ITEM 25570.9663xx - BLAST CLEANING AND ZINC THERMAL SPRAYING OF STRUCTURAL STEEL

1. DESCRIPTION: (cont'd)

     1.07 Submittals

          A. The Contractor shall provide the following written submittals
     before starting any work:

               1.   MSDS sheets.

               2.   Documentation of previous similar work experience.

               3.   Documentation of SSPC QP1 and QP2 qualification.

               4.   Work schedule.

               5.   QA/QC Plan including the application process. This should
                    include equipment capabilities, materials, application
                    procedures, and quality control checkpoints for (a)
                    surface-preparation, (b) spraying, (c) adhesion, (d) coating
                    thickness measurements.

     1.08 Definitions:

          A.   Thermal spray shall include the surface preparation and
               application of a Zinc-Aluminum alloy coating to metal surfaces.
               Zinc-Aluminum (85-15) Thermal Spraying will be referred to as
               spraying.

          B.   White Metal Blast Cleaning shall mean the preparation of surfaces
               to be coated in accordance with standards and specifications for
               "White-Metal Blast Cleaning," SSPC-SP5 as published by the Steel
               Structures Painting Council.

          C.   Hand Tool Cleaning shall mean the preparation of all surfaces to
               be coated in accordance with standards and specifications for
               "Hand Tool Cleaning," SSPC-SP2 as published by the Steel
               Structures Painting Council.

          D.   Power Tool Cleaning shall mean the preparation of all surfaces to
               be coated in accordance with standards and specifications for
               "Power Tool Cleaning," SSPC-SP3 and "Power Tool Cleaning to Bare
               Metal" SSPC-SPl1.

          E.   Paint and sealers if required shall be as specified in the
               contract documents.

          F.   Surface Preparation shall mean the cleaning and/or pretreating of
               surfaces to be sprayed as specified in the contract documents and
               shall include the removal of all debris.

          G.   Field Spraying shall mean the coating of metal surfaces at the
               construction site.

          H.   Zinc-Aluminum Coating shall include cleaning and preparing the
               entire surface, recoating all steel on existing installations or
               structures in service, and sealing the sprayed coating if
               specified.

          I.   Steel Structures Painting Council (SSPC) - Surface Preparation
               (SP). Specifications referred to herein may be obtained through
               the Council at SSPC, Melon Institute, 4400 5th Avenue,
               Pittsburgh, PA 15213.

          J.   Environmental Protection shall mean the containment, collection,
               and removal of existing paint chips, corrosion residues, spent
               abrasives, and any newly applied paint (herein after referred to
               as waste materials) that result from blasting and other cleaning
               and coating operations performed in the field.


                                     3 of 13


<PAGE>






ITEM 25570.9663XX - BLAST CLEANING AND ZINC THERMAL SPRAYING OF STRUCTURAL STEEL

1. DESCRIPTION: (cont'd)

     1.08 Definitions: (cont'd)

          K.   Inaccessibility shall mean the inability to use a standard
               application method because of restrictions such as reduced
               clearance, insufficient hand space or too narrow an opening. It
               shall not mean that the element is too high or that the rigging
               or scaffolding will be difficult. The Engineer will make a final
               determination as to what will be deemed inaccessible.

          L.   Debris shall mean anything on the structure that isn't an
               inherent part of the structure or coating system.

          M.   Flush Rusting - Rusting that occurs on metal within minutes to a
               few hours after blast-cleaning or other cleaning is completed.
               The speed with which flash-rusting occurs may be indicative of
               soluble-salt contaminants on the surface, high humidity, or both.


2. MATERIALS:

     2.01 All equipment used for cleaning and spraying shall meet the
          requirements as specified in the Contract. Zinc-Aluminum alloy shall
          be manufactured for thermal spraying and shall be of the following
          composition:

                              Fe - 0.020% Max.
                              Cu - 0.004% Max.
                              Cd - 0.004% Max.
                              Pb - 0.004% Max.
                              Al - 14.0 - 16.0%
                              Ti - 0.002% Max.
                              Zn - Balance

          The Contractor shall provide certificates of alloy composition for the
          wire.

     2.02 The coating shall be as specified in the Contract and shall be applied
          according to same or the manufacturer's recommendations, whichever is
          more restrictive.

     2.03 The abrasive selected for blast cleaning shall be identified by the
          Contractor and approved by the Engineer prior to use. The abrasive
          shall be certified to be of fine to extra fine gradation. The abrasive
          shall have a sharp, hard cutting surface and shall be clean, dry and
          free of oil or soluble salt contaminants. Silica sand and/or shot are
          not allowed:

     2.04 All material shall be delivered to the site in sealed, original,
          labeled containers and stored in accordance with the manufacturer's
          recommendations.

     2.05 All material and equipment used for environmental protection shall be
          approved by the Engineer. Any material or equipment that is determined
          to be deficient or that becomes damaged to the extent that it no
          longer fulfills the requirements of this specification shall be
          replaced or repaired to the satisfaction of the Engineer, at the
          Contractor's expense, with the replacement material and/or equipment
          meeting the requirements of the contract documents.




