SOUTHWESTERN ELECTRIC POWER CO
35-CERT, 1997-02-13
ELECTRIC SERVICES
Previous: SOUTHWEST WATER CO, SC 13G/A, 1997-02-13
Next: SPARTON CORP, SC 13G, 1997-02-13



                            UNITED STATES OF AMERICA
                                   before the
                       SECURITIES AND EXCHANGE COMMISSION




PUBLIC UTILITY HOLDING COMPANY ACT OF 1935



In the Matter of


SOUTHWESTERN ELECTRIC POWER COMPANY             REPORT FOR PERIOD
Shreveport, Louisiana 71156                     October 1, 1996 TO
                                                December 31, 1996
PUBLIC SERVICE COMPANY OF OKLAHOMA              PURSUANT TO RULE 24
Tulsa, Oklahoma 74102


File No. 70-5741




This report is filed by Southwestern Electric Power Company (SWEPCO) on behalf
of itself and Public Service Company of Oklahoma (PSO) pursuant to Rule 24
promulgated under the Public Utility Holding Company Act of 1935 by the
Securities and Exchange Commission pursuant to Sections 6(a), 7, 9(a) and 10 of
said Act. SWEPCO's and PSO's Application-Declaration, as further amended by
post-effective amendments, in this matter proposed the filing by SWEPCO of
quarterly reports to the Commission, pursuant to Rule 24 of the Act, providing
as to the activities during each quarter: (a) total number of rail cars serviced
by month for both SWEPCO and PSO; (b) the amount of expenditures by month for
direct labor, direct material cost, and indirect expenses for both SWEPCO and
PSO; (c) computation by month of allocated cost to be shared by SWEPCO and PSO
on the basis of the "Cost Ratio", and (d) copies of the monthly reports
furnished by SWEPCO to PSO detailing the work and charges associated with PSO
rail cars assigned to the facility which were repaired during the previous
month, within the context of the Rail Car Maintenance Facility Agreement between
SWEPCO and PSO. This report covers the period October 1, 1996 through December
31, 1996.

                               FORTH QUARTER 1996
                      SWEPCO RAIL CAR MAINTENANCE FACILITY
                                 RULE 24 REPORT


A. NUMBER OF RAIL CARS SERVICED
                                           SWEPCO          PSO         TOTAL
             OCTOBER                        468            234          702
             NOVEMBER                       368            167          535
             DECEMBER                       215            109          324
                                       -----------------------------------------

             TOTAL                        1,051            510        1,561
                                       =========================================

B. AMOUNT OF EXPENDITURES
    DETAIL                                 SWEPCO          PSO         TOTAL
                                           ------          ---         -----
       DIRECT LABOR -
             OCTOBER                       $  54,624      $  6,145    $  60,769
             NOVEMBER                         79,351        10,570       89,921
             DECEMBER                         22,895         6,022       28,917
                                       ----------------------------------------
             TOTAL                          $156,870       $22,737     $179,607
                                       ========================================

       DIRECT MATERIAL -
             OCTOBER                        $336,737      $336,737     $336,737
             NOVEMBER                        189,508        87,399      276,907
             DECEMBER                        264,134        59,248      323,382
                                       ----------------------------------------
             TOTAL                          $790,379      $483,384   $1,273,763
                                       ========================================

       OTHER DIRECT EXPENSES -
             OCTOBER                        ($28,454)     $    388     ($28,066)
             NOVEMBER                         26,710        11,943       38,653
             DECEMBER                        (72,535)       (3,994)     (76,529)
                                       ----------------------------------------
             TOTAL                           (74,279)     $  8,337     ($65,942)
                                       ========================================

       INDIRECT EXPENSES SHARED ON
       COST RATIO
             OCTOBER                        ($27,491)      ($3,092)    ($30,583)
             NOVEMBER                         86,912        11,572       98,484
             DECEMBER                         40,092        10,549       50,641
                                       ----------------------------------------
             TOTAL                           $99,513       $19,029     $118,542
                                       ========================================

