted a new accounting  standard that revises the disclosure  requirements for
pension plans. Prior periods have been restated.

Information on plan assets and benefit obligations is shown below:
<TABLE>
<CAPTION>

In millions                             Year ended December 31,                         1998             1997
- ---------------------------------------------------------------------------------------------------------------

Change in benefit obligation
<S>                                                                                    <C>              <C>   
Benefit obligation at beginning of year                                                $2,094           $2,002
Service cost                                                                               59               44
Interest cost                                                                             141              138
Actuarial loss                                                                             90              192
Benefits paid                                                                            (133)            (282)
- ---------------------------------------------------------------------------------------------------------------
Benefit obligation at end of year                                                      $2,251           $2,094
- ---------------------------------------------------------------------------------------------------------------
Change in plan assets
Fair value of plan assets at beginning of year                                         $2,298           $2,158
Actual return on plan assets                                                              334              369
Employer contributions                                                                     53               53
Benefits paid                                                                            (133)            (282)
- ---------------------------------------------------------------------------------------------------------------
Fair value of plan assets at end of year                                               $2,552           $2,298
- ---------------------------------------------------------------------------------------------------------------

Funded status                                                                         $   301          $   204
Unrecognized net gain                                                                    (372)            (304)
Unrecognized net obligation (17-year amortization)                                         33               38
Unrecognized prior service cost                                                           168              184
- ---------------------------------------------------------------------------------------------------------------
Pension asset (liability)                                                             $   130          $   122
- ---------------------------------------------------------------------------------------------------------------

Discount rate                                                                           6.75%              7.0%
Rate of compensation increase                                                           5.0%               5.0%
Expected return on plan assets                                                          7.5%               8.0%
</TABLE>


                                       29
<PAGE>

- --------------------------------------------------------------------------------
Notes to Consolidated Financial Statements

The components of pension expense were:
<TABLE>
<CAPTION>

In millions                     Year ended December 31,                1998             1997             1996
- ----------------------------------------------------------------------------------------------------------------

<S>                                                                  <C>              <C>               <C>   
Service cost                                                         $   59           $     44          $   49
Interest cost                                                           141                138             178
Expected return on plan assets                                         (170)              (160)           (203)
Net amortization and deferral                                            14                 13               5
- ----------------------------------------------------------------------------------------------------------------
Pension expense under
   accounting standards                                                  44                 35              29
Regulatory adjustment-- deferred                                         11                 17              22
- ----------------------------------------------------------------------------------------------------------------
Net pension expense recognized                                           55                 52              51
Settlement gain                                                          --                 --             (121)
- ----------------------------------------------------------------------------------------------------------------
Total expense (gain)                                                 $   55           $     52          $  (70)
- ----------------------------------------------------------------------------------------------------------------
</TABLE>

Postretirement Benefits Other Than Pensions

Employees  retiring  at or after  age 55 with at least 10 years of  service  (or
those eligible under a 1996 special  voluntary early  retirement  program),  are
eligible for  postretirement  health and dental care,  life  insurance and other
benefits.  In 1996,  SCE recorded  special  termination  expenses from a special
voluntary  early  retirement  program.  In 1998,  SCE  adopted a new  accounting
standard that revises the disclosure  requirements  for  postretirement  benefit
plans. Prior periods have been restated.

Information on plan assets and benefit obligations is shown below:
<TABLE>
<CAPTION>

In millions                  Year ended December 31,                  1998                  1997
- --------------------------------------------------------------------------------------------------

Change in benefit obligation
<S>                                                                 <C>                   <C>   
Benefit obligation at beginning of year                             $1,533                $1,349
Service cost                                                            41                    30
Interest cost                                                           99                    99
Actuarial loss (gain)                                                  (74)                  114
Benefits paid                                                          (54)                  (59)
- --------------------------------------------------------------------------------------------------

Benefit obligation at end of year                                   $1,545                $1,533
- --------------------------------------------------------------------------------------------------

Change in plan assets
Fair value of plan assets at beginning of year                      $  815                $  617
Actual return on plan assets                                           147                   147
Employer contributions                                                 121                   110
Benefits paid                                                          (54)                  (59)
- --------------------------------------------------------------------------------------------------

Fair value of plan assets at end of year                            $1,029                $  815
- --------------------------------------------------------------------------------------------------

Funded status                                                       $ (516)               $ (718)
Unrecognized net loss                                                   84                   244
Unrecognized transition obligation (20-year
   amortization)                                                       376                   403
- --------------------------------------------------------------------------------------------------

Recorded asset (liability)                                          $  (56)               $  (71)
- --------------------------------------------------------------------------------------------------

Discount rate                                                         6.75%                  7.0%
Expected return on plan assets                                         7.5%                  8.0%
</TABLE>


                                       30
<PAGE>

- --------------------------------------------------------------------------------
                                              Southern California Edison Company

The components of postretirement benefits other than pension expense were:
<TABLE>
<CAPTION>

In millions                    Year ended December 31,              1998              1997                1996
- ------------------------------------------------------------------------------------------------------------------

<S>                                                               <C>                <C>                  <C>  
Service cost                                                      $   41             $  30                $  31
Interest cost                                                         99                99                   90
Expected return on plan assets                                       (62)              (50)                 (43)
Amortization of loss                                                   1                 4                    6
Amortization of transition obligation                                 27                27                   27
- ------------------------------------------------------------------------------------------------------------------
Net expense                                                          106               110                  111
Special termination expense                                           --                --                   72
- ------------------------------------------------------------------------------------------------------------------
Total expense                                                     $  106             $ 110                $ 183
- ------------------------------------------------------------------------------------------------------------------
</TABLE>


The  assumed  rate of future  increases  in the  per-capita  cost of health care
benefits is 8.25% for 1999,  gradually  decreasing  to 5.0% for 2009 and beyond.
Increasing  the  health  care cost  trend  rate by one  percentage  point  would
increase the accumulated obligation as of December 31, 1998, by $264 million and
annual  aggregate  service and  interest  costs by $31 million.  Decreasing  the
health  care  cost  trend  rate  by one  percentage  point  would  decrease  the
accumulated  obligation  as of December  31,  1998,  by $211  million and annual
aggregate service and interest costs by $24 million.

