<PAGE> 55
Exhibit 10.14
to Form 10-K
Form of Purchase Order
----------------------
Synthetech Inc. PURCHASE ORDER
1290 Industrial Way
P.O. Box 646
Albany, Oregon 97321
Phone (541) 967-6575
Fax: (541) 967-9424
The following number must appear on all related correspondence,
shipping papers, and invoices:
P.O. NUMBER:
To: Ship To: Synthetech, Inc.
1290 Industrial Way
Albany, Oregon 97321
P.O. DATE REQUISITIONER SHIP VIA F.O.B. POINT TERMS
N/A N/A Net __Days
QTY DESCRIPTION UNIT PRICE TOTAL
$ $
SUBTOTAL $
SALES TAX
SHIPPING
OTHER
TOTAL $
1. Please send two copies of your invoice.
2. Reference the P.O. number on the invoice.
Account Code
Authorized by Date
<PAGE> 56
Schedule of Vendors and Purchase Order Terms
--------------------------------------------
Vendor:
Greenberry Tank & Iron Co., Inc.
5330 NE Elliot Circle, P.O. Box 1990
Corvallis, OR 97339
<TABLE>
<CAPTION>
<S>
<C> <C> <C> <C> <C> <C> <C> <C>
Requi- Terms Unit
PO # PO Date sitioner (in Days) Qty Description Price Total
---- --------- ------- --------- --- ------------------------------ ----------- -----------
16070 29-Mar-99 DMW Net 10 1 Fabricate and deliver one $ 50,133.00 $ 50,133.00
distillation skid per attached
quote. Fabricate and deliver
three tanks, one (1) 3,000G,
two (2) 300G
16118 2-Aug-99 MRM Net 10 1 Contractor shall provide all $255,537.00 $255,537.00
the labor, tools, and equipment
for the tanks, reactors and
piping per the "Synthetech Plant
Expansion - Mechanical Bid
Specification" dated June 23,
1999. The processing equipment,
valves, instrumentation, PTFE
lined piping, and process gaskets
are provided by Synthetech. All
the carbon steel and stainless
steel piping material and the
utility piping gaskets are
provided by Greenberry. Base Bid
per GTI 9906-260, Adder for
seamless 316L Ss process piping:
Per GTI-260 Rev. 1, Adder for 304
SS 1/8" safety Plate: Per GTI-
260 Rev. 1
16146 14-Sep-99 MRM Net 10 1 304 SS Sch 5 welded piping for $ 5,559.00 $ 5,590.00
the process ventilation duct per
the attached list.
1 Install four tank lugs on R208 $ 4,473.00 $ 4,473.00
as specified by Evergreen in
compliance with the ASME pressure
vessel code under Greenberry's R-
Stamp certification. Work to be
completed for installation of R-
208 next week.
16153 27-Sep-99 MRM Net 10 1 3176 x8 (3) Rigging I-Beams, 6" $ 1,650.00 $ 1,650.00
w/ 1/2 " web w/ Zinc epoxy primer
1 3176 x10 Relocate Process Water & $ 3,056.00 $ 3,056.00
Glycol Utility Piping.
1 3176 x11 Modify Tank Farm Suction $ 1,414.00 $ 1,414.00
Lines for flow switches.
1 3176 x12 Fabricate and install $ 10,940.00 $ 10,940.00
(11) pip supports per the
Evergreen Engineering Pipe Rack
drawing dated 9/15. Support No.
11 is modified to miss the tank
base in the distillation berm
area.
16169 22-Oct-99 MRM Net 10 1 3176 x13 Contaminated 6' PTFE $ 1,690.00 $ 1,690.00
piping R201 - work stoppage
1 3176 x14 Welded 6" abort piping $ 1,617.00 $ 1,617.00
R201
1 3176 x15 Additional work 3", 4" $ 3,363.00 $ 3,363.00
1 6" PTFE piping due to incorrect
spool dimensions
1 3176 x18 Welding of support $ 200.00 $ 200.00
plates for T406 & T407
16070 2-Nov-99 KM Net 30 1 Stainless piping changes on the $ 2,177.00 $ 2,177.00
Distillation Column Product Tanks
16185 10-Nov-99 MRM Net 10 1 FRP Stair treads in place of $ 236.32 $ 236.32
galvanized treads: Invoice 99494
1 Double Block Valves on $ 1,359.44 $ 1.359.44
distillation column utilities
lines: Invoice 99517
1 Revisions to Abort Piping R-201: $ 1,616.65 $ 1,616.65
Invoice 99484
<PAGE> 57
Vendor:
Olsson Industrial Electric
1919 Laura St.
Springfield, OR 97477
Requi- Terms Unit
PO # PO Date sitioner (in Days) Qty Description Price Total
----- ------- ------- ---------- --- --------------------------- ----------- -----------
16007 6-Jul-98 DMW Net 30 1 Furnish and/or install all $ 1,000.00 $ 1,000.00
electrical and instrumentation
for building 2 WW neutralization
16104 25-May-99 DMW Net 30 1 Install conduits, wires and $ 1,000.00 $ 1,000.00
hardware for R204 mass meter
16105 26-May-99 DMW Net 30 1 Buildup of Process MCC VFD $ 32,300.00 $ 32,300.00
Cabinet Including VFD's
1 Buildup of Utility Core MCC VFD $ 36,454.00 $ 36,454.00
Cabinet Including VFD's
1 Less one (1) 30 HP VFD-R205 $ (4,061.00)$ (4,061.00)
1 Buildup of Beckhoff I/O cabinet $ 6,600.00 $ 6,600.00
in Utility Core MCC VFD cabinet
16130 12-Aug-99 DMW Net 30 1 Install Conduits, wires and $ 1,500.00 $ 1,500.00
hardware for S265 pH Adjustment
16171 25-Oct-99 DMW Net 30 1 Install I/O and conduits/wires $ 1,404.75 $ 1,404.75
for new fire system, Elevator
Room and Process MCC room
16172 25-Oct-99 DMW Net 30 1 Install I/O and conduits/wires $183,950.00 $183,950.00
for new mezzanine reactor
system, including TCU's; for new
distillation column; for new
equipment including lighting; for
new centrifuge system; for new
dryer sys.
1 Misc. undefined $ 5,000.00 $ 5,000.00
16189 22-Nov-99 KM Net 30 1 Time and Material not to exceed. $ 550.00 $ 550.00
Field Change Order to install a
level transmitter on T302.
16190 22-Nov-99 KM Net 30 1 Time and Material not to exceed $ 410.00 $ 410.00
to install a remote controlled
valve on inlet of Distillation
Feed Tank (T500)
19194 30-Nov-99 DMW Net 30 1 Recable I/O cabinets per $ 5,450.00 $ 5,450.00
attached quote; Cable shall be
Beldin 3083-A, 1000ft
1 Contractor shall install one (1) $ 585.00 $ 585.00
additional UPS. Verbal quote
from Ike Olsson
16202 9-Dec-99 DMW Net 30 1 Furnish and install conduits and $ 13,250.00 $ 13,250.00
wire related to the Building 2
alarm system as described in the
attached quote.
1 Add one (1) additional button in $ 500.00 $ 500.00
the North breezeway 1st floor.
