SOUTHWESTERN ELECTRIC POWER CO
35-CERT, 1997-05-07
ELECTRIC SERVICES
Previous: SECURITY LAND & DEVELOPMENT CORP, 10QSB, 1997-05-07
Next: SOUTHWESTERN ELECTRIC POWER CO, 424B2, 1997-05-07



                            UNITED STATES OF AMERICA
                                   before the
                       SECURITIES AND EXCHANGE COMMISSION




PUBLIC UTILITY HOLDING COMPANY ACT OF 1935



In the Matter of


SOUTHWESTERN ELECTRIC POWER COMPANY             REPORT FOR PERIOD
Shreveport, Louisiana 71156                     January 1, 1997 TO
                                                March 31, 1997
PUBLIC SERVICE COMPANY OF OKLAHOMA              PURSUANT TO RULE 24
Tulsa, Oklahoma 74102


File No. 70-5741




This report is filed by Southwestern Electric Power Company (SWEPCO) on behalf
of itself and Public Service Company of Oklahoma (PSO) pursuant to Rule 24
promulgated under the Public Utility Holding Company Act of 1935 by the
Securities and Exchange Commission pursuant to Sections 6(a), 7, 9(a) and 10 of
said Act. SWEPCO's and PSO's Application-Declaration, as further amended by
post-effective amendments, in this matter proposed the filing by SWEPCO of
quarterly reports to the Commission, pursuant to Rule 24 of the Act, providing
as to the activities during each quarter: (a) total number of rail cars serviced
by month for both SWEPCO and PSO; (b) the amount of expenditures by month for
direct labor, direct material cost, and indirect expenses for both SWEPCO and
PSO; (c) computation by month of allocated cost to be shared by SWEPCO and PSO
on the basis of the "Cost Ratio", and (d) copies of the monthly reports
furnished by SWEPCO to PSO detailing the work and charges associated with PSO
rail cars assigned to the facility which were repaired during the previous
month, within the context of the Rail Car Maintenance Facility Agreement between
SWEPCO and PSO. This report covers the period January 1, 1997 through March 31,
1997.


<PAGE>


                             FIRST QUARTER 1997
                    SWEPCO RAIL CAR MAINTENANCE FACILITY
                               RULE 24 REPORT


A. NUMBER OF RAIL CARS SERVICED
                                   SWEPCO           PSO            TOTAL
           JANUARY                        375             37             412
           FEBRUARY                       280            149             429
           MARCH                          412            186             598
                               -----------------------------------------------

           TOTAL                        1,067            372           1,439
                               ===============================================

B. AMOUNT OF EXPENDITURES DETAIL   SWEPCO           PSO            TOTAL
      DIRECT LABOR -
           JANUARY                 $42,637.26      $6,107.17      $48,744.43
           FEBRUARY                 55,138.87      11,312.73       66,451.60
           MARCH                    51,079.53      10,018.37       61,097.90
                               -----------------------------------------------
           TOTAL                  $148,855.66     $27,438.27     $176,293.93
                               ===============================================

      DIRECT MATERIAL -
           JANUARY                $256,689.36     $38,038.89     $294,728.25
           FEBRUARY                329,494.98      84,062.66      413,557.64
           MARCH                   279,957.30      37,417.38      317,374.68
                               -----------------------------------------------
           TOTAL                  $866,141.64    $159,518.93   $1,025,660.57
                               ===============================================

      OTHER DIRECT EXPENSES -
           JANUARY                ($72,621.40)   ($38,420.98)   ($111,042.38)
           FEBRUARY               (119,974.67)    (27,467.83)    (147,442.50)
           MARCH                  (181,208.05)    (30,097.33)    (211,305.38)
                               -----------------------------------------------
           TOTAL                 ($373,804.12)   ($95,986.14)   ($469,790.26)
                               ===============================================

      INDIRECT EXPENSES SHARED ON
      COST RATIO
           JANUARY                 $66,194.55      $9,482.31      $75,676.86
           FEBRUARY                 57,923.19      11,880.61       69,803.80
           MARCH                    61,776.86      12,118.90       73,895.76
                               -----------------------------------------------
           TOTAL                  $185,894.60     $33,481.82     $219,376.42
                               ===============================================