Employee Savings Plan

SCE has a 401(k)  defined  contribution  savings  plan  designed  to  supplement
employees'  retirement income.  The plan received employer  contributions of $17
million in 1998, $15 million in 1997 and $24 in 1996.

Note 7.    Jointly Owned Utility Projects

SCE owns interests in several generating  stations and transmission  systems for
which each participant  provides its own financing.  SCE's share of expenses for
each project is included in the consolidated statements of income.

The investment in each project, as included in the consolidated balance sheet as
of December 31, 1998, was:
<TABLE>
<CAPTION>

                                                   Original           Accumulated
                                                    Cost of        Depreciation and        Under        Ownership
In millions                                        Facility          Amortization      Construction     Interest
- -------------------------------------------------------------------------------------------------------------------

- -------------------------------------------------------------------------------------------------------------------
Transmission systems:
<S>                                                <C>                   <C>                   <C>          <C>
  Eldorado                                         $    31               $     6               $ 2          60%
  Pacific Intertie                                     239                    78                 5          50
Generating stations:
  Four Corners Units 4 and 5 (coal)                    459                   288                 2          48
  Mohave (coal)                                        315                   183                 6          56
  Palo Verde (nuclear)(1)                            1,605                   908                12          16
  San Onofre (nuclear)(1)                            4,217                 2,762                63          75
- -------------------------------------------------------------------------------------------------------------------
Total                                              $ 6,866               $ 4,225               $90
- -------------------------------------------------------------------------------------------------------------------
</TABLE>

(1) Reported as "Regulatory asset -- unamortized nuclear investment -- net."

Note 8.    Leases

SCE has operating leases, primarily for vehicles, with varying terms, provisions
and expiration dates.


                                       31
<PAGE>

- --------------------------------------------------------------------------------
Notes to Consolidated Financial Statements

Estimated remaining  commitments for noncancellable leases at December 31, 1998,
were:

Year ended December 31,                                       In millions
- --------------------------------------------------------------------------------
1999                                                              $ 13
2000                                                                11
2001                                                                 8
2002                                                                 5
2003                                                                 3
Thereafter                                                           5
- --------------------------------------------------------------------------------
Total                                                              $45
- --------------------------------------------------------------------------------

Note 9.    Commitments

Nuclear Decommissioning

Decommissioning is estimated to cost $1.9 billion in current-year dollars, based
on  site-specific  studies  performed  in 1998 for San  Onofre  and Palo  Verde.
Changes in the estimated costs,  timing of  decommissioning,  or the assumptions
underlying these estimates could cause material revisions to the estimated total
cost to  decommission  in the near term. SCE plans to  decommission  its nuclear
generating  facilities  by a prompt  removal  method  authorized  by the Nuclear
Regulatory  Commission.  Decommissioning  is  scheduled to begin in 2013 for San
Onofre Units 2 and 3, and 2025 at Palo Verde.  In December  1998,  SCE requested
the  CPUC's  approval  to access  its  nuclear  decommissioning  trust  funds to
commence decommissioning of San Onofre Unit 1 in 2000.

Decommissioning  costs,  which are accrued and recovered through  non-bypassable
customer rates over the term of each nuclear facility's  operating license,  are
recorded as a component of depreciation expense.

Decommissioning  expense was $164 million in 1998, $154 million in 1997 and $148
million in 1996. The accumulated  provision for  decommissioning,  excluding San
Onofre  Unit 1, was $1.2  billion at  December  31,  1998,  and $1.1  billion at
December 31, 1997. The estimated costs to  decommission  San Onofre Unit 1 ($368
million) are recorded as a liability.

Decommissioning  funds  collected  in rates are  placed in  independent  trusts,
which,  together  with  accumulated  earnings,   will  be  utilized  solely  for
decommissioning.

Trust investments include:
<TABLE>
<CAPTION>

                                                        Maturity                              December 31,
In millions                                               Dates                         1998                1997
- -------------------------------------------------------------------------------------------------------------------

<S>                                                     <C>                            <C>                <C>   
Municipal bonds                                         2000--2029                      $   547            $  459
Stocks                                                     --                               550               392
U.S. government issues                                  1999--2029                          355               357
Short-term and other                                    1999--2028                           82               163
- -------------------------------------------------------------------------------------------------------------------
Trust fund balance (at cost)                                                           $ 1,534            $1,371
- -------------------------------------------------------------------------------------------------------------------
</TABLE>

Trust fund earnings (based on specific  identification)  increase the trust fund
balance and the accumulated provision for decommissioning. Net earnings were $63
million in 1998,  $54  million in 1997 and $49  million in 1996.  Proceeds  from
sales of  securities  (which are  reinvested)  were $1.2  billion in 1998,  $595
million in 1997 and $1.0  billion in 1996.  Approximately  89% of the trust fund
contributions were tax-deductible.


                                       32
<PAGE>

- --------------------------------------------------------------------------------
                                              Southern California Edison Company

Other Commitments

SCE has fuel supply  contracts  which  require  payment only if the fuel is made
available for purchase.

