SOUTHWESTERN ELECTRIC POWER CO
35-CERT, 1996-08-06
ELECTRIC SERVICES
Previous: SONAT INC, 10-Q, 1996-08-06
Next: STANDARD MICROSYSTEMS CORP, 4, 1996-08-06






                               UNITED STATES OF AMERICA
                                      before the
                          SECURITIES AND EXCHANGE COMMISSION




PUBLIC UTILITY HOLDING COMPANY ACT OF 1935



In the Matter of


SOUTHWESTERN ELECTRIC POWER COMPANY             REPORT FOR PERIOD
Shreveport, Louisiana 71156                     April 1, 1996 TO
                                                June 30, 1996
PUBLIC SERVICE COMPANY OF OKLAHOMA              PURSUANT TO RULE 24
Tulsa, Oklahoma 74102


File No. 70-5741




This report is filed by Southwestern  Electric Power Company  (SWEPCO) on behalf
of itself and Public  Service  Company of  Oklahoma  (PSO)  pursuant  to Rule 24
promulgated  under  the  Public  Utility  Holding  Company  Act of  1935  by the
Securities and Exchange  Commission pursuant to Sections 6(a), 7, 9(a) and 10 of
said Act.  SWEPCO's  and PSO's  Application-Declaration,  as further  amended by
post-effective  amendments,  in this  matter  proposed  the  filing by SWEPCO of
quarterly reports to the Commission,  pursuant to Rule 24 of the Act,  providing
as to the activities during each quarter: (a) total number of rail cars serviced
by month for both SWEPCO and PSO;  (b) the amount of  expenditures  by month for
direct labor,  direct  material cost, and indirect  expenses for both SWEPCO and
PSO; (c)  computation  by month of allocated cost to be shared by SWEPCO and PSO
on the  basis  of the  "Cost  Ratio",  and (d)  copies  of the  monthly  reports
furnished by SWEPCO to PSO  detailing the work and charges  associated  with PSO
rail cars  assigned to the  facility  which were  repaired  during the  previous
month, within the context of the Rail Car Maintenance Facility Agreement Between
SWEPCO and PSO.  This report  covers the period  April 1, 1996  through June 30,
1996.




<PAGE>



A. NUMBER OF RAIL CARS SERVICED
                                             SWEPCO        PSO        TOTAL

        April 1996                             428         241         669
        May 1996                               311         227         538
        June 1996                              419         219         638
        Total Period                         1,158         687       1,845


B. AMOUNT OF EXPENDITURES DETAIL
                                              SWEPCO         PSO        TOTAL

      Direct Labor - April 1996             $  32,406   $   24,138   $   56,544
                   - May 1996                  30,998       31,876       62,874
                   - June 1996                 64,733       22,156       86,889
                   - Total Period             128,137       78,170      206,307

      Direct Material - April 1996            257,395       81,418      338,813
                      - May 1996              161,631      133,827      295,458
                      - June 1996             229,704       70,645      300,349
                      - Total Period          648,730      285,890      934,620

      Other Direct Expenses - April 1996      (55,663)       3,608      (52,055)
                            - May 1996       (126,563)     (51,816)    (178,379)
                            - June 1996       (73,961)     (13,409)     (87,370)
                            - Total Period   (256,187)     (61,617)    (317,804)
      Indirect Expenses Shared
          On Cost Ratio - April 1996           78,936       58,799      137,735
                        - May 1996             52,111       53,591      105,702
                        - June 1996           103,070       35,279      138,349
                        - Total Period        234,117      147,669      381,786

      Total Expenditures - April 1996         313,074      167,963      481,037
                         - May 1996           118,177      167,478      285,655
                         - June 1996          323,546      114,671      438,217
                         - Total Period      $754,797   $  450,112   $1,204,909


C. COMPUTATION OF COST RATIO
                                              SWEPCO         PSO        TOTAL
      April 1996 -
          Direct Labor                     $   32,406  $   24,138   $   56,544
          Cost Ratio                            57.31%      42.69%      100.00%

      May 1996 -
          Direct Labor                     $   30,998  $   31,876   $   62,874
          Cost Ratio                            49.30%      50.70%      100.00%

      June 1996 -
          Direct Labor                     $   64,733  $   22,156   $   86,889
          Cost Ratio                            74.50%      25.50%      100.00%


<PAGE>


D. COPIES OF MONTHLY REPORTS

Copies of the monthly  statements  furnished by SWEPCO to PSO detailing  charges
associated with PSO rail cars are attached as Exhibits 1, 2 and 3.