      TOTAL EXPENDITURES
           JANUARY                $292,899.77     $15,207.39     $308,107.16
           FEBRUARY                322,582.37      79,788.17      402,370.54
           MARCH                   211,605.64      29,457.32      241,062.96
                               -----------------------------------------------
           TOTAL                  $827,087.78    $124,452.88     $951,540.66
                               ===============================================


C. COMPUTATION OF COST RATIO       SWEPCO           PSO            TOTAL
      JANUARY 1997
           DIRECT LABOR            $42,637.26      $6,107.17      $48,744.43
           COST RATIO               87.47%          12.53%         100.00%

      FEBRUARY 1997
           DIRECT LABOR            $55,138.87     $11,312.73      $66,451.60
           COST RATIO               82.98%          17.02%         100.00%

      MARCH 1997
           DIRECT LABOR            $51,079.53     $10,018.37      $61,097.90
           COST RATIO               83.60%          16.40%         100.00%





<PAGE>


D. COPIES OF MONTHLY REPORTS

Copies of the monthly statements furnished by SWEPCO to PSO detailing charges
associated with PSO rail cars are attached as Exhibits 1, 2 and 3.


<PAGE>



                                S I G N A T U R E




As required by Order of this Commission pursuant to the Public Utility Holding
Company Act of 1935, Southwestern Electric Power Company has duly caused this
report to be signed on its behalf on this the 6th day of May, 1997.


                              SOUTHWESTERN ELECTRIC POWER COMPANY




                              By   /S/  R. RUSSELL Davis
                                        R. Russell Davis
                                        Controller and
                                   Chief Accounting Officer





<PAGE>




                                  INDEX TO EXHIBITS




    Exhibit                                                         Transmission
    NUMBER                          EXHIBIT                             METHOD


      1            January 1997 statement furnished by SWEPCO to      Electronic
                      PSO detailing PSO's rail car charges


      2            February 1997 statement furnished by SWEPCO to     Electronic
                      PSO detailing PSO's rail car charges


      3            March 1997 statement furnished by SWEPCO           Electronic
                      to PSO detailing PSO's rail car charges






                       CENTRAL AND SOUTH WEST SERVICES, INC.          Exhibit 1
                          P.O. BOX 21928 TULSA, OKLAHOMA             Page 1 of 3
                        TELEPHONE NUMBER (918) 594 - 2000

           STATEMENT OF PARTICIPATION IN RAIL CAR MAINTENANCE FACILITY
                AT ALLIANCE, NEBRASKA PER SWEPCO - PSO AGREEMENT

                                  JANUARY 1997


A.  NUMBER OF RAIL CARS SERVICED

SWEPCO         375        PSO  37
<TABLE>
<CAPTION>

B.  AMOUNT OF EXPENDITURES:                                      SHARED           SWEPCO            PSO
<S>                                                         <C>               <C>              <C>
COSTS ASSIGNED 100% TO SWEPCO:

PR4001  Direct Material to SWEPCO Coal Cars                                    $256,689.36
PR4018  Stores Salvage - SWEPCO                                                (162,456.02)
PR4101  Direct Labor to SWEPCO Coal Cars                                         21,117.51
PR4104  Direct Labor to Rework SWEPCO Material                                   21,519.75
PR4202  Ad Valorem Taxes - SWEPCO Coal Cars                                           0.00
PR4204  Ad Valorem Taxes - Facility - Direct - SWEPCO                                 0.00
PR4213  Employee Fringe Benefits - Direct Labor - SWEPCO                          9,944.05
PR4230  Payroll Taxes (FICA & UC) - Direct Labor - SWEPCO                         3,310.88
PR4238  Depreciation Expense - SWEPCO                                            10,721.00
PR4263  Lease - Supplemental Expenses - SWEPCO                                        0.00
PR4270  Outside Maintenance of SWEPCO Coal Cars                                  55,820.63
PR4272  Switching Fees - SWEPCO                                                  10,038.06
PR4277  Repainting Coal Cars - SWEPCO                                                 0.00
                                                                           ---------------

                 Total 100% SWEPCO Costs                                       $226,705.22
                                                                           ===============


COSTS ASSIGNED 100% TO PSO:

PR4002  Direct Material to PSO Coal Cars                                                        $38,038.89
PR4015  Inventory Carrying Charges - PSO                                                          2,832.79
PR4019  Stores Salvage - PSO                                                                    (64,665.58)
PR4102  Direct Labor to PSO Coal Cars                                                             1,784.18
PR4103  Direct Labor to Rework PSO Material                                                       4,322.99
PR4205  Ad Valorem Taxes - Facility - Direct - PSO                                                    0.00
PR4214  Employee Fringe Benefits - Direct Labor - PSO                                             1,428.73
PR4231  Payroll Taxes (FICA & UC) - Direct Labor - PSO                                              475.69
PR4239  Depreciation Expense - PSO                                                                    0.00
PR4271  Outside Maintenance of PSO Coal Cars                                                     19,151.35
PR4273  Switching Fees - PSO                                                                        993.24
PR4278  Repainting Coal Cars - PSO                                                                    0.00
                                                                                            --------------

                Total 100% PSO Costs                                                             $4,362.28
                                                                                            ==============
</TABLE>

<PAGE>
                                                                      Exhibit 1
                                                                    Page 2 of 3

<TABLE>
<CAPTION>

COSTS TO BE SHARED {Ratio of Direct Labor}:                      SHARED           SWEPCO            PSO
<S>                                                           <C>              <C>                <C>

PR4010  Shop Material                                           $2,240.72
PR4011  Small Tools                                                947.38
PR4012  Facility Maintenance - Material                          1,052.26
PR4013  Sale of Scrap (Cr.)                                     (8,540.00)
PR4016  Switch Engine Operation and Maintenance                  1,446.86
PR4017  Equipment Operation and Maintenance                      6,195.23
PR4020  Stores Salvage - Joint                                       0.00
PR4110  Supervision                                             10,024.03
PR4111  Clerical                                                 3,774.87
PR4112  Training and Safety                                      1,829.16
PR4113  General Shop Labor                                       4,119.90
PR4114  Facility Maintenance - Labor                             5,884.60
PR4116  Switch Engine Operation and Maintenance                 13,216.55
PR4201  Ad Valorem Taxes - Facility                                  0.00
PR4203  Taxes - Other                                                0.00
PR4206  Data Processing Charges                                    574.40
PR4207  General Office Overhead                                    621.61
PR4210  Employee Activities                                          0.00
PR4211  Employee Expenses                                        2,381.35
PR4212  Employee Fringe Benefits                                10,033.07
PR4215  Employee Sick Benefits                                       0.00
PR4220  Injuries and Damages                                         0.00
PR4221  Insurance - Liability and Property                         211.10
PR4225  Maintenance of Facilities (Contracted)                   1,841.00
PR4226  Office Supplies and Expenses                             1,170.26
PR4232  Payroll Taxes (FICA & UC) - Other                        3,277.00
PR4233  Special Services                                             0.00
PR4234  Utilities - Heat, Light, Power and Water                12,777.28
PR4235  Utilities - Telephone                                      598.23
PR4236  Vehicle Expense                                              0.00
PR4237  Depreciation Expense                                         0.00
PR4250  Miscellaneous                                                0.00
PR4262  Lease - Basic - All Except Coal Cars                         0.00
PR4264  Lease - Supplemental Expenses - Facility                     0.00
               Total Costs Shared on Cost Ratio
                  {see computation below} -

                                                           --------------  ---------------  --------------
           SWEPCO     87.47% PSO        12.53%                 $75,676.86       $66,194.55       $9,482.31


           Capital Recovery on Capital Expenditures not
            Covered Under Lease Agreement {Cost Ratio}                                            1,362.80
                                                                                            --------------


                       TOTAL COSTS FOR THE MONTH                               $292,899.77      $15,207.39
                                                                           ===============  ==============
</TABLE>
<PAGE>

                                                                      Exhibit 1
                                                                    Page 3 of 3


C. COMPUTATION OF COST RATIO:



101, 104   Direct Labor SWEPCO         $42,637.26     87.47% SWEPCO

102, 103   Direct Labor PSO              6,107.17     12.53  PSO
                                    -------------  --------

           Total Direct Labor          $48,744.43    100.00%
                                    =============  ========