SCE  has   power-purchase   contracts   with   certain   qualifying   facilities
(cogenerators  and small power producers) and other  utilities.  These contracts
provide  for  capacity   payments  if  a  facility  meets  certain   performance
obligations and energy payments based on actual power supplied to SCE. There are
no requirements to make debt-service payments.

SCE  has  unconditional  purchase  obligations  for  part  of  a  power  plant's
generating  output, as well as firm  transmission  service from another utility.
Minimum  payments are based,  in part, on the  debt-service  requirements of the
provider,  whether  or not the  plant  or  transmission  line is  operable.  The
purchased-power  contract is not  expected to provide more than 5% of current or
estimated  future  operating  capacity.  SCE's  minimum  commitment  under  both
contracts is approximately $172 million through 2017.

Certain commitments for the years 1999 through 2003 are estimated below:
<TABLE>
<CAPTION>

In millions                                                     1999       2000       2001       2002       2003
- -------------------------------------------------------------------------------------------------------------------

<S>                                                              <C>        <C>       <C>        <C>        <C> 
Projected construction expenditures                              $922       $831      $726       $699       $689
Fuel supply contracts                                             167        136       123        139        117
Purchased-power capacity payments                                 744        786       797        704        689
Unconditional purchase obligations                                  9         10        10          9         10
- -------------------------------------------------------------------------------------------------------------------
</TABLE>

Note 10.     Contingencies

In addition to the matters  disclosed in these  notes,  SCE is involved in other
legal,  tax and regulatory  proceedings  before various courts and  governmental
agencies  regarding  matters  arising in the ordinary  course of  business.  SCE
believes the outcome of these other  proceedings will not materially  affect its
results of operations or liquidity.

Environmental Protection

SCE is subject to numerous environmental laws and regulations,  which require it
to incur substantial costs to operate existing facilities, construct and operate
new  facilities,  and  mitigate or remove the effect of past  operations  on the
environment.

SCE records its environmental  liabilities when site assessments and/or remedial
actions are  probable  and a range of  reasonably  likely  cleanup  costs can be
estimated.  SCE reviews  its sites and  measures  the  liability  quarterly,  by
assessing a range of  reasonably  likely  costs for each  identified  site using
currently  available  information,   including  existing  technology,  presently
enacted  laws and  regulations,  experience  gained at  similar  sites,  and the
probable  level of  involvement  and  financial  condition of other  potentially
responsible  parties.  These  estimates  include costs for site  investigations,
remediation,  operations and  maintenance,  monitoring and site closure.  Unless
there is a probable amount,  SCE records the lower end of this reasonably likely
range of  costs  (classified  as other  long-term  liabilities  at  undiscounted
amounts).

SCE's recorded  estimated minimum liability to remediate its 49 identified sites
is $171 million.  The ultimate costs to clean up SCE's identified sites may vary
from its  recorded  liability  due to  numerous  uncertainties  inherent  in the
estimation  process,  such as:  the  extent  and  nature of  contamination;  the
scarcity of reliable data for identified sites; the varying costs of alternative
cleanup  methods;   developments   resulting  from  investigatory  studies;  the
possibility of  identifying  additional  sites;  and the time periods over which
site  remediation  is  expected  to  occur.  SCE  believes  that,  due to  these
uncertainties,  it is  reasonably  possible  that cleanup costs could exceed its
recorded liability by up to $247 million. The upper limit of this range of costs
was estimated using assumptions least favorable to SCE


                                       33
<PAGE>

- --------------------------------------------------------------------------------
Notes to Consolidated Financial Statements

among a range of reasonably possible outcomes.  SCE has sold all of its gas- and
oil-fueled generation plants and has retained some liability associated with the
divested properties.

The CPUC allows SCE to recover  environmental-cleanup  costs at 41 of its sites,
representing  $88  million  of its  recorded  liability,  through  an  incentive
mechanism (SCE may request to include additional  sites).  Under this mechanism,
SCE will recover 90% of cleanup costs through customer rates;  shareholders fund
the remaining  10%, with the  opportunity  to recover these costs from insurance
carriers and other third parties.  SCE has successfully settled insurance claims
with all  responsible  carriers.  Costs  incurred at SCE's  remaining  sites are
expected to be recovered  through  customer rates. SCE has recorded a regulatory
asset of $141  million for its  estimated  minimum  environmental-cleanup  costs
expected to be recovered through customer rates.

SCE's  identified  sites  include  several  sites for  which  there is a lack of
currently  available   information,   including  the  nature  and  magnitude  of
contamination,  and the extent,  if any,  that SCE may be held  responsible  for
contributing  to any costs  incurred  for  remediating  these  sites.  Thus,  no
reasonable estimate of cleanup costs can now be made for these sites.

SCE  expects to clean up its  identified  sites over a period of up to 30 years.
Remediation  costs in each of the next several  years are expected to range from
$4 million to $10 million. Recorded costs for 1998 were $7 million.

Based on currently  available  information,  SCE believes it is unlikely that it
will incur  amounts  in excess of the upper  limit of the  estimated  range and,
based upon the CPUC's regulatory treatment of  environmental-cleanup  costs, SCE
believes that costs ultimately  recorded will not materially  affect its results
of operations or financial position.  There can be no assurance,  however,  that
future developments,  including  additional  information about existing sites or
the  identification  of new sites,  will not require material  revisions to such
estimates.