       TOTAL EXPENDITURES
             OCTOBER                        $335,416      $340,178     $675,594
             NOVEMBER                        382,481       121,484      503,965
             DECEMBER                        254,586        71,825      326,411
                                       ----------------------------------------
             TOTAL                          $972,483      $533,487   $1,505,970
                                       ========================================


C. COMPUTATION OF COST RATIO               SWEPCO          PSO         TOTAL
       OCTOBER 1996
             DIRECT LABOR                 $54,624        $6,145       $60,769
             COST RATIO                    77.22%        22.78%       100.00%

       NOVEMBER 1996
             DIRECT LABOR                 $79,351        $10,570      $89,921
             COST RATIO                    71.23%        28.77%       100.00%

       DECEMBER 1996
             DIRECT LABOR                 $22,895        $6,022       $28,917
             COST RATIO                    60.14%        39.86%       100.00%


D. COPIES OF MONTHLY REPORTS

Copies of the monthly statements furnished by SWEPCO to PSO detailing charges
associated with PSO rail cars are attached as Exhibits 1, 2 and 3.




                                S I G N A T U R E




As required by Order of this Commission pursuant to the Public Utility Holding
Company Act of 1935, Southwestern Electric Power Company has duly caused this
report to be signed on its behalf on this the 12th day of February, 1997.


                              SOUTHWESTERN ELECTRIC POWER COMPANY




                              By  /S/   R. RUSSELL DAVIS
                                        R. Russell Davis
                              Controller and Chief Accounting Officer




                                INDEX TO EXHIBITS




 Exhibit                                                           Transmission
 NUMBER                          EXHIBIT                              METHOD


   1            October 1996 statement furnished by SWEPCO to      Electronic
                PSO detailing PSO's rail car charges


   2            November 1996 statement furnished by SWEPCO to     Electronic
                PSO detailing PSO's rail car charges


   3            December 1996 statement furnished by SWEPCO        Electronic
                to PSO detailing PSO's rail car charges





                      CENTRAL AND SOUTH WEST SERVICES, INC.         Exhibit 1
                        P.O. BOX 21928 TULSA, OKLAHOMA              Page 1 of 3
                        TELEPHONE NUMBER (918) 594 - 2000

           STATEMENT OF PARTICIPATION IN RAIL CAR MAINTENANCE FACILITY
                AT ALLIANCE, NEBRASKA PER SWEPCO - PSO AGREEMENT

                                  OCTOBER 1996


A.  NUMBER OF RAIL CARS SERVICED

SWEPCO         468        PSO 234
<TABLE>
<CAPTION>

B.  AMOUNT OF EXPENDITURES:                              SHARED           SWEPCO            PSO

COSTS ASSIGNED 100% TO SWEPCO:
<S>     <C>                                            <C>             <C>             <C>
PR4001  Direct Material to SWEPCO Coal Cars                            $336,736.91
PR4018  Stores Salvage - SWEPCO                                        (84,834.88)
PR4101  Direct Labor to SWEPCO Coal Cars                                 37,309.21
PR4104  Direct Labor to Rework SWEPCO Material                           17,314.91
PR4202  Ad Valorem Taxes - SWEPCO Coal Cars                                   0.00
PR4204  Ad Valorem Taxes - Facility - Direct - SWEPCO                       168.00
PR4213  Employee Fringe Benefits - Direct Labor - SWEPCO                 12,796.36
PR4230  Payroll Taxes (FICA & UC) - Direct Labor - SWEPCO                 4,260.63
PR4238  Depreciation Expense - SWEPCO                                    10,724.00
PR4263  Lease - Supplemental Expenses - SWEPCO                                0.00
PR4270  Outside Maintenance of SWEPCO Coal Cars                          23,299.76
PR4272  Switching Fees - SWEPCO                                           5,131.79
PR4277  Repainting Coal Cars - SWEPCO                                         0.00
                                                                   ---------------

                 Total 100% SWEPCO Costs                               $362,906.69
                                                                   ===============


COSTS ASSIGNED 100% TO PSO:

PR4002  Direct Material to PSO Coal Cars                                                $98,335.90
PR4015  Inventory Carrying Charges - PSO                                                  2,946.61
PR4019  Stores Salvage - PSO                                                            (13,978.76)
PR4102  Direct Labor to PSO Coal Cars                                                     5,074.94
PR4103  Direct Labor to Rework PSO Material                                               1,070.04
PR4205  Ad Valorem Taxes - Facility - Direct - PSO                                          101.00
PR4214  Employee Fringe Benefits - Direct Labor - PSO                                     1,439.63
PR4231  Payroll Taxes (FICA & UC) - Direct Labor - PSO                                      479.24
PR4239  Depreciation Expense - PSO                                                            0.00
PR4271  Outside Maintenance of PSO Coal Cars                                              8,095.60
PR4273  Switching Fees - PSO                                                              1,305.12
PR4278  Repainting Coal Cars - PSO                                                            0.00
                                                                                    --------------

                Total 100% PSO Costs                                                   $104,869.32
                                                                                    ==============
</TABLE>


                                                                       Exhibit 1
                                                                     Page 2 of 3
<TABLE>

<CAPTION>

COSTS TO BE SHARED {Ratio of Direct Labor}:              SHARED          SWEPCO           PSO

<S>     <C>                                           <C>             <C>           <C>
PR4010  Shop Material                                  $4,922.76
PR4011  Small Tools                                        28.91
PR4012  Facility Maintenance - Material                 2,063.90
PR4013  Sale of Scrap (Cr.)                                 0.00
PR4016  Switch Engine Operation and Maintenance         1,560.72
PR4017  Equipment Operation and Maintenance             2,384.69
PR4020  Stores Salvage - Joint                              0.00
PR4110  Supervision                                     9,199.43
PR4111  Clerical                                        3,913.20
PR4112  Training and Safety                               337.20
PR4113  General Shop Labor                              3,886.45
PR4114  Facility Maintenance - Labor                   11,833.00
PR4116  Switch Engine Operation and Maintenance         7,848.65
PR4201  Ad Valorem Taxes - Facility                     3,087.00
PR4203  Taxes - Other                                (119,551.65)
PR4206  Data Processing Charges                           574.40
PR4207  General Office Overhead                         1,226.93
PR4210  Employee Activities                             1,357.08
PR4211  Employee Expenses                               7,713.96
PR4212  Employee Fringe Benefits                       10,830.95
PR4215  Employee Sick Benefits                              0.00
PR4220  Injuries and Damages                                0.00
PR4221  Insurance - Liability and Property                239.50
PR4225  Maintenance of Facilities (Contracted)          2,690.00
PR4226  Office Supplies and Expenses                      985.42
PR4232  Payroll Taxes (FICA & UC) - Other               2,901.24
PR4233  Special Services                                    0.00
PR4234  Utilities - Heat, Light, Power and Water        8,627.50
PR4235  Utilities - Telephone                             447.28
PR4236  Vehicle Expense                                   210.56
PR4237  Depreciation Expense                                0.00
PR4250  Miscellaneous                                      97.79
PR4262  Lease - Basic - All Except Coal Cars                0.00
PR4264  Lease - Supplemental Expenses - Facility            0.00
               Total Costs Shared on Cost Ratio
                  {see computation below} -

                                                   -------------   ---------------  --------------
           SWEPCO      89.89% PSO           10.11%   ($30,583.13)      ($27,491.18)     ($3,091.95)


           Capital Recovery on Capital Expenditures not
            Covered Under Lease Agreement {Cost Ratio}                                    1,099.59
                                                                                    --------------


                       TOTAL COSTS FOR THE MONTH                       $335,415.51     $102,876.96
                                                                   ===============  ==============

</TABLE>

                                                                      Exhibit 1
                                                                    Page 3 of 3


C. COMPUTATION OF COST RATIO:



101, 104   Direct Labor SWEPCO         $54,624.12     89.89%  SWEPCO

102, 103   Direct Labor PSO              6,144.98     10.11%  PSO
                                    -------------  --------

           Total Direct Labor          $60,769.10    100.00%
                                    =============  ========