<PAGE>



                                S I G N A T U R E




As required by Order of this  Commission  pursuant to the Public Utility Holding
Company Act of 1935,  Southwestern  Electric  Power Company has duly caused this
report to be signed on its behalf on this the 5th day of August, 1996.


                              SOUTHWESTERN ELECTRIC POWER COMPANY




                              By  /s/   R. Russell Davis
                                        R. Russell Davis
                                        Controller and
                                   Chief Accounting Officer





<PAGE>




                                  INDEX TO EXHIBITS




  Exhibit                                                           Transmission
  Number                          Exhibit                              Method


      1            April 1996 statement furnished by SWEPCO to        Electronic
                      PSO detailing PSO's rail car charges


      2            May 1996 statement furnished by SWEPCO to          Electronic
                      PSO detailing PSO's rail car charges


      3            June 1996 statement furnished by SWEPCO            Electronic
                      to PSO detailing PSO's rail car charges













                                                                       Exhibit 1
                      CENTRAL AND SOUTH WEST SERVICES, INC.
                          P.O. BOX 21928 TULSA, OKLAHOMA            Page 1 of 3
                        TELEPHONE NUMBER (918) 594 - 2000

           STATEMENT OF PARTICIPATION IN RAIL CAR MAINTENANCE FACILITY
                AT ALLIANCE, NEBRASKA PER SWEPCO - PSO AGREEMENT

                                   APRIL 1996


A.  NUMBER OF RAIL CARS SERVICED

  SWEPCO 428          PSO 241
<TABLE>
<CAPTION>

B.  AMOUNT OF EXPENDITURES:                            SHARED        SWEPCO        PSO

COSTS ASSIGNED 100% TO SWEPCO:
<S>                                                            <C>           <C>   
PR4001  Direct Material to SWEPCO Coal Cars .............        $257,394.72
PR4018  Stores Salvage - SWEPCO .........................       ($102,016.36)
PR4101  Direct Labor to SWEPCO Coal Cars ................         $28,817.89
PR4104  Direct Labor to Rework SWEPCO Material ..........          $3,588.07
PR4202  Ad Valorem Taxes - SWEPCO Coal Cars .............              $0.00
PR4204  Ad Valorem Taxes - Facility - Direct - SWEPCO ...            $168.00
PR4213  Employee Fringe Benefits - Direct Labor - SWEPCO           $7,591.49
PR4230  Payroll Taxes (FICA & UC) - Direct Labor - SWEPCO          $2,527.69
PR4238  Depreciation Expense - SWEPCO ...................         $10,604.00
PR4263  Lease - Supplemental Expenses - SWEPCO ..........              $0.00
PR4270  Outside Maintenance of SWEPCO Coal Cars .........         $21,156.95
PR4272  Switching Fees - SWEPCO .........................          $4,305.68
PR4277  Repainting Coal Cars - SWEPCO ...................              $0.00
                                                               -------------

                 Total 100% SWEPCO Costs                         $234,138.13
                                                               =============


COSTS ASSIGNED 100% TO PSO:

PR4002  Direct Material to PSO Coal Cars .............                         $81,417.59
PR4015  Inventory Carrying Charges - PSO .............                          $2,146.47
PR4019  Stores Salvage - PSO .........................                        ($15,450.74)
PR4102  Direct Labor to PSO Coal Cars ................                         $12,302.67
PR4103  Direct Labor to Rework PSO Material ..........                         $11,835.35
PR4205  Ad Valorem Taxes - Facility - Direct - PSO ...                            $101.00
PR4214  Employee Fringe Benefits - Direct Labor - PSO                           $5,654.55
PR4231  Payroll Taxes (FICA & UC) - Direct Labor - PSO                          $1,882.76
PR4239  Depreciation Expense - PSO ...................                              $0.00
PR4271  Outside Maintenance of PSO Coal Cars .........                          $7,639.07
PR4273  Switching Fees - PSO .........................                          $1,635.77
PR4278  Repainting Coal Cars - PSO ...................                              $0.00
                                                                             ------------