Nuclear Insurance

Federal  law limits  public  liability  claims  from a nuclear  incident to $9.6
billion.  SCE and other owners of San Onofre and Palo Verde have  purchased  the
maximum private  primary  insurance  available  ($200  million).  The balance is
covered by the industry's  retrospective  rating plan that uses deferred premium
charges to every reactor  licensee if a nuclear incident at any licensed reactor
in the U.S. results in claims and/or costs which exceed the primary insurance at
that plant site. Federal  regulations  require this secondary level of financial
protection.  The Nuclear Regulatory  Commission  exempted San Onofre Unit 1 from
this secondary level, effective June 1994. The maximum deferred premium for each
nuclear  incident is $88 million per reactor,  but not more than $10 million per
reactor may be charged in any one year for each incident. Based on its ownership
interests,  SCE could be required  to pay a maximum of $175  million per nuclear
incident. However, it would have to pay no more than $20 million per incident in
any one year. Such amounts include a 5% surcharge if additional funds are needed
to satisfy public  liability claims and are subject to adjustment for inflation.
If the public  liability limit above is  insufficient,  federal  regulations may
impose  further  revenue-raising  measures to pay  claims,  including a possible
additional assessment on all licensed reactor operators.

Property  damage  insurance   covers  losses  up  to  $500  million,   including
decontamination costs, at San Onofre and Palo Verde.  Decontamination  liability
and property  damage  coverage  exceeding the primary $500 million also has been
purchased in amounts  greater than federal  requirements.  Additional  insurance
covers part of replacement  power expenses  during an  accident-related  nuclear
unit outage.  These policies are issued primarily by mutual insurance  companies
owned by utilities with nuclear  facilities.  If losses at any nuclear  facility
covered  by the  arrangement  were to  exceed  the  accumulated  funds for these
insurance programs,  SCE could be assessed  retrospective premium adjustments of
up to $22 million per year. Insurance premiums are charged to operating expense.


                                       34
<PAGE>

- --------------------------------------------------------------------------------
                                              Southern California Edison Company

Spent Nuclear Fuel

Under the  Nuclear  Waste  Policy Act of 1982,  the DOE is  responsible  for the
selection  and  development  of  repositories  for,  and the  disposal of, spent
nuclear fuel and  high-level  radioactive  waste.  The Act requires that the DOE
provide for the disposal of spent nuclear fuel and high-level  radioactive waste
from nuclear generation  stations beginning January 31, 1998.  However,  the DOE
did not  meet  its  obligations.  It is not  certain  when  the DOE  will  begin
accepting spent nuclear fuel from San Onofre or from other nuclear power plants.

SCE has paid the DOE the required one-time fee applicable to nuclear  generation
at San Onofre through April 6, 1983 (approximately $24 million,  plus interest).
SCE  is  also  paying  the  required   quarterly  fee  equal  to  one  mill  per
kilowatt-hour of nuclear-generated electricity sold after April 6, 1983.

SCE has primary responsibility for the interim storage of its spent nuclear fuel
at San  Onofre.  Current  capability  to store  spent  fuel is  estimated  to be
adequate  through  2005.  Meeting  spent fuel storage  requirements  beyond that
period could require new and separate interim storage facilities,  the costs for
which  have  not  been  determined.  Extended  delays  by the  DOE  can  lead to
consideration of costly alternatives involving siting and environmental issues.

Palo Verde on-site spent fuel storage capacity will accommodate needs until 2002
for Units 1 and 2, and until 2003 for Unit 3. Arizona Public Services, operating
agent for Palo Verde,  has  commenced  construction  of an interim  fuel storage
facility and projects completion in 2002.

SCE and other  owners of nuclear  power  plants  may be able to recover  interim
storage costs arising from DOE delays in the acceptance of utility spent nuclear
fuel by pursuing  relief  under the terms of the  contracts,  as directed by the
courts, through other court actions.
<TABLE>
<CAPTION>

- -------------------------------------------------------------------------------------------------------------------
Quarterly Financial Data
                                                   1998                                       1997                 
                             ------------------------------------------   -----------------------------------------
In millions                  Total    Fourth    Third  Second    First    Total   Fourth  Third    Second    First
- -------------------------------------------------------------------------------------------------------------------

<S>                        <C>       <C>      <C>      <C>       <C>      <C>    <C>     <C>       <C>       <C>   
Operating revenue(1)       $8,847    $2,245   $3,057   $1,922    $1,623   $7,953 $1,980  $2,434    $1,844    $1,695
Operating income              918       241      237      212       228    1,060    248     349       229       234
Net income                    515       121      169      120       105      606    123     233       129       121
Earnings available for
   common stock               490       115      163      114        98      576    116     226       122       112
Common dividends declared   1,101       141      422      442        96    1,829  1,266     217       171       175
- --------------------------------------------------------------------------------------------------------------------
</TABLE>

(1) Effective second quarter 1998, operating revenue includes sales to the PX.


                                       35
<PAGE>

- --------------------------------------------------------------------------------
Responsibility for Financial Reporting

The management of Southern  California  Edison Company (SCE) is responsible  for
the integrity and  objectivity of the  accompanying  financial  statements.  The
statements have been prepared in accordance with generally  accepted  accounting
principles  applied on a consistent  basis and are based, in part, on management
estimates and judgment.

SCE  maintains  systems  of  internal  control to  provide  reasonable,  but not
absolute,  assurance that assets are  safeguarded,  transactions are executed in
accordance with  management's  authorization  and the accounting  records may be
relied upon for the  preparation of the financial  statements.  There are limits
inherent  in all  systems of  internal  control,  the  design of which  involves
management's  judgment and the recognition that the costs of such systems should
not exceed the  benefits to be  derived.  SCE  believes  its systems of internal
control  achieve  this  appropriate  balance.  These  systems are  augmented  by
internal audit programs through which the adequacy and effectiveness of internal
controls and policies and procedures  are  monitored,  evaluated and reported to
management. Actions are taken to correct deficiencies as they are identified.

