SOUTHWESTERN ELECTRIC POWER CO
35-CERT, 1996-11-12
ELECTRIC SERVICES
Previous: SOUTHWEST WATER CO, 10-Q, 1996-11-12
Next: SPARTON CORP, 10-Q, 1996-11-12



                               UNITED STATES OF AMERICA
                                      before the
                          SECURITIES AND EXCHANGE COMMISSION




PUBLIC UTILITY HOLDING COMPANY ACT OF 1935



In the Matter of


SOUTHWESTERN ELECTRIC POWER COMPANY             REPORT FOR PERIOD
Shreveport, Louisiana 71156                     July 1, 1996 TO
                                                September 30, 1996
PUBLIC SERVICE COMPANY OF OKLAHOMA              PURSUANT TO RULE 24
Tulsa, Oklahoma 74102


File No. 70-5741




This report is filed by Southwestern Electric Power Company (SWEPCO) on behalf
of itself and Public Service Company of Oklahoma (PSO) pursuant to Rule 24
promulgated under the Public Utility Holding Company Act of 1935 by the
Securities and Exchange Commission pursuant to Sections 6(a), 7, 9(a) and 10 of
said Act. SWEPCO's and PSO's Application-Declaration, as further amended by
post-effective amendments, in this matter proposed the filing by SWEPCO of
quarterly reports to the Commission, pursuant to Rule 24 of the Act, providing
as to the activities during each quarter: (a) total number of rail cars serviced
by month for both SWEPCO and PSO; (b) the amount of expenditures by month for
direct labor, direct material cost, and indirect expenses for both SWEPCO and
PSO; (c) computation by month of allocated cost to be shared by SWEPCO and PSO
on the basis of the "Cost Ratio", and (d) copies of the monthly reports
furnished by SWEPCO to PSO detailing the work and charges associated with PSO
rail cars assigned to the facility which were repaired during the previous
month, within the context of the Rail Car Maintenance Facility Agreement between
SWEPCO and PSO. This report covers the period July 1, 1996 through September 30,
1996.




A. NUMBER OF RAIL CARS SERVICED
                                   SWEPCO        PSO         TOTAL
           JULY 1996                   378         217           595
           AUGUST 1996                 385         235           620
           SEPTEMBER 1996              464         147           611
                               ------------ ----------- -------------
           TOTAL                     1,227         599         1,826
                               ============ =========== =============

B. AMOUNT OF EXPENDITURES DETAIL
                                   SWEPCO        PSO         TOTAL
      DIRECT LABOR -
           JULY 1996               $45,114     $10,796       $55,910
           AUGUST 1996              38,780      17,149        55,929
           SEPTEMBER 1996           46,640      10,107        56,747
                               ------------ ----------- -------------
           TOTAL                  $130,534     $38,052      $168,586
                               ============ =========== =============

      DIRECT MATERIAL -
           JULY 1996              $253,464      $9,806      $263,270
           AUGUST 1996             173,555     161,413       334,968
           SEPTEMBER 1996          228,333      40,887       269,220
                               ------------ ----------- -------------
           TOTAL                  $655,352    $212,106      $867,458
                               ============ =========== =============

      OTHER DIRECT EXPENSES -
           JULY 1996              ($11,114)    $60,423       $49,309
           AUGUST 1996             (76,442)    (69,145)     (145,587)
           SEPTEMBER 1996          (35,401)    (10,240)      (45,641)
                               ============ =========== =============
           TOTAL                 ($122,957)   ($18,962)    ($141,919)
                               ============ =========== =============

      INDIRECT EXPENSES SHARED ON
      COST RATIO
           JULY 1996               $86,755     $20,761      $107,516
           AUGUST 1996              54,543      24,117        78,660
           SEPTEMBER 1996           55,749      12,080        67,829
                               ------------ ----------- -------------
           TOTAL                  $197,047     $56,958      $254,005
                               ============ =========== =============