                Total 100% PSO Costs                                          $109,164.49
                                                                             ============
</TABLE>
<PAGE>

                                                                     Exhibit 1
                                                                    Page 2 of 3
<TABLE>
<CAPTION>


COSTS TO BE SHARED {Ratio of Direct Labor}:            SHARED        SWEPCO        PSO

<S>                                                <C>         <C>          <C>   
PR4010  Shop Material ..........................     $3,866.48
PR4011  Small Tools ............................    $36,959.24
PR4012  Facility Maintenance - Material ........     $1,446.91
PR4013  Sale of Scrap (Cr.) ....................    ($8,672.43)
PR4016  Switch Engine Operation and Maintenance      $1,360.47
PR4017  Equipment Operation and Maintenance ....     $3,787.71
PR4020  Stores Salvage - Joint .................         $0.00
PR4110  Supervision ............................    $10,427.83
PR4111  Clerical ...............................     $3,970.36
PR4112  Training and Safety ....................     $2,671.13
PR4113  General Shop Labor .....................     $3,236.65
PR4114  Facility Maintenance - Labor ...........     $7,730.31
PR4116  Switch Engine Operation and Maintenance      $9,274.85
PR4201  Ad Valorem Taxes - Facility ............     $3,087.00
PR4203  Taxes - Other ..........................     $1,234.00
PR4206  Data Processing Charges ................       $574.40
PR4207  General Office Overhead ................     $1,488.14
PR4210  Employee Activities ....................         $0.00
PR4211  Employee Expenses ......................        $71.54
PR4212  Employee Fringe Benefits ...............     $8,849.88
PR4215  Employee Sick Benefits .................         $0.00
PR4220  Injuries and Damages ...................         $0.00
PR4221  Insurance - Liability and Property .....       $269.85
PR4225  Maintenance of Facilities (Contracted) .       $815.00
PR4226  Office Supplies and Expenses ...........       $882.33
PR4232  Payroll Taxes (FICA & UC) - Other ......     $2,942.09
PR4233  Special Services .......................         $0.00
PR4234  Utilities - Heat, Light, Power and Water     $7,988.05
PR4235  Utilities - Telephone ..................       $410.45
PR4236  Vehicle Expense ........................       $100.24
PR4237  Depreciation Expense ...................         $0.00
PR4250  Miscellaneous ..........................         $0.00
PR4262  Lease - Basic - All Except Coal Cars ...    $32,962.00
PR4264  Lease - Supplemental Expenses - Facility         $0.00
               Total Costs Shared on Cost Ratio
                  {see computation below} -

                                                  ------------ ------------- ------------
            SWEPCO  57.31%   PSO     42.69%        $137,734.48    $78,935.63   $58,798.85


           Capital Recovery on Capital Expenditures not
            Covered Under Lease Agreement {Cost Ratio}                          $4,643.08
                                                                             ------------


                       TOTAL COSTS FOR THE MONTH                 $313,073.76  $172,606.42
                                                               ============= ============
</TABLE>

<PAGE>

                                                                     Exhibit 1
                                                                    Page 3 of 3


C. COMPUTATION OF COST RATIO:



101, 104   Direct Labor SWEPCO          $32,405.96    57.31%   SWEPCO

102, 103   Direct Labor PSO             $24,138.02    42.69%   PSO
                                     -------------  --------

           Total Direct Labor           $56,543.98   100.00%
                                     =============  ========






Exhibit 2
                      CENTRAL AND SOUTH WEST SERVICES, INC.
                          P.O. BOX 21928 TULSA, OKLAHOMA            Page 1 of 3
                        TELEPHONE NUMBER (918) 594 - 2000

           STATEMENT OF PARTICIPATION IN RAIL CAR MAINTENANCE FACILITY
                AT ALLIANCE, NEBRASKA PER SWEPCO - PSO AGREEMENT