16204 13-Dec-99 KM Net 30 1 Time and Material not to exceed $ 3,950.00 $ 3,950.00
for electrical hook-up of heat
tracing between T30X Area and the
Distillation Skid Berm
16209 17-Dec-99 MRM Net 30 1 Provide labor, material, tools, $ 2,764.00 $ 2,764.00
and equipment to install the
valve solenoid control wires and
the solvent flow switches for R-
201, R-202, R-203 & R-204
1 Provide all the labor, material, $ 5,438.00 $ 5,438.00
tools and equipment to install
the wiring to the solvent
transfer station and a 480 volt
welding outlet/ 120 volt utility
outlet
16211 21-Dec-99 DMW Net 30 160 Olsson Ind. Elect. Larry Dick - $ 52.00 $ 8,320.00
160 hours at $52.00 /hr
16242 13-Mar-99 KM Net 30 1 Time and Material not to exceed. $ 1,000.00 $ 1,000.00
Modify the location of the
Distillation Column Reboiler RTD
to a location at the column high
point
16244 14-Mar-99 DMW Net 30 FIELD ORDERS
1 Bonding Mezzanine Reactors and $ 1,546.49 $ 1,546.49
Tanks (Invoice 5397)
1 Add Lockout switches for all $ 2,366.55 $ 2,366.55
VFD's (Invoice 5431)
1 Replace 2 wire RTD's with 3 wire $ 514.00 $ 514.00
RTD (Invoice 5357)
1 Scrubber Bldg. Pump Motor $ 2,091.61 $ 2,091.61
Thermal Switches (Invoice 5365)
16249 23-Mar-99 DMW Net 30 1 Part No. PR 442-11A Resistor $ 792.00 $ 792.00
Bank
16249 23-Mar-99 DMW Net 30 1 Part No. 1336-WB035 Brake $ 1,136.00 $ 1,136.00
Chopper Card
16250 29-Mar-99 MRM Net 30 1 Purchase and install emergency $ 2,735.53 $ 2,735.53
lights for equip. mezzanine
1 Add flow meter, valves, pump $ 6,401.94 $ 6,401.94
and PIT to C260 & C261
1 Move lights to accommodate new $ 819.00 $ 819.00
equipment
1 Redo valves on T404, 5 to $ 73.43 $ 73.43
accommodate dip tubes
1 Material for installation of TCU $ 1,400.56 $ 1,400.56
current transmitters less labor
1 Provide all the labor, material, $ 5,997.00 $ 5,997.00
tools and equipment to install
Class I, Division 1, Group D 120V
outlets with disconnects at four
locations in Bldg. 2
<PAGE> 58
Vendor:
Oregon Industrial Contractors, Inc.
P.O. Box B
Albany, OR 97321
Requi- Terms Unit
PO # PO Date sitioner (in Days) Qty Description Price Total
----- ------- -------- --------- --- ------------------------------ ------------ -----------
15025 25-Jun-98 MRM Net 15 1 Contractor shall fabricate one $ 8,043.00 $ 8,043.00
316 SS side tank for C-260
centrifuge and piping changes for
the Boc-Ala-Ala producton run in
Bldg. 2
15027 25-Jun-98 MRM Net 15 1 Contractor shall fabricate two $ 8,795.00 $ 8,795.00
portable work platforms on wheels
that meet OSHA regulations. The
platforms shall be powder coated.
11842 27-Oct-98 MRM Net 15 1 Contractor shall add a 3" $ 1,225.00 $ 1,225.00
Hastelloy C-276 nozzle to an
existing heat exchanger.
16053 15-Jan-99 MRM Net 15 1 Contractor shall fabricate eight $ 590.00 $ 590.00
(8) 304 SS pipe sleeves out of
3"x20" long Sch. 40 pipe with a
1/8" by 3.5" by 9.5" collar as
shown on the attached sketch.
16063 1-Mar-99 MRM Net 15 1 Contractor shall perform the
following work for the Chemical
Warehouse at Synthetech -
Quotations Attached
1 Fabricate and install galvanized $ 1,913.00 $ 1,913.00
pipe supports
2 Run 2" galvanized water line from $ 7,852.00 $ 15,704.00
the Pump House to the Chemical
Warehouse and install the safety
showers.
3 Run a 3" natural gas line through $ 9,170.00 $ 27,510.00
the Utility Building to the space
heaters in the Chemical Warehouse.
16077 29-Mar-99 MRM Net 15 1 Contractor shall modify and $ 34,200.00 $ 34,200.00
install equipment per the
attached shutdown work list
dated March 29, 1999 and the
P&ID's provided by Synthetech.
Items included in the work scope
are galvanized legs for the SS
1400 and 1600 gallon tanks to
create 4ft clearance from the
tank bottom to the floor.
Estimated Cost: T&M NTE
16077 6-May-99 MRM Net 15 1 Adjustment to PO 16077 for $ 12,637.00 $ 12,637.00
additional work performed during
the April 2nd through April 6th
shutdown at Bldg. 2. Refer to
attached extra work scope.
16103 20-May-99 MRM Net 15 Contractor shall install the
following equipment per the
piping isometrics provided by
Synthetech.
1 Install a 2" mass flow meter and $ 6,115.00 $ 6,115.00
associated piping as shown.
1 Install piping for 1600 gal. SS $ 6,775.00 $ 6,775.00
tank Prices per attached
quotation T&M NTE Signed Time
Sheets and Bills of Materials to
be submitted with invoices.