      TOTAL EXPENDITURES
           JULY 1996              $374,219    $101,786      $476,005
           AUGUST 1996             190,436     133,534       323,970
           SEPTEMBER 1996          295,321      52,834       348,155
                               ------------ ----------- -------------
           TOTAL                  $859,976    $288,154    $1,148,130
                               ============ =========== =============


C. COMPUTATION OF COST RATIO     SWEPCO        PSO         TOTAL
      JULY 1996
           DIRECT LABOR          $45,114     $10,796      $55,910
           COST RATIO            80.69%       19.31%      100.00%

      AUGUST 1996
           DIRECT LABOR          $38,780     $17,149      $55,929
           COST RATIO            69.34%       30.66%      100.00%

      SEPTEMBER 1996
           DIRECT LABOR          $46,640     $10,107      $56,747
           COST RATIO            82.19%       17.81%      100.00%


D. COPIES OF MONTHLY REPORTS

Copies of the monthly statements furnished by SWEPCO to PSO detailing charges
associated with PSO rail cars are attached as Exhibits 1, 2 and 3.


                                S I G N A T U R E




As required by Order of this Commission pursuant to the Public Utility Holding
Company Act of 1935, Southwestern Electric Power Company has duly caused this
report to be signed on its behalf on this the 7th day of November, 1996.


                              SOUTHWESTERN ELECTRIC POWER COMPANY




                              By  /S/   R. RUSSELL DAVIS
                                        R. Russell Davis
                                        Controller and
                                   Chief Accounting Officer





<PAGE>




                                INDEX TO EXHIBITS




    Exhibit                                                        Transmission
    NUMBER                          EXHIBIT                            METHOD


      1            July 1996 statement furnished by SWEPCO to         Electronic
                      PSO detailing PSO's rail car charges


      2            August 1996 statement furnished by SWEPCO to       Electronic
                      PSO detailing PSO's rail car charges


      3            September 1996 statement furnished by SWEPCO       Electronic
                     to PSO detailing PSO's rail car charges






                       CENTRAL AND SOUTH WEST SERVICES, INC.         Exhibit 1
                         P.O. BOX 21928 TULSA, OKLAHOMA             Page 1 of 3
                        TELEPHONE NUMBER (918) 594 - 2000

           STATEMENT OF PARTICIPATION IN RAIL CAR MAINTENANCE FACILITY
                AT ALLIANCE, NEBRASKA PER SWEPCO - PSO AGREEMENT

                                    JULY 1996


A.  NUMBER OF RAIL CARS SERVICED

SWEPCO         378        PSO       217

B.  AMOUNT OF EXPENDITURES:                         SHARED    SWEPCO     PSO

COSTS ASSIGNED 100% TO SWEPCO:

PR4001  Direct Material to SWEPCO Coal Cars              $253,464.23
PR4018  Stores Salvage - SWEPCO                           (63,864.63)
PR4101  Direct Labor to SWEPCO Coal Cars                   26,370.15
PR4104  Direct Labor to Rework SWEPCO Material             18,744.09
PR4202  Ad Valorem Taxes - SWEPCO Coal Cars                     0.00
PR4204  Ad Valorem Taxes - Facility - Direct - SWEPCO         168.00
PR4213  Employee Fringe Benefits - Direct Labor - SWEPCO    7,828.32
PR4230  Payroll Taxes (FICA & UC) - Direct Labor - SWEPCO   3,515.58
PR4238  Depreciation Expense - SWEPCO                      10,604.00
PR4263  Lease - Supplemental Expenses - SWEPCO                  0.00
PR4270  Outside Maintenance of SWEPCO Coal Cars            35,706.24
PR4272  Switching Fees - SWEPCO                             5,532.38
PR4277  Repainting Coal Cars - SWEPCO                           0.00
                                                          ----------

                 Total 100% SWEPCO Costs                 $298,068.36
                                                         ===========


COSTS ASSIGNED 100% TO PSO:

PR4002  Direct Material to PSO Coal Cars                             $62,021.16
PR4015  Inventory Carrying Charges - PSO                               3,094.34
PR4019  Stores Salvage - PSO                                         (15,960.64)
PR4102  Direct Labor to PSO Coal Cars                                  9,805.90
PR4103  Direct Labor to Rework PSO Material                              990.10
PR4205  Ad Valorem Taxes - Facility - Direct - PSO                       101.00
PR4214  Employee Fringe Benefits - Direct Labor - PSO                  1,397.24
PR4231  Payroll Taxes (FICA & UC) - Direct Labor - PSO                   842.14
PR4239  Depreciation Expense - PSO                                         0.00
PR4271  Outside Maintenance of PSO Coal Cars                          17,105.83
PR4273  Switching Fees - PSO                                           1,627.24
PR4278  Repainting Coal Cars - PSO                                         0.00
                                                                     ----------

                Total 100% PSO Costs                                 $81,024.31
                                                                     ==========

<PAGE>

                                                                     Exhibit 1
                                                                    Page 2 of 3

COSTS TO BE SHARED {Ratio of Direct Labor}:         SHARED    SWEPCO     PSO


PR4010  Shop Material                         $11,253.96
PR4011  Small Tools                               297.28
PR4012  Facility Maintenance - Material           789.77
PR4013  Sale of Scrap (Cr.)                         0.00
PR4016  Switch Engine Operation and Maintenance     0.00
PR4017  Equipment Operation and Maintenance     2,397.70
PR4020  Stores Salvage - Joint                      0.00
PR4110  Supervision                            10,580.62
PR4111  Clerical                                3,555.89
PR4112  Training and Safety                         0.00
PR4113  General Shop Labor                      3,533.79
PR4114  Facility Maintenance - Labor            9,558.93
PR4116  Switch Engine Operation and Maintenance 9,344.87
PR4201  Ad Valorem Taxes - Facility             3,087.00
PR4203  Taxes - Other                           1,234.00
PR4206  Data Processing Charges                   574.40
PR4207  General Office Overhead                 1,306.25
PR4210  Employee Activities                        52.00
PR4211  Employee Expenses                       1,031.64
PR4212  Employee Fringe Benefits                4,246.19
PR4215  Employee Sick Benefits                      0.00
PR4220  Injuries and Damages                        0.00
PR4221  Insurance - Liability and Property        269.85
PR4225  Maintenance of Facilities (Contracted)  1,970.00
PR4226  Office Supplies and Expenses              581.93
PR4232  Payroll Taxes (FICA & UC) - Other       2,864.10
PR4233  Special Services                            0.00
PR4234  Utilities - Heat, Light, Power and 
          Water                                 3,904.74
PR4235  Utilities - Telephone                     617.04
PR4236  Vehicle Expense                         1,502.00
PR4237  Depreciation Expense                        0.00
PR4250  Miscellaneous                               0.00
PR4262  Lease - Basic - All Except Coal Cars   32,962.00
PR4264  Lease - Supplemental Expenses - 
          Facilility                                0.00
               Total Costs Shared on Cost Ratio
                  {see computation below} -

                                              ----------  ----------  ----------
     SWEPCO      80.69% PSO      19.31%      $107,515.95  $86,754.62  $20,761.33


           Capital Recovery on Capital Expenditures not
            Covered Under Lease Agreement {Cost Ratio}                  2,100.21
                                                                      ----------


                 TOTAL COSTS FOR THE MONTH               $384,822.98 $103,885.85
                                                         =========== ===========
<PAGE>

                                                                     Exhibit 1
                                                                     Page 3 of 3


C. COMPUTATION OF COST RATIO:



101, 104   Direct Labor SWEPCO         $45,114.24     80.69%  SWEPCO

102, 103   Direct Labor PSO             10,796.00     19.31%  PSO
                                       ----------    ------

           Total Direct Labor          $55,910.24    100.00%
                                       ==========    ======