SCE's independent public accountants,  Arthur Andersen LLP, are engaged to audit
the  financial   statements  in  accordance  with  generally  accepted  auditing
standards and to express an informed  opinion on the  fairness,  in all material
respects,  of SCE's  reported  results of  operations,  cash flows and financial
position.

As a further measure to assure the ongoing objectivity of financial information,
the audit  committee  of the board of  directors,  which is  composed of outside
directors, meets periodically, both jointly and separately, with management, the
independent  public  accountants and internal  auditors,  who have  unrestricted
access to the  committee.  The  committee  recommends  annually  to the board of
directors the appointment of a firm of independent public accountants to conduct
audits of its financial statements;  considers the independence of such firm and
the overall  adequacy of the audit scope and SCE's systems of internal  control;
reviews  financial  reporting  issues;  and is advised of  management's  actions
regarding financial reporting and internal control matters.

SCE maintains high standards in selecting,  training and developing personnel to
assure that its operations are conducted in conformity  with applicable laws and
is  committed to  maintaining  the highest  standards of personal and  corporate
conduct.  Management  maintains programs to encourage and assess compliance with
these standards.






             Richard K. Bushey                     John E. Bryson
             -----------------                     --------------
             Richard K. Bushey                     John E. Bryson
             Vice President                        Chairman of the Board
             and Controller                        and Chief Executive Officer


February 4, 1999


                                       36
<PAGE>

- --------------------------------------------------------------------------------
Report of Independent Public Accountants      Southern California Edison Company

To the Shareholders and the Board of Directors,
Southern California Edison Company:

We have  audited  the  accompanying  consolidated  balance  sheets  of  Southern
California  Edison Company (SCE, a California  corporation) and its subsidiaries
as of December 31, 1998,  and 1997, and the related  consolidated  statements of
income,  comprehensive  income and cash flows for each of the three years in the
period  ended   December  31,  1998.   These   financial   statements   are  the
responsibility of SCE's management.  Our responsibility is to express an opinion
on these financial statements based on our audits.

We  conducted  our  audits  in  accordance  with  generally   accepted  auditing
standards.  Those standards require that we plan and perform the audit to obtain
reasonable assurance about whether the financial statements are free of material
misstatement.  An audit includes examining, on a test basis, evidence supporting
the amounts and disclosures in the financial statements.  An audit also includes
assessing the  accounting  principles  used and  significant  estimates  made by
management,  as well as evaluating the overall financial statement presentation.
We believe that our audits provide a reasonable basis for our opinion.

In our opinion,  the financial  statements  referred to above present fairly, in
all material respects,  the financial position of SCE and its subsidiaries as of
December 31, 1998, and 1997, and the results of their  operations and their cash
flows for each of the three years in the period  ended  December  31,  1998,  in
conformity with generally accepted accounting principles.




                                              ARTHUR ANDERSEN LLP
                                              ARTHUR ANDERSEN LLP


Los Angeles, California
February 4, 1999


                                       37
<PAGE>

- --------------------------------------------------------------------------------
Selected Financial and Operating Data:
1994-1998                                     Southern California Edison Company
<TABLE>
<CAPTION>

Dollars in millions                                  1998          1997         1996         1995         1994
- ------------------------------------------------------------------------------------------------------------------

Income statement data:

<S>              <C>                               <C>          <C>          <C>          <C>           <C>     
Operating revenue(1)                               $   8,847    $   7,953    $   7,583    $   7,873     $  7,799
Operating expenses(2)                                  7,929        6,893        6,450        6,724        6,705
Fuel and purchased power expenses(2)                   4,934        3,735        3,336        3,197        3,403
Income tax from operations                               446          582          578          560          508
Allowance for funds used during construction              20           17           25           34           29
Interest expense-- net                                   485          444          453          464          443
Net income                                               515          606          655          680          639
Earnings available for common stock                      490          576          621          643          599
Ratio of earnings to fixed charges                      2.95         3.49         3.54         3.52         3.43

- ------------------------------------------------------------------------------------------------------------------

Balance sheet data:

Assets                                             $  16,947    $  18,059    $  17,737    $  18,155     $ 18,076
Gross utility plant                                   14,150       21,483       21,134       20,717       20,127
Accumulated provision for depreciation and
  decommissioning                                      6,896       10,544        9,431        8,569        7,710
Common shareholder's equity                            3,335        3,958        5,045        5,144        5,039
Preferred stock:
   Not subject to mandatory redemption                   129          184          284          284          359
   Subject to mandatory redemption                       256          275          275          275          275
Long-term debt                                         5,447        6,145        4,779        5,215        4,988
Capital structure:
   Common shareholder's equity                         36.4%        37.5%        48.6%        47.1%        47.3%
   Preferred stock:
      Not subject to mandatory redemption               1.4%         1.7%         2.7%         2.6%         3.3%
      Subject to mandatory redemption                   2.8%         2.6%         2.7%         2.5%         2.6%
   Long-term debt                                      59.4%        58.2%        46.0%        47.8%        46.8%

- -----------------------------------------------------------------------------------------------------------------

Operating data:

Peak demand in megawatts (MW)                         19,935       19,118       18,207       17,548       18,044
Generation capacity at peak (MW)                      10,546       21,511       21,602       21,603       20,615
Kilowatt-hour sales (kWh) (in millions)               76,595       77,234       75,572       74,296       77,986
Total energy requirement (kWh) (in millions)(3)       80,289       86,849       84,236       81,924       85,011
Energy mix:
   Thermal                                             38.8%        44.6%        47.6%        51.6%        59.5%
   Hydro                                                7.4%         6.5%         6.9%         7.7%         3.9%
   Purchased power and other sources                   53.8%        48.9%        45.5%        40.7%        36.6%
Customers (in millions)                                 4.27         4.25         4.22         4.18         4.15
Full-time employees                                   13,177       12,642       12,057       14,886       16,351

- -----------------------------------------------------------------------------------------------------------------
</TABLE>

(1)  1998 includes $1.3 billion from sales to the power exchange (PX).
(2)  1998 includes $2.0 billion for purchases from the PX.
(3)  1998 excludes direct access and resale customer requirements.