16147 15-Sep-99 MRM Net 15 Contractor shall fabricate and
install four temperature control
units (TCU's) for Reactors R205,
R206, R207, and R208.
1 Cost per Items 2&3 on Oregon $ 84,735.00 $ 84,735.00
Industrial Quote.
1 Contractor shall fabricate and $ 7,240.00 $ 7,240.00
mount legs on 4,000 GL Tank.
1 Contractor shall fabricate two $ 15,220.00 $ 15,220.00
(2) hot water skids. Reference
TCU drawings and P&ID's provided
by Synthetech. Quotation Attached.
16156 28-Sep-99 DWM Net 30 1 Install (1) manway on tank T405 $ 2,980.00 $ 2,980.00
in new tank farm per attached
quote.
16158 1-Oct-99 MRM Net 15 1 Contractor shall fabricate and $ 5,697.00 $ 5,697.00
install two 6'x12" dia. Pipes on
TCU's for Reactors R202 and R204
similar to the two existing TCU's
for R201 & R203. Cost per
Oregon Industrial Quote Dated
9/30/99.
16164 15-Oct-99 MRM Net 15 1 Contractor shall fabricate and $ 10,000.00 $ 10,000.00
install SS piping, PTFE piping,
and miscellaneous utility piping
on reactors R201, R202, R203 &
R204. If needed Contractor
shall complete work around the
Mezzanine. Note: Time sheets to
identify extra work so Synthetech
Can back bill Greenberry Tank &
Iron. T&M estimated cost
16170 25-Oct-99 KM Net 30 1 Not to exceed bid for supplying $ 25,500.00 $ 25,500.00
and installing piping from T300
berm to Distillation Feed Tank
16178 3-Nov-99 DWM Net 30 1 Install (6) dip tubes in six (6) $ 5,750.00 $ 5,750.00
tank farm tanks. Tanks T400
through T405. PO Not To Exceed
$5,750.00.
16179 5-Nov-99 KM Net 30 1 Time and material to repipe $ 1,940.00 $ 1,900.00
Distillation Skid Condensate
line, add in y-strainers, and
install a steam bypass line. Bid
on a Not To Exceed basis
16213 23-Dec-99 MRM Net 15 1 Contractor shall fabricate and $450,000.00 $450,000.00
install SS piping, PTFE piping,
and miscellaneous utility piping
as described in the attached
Contract and Phase II 'Scope of
Work'. Extra work outside the
Contract requires written
authorization by Synthetech.
16218 29-Dec-99 MRM Net 15 1 Contractor shall perform ASME $ 1,459.00 $ 1,459.00
pressure vessel code
modifications as specified by
Synthetech to: T-205 - Add 4"
150# nozzle
1 VC-205 - Relocate 3" vapor $ 1,467.00 $ 1,467.00
outlet nozzle
16228 26-Jan-00 KM Net 30 1 Time and material to pipe T302 $ 2,980.00 $ 2,980.00
into the Pump House and repipe
T300/ T301 with added option to
flange new tee into T301. Bid as
"Not to Exceed"
16243 Mar-23-00 KM Net 30 1 Time and material to add strainer $ 2,160.00 $ 2,160.00
between T500 and P500 attach the
berm ladder to the step handrail,
and repipe between P320/1 and
T302.
<PAGE> 59
Vendor:
Reimers Construction Co.
3514 Conser Road NE
Albany, OR 97321
Requi- Terms Unit
PO # PO Date sitoner (in Days) Qty Description Price Total
----- ------- ------- --------- --- ------------------------------ ----------- -----------
15621 19-Oct-98 MRM NA 1 Contractor shall reroute the $ 28,200.00 $ 28,20.00
storm sewer from the ditch to
the existing manhole located
opposite 1335 Industrial Way in
the middle of street. Included
are all permits, materials,
labor and equipment.
Engineering drawings are
provided by K&D Engineering
under a separate PO with
Synthetech. Estimated Cost
16033 19-Nov-98 MRM Net 10 1 Contractor shall install 6" $ 2,087.00 $ 2,087.00
painted CS pipe bollards around
the new nitrogen vaporizer
location as specified by
Synthetech
16034 2-Dec-98 MRM Net 10 1 Contractor shall fill-in the $ 18,000.00 $ 18,000.00
ditch between Synthetech and
Scharpfs with compacted rock and
crushed rock as needed.