                                    MAY 1996


A.  NUMBER OF RAIL CARS SERVICED

  SWEPCO 311          PSO 227
<TABLE>
<CAPTION>


B.  AMOUNT OF EXPENDITURES:                            SHARED        SWEPCO        PSO

COSTS ASSIGNED 100% TO SWEPCO:
<S>                                                            <C>           <C>   
PR4001 Direct Material to SWEPCO Coal Cars ...............       $161,631.17
PR4018 Stores Salvage - SWEPCO ...........................      ($163,256.92)
PR4101 Direct Labor to SWEPCO Coal Cars ..................        $27,199.14
PR4104 Direct Labor to Rework SWEPCO Material ............         $3,798.98
PR4202 Ad Valorem Taxes - SWEPCO Coal Cars ...............             $0.00
PR4204 Ad Valorem Taxes - Facility - Direct - SWEPCO .....           $168.00
PR4213 Employee Fringe Benefits - Direct Labor - SWEPCO ..         $7,260.62
PR4230 Payroll Taxes (FICA & UC) - Direct Labor - SWEPCO .         $2,417.52
PR4238 Depreciation Expense - SWEPCO .....................        $10,604.00
PR4263 Lease - Supplemental Expenses - SWEPCO ............             $0.00
PR4270 Outside Maintenance of SWEPCO Coal Cars ...........        $14,243.92
PR4272 Switching Fees - SWEPCO ...........................         $1,999.00
PR4277 Repainting Coal Cars - SWEPCO .....................             $0.00
                                                               -------------

                 Total 100% SWEPCO Costs                          $66,065.43
                                                               =============


COSTS ASSIGNED 100% TO PSO:

PR4002 Direct Material to PSO Coal Cars ..................                    $133,826.80
PR4015 Inventory Carrying Charges - PSO ..................                      $2,449.57
PR4019 Stores Salvage - PSO ..............................                    ($74,876.94)
PR4102 Direct Labor to PSO Coal Cars .....................                     $17,677.49
PR4103 Direct Labor to Rework PSO Material ...............                     $14,198.21
PR4205 Ad Valorem Taxes - Facility - Direct - PSO ........                        $101.00
PR4214 Employee Fringe Benefits - Direct Labor - PSO .....                      $7,467.31
PR4231 Payroll Taxes (FICA & UC) - Direct Labor - PSO ....                      $2,486.25
PR4239 Depreciation Expense - PSO ........................                          $0.00
PR4271 Outside Maintenance of PSO Coal Cars ..............                      $7,375.41
PR4273 Switching Fees - PSO ..............................                      $3,181.18
PR4278 Repainting Coal Cars - PSO ........................                          $0.00
                                                                             ------------

                Total 100% PSO Costs                                          $113,886.28
                                                                             ============
</TABLE>

<PAGE>

                                                                     Exhibit 2
                                                                    Page 2 of 3
<TABLE>
<CAPTION>


COSTS TO BE SHARED {Ratio of Direct Labor}:            SHARED        SWEPCO        PSO

<S>                                                <C>         <C>          <C>   
PR4010 Shop Material ............................    $4,407.47
PR4011 Small Tools ..............................      $333.53
PR4012 Facility Maintenance - Material ..........      $408.58
PR4013 Sale of Scrap (Cr.) ......................     ($169.00)
PR4016 Switch Engine Operation and Maintenance ..        $0.00
PR4017 Equipment Operation and Maintenance ......    $4,245.41
PR4020 Stores Salvage - Joint ...................        $0.00
PR4110 Supervision ..............................   $11,174.52
PR4111 Clerical .................................    $4,116.96
PR4112 Training and Safety ......................      $199.02
PR4113 General Shop Labor .......................    $3,472.72
PR4114 Facility Maintenance - Labor .............    $7,067.37
PR4116 Switch Engine Operation and Maintenance ..   $10,827.66
PR4201 Ad Valorem Taxes - Facility ..............    $3,087.00
PR4203 Taxes - Other ............................    $1,234.00
PR4206 Data Processing Charges ..................      $574.40
PR4207 General Office Overhead ..................    $1,478.18
PR4210 Employee Activities ......................        $0.00
PR4211 Employee Expenses ........................      $231.74
PR4212 Employee Fringe Benefits .................    $9,057.96
PR4215 Employee Sick Benefits ...................        $0.00
PR4220 Injuries and Damages .....................        $0.00
PR4221 Insurance - Liability and Property .......      $269.85
PR4225 Maintenance of Facilities (Contracted) ...      $800.00
PR4226 Office Supplies and Expenses .............      $636.09
PR4232 Payroll Taxes (FICA & UC) - Other ........    $2,918.91
PR4233 Special Services .........................        $0.00
PR4234 Utilities - Heat, Light, Power and Water .    $5,870.62
PR4235 Utilities - Telephone ....................      $497.81
PR4236 Vehicle Expense ..........................        $0.00
PR4237 Depreciation Expense .....................        $0.00
PR4250 Miscellaneous ............................        $0.00
PR4262 Lease - Basic - All Except Coal Cars .....   $32,962.00
PR4264 Lease - Supplemental Expenses - Facility .        $0.00
              Total Costs Shared on Cost Ratio
                  {see computation below} -