                       CENTRAL AND SOUTH WEST SERVICES, INC.           Exhibit 2
                          P.O. BOX 21928 TULSA, OKLAHOMA             Page 1 of 3
                        TELEPHONE NUMBER (918) 594 - 2000

           STATEMENT OF PARTICIPATION IN RAIL CAR MAINTENANCE FACILITY
                AT ALLIANCE, NEBRASKA PER SWEPCO - PSO AGREEMENT

                                  FEBRUARY 1997


A.  NUMBER OF RAIL CARS SERVICED

SWEPCO         280        PSO 149
<TABLE>
<CAPTION>

B.  AMOUNT OF EXPENDITURES:                                      SHARED           SWEPCO            PSO
<S>                                                         <C>               <C>              <C>
COSTS ASSIGNED 100% TO SWEPCO:

PR4001  Direct Material to SWEPCO Coal Cars                                    $329,494.98
PR4018  Stores Salvage - SWEPCO                                                (205,630.27)
PR4101  Direct Labor to SWEPCO Coal Cars                                         32,752.22
PR4104  Direct Labor to Rework SWEPCO Material                                   22,386.65
PR4202  Ad Valorem Taxes - SWEPCO Coal Cars                                           0.00
PR4204  Ad Valorem Taxes - Facility - Direct - SWEPCO                                 0.00
PR4213  Employee Fringe Benefits - Direct Labor - SWEPCO                         12,867.77
PR4230  Payroll Taxes (FICA & UC) - Direct Labor - SWEPCO                         3,310.88
PR4238  Depreciation Expense - SWEPCO                                                 0.00
PR4263  Lease - Supplemental Expenses - SWEPCO                                        0.00
PR4270  Outside Maintenance of SWEPCO Coal Cars                                  66,528.95
PR4272  Switching Fees - SWEPCO                                                   2,948.00
PR4277  Repainting Coal Cars - SWEPCO                                                 0.00
                                                                           ---------------

                 Total 100% SWEPCO Costs                                       $264,659.18
                                                                           ===============


COSTS ASSIGNED 100% TO PSO:

PR4002  Direct Material to PSO Coal Cars                                                        $84,062.66
PR4015  Inventory Carrying Charges - PSO                                                              0.00
PR4019  Stores Salvage - PSO                                                                    (39,598.09)
PR4102  Direct Labor to PSO Coal Cars                                                             8,021.63
PR4103  Direct Labor to Rework PSO Material                                                       3,291.10
PR4205  Ad Valorem Taxes - Facility - Direct - PSO                                                    0.00
PR4214  Employee Fringe Benefits - Direct Labor - PSO                                             2,676.72
PR4231  Payroll Taxes (FICA & UC) - Direct Labor - PSO                                              475.69
PR4239  Depreciation Expense - PSO                                                                    0.00
PR4271  Outside Maintenance of PSO Coal Cars                                                      6,462.91
PR4273  Switching Fees - PSO                                                                        663.80
PR4278  Repainting Coal Cars - PSO                                                                    0.00
                                                                                            --------------

                Total 100% PSO Costs                                                            $66,056.42
                                                                                            ==============
</TABLE>
<PAGE>
                                                                       Exhibit 2
                                                                     Page 2 of 3

<TABLE>
<CAPTION>

COSTS TO BE SHARED {Ratio of Direct Labor}:                      SHARED           SWEPCO            PSO
<S>                                                           <C>              <C>                <C>