Included are temporary fencing
and a drainage line with
cleanouts for Scharpfs roof
drains from the street to the
back ditch.
16035 2-Dec-98 MRM Net 10 1 Contractor shall construct the $613,494.00 $613,494.00
solvent storage berm, truck
unloading containment area and
chemical storage warehouse as
specified in the IDC drawings
and technical specification.
Item 1 - Lien waivers are
required for all subcontractors
over $5,000.
Item 2 - Monthly billings shall
utilize the cost estimate spread
sheet.
Item 3 - Extra's require a cost
estimate with signature approval
by Synthetech within two days
of the work commencing.
16043 17-Dec-98 MRM Net 10 1 Contractor shall fill-in the $ 4,500.00 $ 4,500.00
existing 8'x 8' opening into the
C-260 centrifuge room with metal
studs, fire rated plywood, and
FDA approved FRP panel. An 8'x
8' opening shall be cust into
the project east wall and framed
with metal channel. A temporary
anti-static plastic strip
curtain shall be installed over
the 8'x 8' opening.
16050 5-Jan-99 MRM Net 30 1 Provide material and labor to $ 3,384.64 $ 3,384.64
install a tank pedistal for the
10,000 gallon SS tank in the
existing waste water berm as
discussed.
16060 23-Feb-99 MRM Net 10 1 Contractor shall provide (8) 1- $ 7,600.00 $ 7,600.00
1/8" by 3 ft galvanized anchor
bolts for each of the eight tank
pads. Pipe bridge anchor bolts
and the reinforced concrete pads
are included. Estimated T&M Cost
16064 2-Mar-99 MRM Net 10 1 Contractor shall provide non- $ 2,346.00 $ 2,346.00
shrink epoxy grout for the void
space in the false tank bottoms
for four (4) 8,000 gal., two (2)
4,000 gal., and one (1) 10,000
gal. tanks. Cost per attached
bid.
16160 6-Oct-99 KM Net 30 1 Installation of anchor bolts $ 1,500.00 $ 1,500.00
3/4" must be 8" embedded.
Required completion by Monday,
10/11/99
16173 26-Oct-99 MRM Net 10 1 Contractor shall build and $ 75,849.00 $ 75,849.00
install a metal building with an
equipment mezzanine in the
middle berm, north side of Bldg.2.
Reference Evergreen Engineering
drawings # CO1, NO1, and NO2 for
design specifications. Building
completion date Thanksgiving,
1999. R.L Reimers Quotation
Dated 10/23/99 attached
16186 12-Nov-99 MRM Net 10 1 Contractor shall install two $ 16,196.00 $ 16,196.00
tank pads with anchor bolts in
the Solvent tank farm per
Evergreen Engineering design
Specification and pads for the
distillation column, tanks, and
pumps as specified by
Synthetech. Work was completed
in October, 1999
16208 17-Dec-99 MRM Net 10 1 Contractor shall install tank $ 1,690.00 $ 1,690.00
pads for two tanks in the berm
area. Per Evergreen Engineering
drawings.
16210 21-Dec-99 MRM Net 10 1 Contractor shall install three $ 2,500.00 $ 2,500.00
concrete scrubber pedestals for
Venture scrubber - 15"x 5 ftx
5ft; two packed columns 9"x 2ft:
And one pump pad 6'x 16'x 46' as
specified. T&M Estimated Cost
16173A 10-Feb-00 MRM Net 10 1 Sprinkler Piping for the $ 3,793.10 $ 3,793.10
scrubber/vacuum pump building.
1 Special Inspection of structural $ 1,005.00 $ 1,005.00
steel welds & metal buildin
16186A 30-Mar-00 MRM Net 10 1 Contractor shall modify the tank $ 3,941.00 $ 3,941.00
pad for T-407, 4600 gal SS, So
that the legs are on the tank
pad per the design. Note:
Evergreen Engineering will
reimburse Synthetech for a
Portion of the charges.
16208A 30-Mar-00 MRM Net 10 1 Contractor shall install tank $ 1,690.00 $ 1,690.00
pads for two tanks in the berm
area Per Evergreen Engineering
drawings.
</TABLE>