                                                  ------------ ------------- ------------
            SWEPCO  49.30%   PSO     50.70%        $105,702.80    $52,111.48   $53,591.32


           Capital Recovery on Capital Expenditures not
            Covered Under Lease Agreement {Cost Ratio}                          $5,514.26
                                                                             ------------


                       TOTAL COSTS FOR THE MONTH                 $118,176.91  $172,991.86
                                                               ============= ============
</TABLE>

<PAGE>

                                                                     Exhibit 2
                                                                    Page 3 of 3


C. COMPUTATION OF COST RATIO:



101, 104   Direct Labor SWEPCO          $30,998.12   49.30%   SWEPCO
 
102, 103   Direct Labor PSO             $31,875.70   50.70%   PSO
                                       -----------  -------

           Total Direct Labor           $62,873.82  100.00%
                                       =========== ========





                                                                      Exhibit 3
                      CENTRAL AND SOUTH WEST SERVICES, INC.
                          P.O. BOX 21928 TULSA, OKLAHOMA            Page 1 of 3
                        TELEPHONE NUMBER (918) 594 - 2000

           STATEMENT OF PARTICIPATION IN RAIL CAR MAINTENANCE FACILITY
                AT ALLIANCE, NEBRASKA PER SWEPCO - PSO AGREEMENT

                                    JUNE 1996


A.  NUMBER OF RAIL CARS SERVICED

  SWEPCO 419          PSO 219
<TABLE>
<CAPTION>

B.  AMOUNT OF EXPENDITURES:                            SHARED        SWEPCO        PSO

COSTS ASSIGNED 100% TO SWEPCO:
<S>                                                            <C>           <C>   
PR4001  Direct Material to SWEPCO Coal Cars ..............       $229,704.34
PR4018  Stores Salvage - SWEPCO ..........................      ($118,288.16)
PR4101  Direct Labor to SWEPCO Coal Cars .................        $38,755.23
PR4104  Direct Labor to Rework SWEPCO Material ...........        $25,977.44
PR4202  Ad Valorem Taxes - SWEPCO Coal Cars ..............             $0.00
PR4204  Ad Valorem Taxes - Facility - Direct - SWEPCO ....           $168.00
PR4213  Employee Fringe Benefits - Direct Labor - SWEPCO .        $15,164.43
PR4230  Payroll Taxes (FICA & UC) - Direct Labor - SWEPCO          $5,049.25
PR4238  Depreciation Expense - SWEPCO ....................        $10,604.00
PR4263  Lease - Supplemental Expenses - SWEPCO ...........             $0.00
PR4270  Outside Maintenance of SWEPCO Coal Cars ..........        $10,803.49
PR4272  Switching Fees - SWEPCO ..........................         $2,538.60
PR4277  Repainting Coal Cars - SWEPCO ....................             $0.00
                                                               -------------

                 Total 100% SWEPCO Costs                         $220,476.62
                                                               =============


COSTS ASSIGNED 100% TO PSO:

PR4002 Direct Material to PSO Coal Cars ..................                     $70,645.18
PR4015 Inventory Carrying Charges - PSO ..................                      $2,889.56
PR4019 Stores Salvage - PSO ..............................                    ($29,805.09)
PR4102 Direct Labor to PSO Coal Cars .....................                     $18,326.39
PR4103 Direct Labor to Rework PSO Material ...............                      $3,829.46
PR4205 Ad Valorem Taxes - Facility - Direct - PSO ........                        $101.00
PR4214 Employee Fringe Benefits - Direct Labor - PSO .....                      $5,190.36
PR4231 Payroll Taxes (FICA & UC) - Direct Labor - PSO ....                      $1,728.17
PR4239 Depreciation Expense - PSO ........................                          $0.00
PR4271 Outside Maintenance of PSO Coal Cars ..............                      $5,511.71
PR4273 Switching Fees - PSO ..............................                        $975.72
PR4278 Repainting Coal Cars - PSO ........................                          $0.00
                                                                             ------------

                Total 100% PSO Costs                                           $79,392.46
                                                                             ============

</TABLE>
<PAGE>

                                                                     Exhibit 3
                                                                    Page 2 of 3
<TABLE>

<CAPTION>

COSTS TO BE SHARED {Ratio of Direct Labor}:            SHARED        SWEPCO        PSO

<S>                                                <C>         <C>          <C>   

PR4010 Shop Material ............................    $3,635.01
PR4011 Small Tools ..............................      $103.02
PR4012 Facility Maintenance - Material ..........      $973.87
PR4013 Sale of Scrap (Cr.) ......................        $0.00
PR4016 Switch Engine Operation and Maintenance ..    $1,690.22
PR4017 Equipment Operation and Maintenance ......    $3,529.01
PR4020 Stores Salvage - Joint ...................        $0.00
PR4110 Supervision ..............................   $13,579.79
PR4111 Clerical .................................    $5,734.74
PR4112 Training and Safety ......................      $404.42
PR4113 General Shop Labor .......................    $6,513.37
PR4114 Facility Maintenance - Labor .............   $15,818.81
PR4116 Switch Engine Operation and Maintenance ..   $11,570.03
PR4201 Ad Valorem Taxes - Facility ..............    $3,087.00
PR4203 Taxes - Other ............................    $1,234.00
PR4206 Data Processing Charges ..................      $574.40
PR4207 General Office Overhead ..................    $1,911.55
PR4210 Employee Activities ......................      $704.52
PR4211 Employee Expenses ........................        $9.73
PR4212 Employee Fringe Benefits .................   $15,913.10
PR4215 Employee Sick Benefits ...................        $0.00
PR4220 Injuries and Damages .....................        $0.00
PR4221 Insurance - Liability and Property .......      $269.85
PR4225 Maintenance of Facilities (Contracted) ...    $2,483.82
PR4226 Office Supplies and Expenses .............    $1,059.50
PR4232 Payroll Taxes (FICA & UC) - Other ........    $4,249.13
PR4233 Special Services .........................        $0.00
PR4234 Utilities - Heat, Light, Power and Water .    $9,712.55
PR4235 Utilities - Telephone ....................      $497.55
PR4236 Vehicle Expense ..........................       $57.34
PR4237 Depreciation Expense .....................        $0.00
PR4250 Miscellaneous ............................       $70.00
PR4262 Lease - Basic - All Except Coal Cars .....   $32,962.01
PR4264 Lease - Supplemental Expenses - Facility .        $0.00
               Total Costs Shared on Cost Ratio
                  {see computation below} -

                                                  ------------ ------------- ------------
            SWEPCO  74.50%   PSO  25.50%           $138,348.34   $103,069.51   $35,278.83


           Capital Recovery on Capital Expenditures not
            Covered Under Lease Agreement {Cost Ratio}                          $2,773.45
                                                                             ------------


                       TOTAL COSTS FOR THE MONTH                 $323,546.13  $117,444.74
                                                               ============= ============
</TABLE>

<PAGE>

                                                                     Exhibit 3
                                                                    Page 3 of 3


C. COMPUTATION OF COST RATIO:



101, 104   Direct Labor SWEPCO          $64,732.67    74.50%   SWEPCO

102, 103   Direct Labor PSO             $22,155.85    25.50%   PSO
                                     -------------  --------

           Total Direct Labor           $86,888.52   100.00%
                                     =============  ========