                       CENTRAL AND SOUTH WEST SERVICES, INC.         Exhibit 2
                          P.O. BOX 21928 TULSA, OKLAHOMA            Page 1 of 3
                        TELEPHONE NUMBER (918) 594 - 2000

           STATEMENT OF PARTICIPATION IN RAIL CAR MAINTENANCE FACILITY
                AT ALLIANCE, NEBRASKA PER SWEPCO - PSO AGREEMENT

                                   AUGUST 1996


A.  NUMBER OF RAIL CARS SERVICED

SWEPCO         385        PSO      235

B.  AMOUNT OF EXPENDITURES:                         SHARED    SWEPCO     PSO

COSTS ASSIGNED 100% TO SWEPCO:

PR4001  Direct Material to SWEPCO Coal Cars              $173,554.96
PR4018  Stores Salvage - SWEPCO                          (117,031.76)
PR4101  Direct Labor to SWEPCO Coal Cars                   22,148.24
PR4104  Direct Labor to Rework SWEPCO Material             16,631.61
PR4202  Ad Valorem Taxes - SWEPCO Coal Cars                     0.00
PR4204  Ad Valorem Taxes - Facility - Direct - SWEPCO         168.00
PR4213  Employee Fringe Benefits - Direct Labor - SWEPCO    9,084.55
PR4230  Payroll Taxes (FICA & UC) - Direct Labor - SWEPCO   3,024.83
PR4238  Depreciation Expense - SWEPCO                      10,665.00
PR4263  Lease - Supplemental Expenses - SWEPCO                  0.00
PR4270  Outside Maintenance of SWEPCO Coal Cars            15,380.24
PR4272  Switching Fees - SWEPCO                             2,268.02
PR4277  Repainting Coal Cars - SWEPCO                           0.00
                                                         -----------

                 Total 100% SWEPCO Costs                 $135,893.69
                                                         ===========


COSTS ASSIGNED 100% TO PSO:

PR4002  Direct Material to PSO Coal Cars                            $161,413.06
PR4015  Inventory Carrying Charges - PSO                               3,109.86
PR4019  Stores Salvage - PSO                                         (83,940.70)
PR4102  Direct Labor to PSO Coal Cars                                 16,212.83
PR4103  Direct Labor to Rework PSO Material                              936.56
PR4205  Ad Valorem Taxes - Facility - Direct - PSO                       101.00
PR4214  Employee Fringe Benefits - Direct Labor - PSO                  4,017.45
PR4231  Payroll Taxes (FICA & UC) - Direct Labor - PSO                 1,337.71
PR4239  Depreciation Expense - PSO                                         0.00
PR4271  Outside Maintenance of PSO Coal Cars                           4,924.07
PR4273  Switching Fees - PSO                                           1,305.12
PR4278  Repainting Coal Cars - PSO                                         0.00
                                                                     ----------

                Total 100% PSO Costs                                $109,416.96
                                                                     ==========
<PAGE>

                                                                     Exhibit 2
                                                                    Page 2 of 3