                                       38
<PAGE>

- --------------------------------------------------------------------------------
Board of Directors                            Southern California Edison Company
- --------------------------------------------------------------------------------
<TABLE>
<CAPTION>

<S>                                       <C>                                        <C>    
John E. Bryson                            Charles D. Miller                          Thomas C. Sutton
Chairman of the Board and CEO,            Chairman of the Board,                     Chairman of the Board and CEO,
Edison International and SCE              Avery Dennison Corporation,                Pacific Life Insurance Company,
                                          Pasadena, California                       Newport Beach, California

Winston H. Chen                           Luis G. Nogales                            Daniel M. Tellep
Chairman of the Paramitas Foundation      President,                                 Retired Chairman of the Board,
and Chairman of Paramitas                 Nogales Partners,                          Lockheed Martin Corporation,
Investment Corporation,                   Los Angeles, California                    Bethesda, Maryland
Santa Clara, California

Warren Christopher                        Ronald L. Olson                            James D. Watkins*
Senior Partner,                           Senior Partner,                            Admiral USN, Retired,
O'Melveny & Myers,                        Munger, Tolles and Olson,                  President, Joint Oceanographic
Los Angeles, California                   Los Angeles, California                    Institutions, Inc., and
                                                                                     President, Consortium for
Stephen E. Frank                          James M. Rosser                            Oceanographic Research and Education,
President and Chief Operating             President,                                 Washington, D.C.
Officer, SCE                              California State University, Los Angeles
                                          Los Angeles, California
                                                                                     Edward Zapanta, M.D.
Joan C. Hanley                            E. L. Shannon, Jr.*                        Physician and Neurosurgeon,
Former General Partner,                   Retired Chairman of the Board,             Torrance, California
Miramonte Vineyards,                      Santa Fe International Corporation,
Rancho Palos Verdes, California           Alhambra, California

Carl F. Huntsinger                        Robert H. Smith
General Partner,                          Managing Director,
DAE Limited Partnership Ltd.,             Smith and Crowley Incorporated,
Ojai, California                          Pasadena, California

* Retiring on April 15, 1999

- ----------------------------------------------------------------------------------------------------------------------
Management Team
- ----------------------------------------------------------------------------------------------------------------------

John E. Bryson                            Robert G. Foster                      R. W. Krieger
Chairman of the Board and CEO             Senior Vice President,                Vice President, Nuclear Generation
                                          Public Affairs
Stephen E. Frank                                                                J. Michael Mendez
President and Chief Operating Officer     Lillian R. Gorman                     Vice President, Labor Relations
                                          Senior Vice President, Human
                                          Resources
Bryant C. Danner                                                                Thomas M. Noonan***
Executive Vice President and              Richard M. Rosenblum                  Vice President and Controller
General Counsel                           Senior Vice President,
                                          T&D Business Unit                     Dwight E. Nunn
Alan J. Fohrer                                                                  Vice President, Nuclear Engineering
Executive Vice President and              Emiko Banfield                        and Technical Services
Chief Financial Officer                   Vice President, Shared Services
                                                                                Frank J. Quevedo
Harold B. Ray                                                                   Vice President, Equal Opportunity
Executive Vice President,                 Richard K. Bushey**
Generation Business Unit                  Vice President and Controller         Anthony L. Smith***
                                                                                Vice President, Tax
Pamela A. Bass                            Bruce C. Foster
Senior Vice President,                    Vice President,                       Mahvash Yazdi
Customer Service  Business Unit           San Francisco Regulatory Affairs      Vice President and Chief
                                                                                Information Officer
Theodore F. Craver, Jr.                   Lawrence D. Hamlin
Senior Vice President and Treasurer       Vice President, Power Production      Beverly P. Ryder
                                                                                Corporate Secretary
John R. Fielder                           Thomas J. Higgins
Senior Vice President,                    Vice President,
Regulatory Policy and Affairs             Corporate Communications

**   Resigned March 1, 1999
***  Effective March 1, 1999
</TABLE>

                                       39
<PAGE>

Shareholder Information

- --------------------------------------------------------------------------------
Annual Meeting of Shareholders

Thursday, April 15, 1999 10:00 a.m.
The Industry Hills Sheraton Resort and Conference Center
One Industry Hills Parkway
City of Industry, California

- --------------------------------------------------------------------------------
Stock Listing and Trading Information

SCE Preferred Stock

The American and Pacific stock  exchanges  use the ticker  symbol SCE.  Previous
day's closing  prices,  when traded,  are listed in the daily  newspapers in the
American  Stock Exchange table under the symbol  SoCalEd.  The 6.05%,  6.45% and
7.23% series are not listed.

Where to Buy and Sell Stock

The listed preferred  stocks may be purchased  through any brokerage firm. Firms
handling unlisted series can be located through your broker.