                                     4 of 13


<PAGE>


ITEM 25570.9663XX - BLAST CLEANING AND ZINC THERMAL SPRAYING OF STRUCTURAL STEEL

3. CONSTRUCTION DETAILS: (cont'd)

     3.04 Spraying Application (cont'd)

          B.   Surface Cleanliness - All surfaces to be coated shall be
               thoroughly cleaned prior to each application to remove dirt,
               dust, or other interference material. Cleaning methods shall be
               by vacuuming only, unless other means are approved by the
               Engineer. Special worker protection and containment measures will
               be required to avoid health and safety problems associated with
               lead contamination.

          C.   Grease/Oil - If grease or oil are/or become deposited on the
               surface, they shall be removed by solvent cleaning in accordance
               with SSPC-SPl prior to the application of the next coat.

          D.   Ambient/Weather Conditions - Coatings shall not be applied to
               surfaces containing frost or applied in rain, fog, or similar
               conditions. Coatings shall be applied in accordance with the
               coating manufacturer's written recommendations.

          E.   Zinc-Aluminum Coating Application Methods

               1.   The coating shall be applied in a neat and workmanlike
                    manner and shall be applied uniformly and shall be free of
                    ridges or other defects. The coating shall be applied by
                    thermal spray employing multiple passes to achieve a
                    thickness of 0.008 to 0.010 inches (8-10 mils) as specified
                    in the contract documents. No single pass shall deposit more
                    than 0.004 inches. Thickness measurements shall be taken
                    frequently.

               2.   The coating, when applied, shall be even and uniform. All
                    subsequent coats shall be perpendicular to previous coats.

               3.   On the areas which are inaccessible to the thermal spray
                    equipment, a zinc silicate coating shall be applied as close
                    in proximity to the area as possible.

          F.   Spraying

               1.   Thermal Spray equipment shall be capable of applying
                    Zinc-Aluminum (85-15) in a fine, even spray so as to produce
                    a uniform film at the specified thickness. Spray equipment
                    shall be as recommended by the Contractor.

               2.   Spray coating shall be done by experienced and qualified
                    applicators. Thermal spray operators shall apply the coating
                    in a manner that promotes uniform coverage and prevents
                    discontinuity of the applied coating. The spray gun shall be
                    moved uniformly across and perpendicular (90 degrees) to the
                    receiving surface. To insure a uniform coating, each spray
                    pass should lap the other by 50%. Any defects shall be
                    immediately corrected.

               3.   Spraying distance should be between 5 and 8 inches from the
                    substrate.

               4.   Special care shall be exercised to avoid contamination of
                    surrounding areas or property by over spraying. Containment
                    tarps should be used when spray application is performed.



                                     9 of 13


<PAGE>


ITEM 2557O.9663XX - BLAST CLEANING AND ZINC THERMAL SPRAYING OF STRUCTURAL STEEL

3. CONSTRUCTION DETAILS: (cont'd)

     3.04 Spraying Application (cont'd)

          F.   Spraying (cont'd)

          G.   Adhesion - Adhesion strength shall be 700 psi minimum with
               approved measuring equipment as per ASTM D4541. All adhesion test
               locations shall be re-metalized in accordance with this
               specification at no additional cost. Measurements shall be taken
               every 500 feet. If adhesion is less than 700 psi, the coating
               shall be removed and re-applied at the Contractor's expense.

          H.   Ventilation - The work area shall be properly ventilated to
               assure proper worker protection and safety.

     3.05 Termination of Coating Operations

          The Engineer is empowered to terminate coating operations, temporarily
          or permanently, if the Engineer determines that any of the following
          conditions exist:

          A.   Satisfactory results are not being obtained.

          B.   The measured film thickness is not within the required range.

          C.   Areas not specifically designated to be coated are likely to be
               or are being affected by the application method.

          D.   The application method is causing damage to public or private
               property.

          If the Engineer permanently terminates coating operations, he may do
          so by verbal order but he shall notify the Contractor, in writing of
          his reasons for termination, within 48 hours of termination. The
          Engineer may temporarily terminate coating operations by verbal
          orders. Coating operations which are terminated due to damage to
          public or private property shall not be resumed until the Contractor
          takes appropriate measures to protect such property and demonstrates
          to the Engineer's satisfaction that such property damage will not
          reoccur.

     3.06 No coating shall begin until cleaned steel surfaces have been
          inspected and approved by the Engineer or Inspector. All structural
          steel members, railings, fascia, downspouts, and other miscellaneous
          steel items which have been previously coated shall be cleaned and
          coated in accordance with these specifications unless specifically
          excluded by the plans, or specifications, or by the Engineer.

     3.07 The coating of metal surfaces shall include, but not be limited to the
          following:

          A.   The proper preparation of all surfaces.

          B.   The application and protection of the coating.

          C.   The protection from spatter or spillage of pedestrians vehicular,
               marine or other traffic upon, beneath or adjacent to the coated
               surfaces. Payment for this work will be made under the item
               Environmental Ground Protection and/or Environmental Waterway
               Protection.



                                    10 of l3