COSTS TO BE SHARED {Ratio of Direct Labor}:         SHARED    SWEPCO     PSO


PR4010  Shop Material                          $4,101.48
PR4011  Small Tools                               399.62
PR4012  Facility Maintenance - Material           621.71
PR4013  Sale of Scrap (Cr.)                    (1,000.00)
PR4016  Switch Engine Operation and
          Maintenance                           2,035.05
PR4017  Equipment Operation and Maintenance     6,805.31
PR4020  Stores Salvage - Joint                      0.00
PR4110  Supervision                             8,635.52
PR4111  Clerical                                3,775.51
PR4112  Training and Safety                        46.83
PR4113  General Shop Labor                      4,227.02
PR4114  Facility Maintenance - Labor           11,444.64
PR4116  Switch Engine Operation and
          Maintenance                           9,693.07
PR4201  Ad Valorem Taxes - Facility             3,087.00
PR4203  Taxes - Other                           1,234.00
PR4206  Data Processing Charges                   574.40
PR4207  General Office Overhead                 1,295.77
PR4210  Employee Activities                        82.32
PR4211  Employee Expenses                       1,877.19
PR4212  Employee Fringe Benefits                9,601.14
PR4215  Employee Sick Benefits                      0.00
PR4220  Injuries and Damages                        0.00
PR4221  Insurance - Liability and Property        269.85
PR4225  Maintenance of Facilities
          (Contracted)                          1,500.00
PR4226  Office Supplies and Expenses            4,414.03
PR4232  Payroll Taxes (FICA & UC) - Other       2,983.06
PR4233  Special Services                            0.00
PR4234  Utilities - Heat, Light, Power and
          Water                                    10.05
PR4235  Utilities - Telephone                     627.18
PR4236  Vehicle Expense                           317.96
PR4237  Depreciation Expense                        0.00
PR4250  Miscellaneous                               0.00
PR4262  Lease - Basic - All Except Coal Cars        0.00
PR4264  Lease - Supplemental Expenses -
          Facility                                  0.00
               Total Costs Shared on Cost Ratio
                  {see computation below} -

                                              ----------  ----------  ----------
     SWEPCO      69.34% PSO        30.66%     $78,659.71  $54,542.64  $24,117.07


           Capital Recovery on Capital Expenditures not
            Covered Under Lease Agreement {Cost Ratio}                  3,334.66
                                                                       ---------


                       TOTAL COSTS FOR THE MONTH         $190,436.33 $136,868.69
                                                         =========== ===========
<PAGE>

                                                                    Exhibit 2
                                                                   Page 3 of 3


C. COMPUTATION OF COST RATIO:



101, 104   Direct Labor SWEPCO       $38,779.85     69.34%  SWEPCO

102, 103   Direct Labor PSO           17,149.39     30.66%  PSO
                                     ----------  --------

           Total Direct Labor        $55,929.24    100.00%
                                     ==========  ========


                       CENTRAL AND SOUTH WEST SERVICES, INC.        Exhibit 3
                          P.O. BOX 21928 TULSA, OKLAHOMA           Page 1 of 3
                        TELEPHONE NUMBER (918) 594 - 2000

           STATEMENT OF PARTICIPATION IN RAIL CAR MAINTENANCE FACILITY
                AT ALLIANCE, NEBRASKA PER SWEPCO - PSO AGREEMENT

                                 SEPTEMBER 1996


A.  NUMBER OF RAIL CARS SERVICED

SWEPCO         464        PSO     147

B.  AMOUNT OF EXPENDITURES:                         SHARED    SWEPCO     PSO

COSTS ASSIGNED 100% TO SWEPCO:

PR4001  Direct Material to SWEPCO Coal Cars              $228,333.18
PR4018  Stores Salvage - SWEPCO                           (65,282.44)
PR4101  Direct Labor to SWEPCO Coal Cars                   31,703.91
PR4104  Direct Labor to Rework SWEPCO Material             14,936.27
PR4202  Ad Valorem Taxes - SWEPCO Coal Cars                     0.00
PR4204  Ad Valorem Taxes - Facility - Direct - SWEPCO         168.00
PR4213  Employee Fringe Benefits - Direct Labor - SWEPCO   10,926.03
PR4230  Payroll Taxes (FICA & UC) - Direct Labor - SWEPCO   3,637.85
PR4238  Depreciation Expense - SWEPCO                      10,724.00
PR4263  Lease - Supplemental Expenses - SWEPCO                  0.00
PR4270  Outside Maintenance of SWEPCO Coal Cars                 0.00
PR4272  Switching Fees - SWEPCO                             4,425.38
PR4277  Repainting Coal Cars - SWEPCO                           0.00
                                                         -----------

                 Total 100% SWEPCO Costs                 $239,572.18
                                                         ===========


COSTS ASSIGNED 100% TO PSO:

PR4002  Direct Material to PSO Coal Cars                             $40,887.01
PR4015  Inventory Carrying Charges - PSO                               3,204.57
PR4019  Stores Salvage - PSO                                         (19,545.78)
PR4102  Direct Labor to PSO Coal Cars                                  9,102.69
PR4103  Direct Labor to Rework PSO Material                            1,004.48
PR4205  Ad Valorem Taxes - Facility - Direct - PSO                       101.00
PR4214  Employee Fringe Benefits - Direct Labor - PSO                  2,367.81
PR4231  Payroll Taxes (FICA & UC) - Direct Labor - PSO                   788.34
PR4239  Depreciation Expense - PSO                                         0.00
PR4271  Outside Maintenance of PSO Coal Cars                               0.00
PR4273  Switching Fees - PSO                                           2,843.77
PR4278  Repainting Coal Cars - PSO                                         0.00
                                                                     ----------

                Total 100% PSO Costs                                 $40,753.89
                                                                     ==========

                                                                     Exhibit 3
                                                                    Page 2 of 3


COSTS TO BE SHARED {Ratio of Direct Labor}:         SHARED    SWEPCO     PSO


PR4010  Shop Material                          $3,109.20
PR4011  Small Tools                                25.33
PR4012  Facility Maintenance - Material           717.48
PR4013  Sale of Scrap (Cr.)                         0.00
PR4016  Switch Engine Operation and
          Maintenance                             381.55
PR4017  Equipment Operation and Maintenance     6,707.38
PR4020  Stores Salvage - Joint                      0.00
PR4110  Supervision                            10,095.76
PR4111  Clerical                                3,882.14
PR4112  Training and Safety                         0.00
PR4113  General Shop Labor                      3,628.07
PR4114  Facility Maintenance - Labor            8,198.01
PR4116  Switch Engine Operation and
          Maintenance                           9,030.35
PR4201  Ad Valorem Taxes - Facility             3,087.00
PR4203  Taxes - Other                               0.00
PR4206  Data Processing Charges                   574.40
PR4207  General Office Overhead                 1,319.68
PR4210  Employee Activities                        19.54
PR4211  Employee Expenses                          71.21
PR4212  Employee Fringe Benefits                8,455.57
PR4215  Employee Sick Benefits                      0.00
PR4220  Injuries and Damages                        0.00
PR4221  Insurance - Liability and Property        269.85
PR4225  Maintenance of Facilities
          (Contracted)                            800.00
PR4226  Office Supplies and Expenses              730.83
PR4232  Payroll Taxes (FICA & UC) - Other       2,746.41
PR4233  Special Services                            0.00
PR4234  Utilities - Heat, Light, Power and
          Water                                 3,177.09
PR4235  Utilities - Telephone                     502.47
PR4236  Vehicle Expense                             0.00
PR4237  Depreciation Expense                        0.00
PR4250  Miscellaneous                             300.00
PR4262  Lease - Basic - All Except Coal CarS        0.00
PR4264  Lease - Supplemental Expenses -
          Facility                                  0.00
               Total Costs Shared on Cost Ratio
                  {see computation below} -

                                              ----------  ----------  ----------
   SWEPCO      82.19% PSO      17.81%         $67,829.32  $55,748.92  $12,080.40


           Capital Recovery on Capital Expenditures not
            Covered Under Lease Agreement {Cost Ratio}                  1,937.06
                                                                      ----------


                       TOTAL COSTS FOR THE MONTH         $295,321.10  $54,771.35
                                                         ===========  ==========
<PAGE>

                                                                    Exhibit 3
                                                                   Page 3 of 3

C. COMPUTATION OF COST RATIO:



101, 104   Direct Labor SWEPCO         $46,640.18     82.19%  SWEPCO

102, 103   Direct Labor PSO             10,107.17     17.81%  PSO
                                       ----------    ------

           Total Direct Labor          $56,747.35    100.00%
                                       ==========    ======