- --------------------------------------------------------------------------------
Transfer Agent and Registrar

Southern California Edison Company maintains shareholder records and is transfer
agent and registrar for SCE preferred  stock.  Shareholders may call Shareholder
Services,  (800) 347-8625,  between 8:00 a.m. and 4:00 p.m. (Pacific time) every
business day, regarding:

o        stock transfer and name-change requirements;
o        address changes, including dividend addresses;
o        electronic deposit of dividends;
o        taxpayer identification number submission or changes;
o        duplicate 1099 forms and W-9 forms;
o        notices of and replacement of lost or destroyed stock certificates;
o        dividend checks;
o        requests to eliminate multiple annual report mailings; and
o        request access to online account information via Edison 
         International's Internet Home Page, www.edisoninvestor.com

The address of Shareholder Services is:

P.O. Box 400, Rosemead, California 91770-0400
FAX:  (626) 302-4815

<PAGE>












Southern California Edison
2244 Walnut Grove Avenue
Rosemead, California 91770
(626) 302-1212







                                                                  EXHIBIT 23



                    CONSENT OF INDEPENDENT PUBLIC ACCOUNTANTS


     As independent public accountants we hereby consent to the incorporation by
reference of our report dated February 4, 1999, (the Report of Independent
Public Accounts) appearing on page 37 of the 1998 Annual Report to Shareholders
of Southern California Edison Company (Exhibit 13 included herein) in this
Annual Report on Form 10-K for the year ended December 31, 1998 of Southern
California Edison Company. It should be noted that we have performed no audit
procedures subsequent to February 4, 1999, the date of our report. Furthermore,
we have not audited any financial statements of Edison International as of any
date or period subsequent to December 31, 1998.

     We further consent to the incorporation by reference of the above-mentioned
Report of Independent Public Accountants, incorporated by reference in this
Annual Report on Form 10-K, and to the incorporation by reference of our report
(the Report of Independent Public Accountants on supplemental schedules),
appearing on page 30 of this Annual Report on Form 10-K, in the Southern
California Edison Company Registration Statements which follow:

     Registration Form               File No.                Effective Date
     -----------------               -------                 --------------

        Form S-3                     33-53288                November 6, 1992
        Form S-3                     33-50251                September 21, 1993
        Form S-3                     33-59001                May 15, 1995
        Form S-3                     333-00497               February 2, 1996



                                            ARTHUR ANDERSEN LLP
                                            ARTHUR ANDERSEN LLP

Los Angeles, California
March 24, 1999




                                                                  EXHIBIT 24.1

                       SOUTHERN CALIFORNIA EDISON COMPANY

                                POWER OF ATTORNEY

     The undersigned, SOUTHERN CALIFORNIA EDISON COMPANY, a California
corporation, and certain of its officers and/or directors do each hereby
constitute and appoint, BRYANT C. DANNER, ALAN J. FOHRER, THEODORE F. CRAVER,
JR., THOMAS M. NOONAN, BEVERLY P. RYDER, KENNETH S. STEWART, MARY C. SIMPSON,
PAIGE W.R. WHITE, TIMOTHY W. ROGERS, PEGGY A. STERN, RAYNA M. MORRISON, BONITA
J. SMITH, POLLY L. GAULT, BEVERLY K. MARSHALL, DOUGLAS G. GREEN and J. A.
BOUKNIGHT, JR., or any of them, to act as attorney-in-fact, for and in their
respective names, places, and steads, to execute, sign, and file or cause to be
filed an Annual Report on Form 10-K for the fiscal year ended December 31, 1998,
Quarterly Reports on Form 10-Q for each of the first three quarters of fiscal
year 1999, any Current Reports on Form 8-K from time to time during 1999 and
through March 16, 2000, and any and all supplements and amendments thereto, to
be filed by Southern California Edison Company with the Securities and Exchange
Commission, under the Securities Exchange Act of 1934 as amended, (the "Act"),
for the purpose of complying with Sections 13 or 15(d) of the Act, granting unto
said attorneys-in-fact, and each of them, full power and authority to do and
perform all and every act and thing whatsoever requisite, necessary and
appropriate to be done in and about the premises as fully and to all intents and
purposes as the undersigned or any of them might or could do if personally
present, hereby ratifying and approving the acts of each of said
attorneys-in-fact.

     Executed at Rosemead, California, as of this 18th day of March, 1999.
SOUTHERN CALIFORNIA EDISON COMPANY


                            By:  JOHN E. BRYSON
                                 ------------------------
                                 JOHN E. BRYSON
                                 Chairman of the Board
                                 and Chief Executive Officer

Attest:

BEVERLY P. RYDER
- ---------------------------
BEVERLY P. RYDER
Secretary


<PAGE>


                     1999 Southern California Edison Company
                      10-K, 10-Q, and 8-K Power of Attorney


Principal Executive Officer:

John E. Bryson
- ---------------------------                     Chairman of the Board, Chief
John E. Bryson                                  Executive Officer and Director


Principal Financial Officer:

Alan J. Fohrer
- ----------------------------
Alan J. Fohrer                                  Executive Vice President,
                                                and Chief Financial Officer


Controller and Principal Accounting Officer:

Thomas M. Noonan
- ----------------------------
Thomas M. Noonan                                Vice President and Controller


Additional Directors:

Winston H. Chen               Director      James M. Rosser         Director
- -----------------------------               -----------------------
Winston H. Chen                             James M. Rosser

Warren Christopher            Director      E. L. Shannon, Jr.      Director
- -----------------------------               -----------------------
Warren Christopher                          E. L. Shannon, Jr.