                        CENTRAL AND SOUTH WEST SERVICES, INC.         Exhibit 2
                          P.O. BOX 21928 TULSA, OKLAHOMA            Page 1 of 3
                        TELEPHONE NUMBER (918) 594 - 2000

           STATEMENT OF PARTICIPATION IN RAIL CAR MAINTENANCE FACILITY
                AT ALLIANCE, NEBRASKA PER SWEPCO - PSO AGREEMENT

                                  NOVEMBER 1996


A.  NUMBER OF RAIL CARS SERVICED

SWEPCO         367        PSO 167
<TABLE>
<CAPTION>

B.  AMOUNT OF EXPENDITURES:                              SHARED          SWEPCO           PSO

COSTS ASSIGNED 100% TO SWEPCO:
<S>     <C>                                          <C>               <C>             <C> 
PR4001  Direct Material to SWEPCO Coal Cars                            $189,508.57
PR4018  Stores Salvage - SWEPCO                                         (53,710.38)
PR4101  Direct Labor to SWEPCO Coal Cars                                 50,141.20
PR4104  Direct Labor to Rework SWEPCO Material                           29,209.86
PR4202  Ad Valorem Taxes - SWEPCO Coal Cars                                   0.00
PR4204  Ad Valorem Taxes - Facility - Direct - SWEPCO                       168.00
PR4213  Employee Fringe Benefits - Direct Labor - SWEPCO                 18,589.00
PR4230  Payroll Taxes (FICA & UC) - Direct Labor - SWEPCO                 6,189.51
PR4238  Depreciation Expense - SWEPCO                                    10,724.00
PR4263  Lease - Supplemental Expenses - SWEPCO                                0.00
PR4270  Outside Maintenance of SWEPCO Coal Cars                          42,365.48
PR4272  Switching Fees - SWEPCO                                           2,384.08
PR4277  Repainting Coal Cars - SWEPCO                                         0.00
                                                                   ---------------

                 Total 100% SWEPCO Costs                               $295,569.32
                                                                   ===============


COSTS ASSIGNED 100% TO PSO:

PR4002  Direct Material to PSO Coal Cars                                                $87,398.75
PR4015  Inventory Carrying Charges - PSO                                                  2,620.59
PR4019  Stores Salvage - PSO                                                            (21,701.84)
PR4102  Direct Labor to PSO Coal Cars                                                     8,636.66
PR4103  Direct Labor to Rework PSO Material                                               1,933.12
PR4205  Ad Valorem Taxes - Facility - Direct - PSO                                          101.00
PR4214  Employee Fringe Benefits - Direct Labor - PSO                                     2,476.14
PR4231  Payroll Taxes (FICA & UC) - Direct Labor - PSO                                      824.39
PR4239  Depreciation Expense - PSO                                                            0.00
PR4271  Outside Maintenance of PSO Coal Cars                                             26,304.68
PR4273  Switching Fees - PSO                                                              1,317.76
PR4278  Repainting Coal Cars - PSO                                                            0.00
                                                                                    --------------

                Total 100% PSO Costs                                                   $109,911.25
                                                                                    ==============
</TABLE>

                                                                      Exhibit 2
                                                                    Page 2 of 3

<TABLE>
<CAPTION>

COSTS TO BE SHARED {Ratio of Direct Labor}:              SHARED          SWEPCO           PSO