PR4010  Shop Material                                           $5,322.59
PR4011  Small Tools                                                310.29
PR4012  Facility Maintenance - Material                            885.74
PR4013  Sale of Scrap (Cr.)                                     (8,061.11)
PR4016  Switch Engine Operation and Maintenance                  1,731.21
PR4017  Equipment Operation and Maintenance                      2,338.13
PR4020  Stores Salvage - Joint                                       0.00
PR4110  Supervision                                             11,507.61
PR4111  Clerical                                                 4,289.25
PR4112  Training and Safety                                        714.84
PR4113  General Shop Labor                                       3,626.72
PR4114  Facility Maintenance - Labor                             5,618.86
PR4116  Switch Engine Operation and Maintenance                 13,391.37
PR4201  Ad Valorem Taxes - Facility                                  0.00
PR4203  Taxes - Other                                                0.00
PR4206  Data Processing Charges                                    574.40
PR4207  General Office Overhead                                    647.31
PR4210  Employee Activities                                         80.00
PR4211  Employee Expenses                                        1,033.70
PR4212  Employee Fringe Benefits                                 9,440.33
PR4215  Employee Sick Benefits                                       0.00
PR4220  Injuries and Damages                                         0.00
PR4221  Insurance - Liability and Property                         211.10
PR4225  Maintenance of Facilities (Contracted)                   1,552.56
PR4226  Office Supplies and Expenses                               369.63
PR4232  Payroll Taxes (FICA & UC) - Other                        4,461.20
PR4233  Special Services                                             0.00
PR4234  Utilities - Heat, Light, Power and Water                 8,940.10
PR4235  Utilities - Telephone                                      807.00
PR4236  Vehicle Expense                                             10.97
PR4237  Depreciation Expense                                         0.00
PR4250  Miscellaneous                                                0.00
PR4262  Lease - Basic - All Except Coal Cars                         0.00
PR4264  Lease - Supplemental Expenses - Facility                     0.00
               Total Costs Shared on Cost Ratio
                  {see computation below} -

                                                           --------------  ---------------  --------------
           SWEPCO      82.98% PSO            17.02%            $69,803.80       $57,923.19      $11,880.61


           Capital Recovery on Capital Expenditures not
            Covered Under Lease Agreement {Cost Ratio}                                            1,851.14
                                                                                            --------------


                       TOTAL COSTS FOR THE MONTH                               $322,582.37      $79,788.17
                                                                           ===============  ==============
</TABLE>
<PAGE>

                                                                       Exhibit 2
                                                                     Page 3 of 3


C. COMPUTATION OF COST RATIO:



101, 104   Direct Labor SWEPCO         $55,138.87     82.98% SWEPCO

102, 103   Direct Labor PSO             11,312.73     17.02  PSO
                                    -------------  --------

           Total Direct Labor          $66,451.60    100.00%
                                    =============  ========







                       CENTRAL AND SOUTH WEST SERVICES, INC.           Exhibit 3
                          P.O. BOX 21928 TULSA, OKLAHOMA             Page 1 of 3
                        TELEPHONE NUMBER (918) 594 - 2000

           STATEMENT OF PARTICIPATION IN RAIL CAR MAINTENANCE FACILITY
                AT ALLIANCE, NEBRASKA PER SWEPCO - PSO AGREEMENT

                                   MARCH 1997


A.  NUMBER OF RAIL CARS SERVICED

SWEPCO         412        PSO 186
<TABLE>
<CAPTION>

B.  AMOUNT OF EXPENDITURES:                                      SHARED           SWEPCO            PSO
<S>                                                         <C>               <C>              <C>
COSTS ASSIGNED 100% TO SWEPCO:

PR4001  Direct Material to SWEPCO Coal Cars                                    $279,957.30
PR4018  Stores Salvage - SWEPCO                                                (202,047.48)
PR4101  Direct Labor to SWEPCO Coal Cars                                         33,682.69
PR4104  Direct Labor to Rework SWEPCO Material                                   17,396.84
PR4202  Ad Valorem Taxes - SWEPCO Coal Cars                                           0.00
PR4204  Ad Valorem Taxes - Facility - Direct - SWEPCO                                 0.00
PR4213  Employee Fringe Benefits - Direct Labor - SWEPCO                         12,177.78
PR4230  Payroll Taxes (FICA & UC) - Direct Labor - SWEPCO                         3,310.88
PR4238  Depreciation Expense - SWEPCO                                                 0.00
PR4263  Lease - Supplemental Expenses - SWEPCO                                        0.00
PR4270  Outside Maintenance of SWEPCO Coal Cars                                   2,427.77
PR4272  Switching Fees - SWEPCO                                                   2,923.00
PR4277  Repainting Coal Cars - SWEPCO                                                 0.00
                                                                           ---------------

                 Total 100% SWEPCO Costs                                       $149,828.78
                                                                           ===============


COSTS ASSIGNED 100% TO PSO:

PR4002  Direct Material to PSO Coal Cars                                                        $37,417.38
PR4015  Inventory Carrying Charges - PSO                                                              0.00
PR4019  Stores Salvage - PSO                                                                    (33,759.84)
PR4102  Direct Labor to PSO Coal Cars                                                             8,482.68
PR4103  Direct Labor to Rework PSO Material                                                       1,535.69
PR4205  Ad Valorem Taxes - Facility - Direct - PSO                                                    0.00
PR4214  Employee Fringe Benefits - Direct Labor - PSO                                             2,388.50
PR4231  Payroll Taxes (FICA & UC) - Direct Labor - PSO                                              475.69
PR4239  Depreciation Expense - PSO                                                                    0.00
PR4271  Outside Maintenance of PSO Coal Cars                                                     (2,657.19)
PR4273  Switching Fees - PSO                                                                      1,671.80
PR4278  Repainting Coal Cars - PSO                                                                    0.00
                                                                                            --------------

                Total 100% PSO Costs                                                            $15,554.71
                                                                                            ==============
</TABLE>
<PAGE>
                                                                       Exhibit 3
                                                                     Page 2 of 3


<TABLE>
<CAPTION>

COSTS TO BE SHARED {Ratio of Direct Labor}:                      SHARED           SWEPCO            PSO
<S>                                                           <C>              <C>                <C>


PR4010  Shop Material                                           $4,787.71
PR4011  Small Tools                                                252.80
PR4012  Facility Maintenance - Material                          2,533.92
PR4013  Sale of Scrap (Cr.)                                     (1,347.36)
PR4016  Switch Engine Operation and Maintenance                  2,663.90
PR4017  Equipment Operation and Maintenance                      1,642.92
PR4020  Stores Salvage - Joint                                       0.00
PR4110  Supervision                                             11,964.66
PR4111  Clerical                                                 4,122.90
PR4112  Training and Safety                                      2,302.66
PR4113  General Shop Labor                                       3,203.76
PR4114  Facility Maintenance - Labor                             5,703.05
PR4116  Switch Engine Operation and Maintenance                 10,316.56
PR4201  Ad Valorem Taxes - Facility                                  0.00
PR4203  Taxes - Other                                                0.00
PR4206  Data Processing Charges                                    574.40
PR4207  General Office Overhead                                    659.59
PR4210  Employee Activities                                         64.56
PR4211  Employee Expenses                                        4,738.50
PR4212  Employee Fringe Benefits                                 9,112.59
PR4215  Employee Sick Benefits                                       0.00
PR4220  Injuries and Damages                                         0.00
PR4221  Insurance - Liability and Property                         211.10
PR4225  Maintenance of Facilities (Contracted)                   2,105.00
PR4226  Office Supplies and Expenses                             1,120.74
PR4232  Payroll Taxes (FICA & UC) - Other                        4,037.64
PR4233  Special Services                                             0.00
PR4234  Utilities - Heat, Light, Power and Water                 2,433.87
PR4235  Utilities - Telephone                                      509.17
PR4236  Vehicle Expense                                              0.00
PR4237  Depreciation Expense                                         0.00
PR4250  Miscellaneous                                              181.12
PR4262  Lease - Basic - All Except Coal Cars                         0.00
PR4264  Lease - Supplemental Expenses - Facility                     0.00
               Total Costs Shared on Cost Ratio
                  {see computation below} -

                                                           --------------  ---------------  --------------
           SWEPCO      83.60% PSO           16.40%             $73,895.76       $61,776.86      $12,118.90


           Capital Recovery on Capital Expenditures not
            Covered Under Lease Agreement {Cost Ratio}                                            1,783.71
                                                                                            --------------


                       TOTAL COSTS FOR THE MONTH                               $211,605.64      $29,457.32
                                                                           ===============  ==============
</TABLE>
<PAGE>

                                                                       Exhibit 3
                                                                     Page 3 of 3

C. COMPUTATION OF COST RATIO:



101, 104   Direct Labor SWEPCO         $51,079.53     83.60%  SWEPCO

102, 103   Direct Labor PSO             10,018.37     16.40   PSO
                                    -------------  --------

           Total Direct Labor          $61,097.90    100.00%
                                    =============  ========