Stephen E. Frank              Director      Robert H. Smith         Director
- -----------------------------               -----------------------
Stephen E. Frank                            Robert H. Smith

Joan C. Hanley                Director      Thomas C. Sutton        Director
- -----------------------------               -----------------------
Joan C. Hanley                              Thomas C. Sutton

Carl F. Huntsinger            Director      Daniel M. Tellep        Director
- -----------------------------               -----------------------
Carl F. Huntsinger                          Daniel M. Tellep

Charles D. Miller             Director      James D. Watkins        Director
- -----------------------------               -----------------------
Charles D. Miller                           James D. Watkins

Luis G. Nogales               Director      Edward Zapanta          Director
- -----------------------------               -----------------------
Luis G. Nogales                             Edward Zapanta

Ronald L. Olson               Director
- -----------------------------
Ronald L. Olson




                                                                 EXHIBIT 24.2


     I, Bonita J. Smith, Assistant Secretary of Southern California Edison
Company, certify that the attached is an accurate and complete copy of a
resolution of the Board of Directors of the corporation, duly adopted at a
meeting of its Board of Directors held on March 18, 1999.

Dated:  March 19, 1999.






Bonita J. Smith
- -------------------------------
Bonita J. Smith
Assistant Secretary
Southern California Edison


                                       
<PAGE>



                     RESOLUTION OF THE BOARD OF DIRECTORS OF
                       SOUTHERN CALIFORNIA EDISON COMPANY
                             Adopted: March 18, 1999
                          RE: FORMS 10-K, 10-Q, AND 8-K

     WHEREAS, the Securities Exchange Act of 1934, as amended, and regulations
thereunder, require that Annual, Quarterly, and Current Reports be filed with
the Securities and Exchange Commission ("Commission"), and it is desirable to
effect such filings over the signatures of attorneys-in-fact;

     NOW, THEREFORE, BE IT RESOLVED, that each of the officers of this
corporation is hereby authorized to file or cause to be filed with the
Commission the Annual Report on Form 10-K of this corporation for the fiscal
year ended December 31, 1998, Quarterly Reports on Form 10-Q for each of the
first three quarters of fiscal year 1999, Current Reports on Form 8-K from time
to time during 1999 and through March 16, 2000, and any required or appropriate
supplements or amendments to such reports, all in such forms as the officer
acting or counsel for this corporation considers appropriate.

     BE IT FURTHER RESOLVED, that each of the officers of this corporation is
hereby authorized to execute and deliver on behalf of this corporation and in
its name a power of attorney appointing Bryant C. Danner, Alan J. Fohrer,
Theodore F. Craver, Jr., Thomas M. Noonan, Beverly P. Ryder, Kenneth S. Stewart,
Mary C. Simpson, Paige W. R. White, Timothy W. Rogers, Peggy A. Stern, Rayna M.
Morrison, Bonita J. Smith, Polly L. Gault, Beverly K. Marshall, Douglas G. Green
and J. A. Bouknight, Jr., and each of them, to act severally as attorney-in-fact
for this corporation for the purpose of executing and filing with the Commission
the above-described reports and any amendments and supplements thereto.

APPROVED:


John E. Bryson
- -------------------------------------
John E. Bryson
Chairman of the Board


Bryant C. Danner
- -------------------------------------
Bryant C. Danner
Executive Vice President and General Counsel



<TABLE> <S> <C>



<ARTICLE> UT
<LEGEND>
Edison Finanical Data Schedule -- Exhibit 27
</LEGEND>
<MULTIPLIER> 1,000
       
<S>                                                   <C>
<PERIOD-TYPE>                                         YEAR
<FISCAL-YEAR-END>                                               DEC-31-1998
<PERIOD-END>                                                    DEC-31-1998
<BOOK-VALUE>                                                    PER-BOOK
<TOTAL-NET-UTILITY-PLANT>                                       7,253,582
<OTHER-PROPERTY-AND-INVEST>                                     2,476,090
<TOTAL-CURRENT-ASSETS>                                          2,377,294
<TOTAL-DEFERRED-CHARGES>                                        4,839,962
<OTHER-ASSETS>                                                          0
<TOTAL-ASSETS>                                                 16,946,928
<COMMON>                                                        2,168,054
<CAPITAL-SURPLUS-PAID-IN>                                         373,493
<RETAINED-EARNINGS>                                               793,625
<TOTAL-COMMON-STOCKHOLDERS-EQ>                                  3,335,172
                                             255,700
                                                       128,755
<LONG-TERM-DEBT-NET>                                            2,568,297
<SHORT-TERM-NOTES>                                                      0
<LONG-TERM-NOTES-PAYABLE>                                       2,878,341
<COMMERCIAL-PAPER-OBLIGATIONS>                                    577,506
<LONG-TERM-DEBT-CURRENT-PORT>                                     400,810
                                               0
<CAPITAL-LEASE-OBLIGATIONS>                                             0
<LEASES-CURRENT>                                                        0
<OTHER-ITEMS-CAPITAL-AND-LIAB>                                  6,802,347
<TOT-CAPITALIZATION-AND-LIAB>                                  16,946,928
<GROSS-OPERATING-REVENUE>                                       8,847,098
<INCOME-TAX-EXPENSE>                                              445,642
<OTHER-OPERATING-EXPENSES>                                      7,483,758
<TOTAL-OPERATING-EXPENSES>                                      7,929,400
<OPERATING-INCOME-LOSS>                                           917,698
<OTHER-INCOME-NET>                                                 74,166
<INCOME-BEFORE-INTEREST-EXPEN>                                    991,864
<TOTAL-INTEREST-EXPENSE>                                          476,742
<NET-INCOME>                                                      515,122
                                        24,632
<EARNINGS-AVAILABLE-FOR-COMM>                                     490,490
<COMMON-STOCK-DIVIDENDS>                                        1,100,777
<TOTAL-INTEREST-ON-BONDS>                                         389,951
<CASH-FLOW-OPERATIONS>                                          1,008,131
<EPS-PRIMARY>                                                         0.0
<EPS-DILUTED>                                                         0.0
        



</TABLE>


© 2022 IncJournal is not affiliated with or endorsed by the U.S. Securities and Exchange Commission