<S>     <C>                                           <C>            <C>          <C>
PR4010  Shop Material                                  $6,008.18
PR4011  Small Tools                                       211.09
PR4012  Facility Maintenance - Material                   457.01
PR4013  Sale of Scrap (Cr.)                                 0.00
PR4016  Switch Engine Operation and Maintenance            90.83
PR4017  Equipment Operation and Maintenance             2,255.65
PR4020  Stores Salvage - Joint                              0.00
PR4110  Supervision                                    15,298.26
PR4111  Clerical                                        6,074.33
PR4112  Training and Safety                                 0.00
PR4113  General Shop Labor                              6,502.19
PR4114  Facility Maintenance - Labor                   14,354.76
PR4116  Switch Engine Operation and Maintenance        13,422.47
PR4201  Ad Valorem Taxes - Facility                     3,087.00
PR4203  Taxes - Other                                   1,234.00
PR4206  Data Processing Charges                           574.40
PR4207  General Office Overhead                         1,040.96
PR4210  Employee Activities                               182.94
PR4211  Employee Expenses                               3,778.08
PR4212  Employee Fringe Benefits                       13,508.26
PR4215  Employee Sick Benefits                              0.00
PR4220  Injuries and Damages                                0.00
PR4221  Insurance - Liability and Property                239.50
PR4225  Maintenance of Facilities (Contracted)          2,899.82
PR4226  Office Supplies and Expenses                      347.13
PR4232  Payroll Taxes (FICA & UC) - Other               4,344.29
PR4233  Special Services                                    0.00
PR4234  Utilities - Heat, Light, Power and Water        1,842.04
PR4235  Utilities - Telephone                             605.64
PR4236  Vehicle Expense                                     0.00
PR4237  Depreciation Expense                                0.00
PR4250  Miscellaneous                                     125.00
PR4262  Lease - Basic - All Except Coal Cars                0.00
PR4264  Lease - Supplemental Expenses - Facility            0.00
               Total Costs Shared on Cost Ratio
                  {see computation below} -

                                                  --------------   ---------------  --------------
           SWEPCO      88.25% PSO         11.75%      $98,483.83        $86,911.98      $11,571.85


           Capital Recovery on Capital Expenditures not
            Covered Under Lease Agreement {Cost Ratio}                                    1,277.96
                                                                                    --------------


                       TOTAL COSTS FOR THE MONTH                       $382,481.30     $122,761.06
                                                                   ===============  ==============
</TABLE>

                                                                      Exhibit 2
                                                                    Page 3 of 3


C. COMPUTATION OF COST RATIO:



101, 104   Direct Labor SWEPCO         $79,351.06     88.25%  SWEPCO

102, 103   Direct Labor PSO             10,569.78     11.75%  PSO
                                    -------------  --------

           Total Direct Labor          $89,920.84    100.00%
                                    =============  ========



                       CENTRAL AND SOUTH WEST SERVICES, INC.          Exhibit 3
                          P.O. BOX 21928 TULSA, OKLAHOMA            Page 1 of 3
                        TELEPHONE NUMBER (918) 594 - 2000

           STATEMENT OF PARTICIPATION IN RAIL CAR MAINTENANCE FACILITY
                AT ALLIANCE, NEBRASKA PER SWEPCO - PSO AGREEMENT

                                  DECEMBER 1996


A.  NUMBER OF RAIL CARS SERVICED

SWEPCO         215        PSO 109
<TABLE>
<CAPTION>

B.  AMOUNT OF EXPENDITURES:                              SHARED          SWEPCO           PSO

COSTS ASSIGNED 100% TO SWEPCO:
<S>     <C>                                            <C>             <C>             <C>
PR4001  Direct Material to SWEPCO Coal Cars                            $264,133.60
PR4018  Stores Salvage - SWEPCO                                         (96,677.08)
PR4101  Direct Labor to SWEPCO Coal Cars                                 15,444.01
PR4104  Direct Labor to Rework SWEPCO Material                            7,450.75
PR4202  Ad Valorem Taxes - SWEPCO Coal Cars                                   0.00
PR4204  Ad Valorem Taxes - Facility - Direct - SWEPCO                       168.00
PR4213  Employee Fringe Benefits - Direct Labor - SWEPCO                  8,031.81
PR4230  Payroll Taxes (FICA & UC) - Direct Labor - SWEPCO                 2,674.32
PR4238  Depreciation Expense - SWEPCO                                    10,721.00
PR4263  Lease - Supplemental Expenses - SWEPCO                                0.00
PR4270  Outside Maintenance of SWEPCO Coal Cars                               0.00
PR4272  Switching Fees - SWEPCO                                           2,547.14
PR4277  Repainting Coal Cars - SWEPCO                                         0.00
                                                                   ---------------

                 Total 100% SWEPCO Costs                               $214,493.55
                                                                   ===============


COSTS ASSIGNED 100% TO PSO:

PR4002  Direct Material to PSO Coal Cars                                                $59,248.46
PR4015  Inventory Carrying Charges - PSO                                                  2,542.25
PR4019  Stores Salvage - PSO                                                            (12,563.64)
PR4102  Direct Labor to PSO Coal Cars                                                     4,502.97
PR4103  Direct Labor to Rework PSO Material                                               1,519.64
PR4205  Ad Valorem Taxes - Facility - Direct - PSO                                          101.00
PR4214  Employee Fringe Benefits - Direct Labor - PSO                                     1,710.96
PR4231  Payroll Taxes (FICA & UC) - Direct Labor - PSO                                      569.75
PR4239  Depreciation Expense - PSO                                                            0.00
PR4271  Outside Maintenance of PSO Coal Cars                                              2,657.19
PR4273  Switching Fees - PSO                                                                988.32
PR4278  Repainting Coal Cars - PSO                                                            0.00
                                                                                    --------------

                Total 100% PSO Costs                                                    $61,276.90
                                                                                    ==============
</TABLE>

                                                                      Exhibit 3
                                                                    Page 2 of 3

<TABLE>
<CAPTION>

COSTS TO BE SHARED {Ratio of Direct Labor}:              SHARED          SWEPCO           PSO

<S>     <C>                                            <C>           <C>            <C>
PR4010  Shop Material                                  $6,194.28
PR4011  Small Tools                                       936.84
PR4012  Facility Maintenance - Material                 1,153.13
PR4013  Sale of Scrap (Cr.)                                 0.00
PR4016  Switch Engine Operation and Maintenance         1,473.74
PR4017  Equipment Operation and Maintenance             4,367.45
PR4020  Stores Salvage - Joint                              0.00
PR4110  Supervision                                     4,957.19
PR4111  Clerical                                        2,480.48
PR4112  Training and Safety                             1,432.86
PR4113  General Shop Labor                              4,939.69
PR4114  Facility Maintenance - Labor                    2,787.94
PR4116  Switch Engine Operation and Maintenance         5,410.99
PR4201  Ad Valorem Taxes - Facility                     3,087.00
PR4203  Taxes - Other                                  (1,234.00)
PR4206  Data Processing Charges                           574.40
PR4207  General Office Overhead                           754.75
PR4210  Employee Activities                               925.13
PR4211  Employee Expenses                             (10,024.14)
PR4212  Employee Fringe Benefits                        7,292.61
PR4215  Employee Sick Benefits                              0.00
PR4220  Injuries and Damages                                0.00
PR4221  Insurance - Liability and Property               (139.70)
PR4225  Maintenance of Facilities (Contracted)          2,105.00
PR4226  Office Supplies and Expenses                      678.11
PR4232  Payroll Taxes (FICA & UC) - Other               2,298.39
PR4233  Special Services                                    0.00
PR4234  Utilities - Heat, Light, Power and Water        6,852.52
PR4235  Utilities - Telephone                             918.52
PR4236  Vehicle Expense                                    23.83
PR4237  Depreciation Expense                                0.00
PR4250  Miscellaneous                                     394.00
PR4262  Lease - Basic - All Except Coal Cars                0.00
PR4264  Lease - Supplemental Expenses - Facility            0.00
               Total Costs Shared on Cost Ratio
               {see computation below} -

                                                  --------------   ---------------  --------------
           SWEPCO      79.17% PSO       20.83%        $50,641.01        $40,092.49      $10,548.52


           Capital Recovery on Capital Expenditures not
            Covered Under Lease Agreement {Cost Ratio}                                    2,265.52
                                                                                    --------------


                       TOTAL COSTS FOR THE MONTH                       $254,586.04      $74,090.94
                                                                   ===============  ==============
</TABLE>

                                                                      Exhibit 3
                                                                    Page 3 of 3

C. COMPUTATION OF COST RATIO:



101, 104   Direct Labor SWEPCO         $22,894.76     79.17%  SWEPCO

102, 103   Direct Labor PSO              6,022.61     20.83%  PSO
                                    -------------  --------

           Total Direct Labor          $28,917.37    100.00%
                                    =============  ========