                             Actual Cost Contract

            ACTUAL COST CONTRACT NO JOR3-CT98-0221 (DG 12 - WSNM )

The European Community ("the Community") represented by the Commission of the
European Communities ("the Commission") represented by the Director General
for DG XII Science, Research and Development or its authorized representative,

and

Laboratoires SORAPEC SA ("the Coordinator") ("SORAPEC") established in France,


Acumuladores Autosil SA, DirecqAo de Novos Produtos e Novas Tecnologias
("ACUMAU.NPNT") established in Portugal,

Transenergie SA ("TRANSEN") established in France,

Angewandte Solarenergie - ASE GmbH, Marketing and Sales ("ASOEN.MS")
established in the Federal Republic of Germany,

Photowatt International SA, Research and Development Department
("PHOTOWATT.RD") established in France,

Shell Solar Energy B.V. (IISSEB") established in the Netherlands,

Commissariat A I'Energie Atomique, Direction des Reacteurs Nucleaires -
Departement d'Etudes des Reacteurs, GENEC - Laboratoire de Valorisation
Technologique ("CEA.DER.GEN") established in France,

(collectively "the Contractors') represented by their authorised
representatives,

HAVE AGREED to a project called "Improvement of the storage process of
electricity in remote photovoltaic installations (IMROVESTORE)" being carried
out in the Non-Nuclear Energy research and technological development programme
("the Specific RTD Programme") according to the following provisions.


Article I - Scope

1.1  The Contractors shall carry out this contract jointly and severally
     towards the Commission for the work set out in Annex I ("the Project').
1.2  Subject to force majeure (including strikes, lockouts and other events
     beyond the reasonable    control of the Contractors), the Contractors
     shall use reasonable endeavours to achieve the    results intended for
     the Project and to fulfil the obligations of a defaulting Contractor. A
     Contractor shall not be liable to take action beyond its reasonable
     control or to reimburse  money due from a defaulting Contractor unless it
     has contributed to the default. Measures to be taken in the event of
     force majeure shall be agreed between the contracting parties.


Article 2 - Duration

2.1  The Project shall last for 36 months from the first day of the month
     after the last signature of the contracting parties ("the Commencement
     Date').
2.2  The contract shall be completed on the date of the final payment due by
     the Commission.( "the Completion Date"). However, Articles 6, 17 and 24
     of Annex 11 shall continue to apply after the Completion Date to the
     extent of any limitations specified in those Articles.

Article 3 - Allowable Costs and Financial Contribution (see Articles 18 to 20
of Annex 11)

3.1  The estimated allowable costs of the Project are 1,641,065 ECU (one
     million six hundred and forty-one thousand and sixty-five European
     Currency Units).
3.2  The Commission shall contribute up to and including 50% of the allowable
     full costs and/or, as appropriate, 100% of the additional costs up to
     809,418 ECU (eight hundred and nine thousand four hundred and eighteen
     European Currency Units) of the Project.

     All money paid by the Commission under this contract shall be taken into
     account in calculating the Commission contribution paid to the Project
     and determining whether the Commission has fulfilled the requirements of
     this Article.

     The estimated apportionment between the participants in the Projectis set
     out in the table following the contract signatures.

     The amount of any indirect taxes, sales taxes or customs duties for any
     invoice or bill by a supplier exceeding ECU 2500 specific to the Project,
     and not.directly recoverable by the participant, may be reimbursed in
     addition to the Community contribution in conformity with arrangements
     implementing the Protocol on the Privileges and Immunities of the
     European Communities enabling the Commission to recover such amount from
     a Member State.

3.3  Except to any extent specified in Article 9, no entity established
     outside the Community or an   Associated State as defined by Article 1(5)
     of Annex II may receive Community finance under   this contract. Such
     financing, however, is allowed for the supply of materials or equipment,
     or   under the conditions of any approval for subcontracts in accordance
     with Article 3 of Annex II.


Article 4 - Payments by the Commission (see Article 23 of Annex 11)

The Commission shall pay its contribution for theProject in ECU as follows:

     -    an advance of 202,354 ECU (two hundred and two thousand three
          hundred and fifty-four European Currency Units) within two months
          after the last signature of the contracting parties;
     -    by instalments, each paid within two months after the approval of
          the respective periodic progress reports and corresponding cost
          statements. The advance and instalments shall not cumulatively
          exceed 90% of the maximum Commission contribution for theProject;
     -    the balance of its total contribution due (a retention of 10%)
          within two months after the approval of the last report, document or
          other Project Deliverables specified in Annex I ("Project
          Deliverables") and the cost statement for the final period, as
          specified in Article 5.2.


Article 5 - Cost Statements (see Article 21 and Part D of Annex II)

5.1  Two signed cost statements shall be submitted through the Coordinator
     each 12 months from the Commencement Date.
5.2  The cost statements for the final period, incorporating adjustments for
     previous periods, shall be submitted not later than three months after
     the approval of the last report, document or other Project Deliverable
     following which no further costs shall be allowable for payments.


Article 6 - Reports (see Article 10 of Annex II)

Reports shall be submitted through the Coordinator in 3 copies in English as
specified in Annex II.

The periodic reports are required as follows:
     -    progress reports each 6 months from the Commencement Date.


Article 7 - Ownership, Exploitation and Technology Transfer

Ownership, exploitation and the granting of licences or rights in respect of
Foreground referred to in Article 1(18) of Annex II shall accord with Part B
of Annex II.


Article 8 - Amendments

This contract including its annexes may be modified only by a written
agreement by duly authorised representatives of the contracting parties.


Article 9 - Special Conditions

9.1  The Specific RTD Programme

There are no special conditions relating to the specific RTD Programme.

9.2  The Project

The following conditions shall apply to the Project:

     (a)  For the purpose of this contract, the only Associated States are
          Iceland, Liechtenstein, and Norway, on the basis of the Agreement on
          the European Economic Area, and Israel, on the basis of the
          Agreement on scientific and technical cooperation concluded with the
          European Community on 25.03.96. If and when the agreement of the
          type referred to in Article 1(5) of Annex II currently being
          negociated with the Swiss Confederation is concluded, this country
          will automatically be considered as an Associated State with effect
          from the date of entry into force of that agreement.

     (b)  In accordance with Article 3.2 of Annex II subcontracts may be
          concluded with the following major subcontractors for the parts of
          the work specified in Annex I:

-              IED - Innovation Energie Developpement S.a.r.l. ("IED")
               established in France

-              The said major subcontractors shall submit the summary cost
               statement specified in Part D of Annex II without supporting
               financial annexes.

(c)  The project cannot be, in any circumstances, during the course of this
contract and for a period of three years following the completion date or the
termination of this contract, exchanged or made available to third parties
other than those benefiting from access rights on such results pursuant to
Articles 13 and 14 of Annex II hereof, without the written authorization of
the Commission.

     (d)  Pursuant to the provisions of Article 2.2 of Annex II to the
          contract, the Subcontractor responsible for managing and directing
          the Project will be IED, who will undertake the duties related to
          management and direction of the Project as described in AnnexI and
          as required by the contract. The maximum cost for these services
          rendered to the Contractors will be 55,000 ECU  (fifty-five thousand
          European Currency Units).

     (e)  The following is added to Article 4 of the contract:

          1.   The Commission undertakes to pay sums due pursuant to this
               contract within a maximum of 60 calendar days running from the
               date on which the Commission approves or should have approved
               the report(s) and/or any other Deliverable(s) due ("the
               approval date") to the date on which the Commission's account
               is debited.

          2.   This payment period may be suspended by the Commission if it
               informs the Contractor(s) concerned, at any time within the
               period of 60 calendar days counting from the approval date,
               that the corresponding cost statement(s) (is) (are) not
               admissible either because the amount is not due or because the
               necessary supporting documents have not been produced or if the
               Commission sees the need for further checks. The payment period
               shall continue to run from the date on which the properly
               established cost statement(s) (is) (are) registered.

          3.   Upon expiry of the time limit set in paragraph 1, and without
               prejudice to paragraph 2, the Contractor(s) concerned may,
               within two months of receiving the late payment, claim interest
               at the rate applied by the European Monetary Institute to its
               operations in ECU plus one and a half percentage points.

9.3  The special conditions in Article 9.1 and 9.2 prevail over all other
     provisions of this contract. If Annex I conflicts with any other
     provision of this contract, the latter shall prevail.


Article 10 -Applicable Law and Entry into Force

The law of France shall govern this contract which shall enter into force only
after the last signature of the contracting parties.


Article 11 - Annexes


The Annexes forming an integral part of this contract are:

Annex I   -    Project Programme
Annex II  -    General Conditions

                              Done in Brussels,
                              in duplicate in the English language,
                              For the Commission,

For the Commission,


Signature:

For (insert acronym of the Coordinator/Contractor),

Name(s)   Serge Chavanni      Status: Director General      Date: 17 Nov 1998

Signatures'

/s/ Serge Chavanni



© 2022 IncJournal is not affiliated with or endorsed by the U.S. Securities and Exchange Commission